Loading...
HomeMy WebLinkAboutCity Council-Agenda Packets-7/18/2023 City of Colleyville Page 1 CITY OF COLLEYVILLE CITY COUNCIL AGENDA 100 Main Street, Colleyville, Texas, 76034 TUESDAY, JULY 18, 2023 WORKSESSION 5:30 PM EXECUTIVE CONFERENCE ROOM THIRD FLOOR CALL TO ORDER WS-1 Discussion of the FY2024-2028 Draft CIP WS-2 Discussion of the Stormwater Master Plan WS-3 Discussion of the July 18, 2023, City Council regular agenda items 1. EXECUTIVE SESSION - In accordance with Texas Government Code, Chapter 551, Subchapter D Section 551.071 - Legal - Consultation with the City Attorney regarding items on the agenda or for matters in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with Chapter 551 of the Texas Code Section 551.072 - Real Estate - Deliberate the purchase, exchange, lease, or value of real property for City facilities Section 551.087 – Economic Development - Discuss or deliberate regarding commercial or financial information the City has received from business prospects the City seeks to have locate, stay, or expand in the City and with which the City is conducting economic development negotiations; deliberate the offer of a financial or other incentive to a business prospect REGULAR MEETING 7:00 P.M. CITY COUNCIL CHAMBERS INVOCATION: Pastor Shelley Poole, Journey Church PLEDGE OF ALLEGIANCE: City Attorney Whitt Wyatt City Council Agenda July 18, 2023 City of Colleyville Page 2 2. EXECUTIVE SESSION READING AND PUBLIC HEARING: CONSIDER AND TAKE ANY ACTION(S) NECESSARY RELATIVE TO ITEMS DISCUSSED IN EXECUTIVE SESSION - RESOLUTION R-23-4859 3. ANNOUNCEMENTS, PROCLAMATIONS, AND PRESENTATIONS Announcements of civic and charitable events Presentation of calendar events and updates Announcements of awards and recognition 4. CONSENT: READING AND PUBLIC HEARING - RESOLUTION R-23- 4860 4a Approval of the minutes of the regular City Council meeting of July 6, 2023 4b Approval of a Professional Services Agreement with Freese and Nichols, Inc. for development of construction documents and bidding assistance for Heroes Park and authorizing the City Manager to execute the agreement 5. ITEMS NOT FOR CITY COUNCIL ACTION 5a Monthly Financial Report - June 2023 6. ORDINANCE(S): SECOND READING AND PUBLIC HEARING 6a Ordinance O-23-2245 Consideration of a Special Use Permit for a reduction in parking for the property being Lot 1, Block 1, of the Corley subdivision, located at 5409 Colleyville Boulevard ZC23-012 7. ORDINANCE(S): FIRST READING AND PUBLIC HEARING 7a Ordinance O-23-2246 Approval of the Fiscal Year 2024 Colleyville Crime Control and Prevention District budget 8. CITIZEN COMMENTS 9. REPORTS Planning and Zoning Commission Meeting Minutes - June 12, 2023 Planning and Zoning Commission Worksession Meeting Minutes - June 26, 2023 City Council Agenda July 18, 2023 City of Colleyville Page 3 10. ACTION/RESOLUTION: DISCUSSION AND CONSIDERATION OF A RESOLUTION RATIFYING COUNCIL AGENDA ACTION FOR TUESDAY, JULY 18, 2023 - READING AND PUBLIC HEARING - RESOLUTION R- 23-4861 11. ADJOURNMENT I hereby certify this agenda was posted on City Hall bulletin boards Friday, July 14, 2023 by 5:00 p.m. Christine Loven, TRMC City Secretary A quorum of any Colleyville board, commission, or committee may be present at this meeting. Any matter on this agenda may, at the discretion of the governing body, be opened for public comment and discussion. If you plan to attend this public meeting and have a disability that requires special accommodations, please advise the City Secretary at least 48 hours in advance at 817.503.1130, and reasonable accommodations will be made to assist you. City of Colleyville Page 1 CITY OF COLLEYVILLE CITY COUNCIL BRIEFING Agenda Number WS-1 Agenda Date 7/18/2023 Type Worksession Department Finance Title Discussion of the FY2024-2028 Draft CIP Explanation This item will provide an overview of the draft FY2024-2028 CIP. Attachments 1. CIP FY24 Presentation 2. CIP Presentation Data Capital Improvement Program (CIP) Presentation and Discussion City Council Worksession July 18, 2023 What is a CIP? Capital Improvement Program (CIP) •A short-range, rolling plan, usually three to five years out, which identifies capital projects and provides a planning schedule, including funding options The Benefits of a CIP Include: •Provides the link between the strategic plans and the City’s annual budget •Supports the City’s long term goals and vision •Focuses on preserving the City’s infrastructure while ensuring the efficient use of public funds Project Selection Several factors are considered when projects are considered for funding in the Capital Improvement Program •Condition of asset (PCI for Streets) •Risk management •Long term vision (Master Plans) •Available funding sources •Use of asset (Average Daily Traffic for Streets) •Classification of asset (Local or Non-local Street) •Considerations of the benefit of the project •All projects receive final approval by City Council Interactive Map Capital Improvement Projects Interactive Map •The City of Colleyville Website has an interactive map which provides detailed information regarding each of the current capital projects •The map will be updated to include the proposed FY2023 projects once adopted www.colleyville.com Department Highlights FY23 - Facilities Senor Center Renovation Contract Award $3,431,000 City Hall/Justice Center Painting and Stone Repair Contract Award $679,389.25 Fire Station 3 Renovation Costs for Materials and Roofing $160,528 Historic Fire Station Renovation Before Historic Fire Station Renovation After Costs for Materials and Roofing $176,114 Department Highlights FY23 - Parks and Recreation Colleyville Gateways Contract Amount $8,367,316 Perry Weather Lightning Warning System Reagan Park Contract Amount $14,778 City Park Tennis Lights Replaced to LED Lights Contract Amount $35,377 Overland Park Playground with pour-in-place surface, irrigation, grass and trees Contract Amount $208,637 Department Highlights FY23 – Sidewalks/Trails Sidewalk Connectivity Design Contract Amount $95,000 Westcoat Drive Connection from existing sidewalk at White Drive to LD Lockett Road / Cotton Belt Trail (1,900 lf) McDonwell School Road Connection from Herbert Road to the existing sidewalk to the East at Montreaux Avenue (700 lf) Glade Road Sidewalk/Trail Connection Colleyville Boulevard to Pool Road Department Highlights FY23 - Streets Local Street Maintenance Project 2023 – 3.18 Lane Miles Resurfaced Partnership with Tarrant County $705,770 Glade Road at Bluebonnet Contract Award $1,560,819•Bluebonnet Drive •Roberts Road •Timberline Drive N •Timberline Drive S •Tinker Road 82.7 Average Network PCI (based on 2017 Report) 86.18 Current Average Network PCI (Weighted Average) New Assessment Fall 2023 Glade Road PH2 Contract Award $14,273,642 Cheek-Sparger TxDOT Grant Funded Project Department Highlights FY23 – Utility Infrastructure WW Project 10: Rehabilitation of Priority 2 Manholes Budget Amount $150,000 Water Project 18: Pecan Park Estates - Design Contract Award $168,000 Woodbriar and Quail Crest Water/Wastewater PHI - Design Contract Award $394,196 Overland Trail Lift Station Emergency Generator Contract Award $67,732 The Proposed Five Yea r CIP The Proposed Fiscal Year 2024-2028 Capital Improvement Program •The program identifies planned projects for the next five years, based on funding availability, and a schedule for completion •The CIP provides an opportunity to consider all of the City’s capital needs in the coming years and determine the priority of each, as well as whether available funding resources are sufficient to support those expenditures FY24 Projects Note: Some projects listed are multi-year and/or multi-fund projects Drainage and Utilities CIP Amount Lead and Copper Rule Revision Professional Svcs $46,000 Preston Manor Low-Pressure Plane Conversion $95,000 Woodbriar and Quail Crest Phase II Design $250,000 Drainage Improvements FY24 $300,000 Reserve Lift Station Rehab $470,000 Pecan Park Estates Phase I $600,000 Jackson Road Waterline Relocation $750,000 Woodbriar and Quail Crest Phase I Construction $3,700,000 Drainage Total $6,211,000 Facilities CIP Amount Awning – Parks Vehicles $100,000 Plaza Stone Restoration $125,000 Webb House Siding and Caboose Painting $150,000 Fire Station #2 Interior Renovation $250,000 Justice Center Improvements (Bitumen roof, backup generator, interior renovations)$1,250,000 Facilities Total $1,875,000 Trails/Sidewalks CIP Amount Montclair Sidewalk Design $120,000 Bransford Sidewalk $1,100,000 Trails/Sidewalks Total $1,220,000 Streets CIP Amount Parking Facility Pavement Marking (annual)$50,000 Tree Removal (annual)$75,000 Street Pavement Marking (annual)$100,000 Glade Road and Roberts Road Intersection $650,000 Street Maintenance Allotment (annual)$1,000,000 Cheek-Sparger County Bond Project Design $2,000,000 Tinker Road Water/Drainage/Road Reconstruction $2,125,000 Streets Total $6,000,000 FY24 Projects Vehicles and Equipment CIP Amount Adobe Creative Cloud Licensing Migration $12,000 Air Compressor $30,000 Office 365 Renewal $50,000 Cybersecurity Server/Endpoint Solution $50,000 Skid Steer $78,000 License Plate Readers $100,000 Estimated Vehicle Leases $315,000 Vactor Truck $465,000 Vehicles and Equipment Totals $1,100,000 Parks and Recreation CIP Amount Parks Beautification (annual)$50,000 Wayfinding Signage/Digital Agenda $160,000 Woodbriar Park Improvements $200,000 Rec Center Fence/Signage $350,000 Kimzey Park Improvements $425,000 Recreation Center Roof Repair $600,000 McPherson Park Improvements $610,000 Recreation Center Renovations $1,500,000 Green Ribbon Beautification Project $1,920,000 Parks and Recreation Total $5,815,000 Funding Summary General Capital Projects Fund •Operating Transfers (Gen. Fund) •Grants •Impact Fees •Available Balance Tax Increment Financing Fund •Property Taxes •Grants •Available Balance CEDC Fund •Sales Tax •Grants •Available Balance Other Special Revenue Funds •Voluntary Park Contributions •Voluntary Library Contributions •Parkland Dedication fees •Available Balance Funding Summary Utility Capital Projects Fund •Capital Project Fees •Operating Transfers •Grants •Impact Fees •Available Balance Drainage Capital Fund •Operating Transfers •Grants •Available Balance Projected Ending Balances Questions and Discussion Project Year Project Umbrella Category Adopted Budget CEDC Capital Projects Fund Grants TIF Drainage Capital Fund Capital Utility Fund Capital Utility - Water Impact Capital Utility - Wastewater Impact Crime Control and Prevention Tomorrow Fund Colleyville Voluntary Park Fund Voluntary Library Fund Parkland Dedication Fund Vehicle/Eq Replacement Fund Parks Tomorrow Fund FY24 beginning Balance 35,626,138.95$ 6,595,551.30$ 6,394,027.41$ (975,619.42)$ 638,780.18$ 1,306,844.25$ 8,928,399.76$ 3,508,453.58$ 710,368.01$ 3,208,257.66$ 555.00$ 1,113,181.00$ 565,128.03$ 640,535.19$ 2,063,383.00$ 928,294.00$ Project Year Project Title Adopted Budget CEDC Capital Projects Fund Grants TIF Drainage Capital Fund Capital Utility Fund Capital Utility - Water Impact Capital Utility - Wastewater Impact Crime Control and Prevention Tomorrow Fund Colleyville Voluntary Park Fund Voluntary Library Fund Parkland Dedication Fund Vehicle/Eq Replacement Fund Parks Tomorrow Fund 2024 Annual Street Maintenance Maintenance/Rehab 500,000$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Annual Street Maintenance Maintenance/Rehab 250,000$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Annual Street Maintenance Maintenance/Rehab 250,000$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Annual Street Maintenance Total 1,000,000.00$ -$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Cheek-Sparger County Bond Project - Design Roads 2,000,000$ -$ -$ -$ 2,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Cheek-Sparger County Bond Project Total 2,000,000.00$ -$ -$ -$ 2,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Facilities Rehabilitation - Webb House Siding / Caboose Painting Facilities 150,000$ -$ 150,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Facilities Rehabilitation - Awning - Parks Vehicles Facilities 100,000$ 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Facilities Rehabilitation - Plaza Stone Restoration Facilities 125,000$ -$ -$ -$ 125,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Facilities Rehabilitation - Fire Station 2 Interior Renovation Facilities 250,000$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Facilities Rehabilitation Total 625,000.00$ 100,000.00$ 400,000.00$ -$ 125,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Drainage Improvements - Annual Allottment Drainage 300,000$ -$ -$ -$ -$ 300,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Drainage Improvements Total 300,000.00$ -$ -$ -$ -$ 300,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Office 365 (3-year renewal, $50k)Vehicles/Equipment 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000.00$ -$ 2024 Cybersecurity Server/Endpoint Solution Vehicles/Equipment 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000.00$ -$ 2024 Air Compressor Vehicles/Equipment 30,000$ -$ -$ -$ -$ -$ 30,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Estimated Annual Purchases (incl. Parks Skid Steer)Vehicles/Equipment 393,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 393,000.00$ -$ 2024 Vactor Truck Vehicles/Equipment 465,000$ -$ -$ -$ -$ -$ 465,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Adobe creative cloud licensing migration Vehicles/Equipment 12,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 12,000.00$ -$ 2024 VERF Purchases Total 1,000,000.00$ -$ -$ -$ -$ -$ 495,000.00$ -$ -$ -$ -$ -$ -$ -$ 505,000.00$ -$ 2024 Justice Center Improvements - Backup Generator Facilities 500,000$ -$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Justice Center Improvements - Interior Renovation Facilities 500,000$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Justice Center Improvements - Bitumen Roof Facilities 250,000$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Justice Center Improvements Total 1,250,000.00$ -$ 750,000.00$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 License Plate Readers Vehicles/Equipment 100,000$ -$ 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 License Plate Readers Total 100,000.00$ -$ 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Kimzey Park Improvements Parks Facilities 425,000$ 425,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Kimzey Park Improvements Total 425,000.00$ 425,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 McPherson Park Improvements Parks Facilities 610,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 280,500.00$ -$ 329,500.00$ -$ -$ 2024 McPherson Park Improvements Total 610,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 280,500.00$ -$ 329,500.00$ -$ -$ 2024 New Park Amenity - Rec Center Fence/Signage Parks Facilities 350,000$ -$ -$ -$ 150,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 200,000.00$ 2024 New Park Amenity Total 350,000.00$ -$ -$ -$ 150,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 200,000.00$ 2024 Park Beautification - Annual Alottment Beautification 50,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000.00$ -$ -$ -$ -$ 2024 Park Beautification Total 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000.00$ -$ -$ -$ -$ 2024 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 100,000$ -$ 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 75,000$ -$ 75,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 50,000$ -$ 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Public Works Annual Maintenance (Non-Roads) Total 225,000.00$ -$ 225,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Recreation Center - Renovation Parks Facilities 1,500,000$ -$ 1,500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Recreation Center - Roof Repair Parks Facilities 600,000$ -$ 600,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Recreation Center Total 2,100,000.00$ -$ 2,100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Water Project 11: Tinker Road Water/Drainage/Road Reconstruction Roads 2,125,000$ 250,000.00$ 650,000.00$ 300,000.00$ 625,000.00$ 300,000.00$ -$ -$ 2024 Water Project 11: Tinker Road Water/Drainage/Road Reconstruction Total 2,125,000.00$ -$ 250,000.00$ -$ 650,000.00$ 300,000.00$ -$ 625,000.00$ 300,000.00$ -$ -$ -$ -$ -$ -$ -$ 2024 Water Project 18: Pecan Park Estates - Phase I Utilities 600,000$ -$ -$ -$ 600,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Water Project 18: Pecan Park Estates Total 600,000.00$ -$ -$ -$ -$ 600,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 CSO Digital Agenda Misc.10,000$ -$ 10,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Wayfinding Signage Misc.150,000$ -$ 150,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Signage Total 160,000.00$ -$ 160,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Woodbriar and Quail Crest Water/WW - PH I Construction Utilities 3,700,000$ -$ -$ -$ -$ -$ 3,700,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Woodbriar and Quail Crest Water/WW - PH II Design Utilities 250,000$ -$ -$ -$ -$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Woodbriar and Quail Crest Water/WW Total 3,950,000.00$ -$ -$ -$ -$ -$ 3,950,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Woodbriar Park Improvements Parks Facilities 200,000$ 200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Woodbriar Park Improvements Total 200,000.00$ 200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Reserve Lift Station Rehab Utilities 470,000$ -$ -$ -$ -$ -$ 470,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Reserve Lift Station Rehab Total 470,000.00$ -$ -$ -$ -$ -$ 470,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Lead and Copper Rule Revision Professional Services Utilities 46,000$ -$ -$ -$ -$ -$ 46,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Lead and Copper Rule Revision Professional Services Total 46,000.00$ -$ -$ -$ -$ -$ 46,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Preston Manor Low-Pressure Plane Conversion Utilities 95,000$ -$ -$ -$ -$ -$ 95,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Preston Manor Low-Pressure Plane Conversion Total 95,000.00$ -$ -$ -$ -$ -$ 95,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Jackson Road Waterline Relocation Utilities 750,000$ -$ -$ -$ -$ -$ 750,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Jackson Road Waterline Relocation Total 750,000.00$ -$ -$ -$ -$ -$ 750,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 SH26 Pavement Condition Assessment Roads -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 SH26 Pavement Condition Assessment Total -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Green Ribbon Beautification - 2024 Beautification 1,920,000$ -$ -$ 1,200,000.00$ 720,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Green Ribbon Beautification - 2024 Total 1,920,000.00$ -$ -$ 1,200,000.00$ 720,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Bransford Sidewalk Trails/Sidewalks 1,100,000$ -$ 1,100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Bransford Sidewalk Total 1,100,000.00$ -$ 1,100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Montclair Sidewalk-Design Trails/Sidewalks 120,000$ -$ 120,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Montclair Sidewalk-Design Total 120,000.00$ -$ 120,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Glade and Roberts Intersection Roads 650,000$ -$ 325,000.00$ -$ 325,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Glade and Roberts Road Intersection Total 650,000.00$ -$ 325,000.00$ -$ 325,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Grand Total 22,221,000.00$ 725,000.00$ 6,530,000.00$ 1,700,000.00$ 3,970,000.00$ 1,200,000.00$ 5,806,000.00$ 625,000.00$ 300,000.00$ -$ -$ 330,500.00$ -$ 329,500.00$ 505,000.00$ 200,000.00$ Non-Project Costs Operating Budget Misc.6,011,612$ 2,540,920.69$ -$ -$ 715,000.00$ -$ -$ -$ -$ 2,585,691.23$ -$ -$ 170,000.00$ -$ -$ -$ Transfers Out -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Economic Development Misc.1,500,000$ -$ -$ -$ 1,500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Misc Misc.