1. CALL TO ORDER
2. PRESENTATION AND DISCUSSION
2a Presentation and Discussion of Infrastructure Management
2b Presentation and Discussion of tiered water rates
3. ADJOURNMENT
I hereby certify this agenda was posted on City Hall bulletin boards December 3, 2011, by
12: 00 p, m.
Cynthia Singleton, TRMC, CMC
City Secretary
Any matter on this agenda may, at the discretion of the governing body, be opened for
public comment and discussion.
If you plan to attend this public meeting and have a disability that requires special
accommodations, please advise the City Secretary at least 48 hours in advance at
817.503.1133, and reasonable accommodations will be made to assist you.
~'T Y ~F City of Colleyville
'~'r City Hall
C4LLEYVILLE C~ty CQU~"'~C~~ 100 Main Street
Colleyville, Texas 76034
r ~. ~ ,~ ~ Agenda Briefing www.colleyville.com
Agenda Number Za Agenda Date 12/08/2011
Type Presentation and Discussion
Department Public Works
Title
Presentation and Discussion of Infrastructure Management
Explanation
Staff will give a detailed presentation in regard to Infrastructure Management, as well
as, Capital Improvement Programs.
Attachments
1. A Strategic Approach to Infrastructure Management
,, ~ <
~~
C[)LL~YVILLE
~ r~
^ Since 1988 the American Society of Civil Engineers
(ASCE) has been preparing a report card on the
condition of the nation's infrastructure
^ The most recent report card (2009) gives an overall
rating of ~~D" and estimates that $2.122 trillion will
be needed over the next five years to bring the
nation's infrastructure to an acceptable level
^ While Colleyville's infrastructure may not be a"D"
right now (we don't really know! ), it will not be long
before it gets that way unless we begin to develop
and execute a long range program to renew it
,~~
~
CC]~.LEYVILI.E
~ ,~ ,~.
• What We Have
^HowWeTakeCareofIt
• What Staff Does
^ Ca pita I Projects
^ Capital Improvement Program
^ The Strategy
^ The Cost
^ The Plan
,,, ,
~~
C[)LL~YVILLE
~ r~
^ Roads, Sidewalks and Bridges
^ Buildings
^ Water and Sewer Lines
^ Storm Water Collection System (pipes, inlets, etc.)
^ Parks and Playgrounds
^ Trails
^ Signs and Signals
~~
Technology (computers, servers, video cameras, etc.)
~.;
r.
~
+;~
~
~/~'\
CC]~.LEYVILI.E
~ ,~ ,~.
^ 282 lane miles of streets
- 144.5 lane miles of concrete streets w/ curbs and gutters
- 137.5 lane miles of asphalt streets ~~ T
:~. _ .,~
^ 130 miles of sidewalks
^ 16 bridges
^ 2 traffic signals
^ 2,575 signs
^ 1,163 storm water inlets
^ 58 miles of storm sewers
~
^ 195 miles of water lines ~~
^ 1,362 fire hydrants ~~ ~
. ~as~ ~ ~
3 elevated water storage tanks
^ 9,200 water meters
^ 264 Computers and servers (plus cables, switches, cameras, etc.)
~
,~} f
~ ~ti
~COLL~YVILLE
- , ,~.
^ 162 miles of sewer lines
^ 2 sewage lift stations
^ 20 buildings (administrative/operations)
^ 3 historic buildings
^ 87 park structures (concession stands,
restrooms, pavilions, maintenance
building and shelters)
^ 6 playgrounds
^ 14 sport courts
(basketball/tennis/volleyball)
^ 45 athletic fields
(baseba I I/softba I I/soccer)
^ 14.6 miles of trails
^ 232.2 acres of parks
~~
~
~~ I ~
~ ~
~
,,~ <
~~
C[)LL~YVILLE
~ r~
City staff (primarily Public Works and Parks) is trained and
equipped to do operations and maintenance (O & M) work
only.
Operations and maintenance includes:
^ Fixing an asset when it is out of order or broken
(breakdown maintenance)
^ Taking routine actions to keep the asset in working order
and minimize or prevent breakdowns (preventive
maintenance)
It does NOT include construction or rehabilitation work.
