Planning & Zoning Commission
Minutes - August 09,1999
Page 1 of 9
The regular meeting of the Planning and Zoning Commission was called to order by Vice
Chairman Fletcher at 7:00 P.M. on August 09, 1999.
Roll Call:
Present:
Juneria Berges, William Tyler, Bryan Hill, Jim Fletcher
(Commissioner Collins arrived after roll call.)
Barry LeBaron, Clayton Husband, Tom Niederauer, Jan
Hofstrom
Staff:
Invocation:
Commissioner Tyler
Approval of Minutes:
July 26, 1999
Commissioner Hill moved to approve the minutes of July 26th as submitted. Commissioner
Berges seconded the motion. The vote being:
Ayes: Berges, Tyler, Hill, Fletcher
Noes: None
[PLEASE NOTE: COMMISSIONER COLLINS ARRIVED AT 7:05 P.M.]
1. Revised Preliminary Plan for Lots 2RR & 6-12, Block 2 and Lot 3, Block 1, Heritage High
School Addition requested by Mark B. Hannon, 9.72 acres & 2.14 acres located at
Gateway Drive and State Highway 121. Case P-99-051
Staff presented the case to the Commission stating that this was a revision to a previously
approved preliminary plan. The first preliminary plan was approved in 1995, revised in 1997 and
final plats have been approved based on those prior preliminary plans. Mark Hannon was present
to represent the case and stated that conditions have changed along Gateway Dr. and the street
is developing into a very nice office area, which utilizes smaller lots than originally anticipated.
Vice Chairman Fletcher asked Mr. Hannon if he was planning on rezoning the lots that do not
meet the CC-2 requirements. Mr. Hannon said that he is anticipating that within the next two
weeks an application would be made for rezoning. The owner never envisioned that the property
along Gateway Drive would be sold as small lots, but that is what has happened to this point.
Commissioner Collins moved to approve case P-99-051 subject to the note that reads Lots
2R, 6, 7, & 8 are being preliminary platted as shown with a minimum width of 100' at the
building line in anticipation of a rezoning to CPO. Commissioner Berges seconded the
motion. The vote being:
Ayes: Berges, Tyler, Collins, Fletcher, Hill
Noes: None
2. Combination Plat for The Sapphire Enclave requested by John Hawkins, 20.565 acres
located to the east of Jewell Estates, north of Tinker Road. Case P-99-029
Planning & Zoning Commission
Minutes - August 09,1999
Page 2 of 9
Staff presented the case to the Commission and explained that this plat was being brought
forward in response to the city council's directive to submit a final plat that is consistent with the
requested zoning district change that is currently pending with the council. The long delay that
has taken place was due to the amount of time required for the developer to prepare the
necessary plans to comply with the subdivision regulations. Vice Chairman Fletcher asked if this
plat could be approved subject to the final approval of the Monterra subdivision. Barry LeBaron
said that if the Commission wanted to do that then the City Council would need to consider that
as part of the Commission's recommendation. Commission Tyler questioned if staff had advised
the developer of staffs thoughts that the timing of the plat was not correct and how the developer
responded. Staff said that the developer was present and it was appropriate to ask him those
questions.
David Washington, the engineer for John Hawkins, was present to represent the case. He stated
that the staff briefing is accurate. All Development Review Committee comments have been
addressed and the plat does meet the technical requirements of the zoning ordinance and
subdivision regulations. The Council did table the zoning request and it has been tabled for some
months waiting for this final plat to get before the Commission and Council. He said that
consequently, the zoning is not an issue and the zoning will hopefully be approved and then the
plat immediately thereafter. The only remaining issue being access. He said that there has been
a lot of discussion with the Jewell Estates residents and there is only an emergency access gate
into their development and they fully intend to honor that agreement. He said that a note on the
plat exists stating no access or construction traffic is permitted through Jewell Estates. He spoke
about the timing with the Pulte project known as Monterra and Mr. Hawkins is fully aware that he
will have to work with Pulte to get access to this property. He said that Mr. Hawkins has every
reason to believe that the Pulte project will be constructed and on that basis he would like the
opportunity to start construction of his property so that his construction can be completed in the
same time frame as theirs. Otherwise, they will be sitting waiting until the Pulte project is 100%
completed before Mr. Hawkins can start. Mr. Washington said that they would like the
Commission's approval so that they can move on to Council. He stated that the access problem
is not a City problem, it is Mr. Hawkins' problem and he would like to go to work.