-$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Total Non-Project Costs 7,511,611.92$ 2,540,920.69$ -$ -$ 2,215,000.00$ -$ -$ -$ -$ 2,585,691.23$ -$ -$ 170,000.00$ -$ -$ -$ 2024 Total Cash Out 29,732,611.92$ 3,265,920.69$ 6,530,000.00$ 1,700,000.00$ 6,185,000.00$ 1,200,000.00$ 5,806,000.00$ 625,000.00$ 300,000.00$ 2,585,691.23$ -$ 330,500.00$ 170,000.00$ 329,500.00$ 505,000.00$ 200,000.00$ Annual Revenues Revenue 19,624,341$ 2,871,554.50$ 1,692,715.52$ 2,675,619.42$ 6,420,000.00$ 743,757.06$ 1,136,434.92$ 344,928.19$ 81,896.40$ 2,745,729.07$ -$ 180,000.00$ 170,000.00$ -$ 549,706.00$ 12,000.00$ TIF Intrafund Cash Transfers -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Transfers In 500,000$ -$ -$ -$ -$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Total Cash In 20,124,341.09$ 2,871,554.50$ 1,692,715.52$ 2,675,619.42$ 6,420,000.00$ 743,757.06$ 1,636,434.92$ 344,928.19$ 81,896.40$ 2,745,729.07$ -$ 180,000.00$ 170,000.00$ -$ 549,706.00$ 12,000.00$ 2024 Ending Balance 26,017,868.11$ 6,201,185.11$ 1,556,742.94$ -$ 873,780.18$ 850,601.31$ 4,758,834.68$ 3,228,381.77$ 492,264.41$ 3,368,295.50$ 555.00$ 962,681.00$ 565,128.03$ 311,035.19$ 2,108,089.00$ 740,294.00$ 2025 Annual Street Maintenance Maintenance/Rehab 500,000$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Annual Street Maintenance Maintenance/Rehab 250,000$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Annual Street Maintenance Maintenance/Rehab 250,000$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Annual Street Maintenance Total 1,000,000.00$ -$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Bedford Rd Trl Roads 1,500,000$ -$ 125,000.00$ 1,250,000.00$ 125,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Bedford Rd Trl Total 1,500,000.00$ -$ 125,000.00$ 1,250,000.00$ 125,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Drainage Improvements - Annual Allottment Drainage 1,000,000$ -$ -$ -$ -$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Drainage Improvements - TIF Contribution Drainage 100,000$ -$ -$ -$ 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Drainage Improvements Total 1,100,000.00$ -$ -$ -$ 100,000.00$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Water Project 18: Pecan Park Estates - Phase II Utilities 2,275,000$ -$ 375,000.00$ -$ -$ 200,000.00$ 1,700,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Water Project 18: Pecan Park Estates Total 2,275,000.00$ -$ 375,000.00$ -$ -$ 200,000.00$ 1,700,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Cybersecurity Server/Endpoint Solution Vehicles/Equipment 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000.00$ -$ 2025 Windows Endpoint/Server Licensing Realignment Vehicles/Equipment 55,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 55,000.00$ -$ 2025 Microsoft Exchange Server Upgrade Vehicles/Equipment 120,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 120,000.00$ -$ 2025 Offsite data recovery solution Vehicles/Equipment 30,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 30,000.00$ -$ 2025 Office 365 (3-year renewal, $50k)Vehicles/Equipment 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000.00$ -$ 2025 Backhoe Vehicles/Equipment 145,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 145,000.00$ -$ 2025 City Hall Datacenter Server Refresh Vehicles/Equipment 400,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 400,000.00$ -$ 2025 VERF Purchases Total 850,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 705,000.00$ -$ 2025 Recreation Amenity (Splash Pad/Fitness/Courts)Parks Facilities 1,000,000$ -$ 450,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ 550,000.00$ -$ -$ -$ -$ 2025 Recreation Amenity (Splash Pad/Fitness/Courts) Total 1,000,000.00$ -$ 450,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ 550,000.00$ -$ -$ -$ -$ 2025 Library Equipment Replacement Vehicles/Equipment 100,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 100,000.00$ -$ -$ -$ 2025 Library Equipment Replacement Total 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 100,000.00$ -$ -$ -$ 2025 Park Beautification - Annual Alottment Beautification 50,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000.00$ -$ -$ -$ -$ 2025 Park Beautification Total 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000.00$ -$ -$ -$ -$ 2025 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 100,000$ -$ 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 75,000$ -$ 75,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 50,000$ -$ 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Public Works Annual Maintenance (Non-Roads) Total 225,000.00$ -$ 225,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Security Cameras in Parks Vehicles/Equipment 100,000$ 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Security Cameras in Parks Total 100,000.00$ 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Senior Center Amenities Parks Facilities 100,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 100,000.00$ -$ -$ 2025 Senior Center Amenities Total 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 100,000.00$ -$ -$ 2025 Water Project 5: Brighton Oaks - Design Utilities 250,000$ -$ -$ -$ -$ -$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Water Project 5: Brighton Oaks Total 250,000.00$ -$ -$ -$ -$ -$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Water Tower Tank Mixers Utilities 250,000$ -$ -$ -$ -$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Water Tower Tank Mixers Total 250,000.00$ -$ -$ -$ -$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Montclair Sidewalk Construction Trails/Sidewalks 1,200,000$ -$ 800,000.00$ -$ 400,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Montclair Sidewalk Construction Total 1,200,000.00$ -$ 800,000.00$ -$ 400,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Pleasant Run Waterline Inner Connection Utilities 1,250,000$ -$ -$ -$ -$ -$ 1,250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2024 Pleasant Run Waterline Inner Connection Total 1,250,000.00$ -$ -$ -$ -$ -$ 1,250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Melrose Park Wastewater Line Utilities 325,000$ -$ -$ -$ -$ -$ 325,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Melrose Park Wastewater Line Total 325,000.00$ -$ -$ -$ -$ -$ 325,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Grand Total 11,575,000.00$ 100,000.00$ 2,975,000.00$ 1,250,000.00$ 625,000.00$ 1,200,000.00$ 3,525,000.00$ 250,000.00$ -$ -$ -$ 600,000.00$ 100,000.00$ 100,000.00$ 850,000.00$ -$ Non-Project Costs Operating Budget Misc.6,218,378$ 2,615,941.10$ -$ -$ 732,600.00$ -$ -$ -$ -$ 2,699,836.88$ -$ -$ 170,000.00$ -$ -$ -$ Transfers Out 4,000,000$ -$ -$ -$ 4,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Economic Development Misc.1,500,000$ -$ -$ -$ 1,500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Misc Misc.-$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Total Non-Project Costs 11,718,377.98$ 2,615,941.10$ -$ -$ 6,232,600.00$ -$ -$ -$ -$ 2,699,836.88$ -$ -$ 170,000.00$ -$ -$ -$ 2025 Total Cash Out 23,293,377.98$ 2,715,941.10$ 2,975,000.00$ 1,250,000.00$ 6,857,600.00$ 1,200,000.00$ 3,525,000.00$ 250,000.00$ -$ 2,699,836.88$ -$ 600,000.00$ 270,000.00$ 100,000.00$ 850,000.00$ -$ Annual Revenues Revenue 18,085,002$ 2,928,535.59$ 1,648,822.57$ 1,250,000.00$ 6,580,500.00$ 1,001,001.41$ 858,022.00$ 344,928.19$ 81,896.40$ 2,800,589.66$ -$ 180,000.00$ 170,000.00$ -$ 228,706.00$ 12,000.00$ TIF Intrafund Cash Transfers 4,000,000$ -$ 3,000,000.00$ -$ -$ -$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Transfers In Revenue 500,000$ -$ -$ -$ -$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2025 Total Cash In 22,585,001.82$ 2,928,535.59$ 4,648,822.57$ 1,250,000.00$ 6,580,500.00$ 1,001,001.41$ 2,358,022.00$ 344,928.19$ 81,896.40$ 2,800,589.66$ -$ 180,000.00$ 170,000.00$ -$ 228,706.00$ 12,000.00$ 2025 Ending Balance 25,309,491.96$ 6,413,779.59$ 3,230,565.51$ -$ 596,680.18$ 651,602.73$ 3,591,856.68$ 3,323,309.96$ 574,160.81$ 3,469,048.28$ 555.00$ 542,681.00$ 465,128.03$ 211,035.19$ 1,486,795.00$ 752,294.00$ 2026 Annual Street Maintenance Maintenance/Rehab 500,000$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Annual Street Maintenance Maintenance/Rehab 250,000$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Annual Street Maintenance Maintenance/Rehab 250,000$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Annual Street Maintenance Total 1,000,000.00$ -$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Woodbriar and Quail Crest Water/WW - PH II Construction / Ph III Des.Utilities 2,650,000$ -$ -$ -$ -$ -$ 2,650,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Woodbriar and Quail Crest Water/WW Total 2,650,000.00$ -$ -$ -$ -$ -$ 2,650,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Drainage Improvements - Annual Allottment Drainage 1,000,000$ -$ -$ -$ -$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Drainage Improvements Total 1,000,000.00$ -$ -$ -$ -$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 City-wide AV Projects Vehicles/Equipment 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 100,000.00$ -$ 2026 Ditch Witch Vehicles/Equipment 125,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 125,000.00$ -$ 2026 Wireless Access Controller/Wireless Access Points Refresher Vehicles/Equipment 75,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 75,000.00$ -$ 2026 Justice Center Server Refresh Vehicles/Equipment 400,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ 400,000.00$ -$ -$ -$ -$ -$ -$ 2026 Cisco Edge Firewall Refresh Vehicles/Equipment 290,000.00$ -$ 145,000.00$ -$ -$ -$ -$ -$ -$ 145,000.00$ -$ -$ -$ -$ -$ -$ 2026 Office 365 (3-year renewal, $50k)Vehicles/Equipment 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000.00$ -$ 2026 City-wide Network Equipment Replacement Vehicles/Equipment 300,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 300,000.00$ -$ 2026 VERF Purchases Total 1,340,000.00$ -$ 145,000.00$ -$ -$ -$ -$ -$ -$ 545,000.00$ -$ -$ -$ -$ 650,000.00$ -$ 2026 Heroes Park Parks Facilities 6,000,000$ -$ 5,250,000.00$ -$ 750,000.00$ 2026 Heroes Park - Funding TBD Total 6,000,000.00$ -$ -$ -$ 5,250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 750,000.00$ 2026 Recreation Center Amenity Parks Facilities 350,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 350,000.00$ -$ -$ -$ -$ 2026 Recreation Center Amenity Total 350,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 350,000.00$ -$ -$ -$ -$ 2026 Park Beautification - Annual Alottment Beautification 50,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000.00$ -$ -$ -$ -$ 2026 Park Beautification Total 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50,000.00$ -$ -$ -$ -$ 2026 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 100,000$ -$ 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 75,000$ -$ 75,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 50,000$ -$ 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Public Works Annual Maintenance (Non-Roads) Total 225,000.00$ -$ 225,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Water Project 17: Monticello - Design Utilities 200,000$ -$ -$ -$ -$ -$ 200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Water Project 17: Monticello Total 200,000.00$ -$ -$ -$ -$ -$ 200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Water Project 5: Brighton Oaks Utilities 2,550,000$ -$ 650,000.00$ -$ -$ -$ -$ 1,900,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Water Project 5: Brighton Oaks Total 2,550,000.00$ -$ 650,000.00$ -$ -$ -$ -$ 1,900,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Advanced Metering Infrastructure Utilities 150,000$ -$ -$ -$ -$ -$ 150,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Advanced Metering Infrastructure Total 150,000.00$ -$ -$ -$ -$ -$ 150,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Grand Total 15,515,000.00$ -$ 2,020,000.00$ -$ 5,250,000.00$ 1,000,000.00$ 3,000,000.00$ 1,900,000.00$ -$ 545,000.00$ -$ 400,000.00$ -$ -$ 650,000.00$ 750,000.00$ Non-Project Costs Operating Budget Misc.6,433,994$ 2,697,517.31$ -$ -$ 750,904.00$ -$ -$ -$ -$ 2,815,572.83$ -$ -$ 170,000.00$ -$ -$ -$ Transfers Out -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Economic Development Misc.1,200,000$ -$ -$ -$ 1,200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Misc Misc.-$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Total Non-Project Costs 7,633,994.13$ 2,697,517.31$ -$ -$ 1,950,904.00$ -$ -$ -$ -$ 2,815,572.83$ -$ -$ 170,000.00$ -$ -$ -$ 2026 Total Cash Out 23,148,994.13$ 2,697,517.31$ 2,020,000.00$ -$ 7,200,904.00$ 1,000,000.00$ 3,000,000.00$ 1,900,000.00$ -$ 3,360,572.83$ -$ 400,000.00$ 170,000.00$ -$ 650,000.00$ 750,000.00$ Annual Revenues Revenue 16,725,422$ 2,997,395.23$ 982,769.00$ -$ 6,745,012.50$ 1,257,425.46$ 858,022.00$ 344,928.19$ 81,896.40$ 2,867,266.75$ -$ 180,000.00$ 170,000.00$ -$ 228,706.00$ 12,000.00$ TIF Intrafund Cash Transfers -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Transfers In Revenue 500,000$ -$ -$ -$ -$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2026 Total Cash In 17,225,421.52$ 2,997,395.23$ 982,769.00$ -$ 6,745,012.50$ 1,257,425.46$ 1,358,022.00$ 344,928.19$ 81,896.40$ 2,867,266.75$ -$ 180,000.00$ 170,000.00$ -$ 228,706.00$ 12,000.00$ 2026 Ending Balance 19,385,919.35$ 6,713,657.51$ 2,193,334.51$ -$ 140,788.68$ 909,028.18$ 1,949,878.69$ 1,768,238.15$ 656,057.21$ 2,975,742.20$ 555.00$ 322,681.00$ 465,128.03$ 211,035.19$ 1,065,501.00$ 14,294.00$ 2027 Annual Street Maintenance Maintenance/Rehab 500,000$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Annual Street Maintenance Maintenance/Rehab 250,000$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Annual Street Maintenance Maintenance/Rehab 250,000$ -$ 250,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Annual Street Maintenance Total 1,000,000.00$ -$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Cheek-Sparger County Bond Project - Construction Roads 8,500,000$ -$ -$ 4,000,000.00$ 2,500,000.00$ -$ 2,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Cheek-Sparger - County Bond Project Total 8,500,000.00$ -$ -$ 4,000,000.00$ 2,500,000.00$ -$ 2,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Woodbriar and Quail Crest Water/WW - Phase III Construction Utilities 1,500,000$ -$ -$ -$ -$ -$ 1,500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Woodbriar and Quail Crest Water/WW Total 1,500,000.00$ -$ -$ -$ -$ -$ 1,500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Drainage Improvements - Annual Allottment Drainage 1,200,000$ -$ 100,000.00$ -$ 100,000.00$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Drainage Improvements - Western Trails Drainage 500,000$ -$ -$ -$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Drainage Improvements Total 1,700,000.00$ -$ 100,000.00$ -$ 100,000.00$ 1,500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Loader Broom Vehicles/Equipment 30,000.00$ 30,000.00$ -$ 2027 VERF Purchases Total 30,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 30,000.00$ -$ 2027 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 100,000$ -$ 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 75,000$ -$ 75,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Public Works Annual Maintenance (Non-Roads)Maintenance/Rehab 50,000$ -$ 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Public Works Annual Maintenance (Non-Roads) Total 225,000.00$ -$ 225,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Water Project 13: Glade at Old Oak / SH121 Utilities 200,000$ -$ -$ -$ -$ -$ 200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Water Project 13: Glade at Old Oak / SH121 Total 200,000.00$ -$ -$ -$ -$ -$ 200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Water Project 15: Rustic Oaks Utilities 400,000$ -$ -$ -$ -$ -$ 400,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Water Project 15: Rustic Oaks Total 400,000.00$ -$ -$ -$ -$ -$ 400,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Water Project 17: Monticello Utilities 3,000,000$ -$ 2,000,000.00$ -$ -$ -$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Water Project 17: Monticello Total 3,000,000.00$ -$ 2,000,000.00$ -$ -$ -$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Dredging of Ponds - Nature Center Drainage 120,000$ 120,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Dredging of Ponds - Nature Center Total 120,000.00$ 120,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Grand Total 16,675,000.00$ 120,000.00$ 3,325,000.00$ 4,000,000.00$ 2,600,000.00$ 1,500,000.00$ 5,100,000.00$ -$ -$ -$ -$ -$ -$ -$ 30,000.00$ -$ Non-Project Costs Operating Budget Misc.6,661,718$ 2,783,281.52$ -$ -$ 769,940.16$ -$ -$ -$ -$ 2,938,496.18$ -$ -$ 170,000.00$ -$ -$ -$ Transfers Out 1,500,000$ -$ -$ -$ 1,500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Economic Development Misc.1,500,000$ -$ -$ -$ 1,500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Misc Misc.-$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Total Non-Project Costs 9,661,717.86$ 2,783,281.52$ -$ -$ 3,769,940.16$ -$ -$ -$ -$ 2,938,496.18$ -$ -$ 170,000.00$ -$ -$ -$ 2027 Total Cash Out 26,336,717.86$ 2,903,281.52$ 3,325,000.00$ 4,000,000.00$ 6,369,940.16$ 1,500,000.00$ 5,100,000.00$ -$ -$ 2,938,496.18$ -$ -$ 170,000.00$ -$ 30,000.00$ -$ Annual Revenues Revenue 20,505,721$ 3,067,932.82$ 482,769.00$ 4,000,000.00$ 6,913,637.81$ 1,230,250.93$ 858,022.00$ 344,928.19$ 81,896.40$ 2,935,577.39$ -$ 180,000.00$ 170,000.00$ -$ 228,706.00$ 12,000.00$ TIF Intrafund Cash Transfers 1,500,000$ -$ 1,500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Transfers In Revenue 500,000$ -$ -$ -$ -$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2027 Total Cash In 22,505,720.55$ 3,067,932.82$ 1,982,769.00$ 4,000,000.00$ 6,913,637.81$ 1,230,250.93$ 1,358,022.00$ 344,928.19$ 81,896.40$ 2,935,577.39$ -$ 180,000.00$ 170,000.00$ -$ 228,706.00$ 12,000.00$ 2027 Ending Balance 15,554,922.03$ 6,878,308.82$ 851,103.51$ -$ 684,486.33$ 639,279.11$ (1,792,099.31)$ 2,113,166.34$ 737,953.61$ 2,972,823.40$ 555.00$ 502,681.00$ 465,128.03$ 211,035.19$ 1,264,207.00$ 26,294.00$ 2028 Annual Street Maintenance Maintenance/Rehab 50,000$ 50,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2028 Annual Street Maintenance Maintenance/Rehab 75,000$ 75,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2028 Annual Street Maintenance Maintenance/Rehab 100,000$ 100,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2028 Annual Street Maintenance Maintenance/Rehab 1,000,000$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2028 Annual Street Maintenance Total 1,225,000.00$ -$ 1,225,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2028 Engine down payment Vehicles/Equipment 500,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 500,000.00$ -$ 2028 VERF Purchases Total 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 500,000.00$ -$ 2028 New Park Amenity - Placeholder Parks Facilities 200,000$ 200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2028 New Park Amenity Total 200,000.00$ 200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2028 Drainage Improvements - Annual Allottment Drainage 1,700,000$ 500,000.00$ -$ -$ 1,200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2028 Drainage Improvements Total 1,700,000.00$ -$ 500,000.00$ -$ -$ 1,200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2028 Grand Total 3,625,000.00$ 200,000.00$ 1,725,000.00$ -$ -$ 1,200,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ 500,000.00$ -$ Non-Project Costs Operating Budget Misc.6,721,100$ 2,869,594.17$ -$ -$ 789,737.77$ -$ -$ -$ -$ 3,061,768.23$ -$ -$ -$ -$ -$ -$ Transfers Out 4,000,000$ -$ -$ -$ 4,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Economic Development Misc.1,500,000$ -$ -$ -$ 1,500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Misc Misc.-$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2028 Total Non-Project Costs 12,221,100.16$ 2,869,594.17$ -$ -$ 6,289,737.77$ -$ -$ -$ -$ 3,061,768.23$ -$ -$ -$ -$ -$ -$ 2028 Total Cash Out 15,846,100.16$ 3,069,594.17$ 1,725,000.00$ -$ 6,289,737.77$ 1,200,000.00$ -$ -$ -$ 3,061,768.23$ -$ -$ -$ -$ 500,000.00$ -$ Annual Revenues Revenue 16,793,778$ 3,140,189.88$ 482,769.00$ -$ 7,086,478.76$ 1,203,225.42$ 858,022.00$ 344,928.19$ 81,896.40$ 3,005,562.09$ -$ 180,000.00$ 170,000.00$ -$ 228,706.00$ 12,000.00$ TIF Intrafund Cash Transfers 4,000,000$ -$ 3,000,000.00$ -$ -$ -$ 1,000,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Transfers In Revenue 500,000$ -$ -$ -$ -$ -$ 500,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2028 Total Cash In 21,293,777.74$ 3,140,189.88$ 3,482,769.00$ -$ 7,086,478.76$ 1,203,225.42$ 2,358,022.00$ 344,928.19$ 81,896.40$ 3,005,562.09$ -$ 180,000.00$ 170,000.00$ -$ 228,706.00$ 12,000.00$ 2028 Ending Balance 21,002,599.61$ 6,948,904.53$ 2,608,872.51$ -$ 1,481,227.32$ 642,504.53$ 565,922.70$ 2,458,094.53$ 819,850.01$ 2,916,617.26$ 555.00$ 682,681.00$ 635,128.03$ 211,035.19$ 992,913.00$ 38,294.00$ City of Colleyville Page 1 CITY OF COLLEYVILLE CITY COUNCIL BRIEFING Agenda Number WS-2 Agenda Date 7/18/2023 Type Worksession Department Engineering Title Discussion of the Stormwater Master Plan Explanation This item provides an opportunity to review the goals and objectives of the City's Drainage Master Plan and provide direction for adoption of a drainage fee ordinance and development of a 5-year Drainage CIP based on revenue projections. Attachments 1. Drainage Master Plan Presentation City of Colleyville Drainage Master Plan July 18, 2023 Purpose & Goals of Drainage Master Plan Identify and evaluate flood risks at public roadway crossings at FEMA designated creeks and tributaries Develop a Prioritized Implementation Plan Evaluate maintenance conditions of roadway culverts and erosion issues Provide a framework for the City to update annually Roadway Crossings Evaluated Components of Drainage Master Plan Prioritize crossings Neighborhood studies of drainage problem areas Provided conceptual design and construction costs Conceptual design used for grant funding opportunities Next Steps Prioritization Implementation Plan -Complete Flat Drainage Fee Ordinance Adoption 5-Year Drainage CIP based on Drainage Fee revenue projections Drainage Fee Summary (next 3 years) Land Use Monthly Rate Per Lot or Tract Current Monthly Rate Per Lot or Tract 10/01/2023 Monthly Rate Per Lot or Tract 10/01/2024 Monthly Rate Per Lot or Tract 10/01/2025 Residential $7.00 $10.00 $12.00 $14.00 Land Use Monthly Rate Per Acre 10/01/2023 Monthly Rate Per Acre 10/01/2024 Monthly Rate Per Acre 10/01/2025 Park $10.68 $15.26 $18.31 $21.36 Church $15.25 $21.79 $26.14 $30.50 School $24.40 $34.86 $41.83 $48.80 Business Commercial –1 $24.40 $34.86 $41.83 $48.80 *Business Commercial –2 $10.68 $15.26 $18.31 $21.36 Industrial –1 $24.40 $34.86 $41.83 $48.80 *Industrial –2 $10.68 $15.26 $18.31 $21.36 Miscellaneous –1 $24.40 $34.86 $41.83 $48.80 *Miscellaneous –2 $10.68 $15.26 $18.31 $21.36 *These land use categories are applicable to business/commercial,industrial or miscellaneous land use,which does not require construction of impervious lot cover. Upcoming Council Meeting Items Adoption of the Drainage Fee Ordinance (set fee for next 3 years) August 1, 2023 (1st Reading) August 15, 2023 (2nd Reading & Adoption) Adoption of the Drainage Master Plan August 15, 2023 5-year Drainage CIP August 15, 2023 –presentation City of Colleyville Page 1 CITY OF COLLEYVILLE CITY COUNCIL BRIEFING Agenda Number WS-3 Agenda Date 7/18/2023 Type Worksession Department City Secretary Title Discussion of the July 18, 2023, City Council regular agenda items City of Colleyville Page 1 CITY OF COLLEYVILLE CITY COUNCIL BRIEFING Agenda Number 1 Agenda Date 7/18/2023 Type Executive Session Department City Secretary Title Section 551.071 - Legal - Consultation with the City Attorney regarding items on the agenda or for matters in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with Chapter 551 of the Texas Code Section 551.072 - Real Estate - Deliberate the purchase, exchange, lease, or value of real property for City facilities Section 551.087 – Economic Development - Discuss or deliberate regarding commercial or financial information the City has received from business prospects the City seeks to have locate, stay, or expand in the City and with which the City is conducting economic development negotiations; deliberate the offer of a financial or other incentive to a business prospect RESOLUTION R-23-4859 A RESOLUTION APPROVING COUNCIL ACTION REGARDING EXECUTIVE SESSION ITEMS AT THE REGULAR CITY COUNCIL MEETING OF JULY 18, 2023 WHEREAS, following discussion in Executive Session, and in full accordance with the requirements of the Open Meetings Act, the City Council determines that the following action is in the best interests of the health, safety, and welfare of the public. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COLLEYVILLE, TEXAS: Sec. 1. THAT AND IT IS SO RESOLVED. APPROVED BY A VOTE OF _ AYES, _ NAYS ON THIS THE 18TH DAY OF JULY 2023. Mayor Bobby Lindamood Aye Mayor Pro Tem Callie Rigney Aye Brandi Elder, Place 1 Aye George Bond, Place 2 Aye Scotty Richardson, Place 3 Aye Ben Graves, Place 4 Aye Chuck Kelley, Place 5 Aye ATTEST: CITY OF COLLEYVILLE Christine Loven, TRMC Callie Rigney City Secretary Mayor Pro Tem RESOLUTION R-23-4860 APPROVING CITY COUNCIL ACTION UNDER CONSENT ITEMS AT THE REGULAR CITY COUNCIL MEETING OF JULY 18, 2023 WHEREAS,City Council has taken action on certain items on the agenda under Consent Items. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COLLEYVILLE, TEXAS: Sec. 1. THAT the agenda decisions approved by City Council action under Consent Items as follows are hereby adopted: a. Approval of the minutes of the regular City Council meeting of July 6, 2023 b. Approval of a Professional Services Agreement with Freese and Nichols, Inc. for development of construction documents and bidding assistance for Heroes Park and authorizing the City Manager to execute the agreement AND IT IS SO RESOLVED. APPROVED BY A VOTE OF AYES, NAYS ON THIS THE 18TH DAY OF JULY 2023. Mayor Bobby Lindamood Aye Mayor Pro Tem Callie Rigney Aye Brandi Elder, Place 1 Aye George Bond, Place 2 Aye Scotty Richardson, Place 3 Aye Ben Graves, Place 4 Absent Chuck Kelley, Place 5 Aye ATTEST: CITY OF COLLEYVILLE Christine Loven, TRMC Callie Rigney City Secretary Mayor Pro Tem City of Colleyville Page 1 CITY OF COLLEYVILLE CITY COUNCIL MINUTES 100 Main Street, Colleyville, Texas, 76034 THURSDAY, JULY 6, 2023 Mayor Bobby Lindamood called the Colleyville City Council Worksession to order on Thursday, July 6, 2023, at 5:32 p.m. ROLL CALL: Mayor Bobby Lindamood, Mayor Pro Tem Callie Rigney, and Councilmembers Brandi Elder, George Bond, Scotty Richardson, and Chuck Kelley. ABSENT: Councilmember Ben Graves. ALSO PRESENT: City Manager Jerry Ducay, Assistant City Manager Mark Wood, Assistant City Manager Adrienne Lothery, Police Chief Michael Miller, Fire Chief Mark Cantrell, Community Development Director Ben Bryner, Public Works Director Amber Beard, City Attorney Whitt Wyatt, and City Secretary Christine Loven. WS-1 Discussion of a Contract for Heroes Park Construction Documents Assistant City Manager Adrienne Lothery presented this item which would provide for an agreement with Freese and Nichols to prepare construction documents for Heroes Park. Manager Lothery reviewed the approved conceptual plan for the park and reviewed the opinion of probable, construction costs, noting the costs do not include graphic/word design for the memorial, heroes, and history walls or the bronze statues and eternal flame sculpture. There was discussion regarding if the tasks are concurrent or if there will be time for comments, if additional staff will be needed, and if the funding is from the TIF. Manager Lothery stated worksessions with the Council will be conducted as the design is at 30, 60, and 90%, thus allowing for comment. City Manager Jerry Ducay stated additional staff will not be needed as the area is a passive space and concurred the funding for the project is the TIF. Approval of moving forward with a contract will be placed on a future City Council agenda. WS-2 Discussion of the July 6, 2023, City Council regular agenda items There was no discussion of this item. Mayor Lindamood adjourned the Worksession at 5:46 p.m. and called the Executive Session to order. City Council Agenda July 6, 2023 City of Colleyville Page 2 1. EXECUTIVE SESSION - In accordance with Texas Government Code, Chapter 551, Subchapter D Section 551.071 - Legal - Consultation with the City Attorney regarding items on the agenda or for matters in which the duty of the attorney to the governmental body under the Texas Disciplinary Rules of Professional Conduct of the State Bar of Texas clearly conflicts with Chapter 551 of the Texas Code Section 551.072 - Real Estate - Deliberate the purchase, exchange, lease, or value of real property for City facilities •Right-of-Way Acquisition - John McCain Road and Culvert Project Section 551.087 – Economic Development - Discuss or deliberate regarding commercial or financial information the City has received from business prospects the City seeks to have locate, stay, or expand in the City and with which the City is conducting economic development negotiations; deliberate the offer of a financial or other incentive to a business prospect There was no action taken and Mayor Lindamood adjourned Executive Session at 6:47 p.m. Mayor Lindamood called the regular meeting of the City Council to order at 7:00 p.m. and called the roll. ROLL CALL: Mayor Bobby Lindamood, Mayor Pro Tem Callie Rigney, and Councilmembers Brandi Elder, George Bond, Scotty Richardson, and Chuck Kelley. ABSENT: Councilmember Ben Graves. INVOCATION: Pastor Dale Molden, CrossCreek Church PLEDGE OF ALLEGIANCE: City Attorney Whitt Wyatt 2. EXECUTIVE SESSION READING AND PUBLIC HEARING: CONSIDER AND TAKE ANY ACTION(S) NECESSARY RELATIVE TO ITEMS DISCUSSED IN EXECUTIVE SESSION - RESOLUTION R-23-4856 This resolution was not needed. 3. ANNOUNCEMENTS, PROCLAMATIONS, AND PRESENTATIONS Announcements of civic and charitable events Presentation of calendar events and updates Announcements of awards and recognition City Council Agenda July 6, 2023 City of Colleyville Page 3 Mayor Lindamood and the City Council made announcements regarding City and community events 4. CONSENT: READING AND PUBLIC HEARING - RESOLUTION R-23-4857 4a Approval of the minutes of the regular City Council meeting of June 20, 2023 4b Approval of the Third Amended Agreement Memorandum of Understanding for the Combined Reconstruction and Accident Specialists, (CRASH) Unit Mayor Lindamood read Resolution R-23-4857 in its entirety. Police Chief Michael Miller presented item 4b, noting this is Memorandum of Understanding established a shared motor vehicle accident investigation unit called the Combined Reconstruction and Accident Specialists (CRASH Unit). The CRASH Unit MOU greatly reduces the cost of each city having to secure a specialized motor vehicle accident unit on their own, while also saving time and manpower. He also noted the second amendment was passed and approved in 2014, and this third amendment has been approved by Bedford, Grapevine, and Coppell and Colleyville, Hurst, and Euless are anticipating approval at their next meetings. Mayor Lindamood opened and closed the public hearing without any speakers. Mayor Pro Tem Rigney made a motion to approve Resolution R-23-4857, seconded by Councilmember Bond. The motion was approved by the following vote: Ayes: 6 – Mayor Lindamood, Mayor Pro Tem Rigney, and Councilmembers Elder, Bond, Richardson, and Kelley. Absent: 1 – Councilmember Graves 5. ORDINANCE(S): FIRST READING AND PUBLIC HEARING 5a Ordinance O-23-2245 Consideration of a Special Use Permit for a reduction in parking for the property being Lot 1, Block 1, of the Corley subdivision, located at 5409 Colleyville Boulevard ZC23-012 Mayor Lindamood read the caption of Ordinance O-23-2245. City Council Agenda July 6, 2023 City of Colleyville Page 4 Community Development Director Ben Bryner presented this item which is a request to reduce the parking required at the Cajun Bistro Café and Market and provide for a shared parking agreement with the adjacent bank. There was discussion regarding the landscaped stairway from the bank lot, a drive in window, and landscaping. The applicant Sptim Maftari and his representative Robert Martin were present to answer questions. Mr. Martin stated they would like the landscaped stairway to remain for convenience, there would be no walk-up window and they would be willing to enhance the landscaping. There were no other questions. Mayor Lindamood opened and closed the public hearing without any speakers. This was a first reading, therefore no action was taken. 6. CITIZEN COMMENTS Kathy Hadley, 204 Timberline Drive North, addressed the City Council. 7. ACTION/RESOLUTION: DISCUSSION AND CONSIDERATION OF A RESOLUTION RATIFYING COUNCIL AGENDA ACTION FOR THURSDAY, JULY 6, 2023 - READING AND PUBLIC HEARING - RESOLUTION R-23- 4858 This resolution was not needed. 8. ADJOURNMENT There being no further business before the City Council, Mayor Lindamood adjourned the meeting without objection by the City Council at 7:43 p.m. APPROVED BY A VOTE OF AYES, NAYS, ON THIS THE 18TH DAY OF JULY 2023. Minutes taken and prepared by: Christine Loven, TRMC City Secretary City of Colleyville Page 1 CITY OF COLLEYVILLE CITY COUNCIL BRIEFING Agenda Number 4b Agenda Date 7/18/2023 Number Resolution R-23-4860 Type Resolution Department City Manager Title Approval of a Professional Services Agreement with Freese and Nichols, Inc. for development of construction documents and bidding assistance for Heroes Park and authorizing the City Manager to execute the agreement Explanation Reading and Public Hearing This agenda item provides for approval of a contract with Freese and Nichols, Inc. to prepare construction documents for Heroes Park. The contract was discussed at the July 6, 2023 Worksession, and the concept plan was developed by a committee of citizens with relevant experience and military backgrounds. The next phase of the project is detailed design engineering to develop construction documents which will be placed out for bid. This process is expected to take 9-12 months. Financial Impact The Heroes Park project is funded with available TIF dollars. Recommendation Approve Attachments 1. Professional Services Agreement with Freese and Nichols, Inc., Heroes Park Construction Documents Professional Services Agreement with Freese and Nichols, Inc. for Heroes Park Final Design 1 PROFESSIONAL SERVICES AGREEMENT HEROES PARK FINAL DESIGN SERVICES This Professional Services Agreement (“Agreement”) is made by and between the City of Colleyville, Texas (“City”), and Freese and Nichols, Inc. (“Professional”) (each a “party” and collectively the “parties”), acting by and through their respective authorized representatives. RECITALS WHEREAS, City desires to engage Professional to perform certain work and services, hereinafter referred to only as "services", as further specified in the Scope of Services defined in Section 1 of this Agreement; and WHEREAS, Professional has expressed a willingness to perform said services in conformance with this Agreement. NOW, THEREFORE, for and in consideration of the covenants and promises made one to the other herein, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: Section 1. Scope of Services Upon written notice to proceed by City, Professional agrees to provide to City Heroes Park Final Design Services (“Project”), as set forth in the Scope of Services attached hereto as Exhibit “A” and incorporated herein by reference (the “Scope of Services”). Professional shall not be entitled to any claim for extra services, additional services or changes in the services without a written agreement with City prior to the performance of such services. Section 2. Term of Agreement The term of this Agreement shall begin on the last date of execution hereof (the “Effective Date”) and shall continue until Professional completes the services required herein and the City has accepted the same, unless sooner terminated as provided in this Agreement. Section 3. Professional’s Obligations (a) Performance of Services. Professional shall furnish and pay for all labor, tools, software, materials, equipment, supplies, transportation and management necessary to perform the services. To the extent reasonably necessary, Professional may engage the services of any agents, assistants, or other persons that Professional may deem proper to assist in the performance of the services under this Agreement; provided, that Professional shall be responsible for all costs related thereto, except as expressly authorized in writing in advance by City. (b) Site Access. City will endeavor to provide such rights of access on any project site as may be reasonably necessary for Professional to perform any necessary studies, surveys, tests or other required investigations in relation to the services; provided, that City shall have no obligation to (i) provide off-site access, (ii) provide access to private property for which City does not have an existing right to access, nor (ii) incur any costs associated with the access to be provided under this Agreement. (c) Standard of Care. Professional shall perform the services with the skill and care ordinarily provided by competent professionals practicing in the same or similar locality and under the same or similar Professional Services Agreement with Freese and Nichols, Inc. for Heroes Park Final Design 2 circumstances and professional licenses. Professional shall be responsible for the professional quality, technical accuracy, and the coordination of all services, including all Project Documents, designs, drawings, specifications, plans, reports, presentations and all other services furnished by Professional under this Agreement. Professional shall, without additional compensation, correct or revise any errors or deficiencies in the services. Professional shall further make, without expense to City, such revisions to the Project Documents as may be required to meet the needs of City and which are within the Professional’s Scope of Services. (d) Additional Services. Should City require additional services not included under this Agreement, Professional shall make reasonable effort to provide such additional services in accordance with the fee schedule set forth in Exhibit A, and within the time schedule prescribed by City; and without decreasing the effectiveness of the performance of services required under this Agreement. (e) No Waiver of City’s Rights. Neither City's review, approval, acceptance of, nor payment for any of the services required under this Agreement, shall be construed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement, and Professional shall be and remain liable to City in accordance with applicable law for all damages to City caused by Professional's negligent performance of any of the services furnished under this Agreement. (f) Independent Contractor. It is understood and agreed by and between the parties that Professional, while performing under this Agreement, is acting independently, and that City assumes no responsibility or liabilities to any third party in connection with Professional’s actions. All services to be performed by Professional pursuant to this Agreement shall be in the capacity of an independent contractor, and not as an agent or employee of City. Professional shall supervise the performance of its services and shall be entitled to control the manner and means by which its services are to be performed, subject to the terms of this Agreement. There is no intended third-party beneficiary to this Agreement. (g) Inspection of Records. Professional grants City and its designees the right to audit, examine or inspect, at City's election, all of Professional's Records (defined below) relating to the performance of services under this Agreement, during the term of the Agreement and any retention period herein. City’s audit, examination, or inspection of Professional’s Records may be performed by a City designee, which may include its internal auditors or an outside representative engaged by City. Professional agrees to retain Professional’s Records for a minimum of four (4) years following termination of the Agreement, unless there is an ongoing dispute under the contract; then, such retention period shall extend until final resolution of the dispute. "Professional's Records" shall include any and all information, materials and data of every kind and character generated in connection with the services under this Agreement. City agrees that it will exercise its right to audit, examine or inspect Professional’s Records during regular business hours unless City has provided advance written notice of an alternate time. Professional agrees to allow City and its designees access to all of Professional's Records, Professional's facilities, and the current or former employees of Professional, to the extent deemed reasonably necessary by City or its designee(s), to perform such audit, inspection or examination. (h) Certification of No Conflicts. Professional hereby warrants to the City that Professional has made full disclosure in writing of any existing or potential conflicts of interest related to Professional's services under this Agreement. In the event that any conflicts of interest arise after the Effective Date of this Agreement, Professional hereby agrees immediately to make full disclosure to the City in writing. (i) Hazardous Materials. Professional shall report the presence and location of any hazardous materials it notices or which an professional of similar skill and experience should have noticed to the City. Professional Services Agreement with Freese and Nichols, Inc. for Heroes Park Final Design 3 Section 4. Performance Schedule (a) Time for Performance. Professional shall perform all services as provided for under this Agreement in a proper, efficient, timely, and professional manner in accordance with City's requirements. In the event Professional's performance of this Agreement is delayed or interfered with by acts of the City or others, Professional may request an extension of time in conformance with this Section 4 for the performance of same as hereinafter provided but shall not be entitled to any increase in fee or price, or to damages or additional compensation as a consequence of such delays. (b) Extensions; Written Request Required. No allowance of any extension of time, for any cause whatever (including an event of Force Majeure as defined herein below), shall be claimed or made to Professional, unless Professional shall have made written request upon City for such extension within forty-eight (48) hours after the cause for such extension occurred, and unless City and Professional have agreed in writing upon the allowance of additional time to be made. Section 5. Documents (a) Project Documents. All proposals, reports, studies, surveys, applications, drawings, plans, specifications, data, and other documents, whether in draft form or final form (including any electronic format) prepared by Professional and its employees, consultants, subcontractors, agents, or representatives (collectively referred to in this section as “Professional) for the use and/or benefit of City in connection with this Agreement (“Project Documents”). Professional shall be deemed the authors of their respective component of the Project Documents. Notwithstanding, upon payment by City as required by this Agreement, City shall own, have, keep and retain all rights, title and interest in and to all Project Documents, including all ownership, common law, statutory, and other reserved rights, including copyrights (except copyrights held by the Professional) in and to all Project Documents, whether in draft form or final form, which are produced at City’s request and in furtherance of this Agreement. City shall have full authority to authorize any contractor(s), subcontractors, consultants, and material or equipment suppliers to reproduce applicable portions of the Project Documents to and for use in their execution of the services or for any other purpose. Acceptance and approval of the Project Documents by City shall not constitute nor be deemed a release of the responsibility and liability of Professional for the accuracy or competency of its designs, working drawings, specifications, or other documents; nor shall such approval be deemed to be an assumption of such responsibility by City for any defect in the designs, working drawings and specifications, or any other documents prepared by Professional. (b) Professional’s Documents. All previously owned intellectual property of Professional, including but not limited to any computer software (object code and source code), tools, systems, equipment or other information used by Professional or its suppliers in the course of delivering the Services hereunder, and any know-how, methodologies or processes used by Professional to provide the services or protect deliverables to City, including without limitation, all copyrights, trademarks, patents, trade secrets and any other proprietary rights inherent therein and appurtenant thereto (“Professional’s Documents”), shall remain the sole and exclusive property of Professional. Notwithstanding, Professional agrees that City shall have the right to access to all such information and City is granted the right to make and retain copies of Professional’s Documents. City acknowledges that any reuse of Professional’s Documents without specific written verification or adaptation by Professional will be at City's sole risk and without liability or legal exposure to Professional. (c) Confidential Information. Professional agrees it will notify City in writing if it considers specific information to be confidential or proprietary trade secrets and will use its best efforts to clearly mark all such information as “Confidential” and/or “Proprietary – Trade Secret” at the time it is delivered or made accessible to City. City acknowledges that all such designated information is considered by Professional Services Agreement with Freese and Nichols, Inc. for Heroes Park Final Design 4 Professional to be confidential and the exclusive property of Professional. Notwithstanding the foregoing, Professional acknowledges that this Agreement, and all services performed hereunder, are subject to the legal requirements of the Texas Public Information Act and that City will have no obligation to protect or otherwise limit disclosure of any confidential or proprietary information if Professional has not notified City of such designation in conformance with this section. Professional agrees and covenants to protect any and all proprietary rights of City (or other persons) in any materials provided to Professional by City. Additionally, any materials provided to Professional by City shall not be released to any third party without the consent of City and shall be returned intact to City upon termination or completion of this Agreement if instructed to do so by City. In the event City delivers to Professional any information that has been expressly marked “Confidential” or has notified Professional is confidential or is the proprietary information of a third-party, Professional agrees it shall not disclose to anyone directly or indirectly during the term of this Agreement or at any time thereafter, any such information, nor shall it use any such information for any purpose other than as reasonably necessary in connection with Professional’s performance of the services under this Agreement. Professional shall further, at its own expense, defend all suits or proceedings instituted against City and pay any award of damages or loss resulting from an injunction, against City, insofar as the same are based on any claim that materials or services provided under this Agreement constitute an infringement of any patent, trade secret, trademark, copyright or other intellectual property rights. Notwithstanding, the foregoing confidentiality obligations shall not extend to and nothing herein shall limit either party’s right to disclose any information provided hereunder which: (i) was or becomes generally available to the public, other than as a result of a disclosure by the receiving party or its personnel; (ii) was or becomes available to the receiving party or its representatives on a non- confidential basis, provided that the source of the information is not bound by a confidentiality agreement or otherwise prohibited from transmitting such information by a contractual, legal, or fiduciary duty; (iii) was independently