That is best done by contractors.
,,, ,
~~
C[)LL~YVILLE
~ r~
The Streets Division, comprised of eight crew members, is
responsible for:
^ Pothole Repair
• Crack Sealing
^ Ice and Snow Removal
^ Sign Maintenance
• Sidewalk Repair
Capital
0%
Salaries
30%
Resurfacing
47%
~'
~5
Contractural '
Services
16%
~'>'.'
Supplies
7%
~,, +~ <
! ~\
C[)LL~YVILLE
~ r~
The Drainage Division, comprised of five crew members, is
responsible for:
Capital
2%
^ Storm sewer inlet and pipe cleaning
• Ditch maintenance
^ Curb and outfall inspections
^ Street sweeping
• Storm water sampling
Supplies
7%
Contractural
Services
22%
Salaries
69%
~,,+ ~<
! ~\
C[)LL~YVILLE
~ r~
The Water Division, comprised of eight maintenance crew
members (and three meter workers), is responsible for:
^ Water line inspections, flushing,
repairs and cleaning
^ Water valve inspection
^ Pump, storage tank and
water tower operations
^ Fire hydrant flushing and
maintenance
Capital ~
Z~io
.~z~ r~.~,,.
Salaries
12%
Contractural
Services
5%
, "' ipplies
1%
Trinity River
Authority
80%
~~
+.~
CC]~.LEYVILI.E
~ ,~ ,~.
The Waste Water Division, comprised of five maintenance
crew members, is responsible for:
^ Sewer line inspections,
repairs and cleaning
^ Access point inspections and
maintenance (manholes and
cleanouts)
Capital
0% ,
Salaries
18%
Contractural
-°
Services
~
3%
~Supplies
2%
rinity River
Authority
77%
~,,+ ~<
! ~\
C[)LL~YVILLE
~ r~
The Parks Division, comprised of seven maintenance crew
members, is responsible for:
^ Litter Control
• Restroom Cleaning
^ Park Facility Maintenance
^ Playground Maintenance
• Irrigation Maintenance
Supplies
3%
Salaries
48%
Contractural
Services
49%
,,, <
~~
C[)LL~YVILLE
~ r~
The Athletics Division, comprised of four maintenance crew
members, is responsible for:
^ Sports Turf Management
• Mowing
^ Athletic Field Maintenance
^ Athletic Field Game Preparation
^ Litter Control
^ Irrigation System Maintenance
Supplies
7%
Contractural
Services
30%
Salaries
63%
,~~
~
CC]~.LEYVILI.E
~ ,~ ,~.
^ A properly designed and constructed street (asphalt or concrete)
should last at least 50 years if it is properly maintained
^ The incremental cost to build a street that will last 50 years (if
properly maintained) is approximately 18% more than the cost of
a street that will last 25 years
^ Water and sewer lines should last about 50 years
^ Concrete storm sewer pipe should last more than 50 years
^ Signs have to be replaced every 7-10 years
• Parks facilities generally have a useful life of 5 to 25 years,
depending on the type of asset (shade structures vs. shelters)
All of this is dependent upon proper design, quality
construction, good inspection and adequate maintenance!
~Ih F
~
C~LLEYVILLE
,~
Maintenance Strategies for Life Cycle Extensian
1oa
90
80
aXi 70
~
c
a 50
~
~
~ 50
~
r
m 4 [}
~
a
~
a 3a
20
io
0
Pa~ement Age ~Years)
-Routine Mafntenance ~nly -Sealcoatanci Overlay
~,, +~ <
! ~\
C[)LL~YVILLE
~ r~
a io za 3a ao ~o
Heritage Avenue
~ .
Cliffwood Drive < ~'~~
+C~LLEYVILLE
,~
Brentwood Drive
Brown Trail
_~ , ~_.
~~
Ct]LLEYVILI.E
~ ,~ ~ ,~.
So what?
,~
~
CC]~.LEYVILI.E
~ ,~ ,~.
