HomeMy WebLinkAboutParks and Rec Advisory Board-Agenda Packets-01/13/2020City of Colleyville Page 1
City of Colleyville
Parks and Recreation
Advisory Board
Agenda
City Hall
100 Main Street
Colleyville, Texas 76034
817. 503.1000
www.colleyville.com
Monday, January 13, 2020
6:00 p.m.
Colleyville Center
5301 Riverwalk Drive
1.CALL TO ORDER
2. APPROVAL OF MINUTES
November 4, 2019
3.REGULAR AGENDA ITEMS
3a Update on Park Restroom Projects
3b Update on future projects from the 2018 Parks, Recreation and Open
Space Master Plan
3c 2019 Citizen Survey update
3d Discussion of 2020 meeting dates
4.REPORTS
4a Parks and Recreation report
5.ADJOURNMENT
I hereby certify this agenda was posted on City Hall bulletin boards Friday,
January 10, 2020 by 5:00 p.m.
Joyceinne Williams
Administrative Secretary
A quorum of the Colleyville City Council and/or any other Colleyville Board,
Commission, or Committee may be in attendance at this meeting.
Any matter on this agenda may, at the discretion of the governing body, be
opened for public comment and discussion.
If you plan to attend this public meeting and have a disability that requires special
accommodations, please advise the Administrative Assistant at least 48 hours in
advance at 817.503.1180, and reasonable accommodations will be made to assist
you.
City of Colleyville Page 1
City of Colleyville
Parks and Recreation
Advisory Board
DRAFT MINUTES
City Hall
100 Main Street
Colleyville, Texas
76034
817.503.1000
www.colleyville.com
Monday, November 4, 2019
6:00 p.m.
Colleyville Center
5300 Riverwalk Drive
1. CALL TO ORDER
Chair Rich Hendler called the meeting of the Parks and Recreation Advisory Board
to order on November 4, 2019, at 6:00 p.m.
Present: Chair Rich Hendler, Vice Chair Mitali Mandlekar and Board Members:
Cliff LeBlanc, John Hillebrand, Justin Fairless, Ajit Purandare, Eric Presson and
Hillary Schwanbeck
City staff: Assistant City Manager Adrienne Lothery, Parks and Recreation Director
Lisa Escobedo, and Administrative Secretary Joyceinne Williams
Pedestrian Transportation Committee Members: Chair Rich Hendler, Vice Chair
David Dudziak and Board Members: Eric Presson, Cliff LeBlanc, Jennifer Johnson,
and Donn Hethcock,
2. APPROVAL OF MINUTES
Board member Eric Presson moved to approve the September 16, 2019
minutes. Board member Cliff LeBlanc seconded the motion. The motion
carried unanimously.
3. REGULAR AGENDA ITEMS
3a Pedestrian Transportation Committee Presentation
David Dudziak, Vice Chair of the Pedestrian Transportation Ad Hoc
Committee reviewed the work and recommendations of the committee.
The committee presented maps with their recommendations for sidewalks,
trails, and bike routes to provide pedestrian transportation within the City
and interconnectivity to other cities.
In developing the recommendations, the Committee established Bransford,
Glade, Jackson, LD Lockett and Bedford Roads as the key areas to be
prioritized for pedestrian safety.
Parks and Recreation
Advisory Board MINUTES November 4, 2019
City of Colleyville Page 2
School access priorities included connectivity through adjoining
neighborhoods to include:
OC Taylor Elementary – from Arbor Trail
Glen Hope Elementary – from Ross Downs/Huntington Meadows
Colleyville Middle/Elementary – from Hardage Estates
Liberty Elementary – from Cimmaron Trail
Board member Ajit Purandare inquired why Bransford Elementary School is
not included in the connectivity plan.
Assistant City Manager Adrienne Lothery explained that discussion of schools
on this list primarily focused on gaining access from the back of properties
through neighborhoods. Bransford Elementary is included in the CIP which
includes the Glade Road trail installation. In 2018, the Council updated
policy for requirements for sidewalks, pending recommendations of the
update of the 2008 street map.