developed by the receiving party without the use of any confidential information of the disclosing party; or (iv) is required to be disclosed by applicable law or a court order. Section 6. Payment (a) Compensation. Professional’s compensation shall be as specified in the payment schedule set forth in Exhibit A; provided, that the total compensation under this Agreement shall not exceed SEVEN HUNDRED AND EIGHTY-EIGHT THOUSAND, EIGHT HUNDRED DOLLARS ($788,800.00). (b) Payment Terms. City agrees to pay Professional for all services authorized in writing and properly performed by Professional in general conformance with the fee schedule set forth in Exhibit A, subject to changes in the Scope of Services or additional services agreed upon in writing. Unless otherwise agreed in writing, all payments to Professional by City shall be based on detailed monthly invoices submitted by Professional for work performed and accepted by City, less any previous payments. Payment will be due within thirty (30) days of the City’s receipt and acceptance of an approved invoice. Notwithstanding the foregoing, City reserves the right to delay, without penalty, any payment to Professional when, in the opinion of City, Professional has not made satisfactory progress on the Project as described in the Scope of Services. (c) Deductions. City may deduct from any amounts due or to become due to Professional any sum or sums owing by Professional to City. In the event of any breach by Professional of any provision or obligation of this Agreement, or in the event of the assertion by other parties of any claim or lien against City, or City's premises, arising out of Professional's performance of this Agreement, City shall have the right to retain out of any payments due or to become due to Professional an amount sufficient to completely protect City from any and all reasonably anticipated loss, damage or expense therefrom, until the breach, claim or lien has been satisfactorily remedied or adjusted by Professional. Professional Services Agreement with Freese and Nichols, Inc. for Heroes Park Final Design 5 Section 7. Default; Force Majeure (a) Default; Notice to Cure. A party shall be deemed in default under this Agreement if the party is in breach of a material provision of this Agreement and said breach is not cured within fifteen (15) days written notice of default by the other party. In the event the breaching party has notified the other party in writing that it is diligently working to cure the breach and has provided reasonable written evidence in support of the same, the breaching party shall not be deemed in default until the thirtieth (30th) day following the non-breaching party’s notice of default. (b) Default by Professional. In addition to default under Section 7(a) above, Professional shall be in default under this Agreement if Professional fails to comply or becomes disabled and unable to comply with the provisions of this Agreement related to Professional’s performance of the services, including the quality or character of the services or time of performance for any material component of the services. If such default is not corrected within ten (10) days from the date of City’s written notice to Professional regarding the same, City may, at its sole discretion without prejudice to any other right or remedy: (i) Terminate this Agreement and be relieved of the payment of any further consideration to Professional except for all services determined by City to be satisfactorily completed prior to termination. Payment for work satisfactorily completed shall be for actual costs, including reasonable salaries and travel expenses of Professional to and from meetings called by City at which Professional is required to attend, but shall not include any loss of profit of Professional. In the event of such termination, City may proceed to complete the services in any manner deemed proper by City, either by the use of its own forces or by re- subletting to others; or (ii) City may, without terminating this Agreement or taking over the services, furnish the necessary labor, materials, equipment, supplies and/or assistance necessary to remedy the situation, at the expense of Professional. (c) Force Majeure. To the extent either party of this Agreement shall be wholly or partially prevented from the performance of any obligation or duty placed on such party by reason of or through stoppage of labor, riot, fire, flood, acts of war, insurrection, court judgment, or a government restriction, quarantine or mandatory closure order enacted in response to a pandemic or other public health crises, or other specific cause reasonably beyond the party’s control and not attributable to its malfeasance, neglect or nonfeasance (each an event of “Force Majeure”), the time for performance of such obligation (other than a payment obligation) may be extended for a period equal to the time lost by reason such event, provided, that the party complies with the provisions of this section. Specifically, the party asserting Force Majeure (i) shall give prompt notice to the other party of the prevention of performance as soon as the asserting party is reasonably aware of such prevention, and (ii) has the burden of demonstrating: (1) how and why their performance was so prevented, (2) the period of time during which they were so prevented from performing (which under the facts may be equal to, or shorter or longer than, the duration of the Force Majeure event itself), and (3) that the party used commercially reasonable efforts to mitigate and/or eliminate such prevention and resumed performance under this Agreement as soon as reasonably practicable. Section 8. Termination; Suspension (a) Termination Upon Default . Either party may terminate this Agreement upon written notice if the other party is in default of this Agreement, subject to the defaulting party’s right to cure in conformance with the terms of this Agreement. Professional Services Agreement with Freese and Nichols, Inc. for Heroes Park Final Design 6 (b) Termination by City . City shall be entitled to terminate this Agreement, with or without cause, by providing thirty (30) days prior written notice to Professional. (c) Termination Following Request for Modification . Should City require a modification of this Agreement with Professional, and in the event City and Professional fail to agree upon a modification to this Agreement, City shall have the option of terminating this Agreement and Professional's services hereunder at no additional cost other than the payment to Professional, in accordance with the terms of this Agreement, for the services reasonably determined by City to be properly performed by Professional prior to such termination date. (d) Suspension. City reserves the right to suspend this Agreement for the convenience of City by issuing a written notice of suspension which shall describe City’s reason(s) for the suspension and the expected duration of the suspension. Such expected duration shall, in no way, guarantee what the total number of days of suspension shall occur. Such suspension shall take effect immediately upon Professional’s receipt of said notice. Should such suspension extend past the expected duration identified by City in its latest notice of suspension, Professional shall have the right to terminate this Agreement if Professional if (i) Professional provides not less than thirty (30) days prior written notice to City requesting to recommence the services, and (ii) City does not recommence the services within the time requested. Section 9. Insurance Professional shall during the term hereof maintain in full force and effect all policies of insurance reasonably required by City. Professional’s obligation to provide acceptable certificates of insurance is a material condition precedent to this Agreement, and services under this Agreement shall not commence until certificates of insurance have been received, reviewed, and accepted by City. The minimum coverages and limits of liability for the policies of insurance required for the specific services under this Agreement are maintained by and accessible through the City’s purchasing department. Section 10. Indemnification; Notice. CITY SHALL NOT BE LIABLE FOR ANY LOSS, DAMAGE, OR INJURY OF ANY KIND OR CHARACTER TO ANY PERSON OR PROPERTY ARISING FROM THE SERVICES OF PROFESSIONAL PURSUANT TO THIS AGREEMENT. PROFESSIONAL HEREBY WAIVES ALL CLAIMS AGAINST CITY, ITS OFFICERS, AGENTS AND EMPLOYEES (COLLECTIVELY REFERRED TO IN THIS SECTION AS “CITY INDEMNITEES”) FOR DAMAGE TO ANY PROPERTY OR INJURY TO, OR DEATH OF, ANY PERSON ARISING AT ANY TIME AND FROM ANY CAUSE OTHER THAN THE GROSS NEGLIGENCE OR WILLFUL MISCONDUCT OF THE CITY INDEMNITEES. PROFESSIONAL AGREES TO INDEMNIFY AND SAVE HARMLESS THE CITY INDEMNITEES FROM AND AGAINST ANY AND ALL LIABILITIES, DAMAGES, CLAIMS, SUITS, COSTS (INCLUDING COURT COSTS, REASONABLE ATTORNEYS’ FEES AND COSTS OF INVESTIGATION) AND ACTIONS OF ANY KIND BY REASON OF INJURY TO OR DEATH OF ANY PERSON OR DAMAGE TO OR LOSS OF PROPERTY TO THE EXTENT CAUSED BY THE NEGLIGENT PERFORMANCE OF SERVICES UNDER THIS AGREEMENT OR BY REASON OF ANY NEGLIGENT ACT OR OMISSION ON THE PART OF PROFESSIONAL, ITS OFFICERS, DIRECTORS, MANAGERS, EMPLOYEES, CONTRACTORS, SERVANTS, REPRESENTATIVES, CONSULTANTS, LICENSEES, SUCCESSORS OR PERMITTED ASSIGNS (EXCEPT WHEN SUCH LIABILITY, CLAIMS, SUITS, COSTS, INJURIES, DEATHS OR DAMAGES ARISE FROM OR ARE ATTRIBUTED TO THE NEGLIGENCE OR WILFUL MISC ONDUCT OF A CITY INDEMNITEE, IN WHOLE OR IN PART, IN WHICH CASE PROFESSIONAL SHALL INDEMNIFY THE CITY INDEMNITEES TO THE EXTENT OR PROPORTION OF NEGLIGENCE ATTRIBUTED TO Professional Services Agreement with Freese and Nichols, Inc. for Heroes Park Final Design 7 PROFESSIONAL, ITS OFFICERS, AGENTS, OR EMPLOYEES AS DETERMINED BY A COURT OR OTHER FORUM OF COMPETENT JURISDICTION). Notices of Claim. Professional shall promptly advise City in writing of any claim or demand against the City, related to or arising out of Professional’s acts or omissions under this Agreement and shall see to the investigation of such claims or demand at Professional’s sole cost and expense; provided, that City, at its option and at its own expense, may participate in such investigation without relieving Professional of any of its obligations hereunder. Professional’s obligations under this section shall not be limited to the limits of coverage of insurance maintained or required to be maintained under this Agreement. THE PROVISIONS OF THIS SECTION SHALL SURVIVE EXPIRATION OR TERMINATION OF THIS AGREEMENT FOR A PERIOD OF FOUR (4) YEARS. Section 11. Notice. All notices required by this Agreement shall be in writing and addressed to the parties at the addresses set forth on the signature page(s) of this Agreement (or to such other address that may be designated by the receiving party from time to time in accordance with this section). All notices shall be delivered by (a) personal delivery, (b) certified or registered mail (in each case, return receipt requested, postage prepaid), (c) nationally recognized overnight courier (with all fees pre-paid), or (d) email of a pdf document containing the required notice. Such notice or document shall be deemed to be delivered or given, whether actually received or not, (i) when received if delivered or given in person, (ii) if sent by United States mail, three (3) business days after being deposited in the United States mail as set forth above, (iii) on the next business day after the day the notice or document is provided to a nationally recognized carrier to be delivered as set forth above, or (iv) if sent by email, the next business day. A confirmation of delivery report which reflects the time that the email was delivered to the recipient’s last notified email address is prima facie evidence of its receipt by the recipient, unless the sender receives a delivery failure notification, indicating that the email has not been delivered to the recipient. Section 12. Verifications by Professional Professional’s execution of this Agreement shall serve as its formal acknowledgement and written verification that: (a) if the requirements of Subchapter J, Chapter 552, Government Code, apply to this Agreement and Professional agrees that the Agreement can be terminated if Professional knowingly or intentionally fails to comply with a requirement of that subchapter; (b) pursuant to Texas Government Code Chapter 2270, that Professional’s organization does not presently boycott Israel and will not boycott Israel during the term of this Agreement; and (c) pursuant to Texas Government Code Chapter 2251, that Professional’s organization does not current discriminate against firearm and ammunition industries and will not for the term of the contract. Discriminating means refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with the firearm or ammunition industry or with a person or entity doing business in the firearm or ammunition industry, but does not include an action made for ordinary business purposes. Professional Services Agreement with Freese and Nichols, Inc. for Heroes Park Final Design 8 Section 13. Miscellaneous (a) Professional shall not assign or sublet this Agreement, in whole or in part, without the prior written consent of City. (b) Professional shall comply with all federal, state, county, and municipal laws, ordinances, resolutions, regulations, rules, and orders applicable to the services under this Agreement. (c) The laws of the State of Texas shall govern this Agreement; and venue for any action concerning this Agreement shall be in the state district courts of Tarrant County, Texas. The parties agree to submit to the personal and subject matter jurisdiction of said courts. (d) This Agreement contains the entire understanding of the parties with respect to the subject matter hereof and there are no oral understandings, statements or stipulations bearing upon the meaning or effect of this Agreement which have not been incorporated herein. (e) The exhibits attached hereto, if any, are incorporated herein and made a part hereof for all purposes. (f) Unless expressly provided otherwise herein, this Agreement may only be modified, amended, supplemented or waived by a mutual written agreement of the parties. (g) In the event any one or more of the provisions contained in this Agreement shall for any reason be held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality or unenforceability shall not affect any other provisions, and the Agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained in it. (h) Any of the representations and obligations of the parties, as well as any rights and benefits of the parties pertaining to a period of time following the termination of this Agreement shall survive termination. (i) This Agreement may be executed by the parties in separate counterparts, each of which when so executed and delivered shall be an original, but all such counterparts shall together constitute one and the same instrument. Each counterpart may consist of any number of copies hereof each signed by less than all, but together signed by all of the parties. (j) Each party represents that it has full capacity and authority to grant all rights and assume all obligations granted and assumed under this Agreement. (k) Subject to the provisions regarding assignment, this Agreement shall be binding on and inure to the benefit of the parties to it and their respective heirs, executors, administrators, legal representatives, successors and assigns. [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK - SIGNATURE PAGE FOLLOWS] Professional Services Agreement with Freese and Nichols, Inc. for Heroes Park Final Design 9 IN WITNESS WHEREOF, the parties have executed and delivered this Agreement as of the Effective Date. For City: CITY OF COLLEYVILLE, TEXAS [sig|req|signer1|Signature] By: Jerry Ducay City Manager [date|req|signer1|Date of Signing] Date: For Professional: FREESE AND NICHOLS, INC. [sig|req|signer2|Signature] By: Wendy Bonneau Principal/Vice President [date|req|signer2|Date of Signing] Date: Notice Address: City of Colleyville Attn: City Manager 100 Main Street, 3rd Floor City of Colleyville, Texas 76034 E: jducay@colleyville.com Colleyville Contract ID: PSA_MM_July 6, 2023_v1.20220714 Notice Address: Freese and Nichols, Inc. Attn: Wendy Bonneau 2711 N Haskell Ave., Ste. 3300 Dallas, Texas 75204 E: wendy.bonneau@freese.com SC-1 ATTA CHMENT SC SCOPE OF SERVICES AND RESPONSIBILITIES OF CLIENT PROJECT UNDERSTANDING Freese and Nichols, Inc. (“FNI”) will perform professional design services for the City of Colleyville (“City”) for developing construction documents for the Heroes Park Project in Colleyville, Texas. FNI will prepare construction documents including plans, specifications, and opinions of probable construction costs for Heroes Park for the purpose of bidding the work in accordance with City standards and budgets, as well as federal, state and local laws. This scope of work includes landscape architectural, engineering, and environmental graphic design services. FNI will be joined by the sub-consultant firms of GHLA, Inc for the architectural and structural design services, Yaggi Engineering, Inc. for the lighting design and electrical engineering services, Greenscape Pump Services (GPSI) for water feature design, Datacom Design Group for Audio/Visual and security design, Alpha Testing, LLC. for the geotechnical investigation and D|G Studios, Inc (D|G) for the environmental graphic design on the project. The Heroes Park scope of work, park programming and fee schedule are based upon the Heroes Park Master Plan and preliminary construction budget of $6,500,000 as identified and approved at a City Council work session which occurred on June 6, 2023. ARTICLE I BASIC SERVICES: FNI shall render the following professional services in connection with the development of the Project: TASK 1 - PROJECT MANAGEMENT: A. Project Management 1. Attend (virtual) kick-off and progress meetings as necessary with the City (up to 12). 2. Monthly progress reporting and invoicing. 3. Weekly internal tracking to keep the project on schedule and within budget. 4. Implement quality review program and perform QA/QC on all client deliverables. 5. Management of sub-consultant efforts and deliverables. TASK 2 – S CHEMATIC DESIGN CONCEPT PLAN (30% CD): A. FNI will meet (Team Meeting #1) with the City to kick off the project and review and finalize the park programming elements. B. Based upon the Heroes Park Master Plan, topographic survey information and other existing information as provided by the City, FNI will summarize and prepare existing base maps, sheet layouts, and a plan sheet index for use in developing the Final Design Concept drawings for the Exhibit A - Scope of Services Exhibit A - Scope of Services SC-2 proposed park improvements. The Schematic Design Concept drawings will be prepared at an approximate 30% level of completion of Construction Documents. C.Based upon the approved Schematic Design plans, FNI will prepare an opinion of probable construction costs (OPCC) for the proposed improvements. D.FNI will meet (Team Meeting #2) with the City to review the approved Schematic Design Plans and the OPCC to confirm the overall design and obtain City approval before proceeding into the Design Development phase of work. If the City substantially, as solely determined by the City, increases the program and construction budget, FNI will review with the City the required additional fees necessary to cover the increase in the scope of work. FNI will not proceed into the Design Development phase until the final program, cost estimates, and consultant design fees have been approved in writing by both FNI and the City. E.FNI will prepare a final schematic design concept plan which will be a color illustrative plan for the City to use as a guide for the design development phase of the project. Deliverables for Preliminary Design Concept Plan: Meetings: •Minutes from Team Meeting #1 •Team Meeting #1 •Park Development Program •Team Meeting #2 •Schematic Design Concept Plan •OPCC TA SK 3 – DESIGN DEVELOPMENT (60% CD): A.Based upon approval of the Schematic Design Concept plan, in writing from the City, FNI will prepare Design Development drawings for the proposed park improvements. The Design Development drawings will be prepared at an approximate 60% level of completion of Construction Documents. B.The City will provide FNI all front-end documents, contracts, insurance requirements, general conditions, etc. for use by FNI in preparing the specifications and contract documents. C.Based upon the Design Development drawings, FNI will prepare a 60% level of completion OPCC for the proposed park improvements. D.FNI will prepare a preliminary Table of Contents for the specifications and contract documents (project manual). E.FNI will submit the Design Development drawings, OPCC and Table of Contents for the specifications and contract documents to City staff for review and approval. In conjunction with this submittal, FNI will attend a pre-submittal meeting (Team Meeting # 3) with the City’s team for their initial plan review. F.FNI will attend one (1) meeting with the City (Team Meeting #4) to review the 60% level of completion Construction Documents and OPCC for the proposed park improvements. Exhibit A - Scope of Services Exhibit A - Scope of Services SC-3 G. The City will forward, in writing, to FNI all review comments for the Design Development drawings submittal. FNI will obtain these comments and approval from the City prior to proceeding with the final construction documents. Deliverables for Design Development: Meetings: • Design Development Drawings (60%) • Team Meeting #3 • Table of Contents for Project Manual • Team Meeting #4 • Design Development OPCC (60%) TASK 4 – FINAL CONSTRUCTION DOCUMENTS (90% & 100% CD): A. Based upon approval from the City for the Design Development drawings submittal, FNI will prepare Final Construction Documents at an approximate 90% level of completion. The Construction Documents will be comprised of both the drawings and the specifications and contract documents. B. Based upon the 90% Construction Documents, FNI will prepare a final OPCC for all the proposed park improvements. C. FNI will conduct a third-party constructability review of the 90% Construction Drawings prior to the City submittal. D. FNI will submit the 90% Construction Documents and OPCC to the City staff for final review and comments. The City will provide FNI with final, written comments for all revisions requested to the Final Construction Documents. FNI will meet with the City (Team Meeting #5) to discuss the final comments. E. Based upon the final written comments received from the City, FNI will prepare the Final 100% Construction Documents for the City to utilize in bidding the project. F. FNI will submit the Final Construction Documents to an approved independent contract provider