Ca pita I Project
^ A new construction, expansion, renovation, or
replacement project for an existing facility or facilities
^ A major maintenance or rehabilitation project for
infrastructure with a useful life of at least 10 years (20
years if debt-funded)
,~~
~
CC]~.LEYVILI.E
~ ,~ ,~.
~ ~~~
~~I - ~r
~;~
~' ~ I ~ ~ , ~
~~- ~'~~~: .~?= - ~
,
. ~_.
~~ fl ~ ~~ --- --- - ~i
~-.~_
City of Colleyville
City Hall ,.
~~
COA,LEYVILLE
,, _ ,- -~.
. _. ~: ~
~` - ~ ~ .
:~ ,. ~ , = .
"s" ~. . ~ ,
Heritage Avenue
,,, ,
~~
C[)LL~YVILLE
~ r~
,, ~ <
~~
C[)LL~YVILLE
~ r~
,, ~ <
~~
C[)LL~YVILLE
~ r~
Capital Improvement Plan (CIP)
A short-range, rolling plan, usually three to five years out, which identifies
capital projects and equipment purchases, provides a planning schedule
and identifies options for financing the plan. Essentially, the plan provides
a link between the comprehensive and strategic plans and the City's
annual budget. The benefits of a CIP include:
^ Allows for a systematic evaluation of all potential projects at the same
time
• Has the ability to stabilize debt and consolidate projects to reduce
borrowing costs
• Serves as a public relations and economic development tool
^ Supports the City's comprehensive plan
^ Focusing on preserving the City's infrastructure while ensuring the
efficient use of public funds
~
~r~\
CC]~.LEYVILI.E
~ ,~ ,~.
-,~^
~~
4~ ~
^ Develop asset inventory (underway)
^ Assess condition of assets (underway)
^ Determine residual life
^ Determine life cycle and replacement costs
^ Set targets for level of service
^ Determine business risk
^ Optimize operations and maintenance
investment
^ Optimize capital investment
• Determine funding strategy
^ Build infrastructure management plan
,~~
~
CC]~.LEYVILI.E
~ ,~ ,~.
^ Acquire asset management software in which to
record inventory and condition assessments
- Inventory
- Condition assessment
- Maintenance and cost tracking
^ Develop data col lection pla n
- What do we own?
- Where is it?
- What condition is it in?
- What is the remaining useful life
~~
,,, ,
~~
C[)LL~YVILLE
~ r~
Streets: $282,000,000
Water Lines: $151,707,000
Sewer Lines: $121,861,000
Storm Sewer Pipes: $ 38,605,000
Public Buildings: $28,500,000
Sidewalks: $13,728,000
Parks and Playgrounds: $8,676,000
Technology: $1,757,800
Traffic Signs: $258,000
,,, ,
~~
C[)LL~YVILLE
~ r~
Approxi mately $647 M i I I ion
~-
~.~~
~~
,~~ ,
~--~
C[)LL~YVILLE
~ r~
^ If an asset, such as a water line, has a useful life
of 50 years, it would be prudent to plan on
renewing 2% of the system every year
• The same logic applies to other infrastructure
components like streets, sewer lines, and storm
sewer pipes
,,, ,
~~
C[)LL~YVILLE
~ r~
Cost Scenarios
_ _ ___ _ __ _ _ _ _ _ _
Roads
@ 0.5% _ $1,410,000 @ 1% _ $2,820,000 @ 2% _ $5,640,000
es
r l
~
.
n
@ 0.5% _ $758,535 @1% _ $1,517,070 @ 2% _ $3,034,140
@ 0.5% _ $609,305 @ 1% _ $1,218,610 @ 2% _ $2,437,220
s+~w+~r5
@ 0.5% _ $193,025 @ 1% _ $386,050 @ 2% _ $772,100
@ 1% _ $86,760 @ 3% _ $260,280 @ 5% _ $433,000
$3,057,625 $6,202,010 $12,316,460
,.~~
.~
COLL~YVILLE
,~
General Fund
Utility Fund
Drainage Fees
Impact Fees
Escrow Funds
G ra nts
CEDC Funds
Park Land Dedication Fund
County Bond Program
Tx DOT
N CTCOG
General Obligation Bonds
Certificates of Obligation
Park Tomorrow Fund
Tomorrow Fund
Voluntary Park Fund
, ~ , ~, ~
~~~
ca~.~.~~vir~.~
'~.