Connections to Parks and other trails - The Council priority request was to
see connectivity from the Nature Center over to Sparger Park. The
committee recommended connectivity to trail systems in adjoining cities and
the creation of “The Colleyville Loop”, which provides pedestrian
transportation around the City. The committee outlined their
recommendations on maps that will be submitted to Council.
Assistant City Manager Adrienne Lothery stated that some gated
communities have previous agreements in place and some adjacent
properties would require negotiating to provide connectivity. Several areas
of land acquisition for trail connections in Colleyville are going to be
challenging.
To assist the public in understanding and locating pedestrian bike routes, the
committee recommended consistent signage for all pedestrian and bike
routes. An “Adopt a Trail” program was also suggested to pursue potential
designations as a bike friendly or pedestrian friendly community.
Vice Chair Mitali Mandlekar requested that once the recommendations for the
trails masterplan are approved, an effort should be made to save as many
existing trees as possible, especially for the proposed trail segments that
may run along very narrow (street) public right -of- ways such as Bedford
Road.
Parks and Recreation
Advisory Board MINUTES November 4, 2019
City of Colleyville Page 3
Board member John Hillebrand suggested that once these recommendations
go forward they stay as a high priority.
Assistant City Manager Adrienne Lothery stated that the recommendations
are included in the CIP and that staff is presently seeking available grant
opportunities.
Board member Ajit Purandare moved to accept the recommendations of the
Pedestrian Transportation Committee. Board member Hillary Schwanbeck
seconded the motion. The motion carried unanimously.
The committee will be presenting the presentation to Council on November
19, 2019.
3b. Update of Parks, Recreation, and Open Space Master Plan Projects
Parks and Recreation Director Lisa Escobedo reported on the update of the
Capital Project priority rankings that the Parks Board submitted to Council.
These rankings have been completed or are currently in progress. Several of
the projects will be taken into consideration, by the Council, from the
feedback of the citizen survey report.
Pleasant Glade Tract (behind Senior Center)
Trails–Implement the Trails Plan
Trails–Develop a trail between Sparger Park and the Colleyville
Nature Center
Senior Center–Renovate Senior Center and add a multi-purpose
program center
Colleyville Nature Center Restroom Building
Colleyville Nature Center-Signage and wayfinding system
L.D. Lockett–Clear out vegetation from drainage channel
City-wide–Provide accessible walkways to all playgrounds, picnic
shelters, athletic fields and spectator areas to meet ADA guideline
Reagan Park-New restroom building
Kimzey Park–Dredge pond
City Park-Replace and enlarge shade shelters over spectator areas
City Park-Both restroom/concession Buildings
City Park-Small playground near ballfields with shade cover
City Park-Additional netting at ball diamonds for spectator safety
McPherson-Rehabilitate the two historic mud house barns
Athletic Fields-Upgrade turf on all fields
Recreation Center
Parks and Recreation
Advisory Board MINUTES November 4, 2019
City of Colleyville Page 4
Senior Center-Develop a new Senior Center Wing on the Recreation
Center with meeting and program space, kitchen, computer lab, game
room, craft room
Recreation Center-Develop an indoor pool as part of the proposed
Recreation Center
Individual Park Projects include:
Bransford/Webb House
Modify Webb House to allow for public use – completed Summer 2019
Decorate in a period appropriate manner – Fall 2019
Utilize as a trail stop and family gathering place - Fall 2019
Add trees and landscaping – completed Fall 2019
City Parks
Upgrade restroom buildings – bid Spring 2020
Update concession – bid Spring 2020
Replace shade structures over dugouts and replace and enlarge shade
over spectator areas – completed Summer 2019
Expand backstop netting – completed Summer 2019
Add small playground near ball diamonds with a shade cover –
scheduled for 2019/2020
Board member Hillary Schwanbeck noted a problem with the need for
additional netting between the backstop and dugout in the quad area.