for submittal to the Texas Department of Licensing and Regulation (TDLR) for the State required accessibility review. The accessibility review will include compliance with TAS and ADA requirements. Fees associated with this review will be included as a reimbursable expense. Deliverables for Final Construction Documents: Meetings: • 90% Construction Documents • Team Meeting #5 • Final OPCC • 100% Construction Documents • Submission of Construction Documents for TDLR Review TASK 5 – BID PHASE: A. FNI will assist the City by responding to questions and interpreting bid documents. Prepare and issue addenda to the bid documents. Exhibit A - Scope of Services Exhibit A - Scope of Services SC-4 B. Assist the City in conducting a pre-bid conference for the construction projects and coordinate responses with the City. Response to the pre-bid conference will be in the form of addenda issued after the conference. FNI will conduct a tour of the project site after the pre-bid conference. C. FNI will assist the City in reviewing, tabulating, and analyzing the bids received. Review the qualification information provided by the apparent low bidder to determine if, based on the information available, they appear to be qualified to construct the project. Recommend award of contracts or other actions as appropriate to be taken by the City. FNI will assist the City on award of contract city council work session. D. The City Staff will: i. Arrange and pay for printing of all documents and addenda to be distributed to prospective bidders. ii. Advertise project for bidding, maintain the list of prospective bidders, receive and process deposits for all bid documents, issue (with the assistance of FNI) any addenda, prepare and supply bid tabulation forms and conduct the Bid Opening. iii. Receive the Engineer/Landscape Architect’s recommendation concerning the bid evaluation and recommendation and prepare agenda materials for the City Council concerning the award of the bid. iv. Prepare and provide copies of the construction contract for execution between the City and the contractor. Deliverables for Bid Phase: Meetings: • Bid Tabulation • Attend Pre–Bid Meeting and Bid Opening • Review of Contractor’s Bids and Letter of Recommendation for Award of Contract TASK 6 – CONSTRUCTION ADMINISTRATION: A. Upon completion of the bid phase services, FNI will proceed with the performance of construction phase services as described below. FNI will endeavor to protect the City by providing these services. However, it is understood that FNI does not guarantee the Contractor’s performance, nor is FNI responsible for supervision of the Contractor’s operation and employees. FNI shall not be responsible for the means, methods, techniques, sequences, or procedures of construction selected by the Contractor, or any safety precautions and programs relating in any way to the condition of the premises, the work of the Contractor or any Subcontractor. FNI shall not be responsible for the acts or omissions of any person (except its own employees or agents) at the Project site or otherwise performing any of the work of the Project. B. FNI will assist the City by attending one (1) pre-construction conference with the Contractor and review construction schedules prepared by the contractor pursuant to the requirements of the construction contract, attend one (1) construction kickoff meeting, and a maximum of nine (9) 2-hour progress meetings during construction to evaluate completion of work by the Contractor. Exhibit A - Scope of Services Exhibit A - Scope of Services SC-5 Should the number of required meetings or the amount of meeting time increase, such time can be provided by FNI as an additional service as requested and approved by the City in writing. C. FNI will not provide the day-to-day construction management or provide any construction inspection services during construction. The City will be responsible for the day-to-day administration and documentation of the construction contract with the general contractor. D. FNI will prepare a written Field Report as necessary for meetings attended during the construction of the project. E. FNI will process submittal and shop drawing reviews as submitted by the contractor during the construction process. After the City has reviewed the requested items for payment by the contractor, FNI will review the contractor’s monthly pay application and then forward this to the City with the appropriate recommendation. F. FNI will assist the City in attending two (2) final project walk-through meetings with the Contractor and his subcontractors to review the completion of work. FNI will provide written comments to the City for the preparation of a final “punch list” for work to be completed by the Contractor. G. FNI will record information furnished by the construction contractor(s) reflecting changes in the Project made during construction that deviate from the Issue for Construction set. FNI will document and modify the final plans per as-built mark ups only as submitted by the contractor. No drawing revisions to confirm the changes will be provided. Furnish Client one (1) electronic copy (.pdf format) of “Record Drawings.” Deliverables for Construction Administration: Meetings: • Field Reports for Progress Meetings/Reviews as Necessary • Pre-Construction Meeting • Processing of Submittals and RFI’S • Nine (9) 2-hour Progress Meetings • Punch List from the Final Project Walk-Thru • Two (2) Final Project Walk-Throughs • Record Drawings ARTICLE II SPECIAL SERVICES: FNI shall render the following professional services, which are not included in the Basic Services described above, in connection with the development of the Project: TASK 1 – MISCELLANEOUS SERVICES: A. GEOTECHNICAL RECOMMENDATIONS i. Field Exploration Field investigation will consist of the drilling and testing of three (3) locations within the project for the pavilion, free standing walls, water feature, entry portal, new roadway and pedestrian paving. Groundwater table measurements will also be taken and recorded during the field exploration. Exhibit A - Scope of Services Exhibit A - Scope of Services SC-6 ii. Laboratory Testing Samples will be stored in moisture proof containers and transported to our laboratory for further evaluation and testing. In the laboratory, samples will be visually classified by one of our Geotechnical Engineers and sorted into groups of similar color and physical properties. iii. Geotechnical Report A comprehensive report will be provided after the completion of the laboratory testing and engineering evaluation. This report will document our field exploration, laboratory testing, engineering evaluation and recommendations for the proposed project. The report will include recommendations for earthwork, foundation systems, bearing capacities, estimated settlement, potential vertical rise, CBR, Proctor, seismic design, soil profiles and recommendation for concrete and or flexible pavement. The final report will be provided in Adobe PDF digital format for use and storage. Deliverables for Geotechnical Recommendations: • Geotechnical Report and Recommendations B. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) i. FNI will develop a reference stormwater pollution prevention plan (SWPPP) for the project to be executed by the project’s Primary Operator to reduce the release of sediment and pollution from the construction site. The SWPPP provided will be written to comply with the requirements of the Texas Commission on Environmental Quality (TCEQ) Texas Pollutant Discharge Elimination System (TPDES) general permit for stormwater runoff from construction activity (TXR150000). ii. The SWPPP document will consist of an erosion control plan and a narrative defining site parameters and best management practices (BMPs), accompanied by a checklist outlining the necessary steps the Primary Operator and Secondary Operator must complete to apply for authorization under this permit. Three copies of the SWPPP reference document can be provided. Deliverables for SWPPP: • SWPPP Document C. CITY COUNCIL WORK SESSIONS i. FNI will attend up to three (3) city council work sessions to provide periodic updates concerning the project. During these meetings, FNI will provide information relating to the overall project scope, schedule, estimated cost, etc. FNI will provide a brief PowerPoint presentation or presentation boards with information regarding the updates. ii. FNI will help facilitate three (3) public open houses to provide an overview of the project scope, design concept plans, schedule, etc. Exhibit A - Scope of Services Exhibit A - Scope of Services SC-7 Meetings: • (3) City Council Work Sessions • (3) Public Open Houses TASK 2 – WATER FEATURE DESIGN: A. At the kickoff meeting (Team Meeting #1) the team will clearly define the intent and water feature effects, design, and layout of the water feature. B. Design Development - Based on the approved water feature in Final Illustrative Plan, FNI and GPSI will begin preparing the Design Development drawings for the water feature. GPSI will provide the necessary plans and details to further completion of the plans for approval and proceed with the final construction documents. Upon completion of the Design Development phase, GPSI will prepare an Opinion of Probable Construction Cost (OPCC). C. Construction Documents - Based on the approved water features from the Design Development Phase, FNI and GPSI will begin preparing the final Construction Documents drawings for the water feature. FNI and GPSI will provide the necessary plans and details and for completion of the plans to deliver signed and sealed construction drawings for the project. D. Construction Administration – FNI and GPSI will review and advise on submittals; shop drawings, product information, samples, etc., respond to any requests for information (RFIs), develop punch list of corrective work prior to Owner’s acceptance of installation and operation. Two (2) site visits to perform a site evaluation and a punch list. Deliverables for Water Feature Design: Meetings: • Design Development Phase Documents • Team Meeting #1 • Design Development Phase OPCC • Design Development Review Meeting • Construction Documents (60%, 90% and 100%) • Construction Documents Review Meetings TASK 3 – AUDIO/VISUAL AND SECURITY DESIGN: A. Information Technology i. UTP cabling with network connectivity to support IP solutions for Electronic Surveillance systems. ii. Infrastructure design to support wireless connectivity (WIFI) throughout the heroes plaza and event lawn. iii. Telecom room design, layout, and connectivity including detailed plan view, rack elevations, and wall sections. iv. Owner Coordination for system preferences. . Exhibit A - Scope of Services Exhibit A - Scope of Services SC-8 B. AudioVisual Infrastructure Design i. AudioVisual design to include infrastructure to support the distributed audio systems within the plaza. ii. Coordination of the AudioVisual infrastructure and active equipment system design requirements with the A/E design team. iii. Owner Coordination for system preferences. C. Electronic Security i. Electronic Security system design including Electronic Surveillance (CCTV/IP Cameras). ii. Coordination of Electronic Security system design requirements with the A/E design team. iii. Owner Coordination for system preferences. Deliverables for Audio/Visual and Security Design: Meetings: • Construction Documents (60%, 90%, and 100%) • Team Meeting #1 • Design Development Review Meeting • Construction Documents Review Meetings TASK 4 – ENVIRONMENTAL GRAPHIC DESIGN FNI will coordinate with and support D|G Studios, Inc. (D|G) to plan and develop content, generate schematic design and design intent documentation, and oversee the implementation of a program of identification, interpretive, and commemorative signage and graphic elements. A. Information Gathering & Content Development i. D|G will prepare for an upcoming Workshop by requesting any additional information that can be provided by the City, and participating in an Information Gathering Virtual Kick-off Meeting. ii. Next, an In-Person Workshop with the City is held to focus on the Storyline and Visitor Experience. iii. Following the Workshop, D|G develops a Content Development presentation recommending suggested presentations of the Graphic components to determine the preliminary appropriate size and environmental needs of the Graphic components. iv. D|G participates in an In-Person Meeting with the City to review the Content Development presentation and to offer clarifications. Exhibit A - Scope of Services Exhibit A - Scope of Services SC-9 Deliverables for Phase A: Meetings: • Content Development Presentation • Virtual Kick-off Meeting • In-Person Workshop • Content Development In-Person City Meeting B. Schematic Design i. Based on the results of the Phase A activities, a Schematic Design presentation is developed for the proposed Graphic components, as appropriate, including message content and material specifications. ii. As part of the Schematic Design phase, D|G addresses the development of an appropriate Graphics Standards Package with recommendations for type fonts, type sizes and color families that enhance and qualify the interpretation of the story through the use of text, images and identity elements. At this time, any listing of names are used as placeholders only. iii. A budget is also developed based on the preliminary Schematic Design presentation and a general understanding of materials and elements (such as special lighting needs, etc.), based on D|G’s professional experience. iv. D|G participates in a virtual meeting with FNI and the City staff to review the Schematic Design presentation, as well as preliminary budget, prior to its review by the City. v. Based on the results of the virtual review meeting of the Schematic Design package, D|G refines the presentation and participates in an In-person meeting with the City to review and receive feedback and comments. vi. Based on the Schematic Design meeting, the presentation is updated to reflect the ongoing decision-making process. The Project’s budget is updated, and a suggested fabrication schedule is also incorporated into the Schematic Design package. vii. During this phase, D|G participates in one (1) additional Schematic Design virtual meeting to review the Schematic Design package prior to its completion. viii. D|G will help FNI to present the schematic design package at the city council work sessions. Deliverables for Phase B: Meetings: • Schematic Design Package • Schematic Design Virtual Meeting • Schematic Design In-Person City Review Meeting • Schematic Design Package Virtual Review Meeting C. Design Development i. Following the completion of the Schematic Design activities, the project continues to Exhibit A - Scope of Services Exhibit A - Scope of Services SC-10 progress into a Design Development phase, with further refinement to include detailed study elevations to illustrate the Graphic components. D|G will prepare the Design Development package. ii. D|G will participate in a virtual meeting with the FNI and the City staff to review the Design Development package, as well as the updated budget, prior to its review by the City. iii. Based on the results of the meeting, additional revisions are made to the Design Development Package and D|G will participate in an In-Person Design Development meeting with the City to resolve outstanding issues, generate approvals and progress the Project to the next phase. iv. D|G will help FNI to present the design development package at the city council work sessions. Deliverables for Phase C: Meetings: • Design Development Package • Design Development Virtual Review Meeting • Design Development In-Person City Review Meeting D. Contract Documents/Artwork Production Files i. Following the City’s review and approval of the Design Development activities, D|G develops Contract Documents for the Graphic components containing plan and specifications, and artwork specifications. ii. The work of all specialty consultants is also incorporated into the documentation packages including required cut-sheets and specifications. iii. D|G will prepare the construction documents package with FNI. D|G will participate in a virtual meeting with FNI and the City staff to review and receive redlines at each milestone (60% and 90%). iv. D|G will help FNI to present the construction documents packages at the city council work sessions. v. The final biddable package includes Contract Documents, Programming Documents and a Graphics Bid Manual that details the required minimum material performance specifications, industry standard terms and conditions of work delivery, bid schedule, and other bid submittal requirements. A Bid Response Form is also included in the Bid Manual along with a listing of D|G recommended Signage Contractors to receive the Bid Package. Deliverables for Phase D: Meetings: • Construction Documentation Packages • Construction Documents Virtual Review Meetings • City Council Work Sessions (up to two, if needed) Exhibit A - Scope of Services Exhibit A - Scope of Services SC-11 E. Bidding and Construction Administration i. D|G will assist FNI in the development of a list of D|G pre-qualified Graphics Contractors and the bidding process for the selection of the Graphics Fabricator. D|G will provide clarifications to bidders during the bidding process and review the final bid submittal with FNI. ii. FNI and D|G will review and advise on submittals; shop drawings, product information, samples, etc., respond to any requests for information (RFIs), develop punch list of corrective work prior to Owner’s acceptance of installation and operation. Two (2) site visits to perform a site evaluation and a punch list. Deliverables for Phase E: Meetings: • Pre-qualified Graphic contractor list • Virtual Bid Tabulation Review Meeting • Review of Graphic Bidders • (2) Site Observation Visits • Processing of Submittals and RFI’S • (2) Punch Lists F. Research / Writer Allowance i. After Phase A (Information Gather & Content Development Phase), D|G will confirm the scope of services for the Researcher/Writer if the Owner is not developing the Content in-house for areas such as the History Wall and coordinates with the Research/Writer to begin to develop the content. D|G manages the Research/Writer directly associated with the Graphic components if they are brought onto the Project’s Team. ASSUMPTIONS A. The City has designated the following program summary that was identified in the completed Heroes Park Master Plan. The program for the improvements is to develop the Heroes Plaza along with the adjacent Open Event Space and includes a Pavilion, Tall Memorial Walls, Low Heroes Walls, Water Walls, Low History Walls, Flexible Lawn Space, Seating Walls, Entry Portal, Shade Trellis, New Roadway, Improved Pedestrian Circulation/ Walkways, Landscape and Irrigation improvements. Should this program and its associated budget increase substantially, as solely determined by the City, or should the City require a significant number of alternate program and bid items to be included in the construction document package, FNI and the City staff will re- evaluate this scope of work and determine the basis of compensation in accordance with revisions to the design services. B. The City will provide as expeditiously as possible all readily available base information that it currently has in its possession, necessary to complete the Scope of Services described herein. Should FNI need any additional survey information, the City will provide this information to FNI. Any information required to complete this Scope of Services that cannot be readily provided by the City will remain the responsibility of the City. All such information shall be provided to FNI, and any costs associated with acquisition of information will be borne by the City. C. Other than those identified in this contract, no additional public meetings and/or presentations are provided within this Scope of Services. D. The City will pay for all required governmental processing fees and public notice advertising costs. Exhibit A - Scope of Services Exhibit A - Scope of Services SC-12 E. It is anticipated that the park design will be prepared as one bid package. If additional bid packages are required by City for phasing breakouts, FNI will re-evaluate the scope of services to address additional fees not covered in this scope of work. F. The design will include compliance with ADA requirements. However, this scope does not include submission of the final Construction Documents to a Registered Accessibility Specialist (RAS) for an accessibility review. G. In regards to a lump sum contractual Agreement, a determination of the overall percentage of Services completed in comparison with the total Services anticipated will be made and the City will only be invoiced for those Services completed, as well as the reimbursable expenses referenced above. ARTICLE III ADDITIONAL SERVICES: Any services performed by FNI that are not included in the Basic Services or Special Services described above are Additional Services. Additional Services to be performed by FNI, if authorized by Client, are described as follows: A. Providing renderings, model, and mock-ups requested by the City. Additional 3D renderings can be prepared for $2,500 each. B. Revising drawings or other report documents when such revisions are not consistent with approvals or instructions previously given by City or due to other causes not solely within the control of FNI. C. Providing services such as investigating subsurface utilities or to investigate other existing conditions or facilities, or to make measured drawings thereof, or to verify the accuracy of drawings or other information as furnished by the City. D. Meeting or trips in excess of the number of meetings included in Article I for site visits, coordination meetings, or other activities. Additional meetings can be requested by the City for an additional service. E. Preparing applications and supporting documents for government grants, loans, or planning advances and providing data for detailed applications. F. Preparing data and reports for assistance to City in preparation for hearings before regulatory agencies, courts, arbitration panels or any mediator, giving testimony, personally or by deposition, and preparations therefore before any regulatory agency, court, arbitration panel or mediator. G. Design, contract modifications, studies or analysis required to comply with local, State, Federal or other regulatory agencies that become effective after the date of this agreement. H. Preparing statements for invoicing or other documentation for billing other than for the standard invoice for services attached to this professional services agreement. I. Providing document revisions more than those outlined in Article I. Exhibit A - Scope of Services Exhibit A - Scope of Services