^ Complete the asset inventory and condition
assessment for each of the infrastructure
components starting with streets
^ Develop a prioritized list of projects based on
severity of need and impact of postponing the
projects
^ Look at alternatives for funding the program
• Come back to City Council with program options
to consider
,,, ,
~~
C[)LL~YVILLE
~ r~
^ The City's infrastructure is aging and we need to start
replacing it
^ Staff is working on an inventory and condition assessment
of the City's existing infrastructure
^ Once the inventory and condition assessment is complete,
an Infrastructure Management Plan needs to be
developed that includes:
- A maintenance program, and
- A Capital Improvement Program (CIP)
^ Funding must be identified for the plan
,,, ,
~~
C[)LL~YVILLE
~ r~
Questions and Discussion
,~
~
CC]~.LEYVILI.E
~ ,~ ,~.
G'~ Y~ City of Colleyville City Hall
C(JLLEYVILLE C~ty CDU~"'~C~~ 100 Main Street
Colleyville, Texas 76034
r F 4.a ~ Agen(~a B~"~ef~ng www.colleyville.com
Agenda Number 2b Agenda Date 12/08/2011 Number
Type Presentation and Discussion
Department City Manager
Title
Presentation and Discussion of tiered water rates
Explanation
Annually, staff updates the utility rate study to include changes in consumption
patterns, incorporation of Trinity River Authority rate increases and the rate effect of
future bond sales. As part of the FY 2011 update process, staff provided information
regarding the feasibility of implementing a tiered water rate structure during the FY
2011 budget workshop. At the November 1, 2011 Pre Council meeting, staff presented
the FY 2012 update of the utility rate study to the City Council. At that time, the City
Council requested that staff provide an update to the feasibility of incorporating a
tiered rate structure into the current water rate structure. Currently, the City charges
the same rate per 1,000 gallons charged for water regardless of the gallons used in
the billing period.
The following information about tiered rate structures is provided on the American
Water Works Association web site:
Definition
The term "tiered" typically refers to a"block" type of rate structure where the
unit price of water changes with each of several preset consumption blocks for
each billing period. For example, from 0 to 10 units [generally units are either
stated in terms of thousands of gallons (Mg) or hundreds of cubic feet (Ccf)] is
one unit price, from 11 to 100 units a different unit price, from 101 to 1,000
units a third unit price, etc.
Measure With an Aim Toward Conservation
Most commonly in such rate structures, there are typically three to five different
tiers or rate blocks. Also, the term is most often used in reference to a rate
structure where the unit price increases with each higher level, or tier, of
consumption. This type of "increasing tier rate" is most often found where the
utility desires to send a strong conservation message to its customer base.
However, it should be noted that this type of rate structure itself, without a
significant accompanying customer information program, will generally not
produce the desired conservation, simply because the vast majority of customers
do not understand rates and do not have any idea that the more they use, the
higher the unit price becomes.
City Council Agenda Briefing 2b
Currently, Colleyville charges same water rate per thousand regardless of the gallons
used in the billing period. Per "Exhibit A", the surrounding cities of Euless, Keller, North
Richland Hills, and Southlake have a tiered water rate structure, where the greater
number of gallons used, the greater the cost. Euless and North Richland Hills
implemented their tiered rate structure in October 2009 and October 2010,
respectively. Additionally, the majority of cities with a population over 20,000 in Collin,
Denton, Dallas and Tarrant counties utilize a tiered rate structure.
A tiered rate structure enables a city to meet its water debt service commitments,
higher repair and replacement costs, and third party water and sewer treatment costs
from the demands that high usage customers place on the water system. Reviewing
the surrounding cities, the highest usage breakpoint with the highest water rate is
35,000 gallons for Euless and 40,000 gallons for Keller and Southlake.