Commissioner Tyler raised questions about the timing and if they can wait until Pulte completes
street construction. Mr. Washington said that Pulte is currently doing utility construction and if Mr.
Hawkins receives approval and begins utility construction, they would begin construction on
streets when the Pulte streets are completed and will work with Pulte to get access through their
property someplace for construction traffic.
Vice Chairman Fletcher stated that no building permit could be granted until the streets were
constructed and accepted by the City.
Commissioner Berges expressed concerns about dwellings being constructed and no accessibility
to the dwellings by emergency response vehicles. Mr. Washington said that they are requesting
plat approval so that they can begin construction from the dirt down, nothing that will burn. He
said that the City would never issue building permits for anything above ground, anything
constructed of wood that could burn until the streets are constructed and approved.
Planning & Zoning Commission
Minutes - August 09,1999
Page 3 of 9
John Hawkins addressed the Commission and stated that he understands that Pulte has finally
gotten approval for their drainage plan and believes that they will be moving quickly. He said that
the sewer is already stubbed out to his property.
Commissioner Tyler raised the question about what would happen if the Commission delays
taking action on the plat. Mr. Washington said that it would possibly create a six-month delay in
construction. He said that Mr. Hawkins already purchased the property and he would like to begin
construction so that he can sell lots. Mr. Hawkins said that not being allowed to proceed now
would create a problem for him and getting into the winter season for construction is not desirable
due to bad weather.
Vice Chairman Fletcher stated that he does not see the problem with having simultaneous
construction of the infrastructure with both subdivisions. He said that if there are some restrictions
of not being able to issue a building permit until Monterra is completed and accepted by the City,
then Mr. Hawkins will have to work with Pulte on the timing and simultaneous construction of the
infrastructure sounds like a logical progression.
Staff raised the concerns that this is a gated subdivision that is at the end of a cul-de-sac that if
it had access through Jewell Estates, it would exceed the number of lots that can be accessed,
assuming Monterra never was completed. If Monterra does not proceed, the Council has already
said that they do not want another subdivision that contributes to the number of lots at the end
of the Jewell Estates addition. The risk is that they would be under construction together and
Monterra goes "belly-up", then Mr. Hawkins would come back before the Council requesting a
change in their position regarding access through Jewell Estates.
Vice Chairman Fletcher said that he could understand staff's position, however if Monterra was
not developed, Sapphire Enclave would be a completely different subdivision. He said that it
would prove that Emerald Drive is a limited access for emergency vehicles only and is an entrance
that that could not be used for construction vehicles as stated by the applicant. The only entrance
is through Monterra and Sapphire Enclave is default and no building permits will be issued. Vice
Chairman Fletcher addressed Commissioner Berges' concerns about fire protection.
Commissioner Berges stated her concerns about a gated community and emergency response.
Mr. Hawkins said that he had a comfort level that Pulte is a multi-billion dollar company, that they
have many subdivisions being constructed around the United States at the same time and they
are anxious to develop and sell lots in Colleyville.
Vice Chairman Fletcher moved for approval on Case P-99-029 subject to the completion
and acceptance by the City of Colleyville of the Monterra subdivision. Commissioner
Collins seconded the motion. The vote being:
Ayes: Tyler, Collins, Fletcher, Hill
Noes: Berges
3. PUBLIC HEARING -- An ordinance to consider an amendment to the Subdivision
Regulations to revise the Erosion and Sedimentation Control Regulations. Case Z-99-052
Planning & Zoning Commission
Minutes - August 09,1999
Page 4 of 9
Staff presented the case to the Commission and explained that the current erosion control
regulations were not producing desirable results. Staff stated that cities have to soil erosion into
creeks and rivers to comply with EPA runoff standards. The proposed erosion control regulations
will require a minimum siltation screening standard for all new subdivisions and when a building
permit is issued. The new standard will require a twelve-inch plastic screen with welded wire
mesh using metal poles on six-foot spacing. Staff explained that during the summer, meetings
were held with area builders to obtain their comments.