SC-13 ARTICLE IV TIME OF COMPLETION: FNI is authorized to commence work on the Project upon execution of this Agreement and agrees to complete the services within the following Schedule. Construction Documents are anticipated to be complete and delivered to the City within 9 months after Notice-to-Proceed is given to FNI by the City. Freese and Nichols, Inc. has no control over the permitting agencies’ review and approval schedules and therefore the completion of the construction documents is contingent upon these agency’s approval of the project. If FNI’s services are delayed through no fault of FNI, FNI shall be entitled to adjust the contract schedule consistent with the number of days of delay. These delays may include but are not limited to delays in Client or regulatory reviews, delays on the flow of information to be provided to FNI, governmental approvals, etc. These delays may result in an adjustment to compensation as outlined on the face of this Agreement and in Attachment CO. Schedule: Task Task Title Time of Completion 1 Project Management Runs through the entire project 2 Schematic Concept Design Plan 2 months from NTP 3 Design Development 2 months from completion of Task 2 4 Final Construction Documents 5 months from completion of Task 3 5 Bid Phase 6-8 weeks from completion of Task 4 6 Construction Phase Services (General Representation) 9-12 months from construction NTP+ Exhibit A - Scope of Services Exhibit A - Scope of Services SC-14 ARTICLE V RESPONSIBILITIES OF CLIENT: Client shall perform the following in a timely manner so as not to delay the services of FNI: A. Provide meeting space and coordinate equipment needs, room set up, and logistics for meetings outlined in Article 1. B. Contact meeting invites for stakeholder and public meeting. This includes email, mail, newsletter, or other forms of notification. C. Client recognizes and expects that change orders may be required to be issued during construction. The responsibility for the costs of change orders will be determined on the basis of applicable contractual obligations and professional liability standards. FNI will not be responsible for any change order costs due to unforeseen site conditions, changes made by or due to the Client or Contractor, or any change order costs not caused by the negligent errors or omissions of FNI. Nothing in this provision creates a presumption that, or changes the professional liability standard for determining if, FNI is liable for change order costs. It is recommended that the Client budget a minimum of 5% for new construction and a minimum of 10% for construction that includes refurbishing existing structures. D. Designate in writing a person to act as Client’s representative with respect to the services to be rendered under this Agreement. Such person shall have contract authority to transmit instructions, receive information, interpret and define Client’s policies and decisions with respect to FNI’s services for the Project. E. Provide all criteria and full information as to Client’s requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; and furnish copies of all design and construction standards which Client will require to be included in the drawings and specifications. F. Assist FNI by placing at FNI’s disposal all available information pertinent to the Project including previous reports and any other data relative to design or construction of the Project. G. Arrange for access to and make all provisions for FNI to enter upon public and private property as required for FNI to perform services under this Agreement. H. Examine all studies, reports, sketches, drawings, specifications, proposals and other documents presented by FNI, obtain advice of an attorney, insurance counselor and other consultants as Client deems appropriate for such examination and render in writing decisions pertaining thereto within a reasonable time so as not to delay, or cause rework in, the services of FNI. I. Approvals and permits from all governmental authorities having jurisdiction over the Project and such approvals and consents from others as may be necessary for completion of the Project. J. Client shall make or arrange to have made all subsurface investigations, including but not limited to borings, test pits, soil resistivity surveys, and other subsurface explorations. Client shall also make or arrange to have made the interpretations of data and reports resulting from such investigations. All costs associated with such investigations shall be paid by Client. Exhibit A - Scope of Services Exhibit A - Scope of Services SC-15 K. Provide such accounting, independent cost estimating and insurance counseling services as may be required for the Project, such legal services as Client may require or FNI may reasonably request with regard to legal issues pertaining to the Project including any that may be raised by Contractor(s), such auditing service as Client may require to ascertain how or for what purpose any Contractor has used the moneys paid under the construction contract, and such inspection services as Client may require to ascertain that Contractor(s) are complying with any law, rule, regulation, ordinance, code or order applicable to their furnishing and performing the work. L. If Client designates a person to serve in the capacity of Resident Project Representative who is not FNI or FNI’s agent or employee, the duties, responsibilities and limitations of authority of such Resident Project Representative(s) will be set forth in an Attachment attached to and made a part of this Agreement before the Construction Phase of the Project begins. Said attachment shall also set forth appropriate modifications of the Construction Phase General Representation services as defined in Attachment SC, Article I, D, together with such adjustment of compensation as appropriate. M. Attend the pre-bid conference, bid opening, preconstruction conferences, construction progress and other job-related meetings and substantial completion inspections and final payment inspections. N. Give prompt written notice to FNI whenever Client observes or otherwise becomes aware of any development that affects the scope or timing of FNI’s services, or any defect or nonconformance of the work of any Contractor. O. Furnish, or direct FNI to provide, Additional Services as stipulated in Attachment SC, Article III of this Agreement or other services as required. P. Bear all costs incident to compliance with the requirements of this Article V. Exhibit A - Scope of Services Exhibit A - Scope of Services SC-16 ARTICLE VI DESIGNATED REPRESENTATIVES: FNI and Client designate the following representatives: Owner’s Designated Representative Name: Address: Phone: Email: Owner’s Accounting Representative – Name: Address: Phone: Email: FNI’s Designated Representative – Sherry Cheng 12770 Merit Drive, Suite 900 Dallas, Texas 75251 (214)217-2338 Sherry.cheng@freese.com FNI’s Accounting Representative – Justin Smith 10431 Morado Circle Building 5; Suite 300 Austin, Texas 78759 (737)702-0986 justin.smith@freese.com Exhibit A - Scope of Services Exhibit A - Scope of Services Adrienne Lothery 100 N. Main St. Colleyville, Texas 76034 817-503-1112 alothery@colleyville.com Karen Hines 100 N. Main St. Colleyville, Texas 76034 817-503-1015 khines@colleyville.com SC-17 COMPENSATION Agreement by and between the City of Colleyville (City) and Freese and Nichols, Inc. (Consultant) for Heroes Park Final Design I. BASIS OF COMPENSATION The cost for performing these services set forth herein will be as follows: Basic Design Services Task 1 – Project Management .......................................................................................................... $49,600 Task 2 – Schematic Design Concept Plan (30%) ................................................................................. $58,430 Task 3 – Design Development (60%) ................................................................................................ $107,700 Task 4 – Final Construction Documents (90% & 100%) ................................................................... $220,780 Task 5 – Bid Phase .............................................................................................................................. $14,040 Task 6 – Construction Administration ................................................................................................ $79,400 Reimbursable Expenses ...................................................................................................................... $9,200 Total – Basic Design Services (Lump Sum) ............................................................................... $539,150 Special Services Task 1 – Miscellaneous Services A. Geotechnical Recommendations .................................................................................... $6,260 B. SWPPP ............................................................................................................................. $7,250 C. City Council Work Sessions ........................................................................................... $22,090 Task 2 – Water Feature Design .......................................................................................................... $52,800 Task 3 – Audio/Visual and Security Design ........................................................................................ $28,090 Task 4 – Environmental Graphic Design .......................................................................................... $133,160 Total – Special Services (Lump Sum) ....................................................................................... $249,650 TOTAL – BASIC DESIGN, AND SPECIAL SERVICES (Lump Sum) ...................................... $788,800 Exhibit A - Scope of Services Exhibit A - Scope of Services City of Colleyville Page 1 CITY OF COLLEYVILLE CITY COUNCIL BRIEFING Agenda Number 5 Agenda Date 7/18/2023 Type Report Department Finance Title Monthly Financial Report - June 2023 Explanation General Fund Through June, the fund has collected 93% of its budgeted revenues and spent 71% of budgeted expenditures, yielding a year-to-date surplus of $6.4m. The increase over last year's surplus is mostly due to the City's elimination of the $1.5m transfer from the General Fund into the Capital Projects Fund, which typically occurred in December. This $1.5m as reallocated to increased personnel costs and will be expensed more evenly throughout the year. As the graph below shows, we expected March to be our peak surplus month, with the following months drawing on the surplus through the end of the year. Sales and franchise tax revenue are showing strong increases over last year, while all non-transfer related spending is on track. Sales tax revenue The City's sixth sales tax collection for FY23, representing sales made in May, came in this month and it showed an increase of 9.1% over last May, which is a stark increase from the results seen so far this year. The City remains up year-over-year, and the total year-to-date increase of 4.38% yields an additional $290,000 to the City. With sales tax having grown a total of 25%, or from $8.5m in 2020 to a record-high $10.29m in the last year, any flat or increasing sales tax is fantastic for the City and indicative that our recent high gains will sustain. To some degree a similar trajectory has been seen across both the State's collections as well as our neighbors. Utility Fund The Utility Fund has collected 73% of its budgeted revenue and spent 61% of its budgeted expenses, which is a little higher than FY22. As the summary above shows, most of our surplus is coming from our relationship with the Trinity River Authority, although interest earnings on Utility Funds are resulting in a substantial surplus over our direct operating expenses. On the other side of the coin, our relationship with the T.R.A. has resulted in a substantial surplus due to the City being under-billed for water usage in October and November. Additionally, the Authority processed its annual "true- up" for the City, which either issues a refund or demands an additional payment based on the previous year's fiscal activity and water use. Colleyville typically receives a City of Colleyville Page 2 City Council Agenda Briefing 5a refund during this process, and FY23 was no exception. In fact, it was determined the City was owed $1.6m in invoiced payments that were ultimately unneeded. As with every year, this surplus cash will be moved to our capital projects spending at year's end. Drainage Fund To date, the Drainage Utility Fund has received 75% of its revenue and spent 67% of its expenditures. This fund's cash flow is lower than the previous year, with a surplus of about $295,000 as opposed to $341,000 last year. The trajectory for the remainder of the year is anticipated to mirror the past two years pretty closely. Historically, drainage fee revenues tended to average at 1.2% higher than the previous fiscal year. However, as the City reaches build out these revenues tend to be more stable from year to year. Per policy, any year-end surplus will be moved for use on the City's Capital Improvement Plan. Hotel Fund COVID-related economic disruptions took a toll on any travel-related revenues in the last few years, but the Hotel Occupancy Tax Fund has kept a strong fund balance. While travel activities are on the rise and revenue in this fund has been making a comeback, this year's first two quarters receipts mirror the same period in FY22. Staff had planned on a significant increase in total receipts this year, and so we will likely need to reallocate some expenses from here in FY24. Fund balance as of the end of this quarter is sitting right at $30,000, and staff will continue to monitor cash here closely. Costs funded include personnel related directly to advertising the City, as well as Colleyville Center costs and some special events. Debt Service Fund Being predominately funded through property taxes, the Debt Service fund has received the majority of its revenue for the year. Cash-flow for this fund is very predictable, as most revenues are recognized in December/January and debt service payments occur twice annually, with lease payments also occurring throughout the year. As of April's figures, the fund is running a deficit of about $136,000. We won't see any further expenses here until August, when our second interest payments are due on our bond issues. The most recent issue, taken out in December 2022, includes a large interest payment of $309,000 to be paid this year. Together with our 2016 refunding issue, we can expect additional expenses of almost $325,000 in this fund before the year is over. This increase was planned in December, and the fund's balance should end the year at around $450,000. The City's current outstanding bonds are on schedule to be paid off in 2027, and the new 2023 $10m issue is structured to be callable in 2030. Attachments 1. June 2023 Financial Report Presentation 2. June 2023 Financial Report Monthly Financial Report June 2023 City Council Meeting July 18, 2023 5a- Items not for council action General Fund General Fund  FY23 Budget FY23 YTD % of Budget FY22 YTD FY22 % of Budget Revenues $ 26,227,785 $ 24,351,043 93% $ 23,846,931 93% Expenditures $ 25,297,424 $ 17,945,535 71% $ 18,558,344 74%   $ 930,361 $ 6,405,508   $ 5,288,587   *75% of the year is completed MillionsOctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptember$ - $ 2 $ 4 $ 6 $ 8 $ 10 $ 12 $ (2) $ (4) GENERAL FUND CASH FLOW Budget FY23 5 Yr Avg Property Tax Highlight FY23 FY22 $ 15,696,876 $ 15,429,319 $ 160,015 $ 183,821 Collected to Date Collected Later Sales Tax Highlight City/State ComparisonsFY23 YTD Receipts compared to Previous Years Millions2023 2022 2021 2020 2019 2018 5-Yr Avg $0.00 $2.00 $4.00 $6.00 $8.00 $10.00 $12.00 Total FY23 Sales Tax Receipts (Comparison) Fiscal Year-to-Date FY Actuals FY Budget ColleyvilleNorth Richland HillsHurstSouthlakeGrapevineKellerBedfordState CollectionsAll Texas CitiesAll DFW Cities0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% City/State Comparisons Sales Tax Highlight Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep $ - $ 200,000 $ 400,000 $ 600,000 $ 800,000 $ 1,000,000 $ 1,200,000 MONTH OVER MONTH COLLECTIONS 2019 2020 2021 2022 2023 Utility Fund Utility Fund  FY23 Budget FY23 YTD % of Budget FY22 YTD FY22 % of Budget Revenues $ 19,832,854 $ 14,451,969 73% $ 12,388,358 70% Expenditures $ 19,832,854 $ 12,046,804 61% $ 10,256,201 58%   $ - $ 2,405,165   $ 2,132,157   *75% of the year is completed TRA Revs/Exps  FY23 Budget FY23 YTD Revenues $ 15,878,131 $ 11,359,415 Expenditures $ 15,428,131 $ 9,020,660   $ 450,000 $ 2,338,755 City Revs/Exps  FY23 Budget FY23 YTD Revenues $ 3,954,723 $ 3,092,554 Expenditures $ 3,954,723 $ 3,026,144   $ - $ 66,411 Drainage Fund Drainage Fund  FY23 Budget FY23 YTD % of Budget FY22 YTD FY22 % of Budget Revenues $ 1,045,000 $ 782,209 75% $ 783,546 76% Expenditures $ 721,619 $ 486,874 67% $ 442,055 64%   $ 323,381 $ 295,335   $ 341,491   *75% of the year is completed OctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptember$ - $ 50,000 $ 100,000 $ 150,000 $ 200,000 $ 250,000 $ 300,000 $ 350,000 $ 400,000 $ 450,000 $ 500,000 FY23 VS. FY22 CASH FLOW FY23 FY22 Hotel Fund Hotel Fund  FY23 Budget FY23 YTD % of Budget FY22 YTD Revenues $ 275,000 $ 100,637 37% $ 100,260 Expenditures $ 273,569 $ 224,589 82% $ 209,410   $ 1,431 $ (123,952)  $ (109,150) *75% of the year is completed OctoberNovemberDecemberJanuaryFebruaryMarchAprilMayJuneJulyAugustSeptember$ - $ 50,000 $ 100,000 $ 150,000 $ 200,000 EXPECTED FUND BALANCE VS. ACTUAL FUND BALANCE (BY MONTH) Actual FY23 Expected FY23 Debt Service Fund Debt Service Fund  FY23 Budget FY23 YTD % of Budget FY22 YTD FY22 % of Budget Revenues $ 608,660 $ 612,434 101% $ 611,768 97% Expenditures $ 769,010 $ 749,110 97% $ 796,223 97%   $ (160,350) $ (136,677)  $ (184,455)  *75% of the year is completed 20232024202520262027202820292030203120322033203420352036203720382039204020412042$ - $ 100,000 $ 200,000 $ 300,000 $ 400,000 $ 500,000 $ 600,000 PROPERTY TAX BACKED DEBT SERVICE (BONDS AND PUBLIC SAFETY VEHICLE LEASES) 75% 71% FY23 Budget FY23 YTD % of Budget FY22 YTD FY22% of Budget Revenues 26,227,785$ 24,351,043$ 93%23,846,931$ 93% Expenditures 25,297,424$ 17,945,535$ 71%18,558,344$ 74% 930,361$ 6,405,508$ 5,288,587$ General Fund Highlights Revenue (FY23/FY22) Property Tax + $268k Sales Tax + $112k Franchise Tax + $319k Licenses -$78k Other Revenue -$109k Total Rev + $511k Expenditures (FY23/22) Personnel + $673k Contractual + $282k Supplies -$40k Capital -$28k Transfers -$1,500k Total Exp -$613k Monthly Financial Report - June 2023 % of year Completed % of Budget SpentGeneral Fund Through June, the fund has collected 93% of its budgeted revenues and spent 71% of budgeted expenditures, yielding a year-to-date surplus of $6.4m. The increase over last year's surplus is mostly due to the City's elimination of the $1.5m transfer from the General Fund into the Capital Projects Fund, which typically occurred in December. This $1.5m as reallocated to increased personnel costs and will be expensed more evenly throughout the year. As the graph below shows, we expected March to be our peak surplus month, with the following months drawing on the surplus through the end of the year. Sales and franchise tax revenue are showing strong increases over last year, while all non-transfer related spending is on track. $(5) $- $5 $10 $15 MillionsGeneral Fund Cash Flow Budget FY23 5 Yr Avg 1 Revenue Highlight: Property Tax Colleyville anticipates receiving $15.85m in General Fund property tax this year, which represents about a 1.5% increase from FY22. As with the previous four years, this increase comes from taxes off of new property, as opposed to increased taxes on existing property inside the City. Per Council direction, Colleyville's FY23 budget has been balanced using the no-new-revenue tax rate, which is designed to keep residents' tax bills to Colleyville largely the same from year-to- year. Revenue Highlight: Sales Tax MTD Increase YTD Increase The City's sixth sales tax collection for FY23 (representing sales made in May) came in this month and it showed an increase of 9.1% over last May, which is a stark increase from the results seen so far this year. The City remains up year-over-year,and the total year-to-date increase of 4.38% yields an additional $290,000 to the City. With sales tax having grown a total of 25%,or from $8.5m in 2020 to a record-high $10.29m in the last year,any flat or increasing sales tax is fantastic for the City and indicative that our recent high gains will sustain.To some degree a similar trajectory has been seen across both the State's collections as well as our neighbors. 4.4%9.1% Monthly Financial Report - June 2023 $15,696,876 $15,429,319 $160,015 $183,821 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% FY23 FY22 Collected to Date Collected Later $0.00 $5.00 $10.00 $15.00 2023 2022 2021 2020 2019 2018 5-Yr AvgMillionsTotal FY23 Sales Tax Receipts (Comparison) Fiscal Year-to-Date FY Actuals FY Budget 2 75% 61% FY23 Budget FY23 YTD % of Budget FY22 YTD FY22% of Budget Revenues 19,832,854$ 14,451,969$ 73%12,388,358$ 70% Expenditures 19,832,854$ 12,046,804$ 61%10,256,201$ 58% -$ 2,405,165$ 2,132,157$ Breakout of City's revenues/expenses from those related to the Trinity River Authority: FY23 Budget FY23 YTD FY23 Budget FY23 YTD Revs 15,878,131$ 11,359,415$ Revs 3,954,723$ 3,092,554$ Exps 15,428,131$ 9,020,660$ Exps 3,954,723$ 3,026,144$ Net 450,000$ 2,338,755$ Net -$ 66,411$ Annual Trinity River Authority True-Up Expenditures (FY23/22) Personnel + $112k Contractual + $1,613k Supplies + $55k Capital -$11k Transfers + $21k Total Exp + $1,791k Colleyville's rate structure enables the City to more easily manage years of varying water consumption from year-to-year. The majority of the City's rate is comprised of a direct pass-through to TRA for water costs. Funding for the City's operational costs come from a fixed monthly charge to customers based on meter size. The goal of this fund is to break-even at the end of the year. The Utility Fund has collected 73% of its budgeted revenue and spent 61% of its budgeted expenses, which is a little higher than FY22.As the summary above shows, most of our surplus is coming from our relationship with the Trinity River Authority, although interest earnings on Utility Funds are resulting in a substantial surplus over our direct operating expenses.On the other side of the coin,our relationship with the T.R.A.has resulted in a substantial surplus due to the City being underbilled for water usage in October and November. Additionally, the Authority processed its annual "true-up" for the City, which either issues a refund or demands an additional payment based on the previous year's fiscal activity and water use. Colleyville typically receives a refund during this process,and FY23 was no exception.In fact,it was determined the City was owed $1.6m in invoiced payments that were ultimately unneeded. As with every year, this surplus cash will be moved to our capital projects spending at year's end. Mostly TRA costs ↓ The Trinity River Authority is the water/wastewater provider used by Colleyville and several other local cities. Each year, the Authority apportions its operating budget among its customer cities based on projected water usage. After the year concludes, the Authority "trues up"its actual expenditures with its actual revenues.In the event there is a shortfall, the Authority will charge its customer cities an additional amount. If there is a surplus, the Authority issues prorated refunds to each customer city. *TRA Revenue/Expense Summary City Revenue/Expense Summary % of year Completed Monthly Financial Report - June 2023 Water/Sewer Utility Fund % of Budget Spent 3 75% 67% FY23 Budget FY23 YTD % of Budget FY22 YTD FY22% of Budget Revenues 1,045,000$ 782,209$ 75%783,546$ 76% Expenditures 721,619$ 486,874$ 67%442,055$ 64% 323,381$ 295,335$ 341,491$ Revenue - Drainage Fees Expenditures (FY23/22) Personnel + $60k Contractual -$19k Supplies + $4k Capital/Xfers $0k Debt Service $0k Total Exp.