Exhibit "B" is a five year projection of utility fund expenses and coverage for FY 2012-
2016 under the tiered water rate structure with implementation of the tiered rate
structure in FY 2013. Included in the model is the assumption that overall annual
usage will decrease by 5 percent in FY 2014 and stay at that level throughout FY 2015
and 2016. The tiered water rate option has water rates set at $3.25 for 2,000-10,000
gallons, $3.90 for 10,001-25,000, $4.55 for 25,001-40,000 and $5.20 over 40,000
gallons with the first 2,000 gallons of usage continuing to be included in the minimum
bill. The differential between the lowest rate and the highest rate is 60%. The average
differential between Keller and Southlake's lowest rate and highest rate is 59%. These
two cities were utilized as comparison cities for the development of the rate structure
because of their similarity in terms of residential lot size. The monthly effect on
customer's bills for varying usage is 10,000 gallons: ($3.92) decrease; 20,000 gallons:
($2.32) decrease; 30,000 gallons: $2.53 increase; 40,000 gallons: $10.63 increase;
and 50,000 gallons: $25.23 increase. The rates were set using the monthly average of
the six years of usage (FY 2005 - 2010), which included periods of drought and record
breaking rainfall. FY 2011 was not included in the average because the
average monthly usage during this period of record drought and heat was over 4,000
gallons greater than the average monthly usage of the past six years.
Additionally, a few area cities such as Arlington charge a significantly higher rate for
water used in construction meters and for gas drilling operations. The rate is often
double the existing water rate for metered connections. As a part of implementing
tiered water rates, a higher rate for construction meter use could be charged on a per
1,000 gallon basis regardless of the amount used. The current non-tiered water rate
per 1,000 gallons is $3.74 and a rate that is double that amount would be $7.48 per
1,000 gallons.
With a tiered rate structure, there is a risk of not meeting coverage ratio in a year with
heavy rainfall. An adequate reserve fund would need to be maintained to fund items
such as equipment replacement payments to the Colleyville Tomorrow Fund. For years
with significant usage due to drought conditions, revenue received in excess of
City Council Agenda Briefing 2b
coverage ratio requirements could be reserved for future infrastructure
replacement. Additionally, with tiered rates, there is the need for a major public
education effort to inform citizens that greater water usage will increase their utility bill
at an exponential rate. If a tiered rate structure was adopted, it would be planned
that future TRA rate increases would be passed along on an annual basis.
Attachments
1. Water and sewer rate comparison of surrounding-includes tiered rates for Colleyville
