ORDINANCE 0-01-1291
AN ORDINANCE APPROVING THE DEVELOPER PARTICIPATION IN CONTRACT
FOR PUBLIC IMPROVEMENTS BETWEEN MELVIN & MARTINDALE, LTD., AND
THE CITY OF COLLEYVILLE, TEXAS FOR THE COLLEYVILLE TOWN CENTER
WHEREAS, Melvin & Martindale, Ltd., (Developer) shall construct public
improvements and the City of Colleyville, Texas shall participate in the
cost as determined by municipal ordinance under Subchapter C.
Developers Participation in Contract for Public Improvements, Local
Government Code, State of Texas; and
WHEREAS, The City of Colleyville and Developer hereby entered into a City-
Developer Agreement/Contract for The Colleyville Town Center, which
specifies certain construction costs that the City has agreed to participate
in with the Developer.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
COLLEYVILLE, TEXAS:
Sec. 1.
Sec. 2.
Sec. 3.
Sec. 4.
Sec. 5.
THAT the Developer shall construct the improvements and the City shall
participate in their cost.
THAT the City's total cost participation ($204,314) does not exceed thirty
percent (30%) of the total contract price.
THAT the Developer must execute a performance bond for the
construction of the improvements to ensure completion of the project, said
bond must be executed by a corporate surety in accordance with Chapter
2253, Government Code.
THAT the City shall be reimbursed by the Developer the total cost
participation by the City if City finds there was any undue loading of cost,
collusion, or fraud.
THAT all of the Developer's books and other records related to the project
shall be available for inspection by the City.
Ordinance 0-01-1291
Page 2 of 2
AND IT IS SO ORDERED.
~. f~~t reading and public hearing being conducted on the /'I'tI.. day of
~ ,2001.
The second reading and public hearing being conducted on the g~ day of
O/-<1.uLJC ,2001.
ATTEST:
CITY OF COLLEYVILLE
~>'-k0xJ~
Cynthia Singleton, TRMC
City Secretary
S TO FORM AND LEGALITY:
Ross T. Foster
City Attorney
CITY OF COLLEYVILLE
CITY-DEVELOPER AGREEMENT
STATE OF TEXAS
COUNTY OF TARRANT
KNOW ALL MEN BY THESE PRESENTS:
That Melvin & Martindale, Ltd. a Texas Limited Partnership organized under the laws of The State of
Texas, Herein after called "Owner/Developer" and the City of Colleyville, Tarrant County, Texas,
HERBINAt' IJ::.K call the "City", enter into the following agreement ("The Agreement").
In consideration of the mutual covenants herein contained and for the purpose of developi~ lots in
Colleyville Town Center, an addition to the City of Colleyville, as Filed for Record in Cabinet
Slide~ of the Plat Records of Tarrant County, Texas, the parties hereto do agree:
1. The Owner/Developer will provide a complete service connection at each lot, including tap, service
line, curb stop and tap for sewer. The charge for the right to connect to the system shall be in
accordance with the City's current water and sewer tap fees. Fees will be charged and paid at the time
building permits are issued.
2. The Owner/Developer will contract for street, drainage, water and sewer requirements with reputable
contractors. All contract documents shall be prepared under the supervision and bear the seal of the
Registered Professional Engineer who shall be licensed in the State of Texas. Before acceptance of the
public improvements by the City, the contractor or contractors will furnish a two year maintenance
bond or place funds in escrow with the City for two years, such bond or escrow to be in the amount of
ten percent (10%) of the construction cost of all public improvements.
3, The Owner/Developer agrees to pay the City for plan review and inspection fees for the water, sanitary
sewer, drainage and paving improvements in accordance with the current ordinance requirements, prior
to acceptance of public facilities.
4. City agrees to pay the Developer the sum of $13,531.00 for utility improvements performed in
Colleyville Town Center addition for the oversizing cost between an 8-inch water line and the lO-inch
water line installed along Riverwalk Drive, Church Street, Colleyville Blvd. and Hall Johnson Road as
shown on the City approved construction plans titled "Colleyville Town Center" Prepared by
Washington & Associates. (See Exhibit "A")
5. The City agrees to reimburse the developer the cost for the installation of a sanitary sewer manhole and
sewer line for the Justice Center at a cost of $4,590.00. (See Exhibit "B,,)
6, Developer agrees to construct Riverwalk Drive and Church Street, streets on the Colleyville Master
Thoroughfare Plan, in lieu of paying roadway impact fees for Lots 1, 2, and 3, Block 1 and Lot 1 and
2, Block 2, Colleyville Town Center Addition (See Exhibit "C").
7. The City agrees to refund one-half the total estimated cost of $350,178.00 for Riverwalk Drive
fronting the Justice Center and the Community Center. The City of Colleyville's portion is
$175,089.00 per the Development Agreement dated October 1, 1996. (See Exhibit "D")
8. City agrees to reimburse Developer $15,694.00 for the installation of 2"-4" electrical conduits along
Church Street for communication lines for the Justice Center. (See Exhibit "E")
9. The City agrees to install the temporary signalization at the intersection of Church Street and
Colleyville Boulevard (State Highway 26) at no cost to the developer upon the warranting of such
signalization to the Texas Department of Public Transportation.
10. If for any reason the ownership of the property should change prior to the acceptance by the City of the
water, sewer, drainage and paving improvements in "Town Center", it is agreed that these conditions
will pass from this "Developer" to the next owner and the City will require proper signatures of the
new "developer" agreeing to the terms of this agreement.
11. The Developer understands that he has no authority to cancel or amend the terms of the agreement
without specific written authority of the City.