+ $45k Monthly Financial Report - June 2023 Drainage Fund Operation Highlights % of Budget Spent 0.9%FY23/FY22 To date,the Drainage Utility Fund has received 75%of its revenue and spent 67%of its expenditures. This fund's cash flow is lower than the previous year,with a surplus of about $295,000 as opposed to $341,000 last year.The trajectory for the remainder of the year is anticipated to mirror the past two years pretty closely.Historically,drainage fee revenues tended to average at 1.2%higher than the previous fiscal year.However,as the City reaches build out these revenues tend to be more stable from year to year.Per policy,any year-end surplus will be moved for use on the City's capital improvement plan. Drainage Utility Fund % of year Completed Note:this fund's debt service is has been retired as of fiscal year 2021. 0.7%FY23/5-Yr Avg $- $100,000 $200,000 $300,000 $400,000 $500,000 FY23 vs. FY22 Cash Flow FY23 FY22 4 75% 82% FY23 Budget FY23 YTD % of Budget FY22 YTD FY22% of Budget Revenues 275,000$ 100,637$ 37%100,260$ 40% Expenditures*273,569$ 224,589$ 82%209,410$ 85% 1,431$ (123,952)$ (109,150)$ COVID-related economic disruptions obviously took a toll on any travel-related revenues in the last few years,but the Hotel Occupancy Tax Fund has kept a strong fund balance.While travel activities are on the rise and revenue in this fund has been making a comeback,this year's first two quarters receipts mirror the same period in FY22.Staff had planned on a significant increase in total receipts this year,and so we will likely need to reallocate some expenses from here in FY24.Fund balance as of the end of this quarter is sitting right at $30,000,and staff will continue to monitor cash here closely.Costs funded out of here include personnel related directly to advertising the city as well as Colleyville Center costs and some special events. Monthly Financial Report - June 2023 % of year Completed % of Budget SpentHotel Tax Fund Hotel Tax Performance $- $50,000 $100,000 $150,000 $200,000 Expected Fund Balance vs. Actual Fund Balance (by month) Actual FY23 Expected FY23 $- $50,000 $100,000 $150,000 $200,000 $250,000 FY22 Revenue vs. History 2020 2021 2022 2023 5 75% 97% FY23 Budget FY23 YTD % of Budget FY22 YTD FY22% of Budget Revenues 608,660$ 612,434$ 101%611,768$ 97% Expenditures*769,010$ 749,110$ 97%796,223$ 97% (160,350)$ (136,677)$ (184,455)$ For any questions or comments regarding this report, please contact: Kyle Lester Finance Director City of Colleyville, TX klester@colleyville.com 817-503-1014 Monthly Financial Report - June 2023 % of year Completed % of Budget SpentDebt Service Fund Being predominately funded through property taxes, the Debt Service fund has received the majority of its revenue for the year. Cash-flow for this fund is very predictable, as most revenues are recognized in December/January and debt service payments occur twice annually, with lease payments also occurring throughout the year. As of April's figures, the fund is running a deficit of about $136,000. We won't see any further expenses here until August, when our second interest payments are due on our bond issues. The most recent issue, taken out in December 2022, includes a large interest payment of $309,000 to be paid this year. Together with our 2016 refunding issue, we can expect additional expenses of almost $325,000 in this fund before the year is over. This increase was planned in December, and the fund's balance should end the year at around $450,000. The City's current outstanding bonds are on schedule to be paid off in 2027, and the new 2023 $10m issue is structured to be callable in 2030. All bond payments are scheduled as follows: $- $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 Property Tax Backed Debt Service (Bonds and Public Safety Vehicle Leases) 6 City of Colleyville Page 1 CITY OF COLLEYVILLE CITY COUNCIL BRIEFING Agenda Number 6a Agenda Date 7/18/2023 Number Ordinance O-23-2245 Type Ordinance Department Community Development Title Consideration of a Special Use Permit for a reduction in parking for the property being Lot 1, Block 1, of the Corley subdivision, located at 5409 Colleyville Boulevard ZC23- 012 Explanation Second Reading and Public Hearing The applicant was present at the meeting to speak in favor of the request and answer questions from the City Council. The applicant agreed to restore the monument sign and plant landscaping around the base. No one spoke during the public hearing. First Reading and Public Hearing Sptim Miftari, of the Cajun Bistro Café & Market, has submitted a request for a Special Use Permit (SUP) to allow for a reduction in parking at 5409 Colleyville Boulevard. A reduction in parking is allowed in the CC-2 Shopping Center district with the approval of an SUP. Existing Conditions/Background: The subject property is zoned CC-2 and generally located on the east side of Colleyville Boulevard, south of Hall-Johnson Road near the intersection of Church Street. The subject property is a platted lot and currently shares the lot with an auto use business. Proposed Special Use Permit: Request – The applicant is requesting approval of an SUP to allow for a reduction in parking at this location. Ordinance – Land Development Code, Chapter 3, Section 3.29 Parking Requirements I. Supplemental Parking Space Requirements 5.: "A reduction may be authorized after approval of a Special Use Permit by the City Council when associated with new development or a significant change in use of an existing building or site. A parking analysis report justifying the reduction shall be provided as part of the request for parking reduction." Analysis: The applicant is requesting an SUP for a reduction in parking. The parking ratio for a fish market is one space per 200 SF, or 13 required spaces. The parking ratio for a restaurant is one space per 100 SF, or 26 required spaces. Currently, the provided parking for the Cajun Bistro Café & Market is 16 spaces. The adjacent bank provides 40 City of Colleyville Page 2 City Council Agenda Briefing 6a spaces with only 18 of those spaces needed to meet their parking space requirement. Therefore, a shared parking agreement between the Cajun Bistro Café & Market and the adjacent bank will allow the cafe to meet the parking requirement for a restaurant use. Approval of an SUP at this location for this user should not adversely impact surrounding uses or the character of the neighborhood. Plat Status: The property is platted as Lot 1, Block 1, of the Corley Subdivision. DRC Review: The DRC reviewed the request during their May 22, 2023 meeting and determined the application was complete and may be scheduled for the next available Planning and Zoning Commission meeting. Drainage: NA Surrounding Development: The properties to the north and east are zoned CC-1 Village Retail district and developed with a mixture of retail and automotive uses. The properties to the south and west are zoned CC-2 Shopping Center district and developed with a mixture of retail and institutional uses. Comprehensive Plan: The City’s Comprehensive Plan, Destination Colleyville, identifies the subject property as “Colleyville Boulevard Corridor” and located within a Sales Tax Preferred Intersection. Public Notification: Staff mailed notices to all property owners within 500 feet as well as any Homeowners Associations within 500 feet of the subject property regarding this request. Grapevine-Colleyville ISD, where the subject property is located, was notified per State law. Notice was published in the Fort Worth Star-Telegram as required by State law and the Land Development Code. Staff Recommendation: Staff is neutral on this request. Planning and Zoning Commission Recommendation: The Planning and Zoning Commission recommended approval of the request at their June 12, 2023 meeting by a vote of 5-0. Recommendation None Attachments 1. Aerial Map 2. Zoning Map 3. Future Land Use Map 4. Site Plan 5. Parking Agreement 1 6. Parking Agreement 2 7. Notification List City of Colleyville Page 3 City Council Agenda Briefing 6a 8. Notification Letter 9. Notification Map 10. Ordinance O-23-2245 HALL JOHNSON RD PLEASANT RUN RDRIVERWALKDRCOLLEYVILLE BLVDMAIN ST COLLEYVILLE BLVDCH U R C H S T HALLJOHNSON RDH IDDENOAKSD R BLUEBONNET DRNUECES CT CHERRY LN ROYAL LN KINGSWOOD LN HIDDEN OAKS CT DOGWOOD CT Subject Property DISCLAIMER: This map and information contained in it were developed exclusively for use by the City of Colleyville. Any use or reliance on this map by anyone else is at that party's risk and without liability to the City of Colleyville, its officials or employees for any discrepancies, errors, or variances which may exist. ZC23-012 5409 Colleyville Blvd Aerial Map HALL JOHNSON RD PLEASANT RUN RDRIVERWALKDRCOLLEYVILLE BLVDMA I N S T COLLEYVILLE BLVDCH U R C H S T HALL JOHNSON RDH IDDENOAKSD R BLUEBONNET DRNUECES CT ROYAL LN KINGSWOOD LN HID DEN OAK S CT DOGWOOD CT R-20 CN AG CC-1CC-1 AG CPO CC-1 PUD-R CC-1 PUD-C PUD-C CN CC-1 PUD-R R-30 PUD-C R-20 CC-1 R-20 CC-2 CC-2 AG RE CC-1 PUD-R AG PUD-C R-40 AG Subject Property DISCLAIMER: This map and information contained in it were developed exclusively for use by the City of Colleyville. Any use or reliance on this map by anyone else is at that party's risk and without liability to the City of Colleyville, its officials or employees for any discrepancies, errors, or variances which may exist. ZC23-012 5409 Colleyville Blvd Zoning Map HALL JOHNSON RD PLEASANT RUN RDRIVERWALKDRCOLLEYVILLE BLVDMAIN ST COLLEYVILLE BLVDCH U R C H S T HALLJOHNSON RDH IDDENOAKSD R BLUEBONNET DRNUECES CT CHERRY LN ROYAL LN KINGSWOOD LN HIDDEN OAKS CT DOGWOOD CT Residential Institutional Colleyville Blvd Corridor Open Space; Parks Water Body Subject Property DISCLAIMER: This map and information contained in it were developed exclusively for use by the City of Colleyville. Any use or reliance on this map by anyone else is at that party's risk and without liability to the City of Colleyville, its officials or employees for any discrepancies, errors, or variances which may exist. ZC23-012 5409 Colleyville Blvd Future Land Use Map 1 OBJECTID Owner Name 1 EAGLE-COLLEYVILLE TOWNE SQUARE 3 CHARLES & ROB LTD 5 BAJRAM & RUZDI INVESTMENTS LLC 6 DEDIEGO FAMILY TRUST 7 BAJRAM & RUZDI INVESTMENTS LLC 8 R P GANTOS VENTURES LLC 9 JD JUDD REALTY HOLDINGS LLC 10 BRADY, LIBBY W 11 5520 COLLEYVILLE LLC 13 SVAP III TC COLLEYVILLE LLC 14 MDC COAST 7 LLC 15 CHIVAKULA, LAKSHMI 16 FIRST BAPTIST CH COLLEYVILLE 17 GII SHP EBSW DFW LLC 18 LAUKIEN, DIRK D 19 BRANCH BANKING & TRUST CO 20 C & S SKY BLUE CORPORATION 21 HIDDEN OAKS ESTATES 22 GRAPEVINE COLLEYVILLE ISD 23 CAVALIER INVESTMENT COMPANY INC 2 Owner Address PO BOX 12670 8235 DOUGLAS AVE STE 815 4701 MILL CREEK RD 4381 MORRIS DR 4701 MILL CREEK RD 7213 COTTONWOOD CT 1109 CHURCH ST 5405 COLLEYVILLE BLVD 1401 FOUNTAIN GROVE PKWY # M117 302 DATURA ST STE 100 11995 EL CAMINO REAL 4104 CHARBRAY CT 5405 PLEASANT RUN RD 707 WESTCHESTER AVE SUITE 401 24 WATERWAY AVE STE 225 PO BOX 167 3051 IRA E WOODS AVE 5829 N MESA ST 3 Owner City DALLAS, TX DALLAS, TX COLLEYVILLE, TX SOQUEL, CA COLLEYVILLE, TX NORTH RICHLAND HILLS, TX COLLEYVILLE, TX COLLEYVILLE, TX SANTA ROSA, CA WEST PALM BEACH, FL SAN DIEGO, CA CEDAR PARK, TX COLLEYVILLE, TX WEST HARRISON, NY SPRING, TX WINSTON SALEM, NC COLLEYVILLE ,TX GRAPEVINE, TX EL PASO, TX 4 Owner Zip Situs Address 75225 5600 COLLEYVILLE BLVD 75225 5601 COLLEYVILLE BLVD 76034 5311 COLLEYVILLE BLVD 95073 5510 COLLEYVILLE BLVD 76034 5309 COLLEYVILLE BLVD 76182 5413 COLLEYVILLE BLVD 76034 1109 CHURCH ST 76034 5401 COLLEYVILLE BLVD 95403 5520 COLLEYVILLE BLVD 33401 5605 COLLEYVILLE BLVD 92130 1221 CHURCH ST 78613 5601 HIDDEN OAKS DR 76034 5300 COLLEYVILLE BLVD 10604 5500 COLLEYVILLE BLVD 77380 1205 CHURCH ST 27102 1201 CHURCH ST 5307 COLLEYVILLE BLVD 76034 COURTESY NOTICE 76051 3051 IRA E WOODS AVE 79912 5501 COLLEYVILLE BLVD NOTICE OF PUBLIC HEARING «Owner_Name» «Owner_Address» «Owner_City» «Owner_Zip» The City of Colleyville has scheduled public hearings concerning the below referenced request on the following dates and location: Planning and Zoning Commission Meeting: Monday, June 12, 2023 at 7:00 p.m. City Council Meetings: Tuesday, July 6, 2023 & Tuesday, July 18, 2023 at 7:00 p.m. 3rd floor of City Hall, 100 Main Street, Colleyville, Texas Request: Consideration of a Special Use Permit for a reduction in parking. The purpose is to allow for the business, Cajun Bistro Café and Market, to operate as a restaurant. Zoning Case:ZC23-012 Applicant:Sptim Mifari Owner: Russel Gantos Location:5409 Colleyville Boulevard Property Description:Lot 1, Block 1, Corley Subdivision Present Zoning:CC-2 Shopping Center District This notice has been sent to all owners of real property within 500 feet of the request as such ownership appears on the last approved tax roll and all homeowners associations within 1000 feet. Approval by the Planning and Zoning Commission serves as a recommendation to the City Council and is not a final action on the request. Denial of the proposal by the Commission is final, unless the applicant submits a written notice of appeal within 10 days from the date of action by the Commission. If appealed, the request will be placed on the next available City Council agenda as listed above. Rezoning requests, zoning amendments and conditions recommended by the Commission for approval by the City Council may be more restrictive than those described in this notice. All interested persons are encouraged to attend the public hearing and express their opinions on the zoning change request. If you are unable to attend, but wish to have your opinions made a part of the public record, please submit written comments prior to the public hearing, to the address below: Community Development Department City of Colleyville 100 Main Street Colleyville, TX 76034 If the property owners of 20% or more of the land within the 200 foot notification area file a written protest prior to the public hearing, State law provides that the approval of the zoning change request shall require the approval of a super majority vote by City Council. NOTICE OF PUBLIC HEARING The application is on file for public examination in the Community Development Department at 100 Main Street, Colleyville, Texas 76034. A brief project description can be found online on the Agenda Packet and Active Development Case map (please use your phone’s camera to scan QR code below): For additional information, please contact the Community Development Department at 817.503.1056. Please reference the zoning case number when requesting information. Jacquelyn Reyff Principal Planner jreyff@colleyville.com 1005 5405 5509 908 16 17 5709 5707 5600 5645 14 1501 1500 5124 5209 5601 5150 1004 1009 5611 1003 5312 1007 5701 5121 5405 1005 5603 5319 5700 5655 5501 5201 5703 1008 5311 5705 5201 1000 5505 5309 5510 5665 5109 1501 1007 1211909 1003 5317 5609 5309 5313 5705 5120 5605 5209 5707 5609 5204 5217 5204 5701 1109 5121 1000 5305 1007 5301 5401 5125 5199 908 5301 51125113 5606 14121200 5201 5520 5108 5200 5505 5605 5708 1006 5607 5200 5301 1221 1001 1513 5601 5300 5500 5611 5701 5609 5201 1105 5703 5695 1008 1205 5615 909 1213 1201 1104 5205 5232 1001 5112 1215 5307 MA I N S T COLLEYVILLE BLVDCOLLEYVILLE BLVDHALL JOHNSON RD RIVERWALKDRCH U R C H S T PROFESSIONAL CT HALL JOHNSON RD ROYAL LN BLUEBONNET DRH I D D E N OAKSDRKINGSWOOD LN NUECES CTMISSIONLNHIDDENOAKSCT Parcels to be notified Buffer Subject Property DISCLAIMER: This map and information contained in it were developed exclusively for use by the City of Colleyville. Any use or reliance on this map by anyone else is at that party's risk and without liability to the City of Colleyville, its officials or employees for any discrepancies, errors, or variances which may exist. ZC23-012 5409 Colleyville Blvd Notification Map ORDINANCE O-23-2245 AMENDING THE ZONING ORDINANCE AND THE OFFICIAL ZONING MAP OF THE CITY OF COLLEYVILLE, TEXAS, BY CHANGING THE ZONING ON APPROXIMATELY 0.609 ACRES, BEING LOT 1, BLOCK 1, OF THE CORLEY SUBDIVISION, LOCATED AT 5409 COLLEYVILLE BOULEVARD, BY AUTHORIZING A SPECIAL USE PERMIT FOR A REDUCTION IN PARKING; PROVIDING A PENALTY OF FINE NOT TO EXCEED THE SUM OF TWO THOUSAND DOLLARS ($2,000.00) AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City of Colleyville has received an application for a Special Use Permit for a reduction in parking for the business known as Cajun Bistro Café & Market, Case No. ZC23-012; and WHEREAS, the City of Colleyville deems it necessary, for the purpose of promoting the health, safety, morals, or general welfare of the City to amend the City’s zoning ordinance; and WHEREAS, the Planning and Zoning Commission, has given reasonable consideration to, among other things, the character of the City’s zoning districts and their peculiar suitability for particular uses, with a view to conserving the value of buildings and encouraging the most appropriate use of land throughout the City; and WHEREAS, the City Council is of the opinion that the change in zoning provided for herein should be made, in compliance with the City Charter, and state law with reference to changes to zoning classifications under the City’s zoning ordinance and zoning map, having given the requisite notices required by law and having held public hearings affording all interested persons and property owners a full and fair opportunity to be heard. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COLLEYVILLE, TEXAS: Sec. 1.THAT the Comprehensive Zoning Ordinance of the City of Colleyville, Texas, be, and the same is hereby amended by authorizing a Special Use Permit for a reduction in parking on 0.609 acres, being Lot 1, Block 1, of the Corley Subdivision, located at 5409 Colleyville Boulevard, for the business known as Cajun Bistro Café & Market as depicted on the attached as Exhibit “A”. Ordinance O-23-2245 Page 2 of 3 Sec. 2.THAT the above described tract of land shall be used only in the manner and for the purposes provided by the Comprehensive Zoning Ordinance of the City of Colleyville as heretofore amended, and as amended herein. Sec. 3.THAT the above described tract of land shall be subject to the following conditions: 1. GENERAL a. The Special Use Permit shall apply to a reduction in parking. b. The name of the business authorized for a reduction in parking by this Special Use Permit shall be called “Cajun Bistro Café & Market”. c. Exhibit C - “Shared Parking Agreements” shall apply. The Special Use Permit shall automatically expire if an agreement is terminated. d. The Special Use Permit shall automatically expire upon the abandonment of the business, change in use, a change in ownership or upon the expiration or termination of the Certificate of Occupancy. e. All requirements of the Land Development Code shall be met, except where amended herein. Sec. 4.THAT any person, firm or corporation violating any of the provisions or terms of this ordinance shall be subject to the same penalty as provided for in the Comprehensive Zoning Ordinance of the City of Colleyville, and upon conviction shall be punishable by a fine not to exceed the sum of Two Thousand Dollars ($2,000.00) for each offense. Sec. 5.THAT if any section, paragraph, subdivision, clause, phrase or provision of this ordinance shall be judged invalid or unconstitutional, the same shall not affect the validity of this ordinance as a whole or any portion thereof other than that portion so decided to be invalid or unconstitutional. Ordinance O-23-2245 Page 3 of 3 Sec. 6.THAT in addition to and accumulative of all other penalties, the City shall have the right to seek injunctive relief for any and all violations of this ordinance. Sec. 7.THAT this ordinance shall take effect immediately from and after its passage subject to the publication of the caption, as the law or charter in such cases may provide. AND IT IS SO ORDERED. The first reading and public hearing being conducted on the 6th day of July 2023. The second reading and public hearing being conducted on the 18th day of July 2023. PASSED AND APPROVED BY A VOTE OF _ AYES, _ NAYS, ON THIS THE 18TH DAY OF JULY 2023. Mayor Bobby Lindamood Aye Mayor Pro Tem Callie Rigney Aye Brandi Elder, Place 1 Aye George Bond, Place 2 Aye Scotty Richardson, Place 3 Aye Ben Graves, Place 4 Aye Chuck Kelley, Place 5 Aye ATTEST: CITY OF COLLEYVILLE Christine Loven, TRMC Callie Rigney City Secretary Mayor Pro Tem APPROVED AS TO FORM: Whitt Wyatt City Attorney Exhibit “A” - Location and Zoning Map Exhibit “B” – Site Plan Exhibit “C” – Shared Parking Agreements City of Colleyville Page 1 CITY OF COLLEYVILLE CITY COUNCIL BRIEFING Agenda Number 7a Agenda Date 7/18/2023 Number Ordinance O-23-2246 Type Ordinance Department Police Title Approval of the Fiscal Year 2024 Colleyville Crime Control and Prevention District budget Explanation First Reading and Public Hearing In accordance with Chapter 363 of the Local Government Code, the Colleyville Crime Control and Prevention District (CCCPD) Board, must hold a public hearing on the proposed annual budget at least 100 days before the start of the fiscal year and adopt a budget at least 80 days before the start of the fiscal year. The CCCPD Board held a public hearing on the proposed FY 2024 CCCPD budget on July 6, 2023, and advertised this public hearing in the Fort Worth Star-Telegram. On July 6, 2023, the Board approved the proposed FY 2024 CCCPD budget. Upon Board approval, the CCCPD budget must be submitted to the City Council for approval or rejection within ten days. Per Sec. 363.205(d) of the Local Government Code, the governing body may not amend the budget submitted by the Board. If the governing body rejects the budget submitted by the Board, the governing body and the