2. FY 2012-2016 rate study with FY 2013 tiered water rate implementation
3. Tiered water rate presentation
WATER AND SEWER RATE COMPARISON OF SURROUNDING CITIES EXHIBIT A
WATER RATE COMPARISON OF SURROUN DING CITIES
MINIMUM # OF GALLONS BILL FOR RATE PER CUSTOMER CUSTOMER CUSTOMER
CITY BILL IN MINIMUM 2,000 GALS 1,000 GALS BILL BILL BILL
10,000 GALS 15,000 GALS 20,000 GALS
BEDFORD $18.37 0 $24.15 $2.89 $47.27 $61.72 $76.17
EULESS " $7.95 0 $12.91 $3.54 ^^ $40.19 $61.23 $83.03
GRAPEVINE $9.75 2,000 $9.75 $2.74 $31.67 $45.37 $59.07
HURST $14.18 2,000 $14.18 $5.70 $59.78 $88.28 $116.78
KELLER *` $16.88 0 $20.44 $2.99 ^^ $44.04 $60.39 $76.74
NORTH RICHLAND HILLS " $9.75 2,000 $9.75 $3.94 ^^ $41.27 $60.97 $80.67
SOUTHLAKE" $27.00 2,000 $27.00 $3.45 ^^ $52.36 $70.71 $89.06
AVERAGE $14.84 $16.88 $3.61 $45.23 $64.10 $83.07
COLLEYVILLE CURRENT $12.52 2,000 $12.52 $3.74 $42.44 $61.14 $79.84
VARIANCE IN RATES ($z.32) ($4.36) $0.13 ($2.79) ($2.96) ($3.23)
AVERAGE $14.84 $16.88 $3.61 $45.23 $64.10 $83.07
COLLEYVILLE TIERED RATE - $12.52 2,000 $12.52 ~3.61 ^^ $38.52 $58.02 $77.52
VARIANCE IN RATES ($2.32) ($4.36) $0.00 ($6.71) ($6.08) ($5.55)
'* TIERED WATER ARE IN EFFECT IN THE FOLLOWING CITIES:
" EULESS' WATER RATE IS $2.48 FOR 0 TO 2,000 GALLONS, $3.41 FOR 3,001 TO 8,000 GALLONS, $3.98 FOR 9,000 TO 15,000
GALLONS, $4.36 FOR 16,000 TO 35,000 GALLONS, AND $4.96 FOR ALL USAGE ABOVE 35,000 GALLONS
'" KELLER'S WATER RATE IS $178 FOR 0 TO 2,000 GALLONS, $2.95 FOR 2,000 TO 10,000 GALLONS, $3.27 FOR 10,001 TO 20,000 GALLONS,
$370 FOR 20,001 TO 25,000 GALLONS, $4.81 FOR 25,000 TO 40,000 GAILONS, AND $5.24 FOR ALL USAGE ABOVE 40,000 GALLONS
" NORTH RICHLAND HILLS' WATER RATE IS $3.94 FOR 2,000 TO 22,440 GALLONS AND $4.02 FOR ALL USAGE ABOVE 22,440 GALLONS
" SOUTHLAKE'S WATER RATE IS $3.17 FOR 2,000 TO 10,000 GALLONS, $3.67 FOR 10,001 TO 25,000 GALLONS
AND $3.92 FOR 25,000 TO 40,000, AND $4.42 FOR ALL USAGE ABOVE 40,000 GALLONS
- COLLEYVILLE'S PROPOSED WATER RATE IS $3.25 FOR 2,000 TO 10,000 GALLONS, $3.90 FOR 10,001 TO 25,000 GALLONS
AND $4.55 FOR 25,000 TO 40,000, AND $520 FOR ALL USAGE ABOVE 40,000 GALLONS
^^ RATES SHOWN ARE THE AVERAGE OF THE TIERED RATE USAGE OF 0-20,000 GALLONS
SEWER RATE COMPARISON OF SURROUNDING CITIES
CITY MINIMUM # OF GALS BILL FOR RATE PER WINTER CUSTOMER
BILL IN MINIMUM 2,000 GALS 1,000 GALS AVERAGE BILL
BILL BILLED 10,000 GALS
BEDFORD $10.88 0 $14.32 $1.72 Y $28.08
EULESS $6.75 0 $12.15 $2.70 N $33.75
GRAPEVINE $7.80 2,000 $7.80 $3.26 Y $33.88
HURST $10.27 0 $16.85 $3.29 Y $43.17
KELLER $11.85 0 $17.69 $2.92 Y $41.05
N RICHLAND HILLS $8.12 0 $11.92 $1.90 Y $27.12
SOUTHLAKE $26.16 2,000 $26.16 $3.00 N $50.16
AVERAGE $11.69 $15.27 $2.68 Y $36.74
COLLEYVILLE CURRENT $8.80 2,000 $8.96 $2.35 Y $27.76
VARIANCE IN RATES ($2.89) ($6.31) ($0.33) ($8.98)
FIVE YEAR PROJECTION OF UTILITY FUND EXPENSESICOVERAGE FY 2012 - FY 2016 EXHIBIT B
