HomeMy WebLinkAboutParks and Rec Advisory Board-Minutes-1/2/1992
ORr..f1
MINUTES
PARKS AND RECREATION ADVISORY BOARD
JANUARY 2, 1991
tJltllP't
CAll TO ORDER: Chairman Linford called the Public hearing to order at 7:00
P.M. on Thursday, January 2, 1992.
ROll CAll: PRESENT: Board Members: Chairman Linford, Mike Billings, Lila
Coley, Mike Shelton, Gail Mills and Jim Hoff
City Staff: Sha ron Curry, Recreati on Supervi sor; Keith Fi scher, City Engi neer,
and Terry Cheek, Schrickel, Rollins & Associates
City Council Members: Ed McKninght, Steve McCain and Richard Newton
Special Guests: Sammy Bowling, Phil Fiegel and Pleasant Run Park area residents
ABSENT: Paul Vigiletti
Chairman Linford presented a brief background on the planning process and
explained that initial plans called for the third Public Hearing to be held
in September, however, the process has been delayed while agreements were worked
out with TU Electric and Crown of Life Church for use of their property in
conjunction with the Pleasant Run Park development.
He stated the goal is to build the park and have it ready for play in the Fall
of 1993. To accomplish this will require a very tight timetable. Due to the
growing seasons and length of time requi red to establ ish adequate turf for
soccer play, missing the timetable by a month can cost up to a year of playing
time. It is critical to complete all phases of the project in a timely, orderly
manner.
Terry Cheek, Schrickel, Rollins & Associates, presented the master plan for
the park's development stating that although very preliminary every effort
has been made to address the neighbors concerns addressed at previous meetings.
The plans address access, parking and drainage and the hazards of the railroad
tracks. The key areas of the plan are: preserving the existing tree line,
green areas along the front and the connected pathway system.
Access to the park has presented some problems - the neighbors did not want
access 1 ined up wi th McDonwe 11 School Road due to the proximi ty of traffi c
to their homes. The original plan lined up ingress and egress with L. D. Lockett
Road; however, L. D. Lockett presents significant safety hazards and traffic
congestions problems due to the proximity of the inclined railroad tracks.
Various options for locating the access were discussed. While being sensitive
to the neighbors concerns, Terry Cheek recommends a compromise in locating
the access at the north corner of the TU property. This approach would place
the entrance at the rear of two lots that are undeveloped at this time.
Jim Hoff made a recommendation to utilize as much space as possible for park
areas while maintaining the number of playing fields in the original plan.
Several alternatives were discussed by Board members and residents. The
consensus is to be as conscious as possible to the neighbor's concerns when
relocating the access points; to maintain the number of fields in the original
plan and to utilize the TU .property for parking.
Parks and Recreation Advisory Board
Minutes of January 2, 1992
page 2...
Key dates for completion of the project are: Summer, 1992 - construction begins;
turf plantings must be complete by 06-01-93; Summer, 1993 - construction
complete, August, 1993 - play begins.
JIM HOFF MADE A MOTION TO APPROVE THE MASTER PLAN OF DEVELOPMENT FOR PLEASANT
RUN PARK TO INCLUDE: 280-300 PARKING SPACES UTILIZING THE TU PROPERTY; MOVE
THE ENTRANCE TO THE NORTH END OF THE TU PROPERTY, WITH THE MAIN ACCESS ROAD
ALONG THE RAILROAD TRACKS; EIGHT PLAYING FIELDS, MINIMUM - NINE, OPTIMUM
(REDUCING SIZE FROM MAXIMUM TO MORE THAN MINIMUM IF NECESSARY); ALLOW ROOM
FOR A PATHWAY TO CONNECT WITH FUTURE LINEAR PARK DEVELOPMENT ALONG THE RAILROAD
TRACKS. CHERYL LIVINGSTON SECONDED THE MOTION WHICH CARRIED BY A UNANIMOUS
VOTE.
Board Members will meet at 12:30 P.M. at Terry Cheeks office on Monday, January
7 to review the revised drawings before presentation to the City Council.
Terry Cheek presented the Board with preliminary cost estimates for development
of the park (attachment) indicating the total cost estimate and the recommended
Phase I development. Jim Hoff stated that field lighting (not included in
the preliminary estimate) is crucial to the soccer program and recommends
lighting be added at the expense of other items.
The Board discussed various options for development with available bond funding.
Along with funding some items from the general fund, some items can be
accomplished more cost effectively if the are handled "in-house" rather than
through a general contractor. The Board will meet to further discuss these
issues when more definite figures become available during the design phase
of the project.
At the conclusion of the Public Hearing the Board discussed PUD-91-931. The
PUD, the third tract north of Pleasant Run Park, would provide linkage from
Pleasant Run Park to the PUD and further development along the railroad tracks,
with future potential to hike or bike from John McCain to L.D. Lockett Park.
The consensus of the Board is the property presents significant security and
safety hazards as presented. The recommendations are:
1. not less than 25% street frontage;
2. public access
3. 81 chainlink security fence along the railroad
4. security lighting installed
5. minimum six parking spaces
In addition, the Park Board requests a Chandler/Cantrell representative attend
the January 9 Board meeting to discuss the plans.
GAIL MILLS MADE A MOTION TO ADJOURN AT 10:45 P.M. MIKE SHElTON SECONDED THE
MOTION WHICH CARRIED BY A UNANIMOUS. VOTE.