12. Upon completion of the work, good and suffieient title to all facilities constructed, warranted free of
any liens or encumbrances, is hereby vested in the City of Colleyville.
IN WITNESS WHEREOF, the parties to these presents have executed this contIact in three (3)
counterparts, each of which shall be deemed an original on this L day of /f..I,u~-r , 2001.
DEVELOPER
CITY OF COLLEYVILLE
~~~~
M lvin & Martindale,
A Texas Limited Partn
By: R M. Farrell, Inc. General Partner
By: Robert M. Farrell, President
EXHmIT "A"
I. WATER SYSTEM IMPROVEMENTS
Item 12" Water Line 8" Water Line Unit Difference Total
PVC Pipe $24.00 per LF $20.00 per LF 196 $4.00 $784.00
10" Water Line 8" Water Line
PVC Pipe $22.00 per LF $20.00 per LF 4,796 $2.00 $9,592.00
Gate Valves $880.00 EA $640.00 EA 10 $230.00 $2,300.00
Fittings 4.0 Tons 3.7 Tons 0.3 $2,850.00 $855.00
TOTAL DIFFERENCE
$13,531.00
OWNER: Herman Smith Co.
EXHIBIT "B"
OPINION OF THE PROBABLE CONSTRUCTION COST
Colleyville Town Center
Colleyville, Texas
Sanitary Sewer System Cost
Justice Center Cost
May 9, 2001
\ Quantity I I I
I. 'SANITARY SEWER SYSTEM Unit Unit Prices I ! Amount
f-- '
T 1! 8" PVC Sewer Pipe 95 LF i 20.00 : 1$ 1,900.00
I L ..- Urop-'V'ClIIIIV'<:> .~ C^ ') ,;;nn nn 2500.00
3 Trench Safety 95 LF 2.00 · 190.00
I $ 4,590,00
I I I I
i I --
I
I
I
I
I
+ I
I
,
T I
i ~
----L-.
.--
: I !
\ I r
City Developer Agreement Exhibits
EXHIBIT C
Page 2
EXHIBIT "c"
CITY ROADWAY
IMP ACT FEES
COLLEYVILLE TOWN CENTER
301,200 S.F. - Retail
19,500 S.P. - Restaurant
58,500 S.F. - Future Site - Office
301.2 x $955.00
19.5 x $1,613.00
58.5 x $790.00
Total
=
$ 287,646.00
$ 31,'153.50
$ 46.215.00
$ 365,314.00
EXHffiIT "C"
STREET COST
RIVERW ALK DRIVE & CHURCH STREET
Item Description Ouantity Unit Unit Price Amount
1. Street Excavation 12,400 CY 2.00 24,800.00
2. 7" Concrete Pavement 16,076 SY 24.00 385,824.00
3. G" Stabilized Subgrade 17,871 SY 2.00 35,742.00
4. Material 289 TONS 90.00 26,010.00
5. Monolithic Curb 3,021 LF 2.00 6,042.00
6. Hand-cap Ramps 12 EA 500.00 6,000.00
7. Asphalt Transition 273 SY 25.00 6,825.00
8. Asphalt Sawcut 121 LF 10.00 1,210.00
9. Pavement Markings 1 LS 8,000.00 8,000.00
10. Brick Pavers 3,925 SF 6.00 23,550.00
11. Sidewalk (5') 2,225 SF 3.00 6,675.00
TOTAL COST $530,678.00
ENGINEERING
SURVEYING
TESTING
INSPECTION FEES
TOTAL
$35,000.00
26,000.00
13,500.00
26.600.00
$101,100.00
101.100.00
$631.778.00
OWNER: Herman Smith Co.
EXHIBIT "0"
OPINION OF THE PROBABLE
CONSTRUCTION COST
Colleyville Town Center
Colleyvllle, Texas
Riverwalk Orive
Community Center and Justice Center Cost
May 9, 2001
I
I. i STREET EXCA V A TION $ 10,855.00
II. STREET IMPROVEMENTS 216,388.00
!WATER SYSTEM - 41,175.00 i --
III.
IV nDJ\ '''1 ,v, I I-I\n ---
26,160.00 ;
I $ 294,578.00 :
-----------r---.---
:
I I
ENGINEERING $ 19,150.00
SURVEYING 14,700.00
TESTI NG 7,000.00 I
--
INSPECTION FEES 14,750.00 I
55,600.00 ! _._-
55,600.00 ----~------
i
------ - ----
;
TOTAL $ 350,178.00
i
CITY OF COLLEYVILLE PORTION 50% = $ 175,089.00 I
I
~
I
I
I I
:
i
I
.---.-r I
e-- i H_
, -- --- .--
,
---
I
....0...--------.--.---
-- -
,
City Developer Agreement Exhibits revision-2
EXHIBIT D summary
OWNER: Herman Smith Co.
EXHIBIT "E"
OPINION OF THE PROBABLE CONSTRUCTION COST
Colleyville Town Center
Colleyville, Texas
Electrical Conduit
May 9, 2001
I
I. 1[ ELECTRICAL CONDUIT Quantity Unit Unit Prices Amount
; 1 Conduit in Church Street 2,242 LF 7.00 [ 15,694.00
~-~I I ! $ 15,694.00
[ , .-
--+ _______ ________ _ -J-___
I [
_____-----r---___ ---- -
t------~~-L--- ~--- - - --
I !
!
!
i
i -----------~-
, ! ._u_____
I
, ,
I i
-~
, I
I I
I i
1
I
I I i !
I
City Developer Agreement Exhibits
EXHIBIT E
Page 5