IMPLEMENTATION OF TIERED WATER RATES AND PASS THROUGH OF TRA RATE INCREASES
ASSUMPTIONS: 70 NEW WATER/SEWER CUSTOMERS ANNUALLY
5% WATER REDUCTION BEGINNING IN FY 20141 NO ADDITIONAL REDUCTION IN FY 2015 AND 2016
FISCAL YEAR 2012 2013 2014 2015 2016
AVERAGE ANNUAL WATER CUSTOMERS 9,128 9,198 9,268 9,338 9,408
AMOUNT DERIVED FROM MINIMUM BILL $1,325,386 $1,335,550 $1,345,714 $1,355,878 $1,366,042
AMOUNT DERIVED FROM VOLUME CHARGE $7,423,912 $8,180,552 $7,829,311 $7,888,534 $7,947,698
AVERAGE ANNUAL SEWER CUSTOMERS
AVERAGE MONTHLY USAGE
AMOUNT DERIVED FROM MINIMUM BILL
AMOUNT DERNED FROM VOLUME CHARGE
3,512 8,582 8,652 3,722 8,792
10,100 10,100 10,100 10,100 10,100
$398,867 $906259 $913,651 $921,043 $928,435
$1,878,122 $1,893,567 $1,909,012 $1,924,457 $1,939,902
OPERATING REVENUE
WATER SALES
CUMULATNE TRA PASS-THROUGH WATER RATE INCREASE
WATER MINIMUM BILL TRA PASS THROUGH ON 2,000 GALLONS
SEWER CHARGES
CUMULATNE TRA PASS-THROUGH SEWER RATE INCREASE
SEWER MINIMUM BILL TRA PASS THROUGH ON 2,000 GALLONS
WATER INSTALLATION
SEWER INSTALLATION
ENGINEERING AND DEVELOPMENT
PENALTY
SEWER TIE ON REVENUE
MISC REVENUE
$8,749,298 $9,516,102
$364,207 $545,257
$38,338 $57,396
$2,776,989 $2,799,326
$65,372 $189,491
$16,343 $47,373
$21,000 $21,000
$7,000 $7,000
$5,000 $5,000
$180,158 $195,760
$5,000 $5,000
$13,000 $13,000
$9,175, 524
$802,980
$84,524
$2,822,663
$398,684
$99,671
$21,000
$7,000
$5,000
$197,998
$5,000
$13,000
$9,244,412 $9,313,740
$351,626 $900,910
$89,645 $94,833
$2,845,500 $2,868,337
$519,133 $633,024
$129,783 $158,256
$21,000 $21,000
$7,000 $7,000
$5,000 $5,000
$201,910 $205,740
$5,000 $5,000
$13,000 $13,000
TOTAL OPERATING REVENUE
OPERATING EXPENSES:
ADMINISTRATION
BILLING
OPERATIONS
TRA WATER
TRA SEWER
OPERATING TRANSFER
TOMORROW FUND REPAYMENT
TOTAL OPERATING EXPENSES
OPERATING INCOME
PLUS NON-OPERATING REVENUE QNT INCI
NETINCOME
CALCULATION OF AMOUNT AVAILABLE FOR DEBT COVERAGE
ANNUAL DEBT SERVICE
2002 REFUNDING SERIES
2004 REFUNDING SERIES
2010 REFUNDING BOND ISSUE
ANNUAL DEBT SERVICE
AMOUNT AVAILABLE FOR COVERAGE RATIO
AMOUNT NEEDED FOR COVERAGE RATIO
AMOUNT AVAILABLE FOR CIP/REHAB
TARGET COVERAGE RATIO
ACTUAL COVERAGE RATIO
PASS THROUGH TRA RATE INCREASES
$12,241,705 $13,402,204 $13,633,044 $13,533,009 $14,225,340
$223,405 $227,373 $232,431 $237,079 $241,821
$356,883 $364,021 $371,301 $378,727 $386,302
$1,930,026 $1,934,381 $1,973,069 $2,012,530 $2,052,781
$6,078,7G8 $6,402,667 $6,422,492 $6,471,000 $6,519,508
$1,695,078 $1,968,046 $2,261,124 $2,423,216 $2,585,740
$901,829 $956,469 $1,044,054 $1,055,988 $1,076,854
$44,286 $44,286 $44,286 $44,286 $44,286
$11,230,274 $11,897,743 $12,348,756 $12,627,326 $12,907,291
$1,011,431 $1,504,461 $1,284,289 $1,305,183 $1,318,549
$20,300 $20,300 $20,300 $20,300 $20,300
$1,031,731 $1,524.761 $1,304,589 $1,325,483 $1,338,849
$249,288 $0
$202,624 $195,723
$381,100 $632,100
$833,012 $827,823