The Commission asked how many builders attended the meetings and if surrounding cities had
been looked at to see what regulations they have in place and if they worked. Staff stated that
as many as twenty builders attended these meetings and that surrounding cities only required
some form of erosion control measure, but none had minimum standards. Staff explained that
the proposed erosion control regulations are one of the chapters contained within the subdivision
regulations and that any amendment to these regulations required a public hearing.
Vice Chairman Fletcher opened the pubic hearing. There being no one present wishing to speak,
the public hearing was closed.
Commissioner Berges moved to recommend approval of the amendment as presented.
Commissioner Tyler seconded the motion. The vote being:
Ayes: Berges, Tyler, Collins, Fletcher, Hill
Noes: None
4. Request of Rick Bradford for an Appeal of the Tree Mitigation Requirements for Lot 3,
Block 1, Heritage High School Addition located at 5100 State Highway 121. Case SP-99-
006
Staff presented the case to the Commission stating that the applicant was building a new retail
store on Highway 121 but had encountered problems with the site plan because the site is heavily
wooded. Staff indicated that the applicant was seeking relief from mitigating 83 inches of trees.
The Planning and Zoning Commission is authorized to approve this type of request according to
the Tree Preservation Ordinance. Glenn Hahn, Innovative Developers, Inc., was present to
represent the owner, Rick Bradford. He presented the case to the Commission. He said that
three things impacted the development: A lot of trees on the site, the parking requirements, the
right-of-way requirements on a state highway, and the landscape ordinance. They have added
34 new trees to the site. Mr. Hahn said that they would like relief on curb issues and would like
to use paves to expand the islands in the parking lot in order to accommodate and keep the
number of trees they have. He said that the State of Texas Agricultural Department recommends
planting 3" in diameter trees rather than 6" in diameter trees because the survival rate of being
transplanted is much better. They would like to amend their request and be allowed to not pay
into the tree fund and plant 34 - 3" in diameter trees rather than 6" trees and donate an additional
34 - 3" trees to the City. He said that the lot is 450' deep and the existing trees are in the first
200'.
Planning & Zoning Commission
Minutes - August 09,1999
Page 5 of 9
Vice Chairman Fletcher said that he is intrigued by the donation of trees to the City, however the
ordinance states that money would be placed into a fund and the City did not have a facility to
store trees. He said that his interpretation of the Tree Ordinance is that it is not the intent of the
ordinance to penalize people who are developing in highly wooded lots, but to preserve trees
where the trees are in limited areas and to prevent a possible course of action by a developer to
plow all of the trees down and begin construction. He can appreciate the problems stated by the
owner and the cost over-runs on the project. He said that the Commission wants to see the
development proceed as it will be an asset to the community. Unfortunately the City has a tree
ordinance that in this case is very restrictive and he would be in favor of some type of break on
the enforcement of the Tree Ordinance. Vice Chairman Fletcher asked staff if 3" in diameter trees
were planted on the property rather than 6" trees being planted would it be a detriment to the
project.
Staff stated that it is a matter of perception, however staff is required to enforce the ordinances
as they are written and the Planning and Zoning Commission is the relief mechanism for the
owner. It is up to the Commission to make that determination.
Vice Chairman Fletcher said that he would be inclined to approve the original request by the
applicant, but the second request to plant smaller trees has not been presented in visual form and
it is difficult for them to judge the request. He stated that he is intrigued by the idea of donating
trees to the City for parks if this is a possibility. Vice Chairman Fletcher also said that if it makes
sense to use pavers and no curb in order to save the trees and if the possibility that curbs could
kill the trees, the applicant should file a variance request before the Zoning Board of Adjustment.
Rick Bradford, 3113 Cedar Point, Grapevine, spoke regarding how the cost of planting trees has
reached the saturation point and the project is over budget. Depending on other cost overruns,
they may have to sell the lot and scrap the project, but they want to continue their business in
Colleyville and grow the business by getting out of the lease shopping center into it's own building.
Being a small businessman, the cost overruns have its limits. Contributing 83" of trees to the City
at a cost of $110.00 per inch would put them even in more cost overruns. He requested a
variance from having to donate trees and an acceptance of 34 - 3" in diameter trees.