Board shall meet and together amend and approve the budget before the beginning of the fiscal year. This agenda item allows for City Council consideration of the CCCPD budget. The July 18, 2023 City Council agenda item for the first reading of the CCCPD budget ordinance will also serve as the required public hearing by the governing body and was advertised in the Fort Worth Star-Telegram. During the discussion of the FY 2024 proposed CCCPD budget on July 6, 2023 staff presented a complete FY 2023 budget proposal and a five-year forecast based on current information. No changes to the FY 2024 proposed CCCPD budget were requested. Financial Impact The attached proposed budget provides estimated fund balances and revenues, as well as a detailed list of proposed expenditures. Recommendation Approve City of Colleyville Page 2 City Council Agenda Briefing 7a Attachments 1. CCCPD Budget Presentation 2. Proposed FY2024 CCCPD Budget 3. Ordinance O-23-2246 Discussion of Proposed FY 2024 Colleyville Crime Control Prevention District (CCCPD) Budget City Council Meeting July 18, 2023 Creation & Authorization •The CCCPD was first established in 1999 by local voters for an initial five year period •In 2023, voters renewed the District for an additional 20 year period •The District will be eligible for renewal again in 2043 District Powers •Local Government Code Chapter 363, Section 363.151 “The district may finance all the costs of a crime control and crime prevention program, including the costs for personnel, administration, expansion, enhancement, and capital expenditures.” CCCPD History Updates on Initiatives from Previous FYs Funding for the Addition of Six School Resource Officers •The Council approved funding to add 6 new School Resource Officer (SRO) positions to our organization last FY. •This ensured we had an SRO in every public school in the City of Colleyville. •We have hired, selected, and trained our six additional SRO’s and they are ready to start school in August! Updates from Previous FYs Updates from Previous FYs Funding for CAD/RMS System Replacement Approved for FY21 / FY22 •Consortium of Colleyville, Southlake, and Keller selected a CAD and RMS vendor (CentralSquare) and began implementation in 2021. We went live on the new system on June 27th, 2022. ü Funding approved for FY21 was $550,000 (est. implementation costs) ü Keller received a grant for $338,757 which lowered our actual costs ü Actual costs are $124,880 over FY21 and FY22 CALEA Accreditation •The department achieved national accreditation through CALEA in November 2021 culminating a 3 ½ year effort where every policy and procedure was reviewed and updated to align with national best practices. The department was re-recognized as an accredited agency in Texas in 2019 and this recognition goes through 2023. We are only one of six agencies in Texas to hold both state and national accreditation. Updates from Previous FYs Mobile Field Force Training •We now have multiple personnel trained as Mobile Field Force instructors who will provide ongoing and regular department-wide training on crowd- control techniques and strategies. Justice Center Security Enhancements •Last FY, you approved security enhancements to the building/grounds to better protect Police and Court personnel and equipment. Included replacement of chain link fence with brick wall similar to what’s already built in the front, rolling metal panel gates, covered parking structures, protective bollards, mirrored film on glass for offices backing up to pedestrian walking trail. Our team loves the security enhancements to the Justice Center. New Funding Requests for FY24 New FY24 Funding Requests Wellness Program Enhancements – Enhanced Health Screening •Life expectancy of police officers is 21.9 years less than the civilian population. •One of the leading killers of men and women in uniform is heart disease. •We hope to change these statistics for our team members. •We are asking for additional funding per employee to provide additional voluntary health assessments to identify those life threatening, yet treatable, issues as early as possible. •Specifically tailored assessments to first responders and the health issues we face. •We are asking for a total of $27,350 per year (approximately $500 per employee) to ensure our team remains healthy and able to serve the community as long as possible. Ongoing Initiatives: •Funding of Salary and Benefits for nineteen (19) sworn officer positions ü We are currently authorized for 50 sworn City-wide ü 6 of the 19 are our new SRO positions •Funding for a part-time Accreditation Coordinator position •Funding for two part-time Public Service Officer positions •Records Management System software (CentralSquare) and maintenance •Various software maintenance agreements •Participation in the Metroport Teen Court Program at one-quarter of the regional costs FY 24 Proposed Budget Ongoing Initiatives (cont): •All Police Department vehicles funded through CCCPD budget ü Utilizing Enterprise for all fleet needs City-wide. •Continuation of weapons replacement schedule •Funding for SWAT training and equipment. We fill up to three slots on the Northeast Tarrant SWAT Team. This line item sets aside funding for all the necessary equipment and training for our members of the team. •Funding for safety equipment and on going replacement, these items include collapsible rubber base traffic cones for each patrol unit •Funding for Early Warning System / Internal Affairs System Annual Subscription FY 24 Proposed Budget Ongoing Initiatives (cont): •License Plate Reader camera annual licensing costs •Funding for Crime Scene Response •Funding for annual training for de-escalation / crisis intervention and leadership development training FY 24 Proposed Budget •5-Year projection allows for longer term planning and forecasting •Current expenditures funded by the CCCPD are projected to continue •Certain equipment replacement, capital, and facility needs vary from year to year •As of FY20, the CCCPD remains debt-free CCCPD Fund 5-Year Projections Questions and Discussion ADOPTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED FISCAL YEAR FY 2023 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 BEGINNING FUND BALANCE $3,220,337 $3,220,337 $3,484,672 $3,644,710 $3,773,206 $3,323,934 $3,375,557 REVENUES: 1/2 CENT SALES TAX REVENUE $2,400,000 $2,558,228 $2,527,529 $2,603,355 $2,681,456 $2,755,196 $2,824,076 INTEREST INCOME $3,200 $48,467 $53,200 $55,860 $56,419 $56,983 $57,553 MISC. (POTENTIAL GCISD CONTRIBUTION)$0 $0 $150,000 $151,500 $153,015 $154,545 $156,091 SALE OF CAPITAL ASSETS $0 $39,575 $15,000 $15,150 $15,302 $15,455 $15,609 TOTAL REVENUES $2,403,200 $2,646,270 $2,745,729 $2,825,865 $2,906,191 $2,982,178 $3,053,328 EXPENDITURES: ADMINISTRATIVE BOARD/AUDIT EXPENSES:$1,850 $1,500 $1,850 $1,906 $1,963 $2,022 $2,082 SOFTWARE: ANNUAL MAINTENANCE CONTRACT $49,500 $47,171 $49,500 $49,995 $50,745 $51,506 $52,279 EARLY WARNING/INTERNAL AFFAIRS $6,424 $6,424 $6,681 $6,748 $6,849 $6,952 $7,056 ONLINE SCHEDULING (PLANIT POLICE)$2,075 $2,075 $2,075 $2,179 $2,288 $2,402 $2,522 ANNUAL LICENSE PLATE READER CAMERA LICENSES $9,000 $9,000 $10,296 $10,399 $10,555 $10,713 $10,874 INVESTIGATIVE TOOL $9,750 $9,750 $9,750 $9,848 $9,995 $10,145 $10,297 CRIME REPORTS ANALYTICAL CRIME MAPPING $5,730 $5,730 $0 $0 $0 $0 $0 RECRUITING AND HIRING PROCESS $2,500 $2,500 $2,500 $2,625 $2,756 $2,894 $3,039 TRAINING - LEADERSHIP DEVELOPMENT $10,000 $10,000 $10,000 $10,500 $11,025 $11,576 $12,155 TRAINING - DE-ESCALATION & CRISIS INTERVENTION $10,000 $10,000 $10,000 $10,500 $11,025 $11,576 $12,155 MOBILE FIELD FORCE TRAINING $0 $0 $0 $0 $0 $0 $0 CRIME SCENE RESPONSE UNIT $5,000 $5,000 $5,000 $5,250 $5,513 $5,788 $6,078 NETMOTION WIRELESS MAINTENANCE AGREEMENT $3,219 $3,219 $3,219 $3,251 $3,300 $3,349 $3,400 $1,600 $1,600 $1,600 $1,680 $1,764 $1,852 $1,945 WELLNESS PROGRAM EXPANSION $4,000 $4,000 $4,000 $4,200 $4,410 $4,631 $4,862 $0 $0 $0 $0 $0 $0 $0 OFF-DUTY WEBSITE ANNUAL FEES/MAINTENANCE $1,000 $1,000 $0 $0 $0 $0 $0 $4,700 $4,700 $4,700 $4,747 $4,818 $4,890 $4,964 INTERVIEW NOW SOFTWARE SUBSCRIPTION $0 $0 $4,500 $4,725 $4,961 $5,209 $5,470 $0 $0 $1,875 $1,969 $2,067 $2,171 $2,279 ON-DUTY HEALTH (WELLNESS PROGRAM)$0 $0 $27,350 $28,718 $30,153 $31,661 $33,244 $0 $0 $7,911 $8,307 $8,722 $9,158 $9,616 JUSTICE CENTER DATACENTER WARRANTY $0 $0 $11,000 $11,110 $11,277 $11,446 $11,617 $17,750 $17,750 $22,496 $23,621 $24,802 $26,042 $27,344 PERSONNEL: $1,425,723 $1,500,501 $1,490,236 $1,562,861 $1,635,115 $1,711,952 $1,788,802 $545,720 $100,000 $571,603 $601,845 $631,672 $663,568 $695,242 TEEN COURT $33,750 $33,750 $33,750 $33,750 $33,750 $33,750 $33,750 EQUIPMENT: $10,000 $35,000 $10,000 $10,100 $10,252 $10,405 $10,561 $6,150 $6,150 $6,150 $6,212 $6,305 $6,399 $6,495 SAFETY EQUIPMENT AND REPLACEMENT $5,000 $5,000 $5,000 $5,050 $5,126 $5,203 $5,281 VEHICLES: ANNUAL REPLACEMENT FUNDING $262,650 $262,650 $262,650 $265,277 $269,256 $273,294 $277,394 TRANSFERS: CAPITAL EQUIPMENT REPLACEMENT FUND - $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 CAPITAL - REPLACE CAD/RMS SYSTEM $0 $37,464 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $0 $0 CISCO FIREWALL REFRESH (FUND BALANCE DRAW)$0 $0 $0 $0 $145,000 $0 $0 $0 $250,000 $0 $0 $0 $0 $0 TOTAL EXPENDITURES $2,443,091 $2,381,934 $2,585,691 $2,697,370 $3,355,462 $2,930,556 $3,050,802 EXCESS REVENUES OVER EXPENDITURES*-$39,891 $264,335 $160,038 $128,495 -$449,271 $51,622 $2,525 ENDING FUND BALANCE $3,180,446 $3,484,672 $3,644,710 $3,773,206 $3,323,934 $3,375,557 $3,378,082 *WILL DRAW ON FUND BALANCE IN FY26 GUARDIAN PLATFORM ALLIANCE FOR CHILDREN CONTRIBUTION CALEA ACCREDITATION JUSTICE CENTER SERVER (FUND BALANCE DRAW) IN-CAR MOBILE DIGITAL COMPUTER SYSTEM REIMBURSE CAPITAL FUND FOR JUSTICE CTR. COSTS COLLEYVILLE CRIME CONTROL DISTRICT SUMMARY DETECTIVE SAFEGUARDING PROGRAM (CHILD ABUSE CASES) TICKET WRITER REPLACEMENT 6 NEW SCHOOL RESOURCE OFFICERS SWAT EQUIPMENT AND TRAINING IN-CAR VIDEO SYSTEM SERVER MAINTENANCE ANNUAL WEAPONS REPLACEMENT 13 OFFICERS, 2 PT PUBLIC SAFETY OFFICERS, 1 PT ACCREDITATION COORDINATOR ORDINANCE O-23-2246 ADOPTING AN ANNUAL BUDGET FOR FISCAL YEAR 2024 FOR THE COLLEYVILLE CRIME CONTROL AND PREVENTION DISTRICT, FOR THE FISCAL YEAR BEGINNING OCTOBER 1, 2023 THROUGH SEPTEMBER 30, 2024, A COPY OF SAME BEING ON FILE IN THE OFFICE OF THE CITY SECRETARY, TO BECOME EFFECTIVE UPON PASSAGE BY THE CITY COUNCIL WHEREAS,the laws of the State of Texas require the Board of Directors of the Colleyville Crime Control and Prevention District to adopt a budget of projected revenues and proposed expenditures, cash on hand at the start of the year, the amount of money received during the prior year, the tax rate, and the projected ending fund balance; and WHEREAS,on July 6, 2023, the Board of Directors of the Colleyville Crime Control and Prevention District approved the following budget; and WHEREAS,the City Council determines that the passage of this Ordinance is in the best interests of the health, safety, and welfare of the public. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COLLEYVILLE, TEXAS: Sec. 1. THAT the budget for the fiscal year beginning October 1, 2023 and ending September 30, 2024 for the Colleyville Crime Control and Prevention District, a copy of which is on file in the office of the City Secretary, is hereby made a part of this Ordinance by reference and is hereby approved and adopted by the City Council of the City of Colleyville, Texas, as the official budget for the fiscal year beginning October 1, 2023 and ending September 30, 2024 and that the City Manager is authorized to execute all contracts and agreements approved as a part of the budget. Sec. 2. THAT the budget of the fiscal year beginning October 1, 2023, and ending September 30, 2024, for the Colleyville Crime Control and Prevention District with a sales and use tax rate of .5%, is hereby fixed as follows: Ordinance O-23-2246 Page 2 of 2 Projected Revenue Received in Fiscal Year 2023 $2,646,270 Projected Cash on Hand as of October 1, 2023 $3,208,258 Revenues $2,745,729 Expenditures $2,585,691 Projected Ending Fund Balance at September 30, 2024 $3,368,295 AND IT IS SO ORDERED. The first reading and public hearing being conducted on the 18th day of July 2023. The second reading and public hearing being conducted on the 1st day of August 2023. APPROVED BY A VOTE OF ___ AYES, ___ NAYS, ON THIS THE 1ST DAY OF AUGUST 2023. Mayor Bobby Lindamood Aye Mayor Pro Tem Callie Rigney Aye Brandi Elder, Place 1 Aye George Bond, Place 2 Aye Scotty Richardson, Place 3 Aye Ben Graves, Place 4 Aye Chuck Kelley, Place 5 Aye ATTEST: CITY OF COLLEYVILLE Christine Loven, TRMC Bobby Lindamood City Secretary Mayor APPROVED AS TO FORM: Whitt L. Wyatt City Attorney City of Colleyville Page 1 CITY OF COLLEYVILLE CITY COUNCIL BRIEFING Agenda Number Agenda Date 7/18/2023 Type Report Department City Secretary Title Planning and Zoning Commission Meeting Minutes - June 12, 2023 Planning and Zoning Commission Worksession Meeting Minutes - June 26, 2023 Attachments 1. Planning and Zoning Commission Meeting Minutes - June 12, 2023 2. Planning and Zoning Commission Worksession Meeting Minutes - June 26, 2023 City of Colleyville Page 1 City of Colleyville Planning and Zoning Commission Minutes City Hall 100 Main Street Colleyville, Texas 76034 817. 503.1000 www.colleyville.com Monday, June 12, 2023 Executive Conference Room CALL MEETING TO ORDER The City of Colleyville Planning and Zoning Commission Meeting was called to order by Chair Bevill on June 12, 2023, at 6:15 p.m. Roll Call Present: David Groves, Mark Alphonso, Jim Linn, Sayeda Syed, and Claudia Bevill Absent: Tim Raine Staff Present: Ben Bryner, Jacquelyn Reyff, and Kris Potts Also Present: Attorney, Nicole Corr There was general discussion amongst Staff and the Commission regarding items to be presented this evening at the regular meeting. Chair Bevill adjourned the Planning and Zoning Commission Meeting at 6:35 p.m. CALL MEETING TO ORDER CITY COUNCIL CHAMBERS The City of Colleyville Planning and Zoning Commission Meeting was called to order by Chair Bevill on June 12, 2023, at 7:00 p.m. Roll Call Present: David Groves, Mark Alphonso, Sayeda Syed, Jim Linn, and Claudia Bevill Absent: Tim Raine Staff Present: Ben Bryner, Jacquelyn Reyff, and Kris Potts Also Present: Attorney, Nicole Corr Planning and Zoning Commission Minutes June 12, 2023 City of Colleyville Page 2 1. APPROVAL OF MINUTES 1a Planning and Zoning Commission Meeting Minutes – May 8, 2023 Planning and Zoning Commission Worksession Minutes – May 22, 2023 Commissioner Linn made a motion to approve the May 8, 2023 Planning and Zoning Commission Meeting Minutes and the May 22, 2023 Planning and Zoning Commission Worksession Minutes. Commissioner Groves seconded the motion. The motion was carried by the following vote: Aye: 5 – Groves, Alphonso, Syed, Linn, and Bevill Nay: 0 2. PUBLIC HEARING AGENDA ITMES 2a TABLED FROM APRIL 10th PLANNING AND ZONING COMMISSION MEETING. Consideration of a Zoning Change from PUD-C Planned Unit Development - Commercial to PUD-C Planned Unit Development - Commercial district, specifically for new commercial offices, for Lot 1, Block 1, San Bar Square Addition, located at 105 Cheek-Sparger Road, Case ZC23-006 Commissioner Linn made a motion to remove Case ZC23-006 from the table. Commissioner Groves seconded the motion. The motion was carried by the following vote: Aye: 5 – Groves, Alphonso, Syed, Linn, and Bevill Nay: 0 The applicant wrote a notice to the Commission requesting to table the item to the next Planning and Zoning Commission Meeting on July 10th, 2023. Commissioner Sayeda made a motion to table Case ZC23-006. Commissioner Alphonso seconded the motion. The motion was carried by the following vote. Aye: 5 - Groves, Alphonso, Syed, Linn, and Richardson. Nay: 0 Planning and Zoning Commission Minutes June 12, 2023 City of Colleyville Page 3 2b Consideration of a Special Use Permit for a reduction in parking for the property being Lot 1, Block 1, of the Corley subdivision, located at 5409 Colleyville Boulevard ZC23-012 Jacquelyn Reyff presented the case and briefed the Commission. The applicant, Sptim Miftari, 5601 Hidden Oaks Dr, Colleyville, Texas came forward and discussed the request for a parking reduction and explained the parking agreement with Truist bank. The applicant answered questions regarding the operation of the restaurant and market. The public hearing was opened at 7:20 p.m. With no one wishing to speak, the public hearing was closed at 7:20 p.m. Commissioner Groves made a motion to approve Case ZC23-012. Commissioner Sayeda seconded the motion. The motion was carried by the following vote: Aye: 5 – Groves, Alphonso, Syed, Linn, and Bevill Nay: 0 3.CITIZEN COMMENTS The public forum opened at 7:22 p.m. and with no one wishing to speak closed at 7:22. 4. ADJOURNMENT The meeting adjourned at 7:22 p.m. The minutes were written and prepared by: JR Jacquelyn Reyff Planning Manager The meeting minutes were approved on July 10, 2023 by a vote of 7-0. City of Colleyville Page 1 City of Colleyville Planning and Zoning Commission Minutes City Hall 100 Main Street Colleyville, Texas 76034 817. 503.1000 www.colleyville.com Monday, June 26, 2023 Executive Conference Room CALL MEETING TO ORDER The City of Colleyville Planning and Zoning Commission Worksession Meeting was called to order by Chair Bevill on June 26, 2023, at 6:15 p.m. Roll Call Present: David Groves, Mark Alphonso, Tim Raine, Claudia Bevill, Sayeda Syed, Jim Linn, and Jerome Obinabo Absent: None Staff Present: Ben Bryner, Jacquelyn Reyff, Kristopher Potts, Scott Hammons Also Present: Attorney, Nicole Corr and Fire Marshal, Robert McKeown 2.WORKSESSION AGENDA ITMES 2a Presentation and discussion of a Minor Plat with a Plat Waiver for Lot Size on Tract 6B01F, Abstract 328, of the Cotrail Simon Survey, located at 4704 Behrens Road, Case PC23-004 2b Presentation and discussion of a Special Use Permit for a Cemetery use on Lot 1, Block 1, of the Bob Moore Sports Center Addition, located at 6113 Colleyville Blvd, Case ZC23-013 2c Presentation and Discussion of a change in zoning from CC-1 Village Retail district to PUD-C Planned Unit Development – Commercial district on Lot 1, Block 1, of the Tuntun Addition, located at 5311 Colleyville Blvd, Case ZC23-014 Jacquelyn Reyff presented the items and briefed the Commission. Staff addressed questions from the Commission regarding the Minor Plat, content of SUP, and the request for a zoning change from CC-1 Shopping Center District to PUD-C Planned Unit Development - Commercial district. Planning and Zoning Commission Minutes June 26, 2023 City of Colleyville Page 2 3. ADJOURMENT The meeting adjourned at 6:46 p.m. The minutes were written and prepared by: Kristopher Potts The meeting minutes were approved on July 10, 2023 by a vote of 7-0. RESOLUTION R-23-4861 A RESOLUTION APPROVING CITY COUNCIL ACTION UNDER BUSINESS AT THE REGULAR CITY COUNCIL MEETING OF JULY 18, 2023 WHEREAS, City Council has taken action on certain items on the agenda under Business. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COLLEYVILLE, TEXAS: Sec. 1. THAT AND IT IS SO RESOLVED. APPROVED BY A VOTE OF _ AYES, _ NAYS, ON THIS THE 18TH DAY OF JULY 2023. Mayor Bobby Lindamood Aye Mayor Pro Tem Callie Rigney Aye Brandi Elder, Place 1 Aye George Bond, Place 2 Aye Scotty Richardson, Place 3 Aye Ben Graves, Place 4 Aye Chuck Kelley, Place 5 Aye ATTEST: CITY OF COLLEYVILLE Christine Loven, TRMC Callie Rigney City Secretary Mayor Pro Tem SPEAKER CARD Date: l d�a3 n -F, 1 `t l'�i1°iLt f S Agen Item Number: —3— -*-- Item must be completed! For example: 5a (this can be found on the far left side of the agenda copy) Do you have special technology needs, such as loadintos, connecting a laptop �or�tablet, during your time to speak? Yes No 1 /a I will speak In Support of this item. I will speak In Opposition to this item. I do not ,✓wish o speak, ut /l/elaase record my: support opposition Name: 1 Address: Ciaf� e City: I understand I am limit6d to speaking for rive minutes. For agenda items not listed on the agenda as a Public Hearing, City Council cannot respond to speakers in accordance with the Texas Open Meetings Law, Chapter 551 of the Texas Loc I Government Code. This includes persons speaking under thq Citizen's Co mr mts ection of he enda. Signed: This inforthation is a Public Record SPEAKER CARD Date: 9 /Poz3 Agenda Item Number: _Y -*-- Item must be completed! For example: Sa (this can be found on the far left side of the agenda col2v) Do you have special technology needs, such as loading photos, connecting a laptop or tablet, during your time to speak? Yes _z,--' No aI will speak In Support of this item. I will speak In Opposition to this item. I do not wish to speak, but please record my: support opposition Name:'lL��1i Address:J�;/ � S� City: I understand I am limited to speaking for rive minutes. For agenda items not listed on the agenda as a Public Hearing, City Council cannot respond to speakers in accordance with the Texas Open Meetings Law, Chapter 551 of the Texas Local Government Code, This includes persons speaking under the Citizin's Comments -section of the agenda, Signed; This inrormation is a Public Record SPEAKER CARD Date: -&93 Agenda Item Number: U 4--- Item must be completed! For example: Sa (this can be found on the far left side of the agenda cony) Do you have special technology needs, such as loading photos, connecting a laptop or tablet, during your time to speak? Yes No I will speak In Support of this item. I will speak In Opposition to this item. I do not wish to speak, but please record my: support opposition Name: Address: I A- f City: �Q ��� e I understand I am limited to speaking for rive minutes. For agenda items not listed on the agenda as a Public Hearing, City Council cannot respond to speakers in accordance with the Texas Open Meetings Law, Chapter 551 of the Texas Local Government Code. This includes persons speaking under the CitizenC. Comrpents section of the agenda. This M ormation is a Public Record SPEAKER CARD Date: /9 )J '� 2 3 Agenda Item Number: �3 f-- Item must be completed! For example: Sa (this can be found on the far left side of the agenda cove) Do you have special technology needs, such as loading photos, connecting a laptop or tablet, during your time to speak? Yes X_ No v I will speak In Support of this item. I will speak In Opposition to this item. I do not wish to speak, but please record my: support opposition Name: el'(Af,s / � r�' �L-e✓ Y� S Cit mil ew rx Address: Ol . .0 I understand I am limited to speaking for five minutes. For agenda items not listed on the agenda as a Public Hearing, City Council cannot respond to speakers in accordance with the Texas Open Meetings Law, Chapter 551 of the Texas Local Government Code. This includes persons speaking under the Citizen's omments section of the agenda. . Signed: This infori ation is a Public Record