$1,031,731 $1,524,761
$999,G14 $993,338
$32,116 $531,373
1.20 1.20
1.24 1.84
$0
$198,673
$620,500
$819,173
$1,304,589
$983,003
$321,581
1.20
1.59
$0 $0
$0 $0
$490,100 $365,325
$490,100 $365,325
$1,325,483 $1,333,849
$588,120 $438,390
$737,363 $900,459
1.20 1.20
2.70 3.66
ANNUAL PASS THROUGH TRA WATER INCREASE - PER 1,000 GALLON $0.21 $0.05 $0.12 $0.02 $0.02
CUMULATIVE TRA RATE INCREASE FROM CURRENT RATES $0.21 $0.26 $0.38 $0.40 $0.42
ANNUAL PASS THROUGH TRA SEWER INCREASE - PER 1,000 GALLON $0.08 $0.15 $0.25 $0.14 $0.13
CUMULATIVE TRA RATE INCREASE FROM CURRENT RATES $0.08 $0.23 $0.48 $0.62 $0.75
Tiered Water Rate Presentation
City Cou nci I Worksession
Decem ber 8, 2011
Considerations i n Setti ng Water a nd
Sewer Rates
• Meet debt coverage ratio covenant - 1.20 times
• Include future projected annual rate increases
from Trinity River Authority (TRA) for treated
water and sewer
• Funding of infrastructure needs (new or
replacement)
~
`' `,~`~
CdLLEYVILLE
~
Tiered Water Rates ( H ig her Cost Per
1,000 gallons for Higher Usage)
• Encourages water conservation by customers
• Customers with greater usage pay a greater
portion of the capital cost of providing treated
water
• Tiered rates i n effect i n Eu less, Kel ler,
North Richland Hills and Southlake
• In high rainfall years, there is a risk of not
meeting coverage ratio
~
`' `,~`~
CdLLEYVILLE
~
Cities Uti I izi ng Tiered Water Rates -
Ta rra nt Cou nty
Arl i ngton
Euless
Keller
North Richland Hills
Southlake
Benbrook
Fo rt W o rt h
Mansfield
Sag i naw
~
`' `,~`~
CdLLEYVILLE
~
Cities Uti I izi ng Tiered Water Rates -
Dallas County
Coppell
DeSoto
Garland
Highland Park
Mesq u ite
Rowlett
Dallas
Farmers Branch
Grand Prairie
Irving
Richardson
University Park
~
`' `~~
~~LLEYVILLE
~
Cities Uti I izi ng Tiered Water Rates -
Col I i n a nd Denton Cou nties
Allen
Corinth
Flower Mou nd
Carrollton
Denton
Frisco
Highland Village McKinney
Plano
The Colony
Roanoke
Trophy Club
~
`' `,~`~
CdLLEYVILLE
~
Comparison Cities - Tiered Rates
• Keller
- Lowest rate: $2.95 (0 - 10,000 gallons)
- Highest rate: $5.24 (over 40,000 gallons)
- Rate differential: 78%
• Southlake
- Lowest rate: $3.17 (0 - 10,000 gallons)
- Highest rate: $4.42 (over 40,000 gallons)
- Rate differential: 39%
~
`' `~~
~~LLEYVILLE
~
Proposed Tiered Water Rates
Current rate per 1,000 gallons -$3.74
Differential of lowest to highest rate - 60%
First 2,000 gallons of usage continues to be
included in the minimum bill
Tiered rate break points
(20% increase between tiers):
2,000 - 10,000 gallons $3.25
10,001 - 25,000 gallons $3.90
25,001 - 40,000 gallons $4.55
Over 40,000 gallons $5.20
~
` t ~~`~`~
CdLLEYVILLE
~
Effect of Tiered Water Rates
Water Current Tiered Difference
Usage Rates Rates
10,000 $42.44 $38.52 ($3.92)
20,000 $79.84 $77.52 ($2.32)
30,000 $117.24 $119.77 $2.53
40,000 $154.64 $165.27 $10.63
50,000 $192.04 $217.27 $25.23
~
` t ~~`~`~
CdLLEYVILLE
~