Commissioner Hill questioned the past history of cases coming before the Planning and Zoning
Commission. Staff told Commissioner Hill that the Commission considered the site to the north
as they presented a tree preservation plan that established parameters of trees to be saved on
the property and it was approved and told of several others.
Commissioner Berges said that she could support the plan that is submitted and there is a need
to buffer the school and trees could be planted in the back of the property.
Vice Chairman Fletcher said that some cases that have come before the Commission were based
on intent. If they have a developer show their intent to preserve the trees and follow it with action,
it is looked somewhat more favorably over someone who had an opportunity to improve a site and
made little effort to retain the trees on the property. He stated that that has not always been the
case before, and those cases the Commission issued very severe penalties were because the
developer did not follow through with their commitments to preserve the trees.
Planning & Zoning Commission
Minutes - August 09,1999
Page 6 of 9
Commissioner Berges moved to approve SP-99-006 as submitted. Commissioner Tyler
seconded the motion. Vice Chairman Fletcher stated that it is his understanding of the motion
that the Commission grants the applicant a waiver on 83 caliper inches of replacement of the
trees, however the other requirements of the Tree Ordinance will remain in place. Commissioner
Berges agreed.
Commissioner Hill asked the applicant if they were just trying to put as many trees on the bald part
of the property as he possibly can to increase the required inches. The applicant stated that the
bald part of the property is for the main pad of the building and the water retention area also. He
said that every area has a function. The trees in the front of the property are mostly 18 to 20"
oaks and they are doing everything possible to preserve them. They only hope that the business
is somewhat visible from the highway. Mr. Hahn said that they originally submitted a plan with 34
- 3" trees and then changed it to 6" trees in order to increase their figures. He said that 3" trees
are good size trees and they are healthier than the 6" trees. Mr. Hahn said that they would hope
that the request could be amended to 3" trees. Vice Chairman again said that they did not have
a visual comparison for the difference. He asked Commissioner Berges if she wanted to amend
her motion.
Commissioner Tyler asked if they changed the motion to give the applicant some relief from the
6" trees to the 3" trees, could the Commission put in some type of stipulation similar to the
Walgreen's site, that staff will review the plan in a few years to determine what trees need to be
replanted. The applicant proposed that if in 4 to 5 years the 3" trees did not grow to 6" trees, they
would consider replacing them with 6" trees and they would have a better chance of survival of
trees.
Staff told the Commission that the Ordinance required any trees that die have to be replaced. This
provision falls under the maintenance section of the Landscape Ordinance.
Commissioner Berges asked if the applicant wants to retract their case and present another plan.
She said that she could only recommend approval on the plan as submitted. Chairman Fletcher
asked the applicant if Mr. Hahn wanted to table the case and submit another plan. Mr. Hahn
stated that Mr. Bradford needs to get a building permit and a wait will impact that process and
asked the Commission to grant a plan that is 34 trees at 3" rather than 34 trees at 6". Vice
Chairman said that he is inclined to vote for the motion before them and if they want another plan
they should ask for the case to be tabled. He called for a vote.
The vote being:
Ayes: Berges, Tyler, Collins, Fletcher, Hill
Noes: None
5. TABLED ITEM -- PUBLIC HEARING - Zoning change requested by David Whisenant,
from R20 to PUD-R on 27.166 acres located on the north side of Glade Road in the 1100
-1200 block. Case Z-99-031
Planning & Zoning Commission
Minutes - August 09,1999
Page 7 of 9
Commissioner Berges moved to remove the item from the table. Commissioner Collins
seconded the motion. The vote being:
Ayes: Rutherford, Berges, Tyler, Collins, Fletcher, Hill, Hart
Noes: None
Staff presented the case to the Commission and explained that the rezoning request had been
tabled to allow the applicant to incorporate a 20 foot buffer strip along the north side and to allow
staff to comply with re-notification and advertisement requirements. Mark Howe was present to
represent David Whisenant. He explained the additional 20' buffer that has been incorporated
into the zoning change request, which would ultimately created a 40' buffer from any future
commercial development since the property to the north would also need to provide a 20' buffer
from residential development. The Homeowners Association will maintain all open spaces.
Vice Chairman Fletcher requested that Mr. Howe explain the demographics of the subdivision.
He said that the single-family homes would be $400,000 to $450,00 high quality dwellings and
the open spaces will be highly landscaped. There will be an emergency access gate at Glade
Road.
Commissioner Collins questioned why the development does not meet the requirement for a PUD-
R as established by the Master Plan. Mr. Howe responded by siting amenities being offered by
the developer and the significant cost of drainage and the improvement this will create to the
adjoining residential properties consideration needs to be given to lot sizes and density.
Vice Chairman Fletcher opened the public hearing. Those present wishing to speak were:
Tim Dacey, 1112 Glade Road, speaking on behalf of his father-in-law Bernie Crowder and Mr.
Crowder's daughter Carol. He said that Mr. Crowder's property is east of the development and
said that high-end housing is more desirable in an area that is conducive to foot traffic rather than
what is proposed by the Master Plan. He told the Commission that they have an opportunity to
create a win-win situation for the sellers and the developer and for the surrounding property
owners;
Terrance Grisso, 1205 Glade Road, has concerns about high density and lack of space between
houses. Property values, aesthetic values preferred by Colleyville residents, and lack of regard
of requirements for a PUD-R. He said that this subdivision meets only 1 out of 8 criteria for a
PUD-R and does not want it approved;
Harvey Collins, 5013 Oak Timbers, said that the developer has worked with the neighbors and
he is now in support of the plan. He said that his life style will be much better with this
development behind him rather than offices as proposed by the Master Plan;
Maurine Wellman, 1204 Glade Road, agrees to the plan and believes that it is pleasing to the
community. She said that people want smaller yards and the river walk and gazebo will add
beauty; and
Planning & Zoning Commission
Minutes - August 09,1999
Page 8 of 9
David Hannah, 200 W. Mill Valley, questioned the validity of the Master Plan requiring commercial
development such a far distance from Colleyville Blvd. He stated that a commercial use is not
feasible in the area. He said that high-end rooftops will support future commercial development
and hasten the growth of commercial development.
There being no one else present wishing to speak, the public hearing was closed.
Vice Chairman Fletcher called for a motion. Commissioner Berges said that even though she
normally stands behind the Master Plan, in this case she moved to recommend approval
of the zoning change as submitted. Vice Chairman Fletcher seconded the motion.
Vice Chairman Fletcher asked for discussion. He said that he wanted to commend Mr. Howe for
his efforts in responding to the suggestions made by the Commission as they have heard the case
several times. He said that he is not 100% in favor of the plan since it falls short of the PUD-R
requirements. He feels that through deliberations, the developer provided additional setbacks to
the north and an increased setback along Glade Road to create a better visual barrier on Glade
so that traffic going down Glade Road will not see a brick wall that creates a tunnel effect. He said
that citizens will experience an open effect with the landscaping open space. Vice Chairman
Fletcher said that additional acquisition of property to the north ultimately creates a 40'
landscaped buffer between residential and commercial developments and this is important
because of complaints by citizens in other cases they have heard stating opposition to residential
lots being near commercial development. He said that the close proximity to a major thoroughfare
will not increase the traffic significantly on feeder streets and it will be good for other business and
hopefully spur commercial development. He said that there are not too many cases where the
Commission varies from the PUD ordinance, but overall this will be good development and a
positive for the City.
The vote being:
Ayes: Berges, Tyler, Fletcher, Hill
Noes: Collins
6. Staff comments, reports and discussion items: Staff advised the Commission of the
upcoming training program sponsored by the Midwest Section of A.P.A.. Barry spoke
about potential revisions to the Tree Ordinance concerning "trash" trees.
7. Commissioners' comments and repots: There were none.
ADJOURNMENT:
Commissioner Berges moved to adjourn the meeting at 8:55 p.m. Commissioner Hill
seconded the motion. The motion passed by an "Aye" voice vote.
Planning & Zoning Commission
Minutes - August 09,1999
Page 9 of 9
Respectfully Submitted,
(~
Planning & Zoning Assistant
-
App roved on: I'J y I ;)~/ 9 <1 cALa. ....-o<<.--6-n. ....cr--u<- -?)I .
NOTE:
As a matter of public record, an audio recording of the above Planning and Zoning
Commission meeting is available upon request.
[ jh/min/0809pz.min]