Colleyville Nature Center
Install a restroom building – bid Spring 2020
Install improved signage and wayfinding signage system – pond sign
installed Spring 2019; wayfinding and signage 2020
Colleyville Senior Center and Pleasant Glade Tract
Colleyville Senior Center and Pleasant Glade Tract-currently reviewing
the 2019 citizen survey
Kimzey Park
Dredge the pond – complete Fall 2018-stocked fish in Spring 2019
McCain Park
Parks and Recreation
Advisory Board MINUTES November 4, 2019
City of Colleyville Page 5
Improvements to be considered in the SH26 landscape design
project
McPherson Park
Complete development of Community Garden – Advisory Committee
was formed in January 2019 and the group is working towards the
creation and implementation of a community garden
Rehabilitate the two mud house barns for future functionality –
completed Spring 2019
Pleasant Run Soccer Complex
Recently replaced(2) of the practice light poles and fixtures and
Inspected the integrity of all of the soccer complex athletic light
poles
Reagan Park
Add a small restroom building – bid Spring 2020
Upgrade irrigation system – completed Winter 2018
City Park
Fields 4, 5, & 6 laser graded in 2019. Upgrade of fields 8 & 9 will
be in the future.
Sparger Park
Replaced playground material
Improve connections to Tara neighborhood trail system – Public
Works rehabilitated the bridge from Sparger Park to Tara Trail
Board member Cliff LeBlanc asked about future projects for Parks and Recreation.
Assistant City Manager Adrienne Lothery and Parks and Recreation Director Lisa
Escobedo responded with the following:
Bathrooms are a major project in Spring and Summer 2020
Quad area improvements for shade in the softball area
Batting cage warmup area for softball area
Sparger Park install a more permanent child type play area
Moving sand volleyball courts
Several other maintenance projects – resurfacing new tennis courts
Parks and Recreation
Advisory Board MINUTES November 4, 2019
City of Colleyville Page 6
McPherson Park beautification project/Rock House
Lighting package for Hwy. 26 is out for bid
Working on median and right of way landscaping package for bidding
3c. Discussion of Tree Board and Park Land Dedication Committees
Assistant City Manager Adrienne Lothery discussed the recommendations
from Council on the future of the Tree Board and Park Land Dedication
Committee. It was recommended that the Parks and Recreation Board
acquire the duties of the Tree Board and the Park Land Dedication
Committee.
4. Reports
4a. Parks and Recreation
Director Lisa Escobedo provided the board with the following information:
Winter Ball–registration begins December 16, 2019; Event January 24, 2020
2020 Winter brochure will be mailed out in early December
All Fall athletic sports will be ending-sand volleyball championship game
had to be rescheduled because of inclement weather
Senior Halloween Party was held on October 30, 2019
Senior Holiday Dance is scheduled for December 18, 2020
Pleasant Run Soccer Complex was over-seeded with rye
Have implemented an after hour answering installed for parks
Installed baby changing table in all park restrooms in the men and
women bathrooms
Leslie Hill planted 22 new trees at Colleyville Center
Tree Mitigation project (including from John McCain going north toward
Timarron along the Cottonbelt) is wrapping up
Finishing the Webb House
Upcoming Events:
Sand volleyball pit relocation should be completed in January
Working with vendors to get quotes and bids for fiscal year 2020 projects
The ribbon cutting for the new Plaza is scheduled for Thursday, December 3.
Friday, December 6, Tree Lighting Event at the Plaza
The Board discussed ways to improve the Haunted Trail Event for next year.
Parks and Recreation
Advisory Board MINUTES November 4, 2019
City of Colleyville Page 7
Chair Hendler suggested that the projects on the 2018 Parks, Recreation, and
Open Master Plan list, that are not highlighted, be discussed at our next board
meeting.
Chair Hendler also discussed submitting an agenda item for the March 2020
meeting inviting the Sports Association to attend.
Assistant City Manager Adrianne Lothery discussed letters will be sent out,
by Council, asking for the extension for board members service that are
expiring in 2019.
Next Scheduled Meeting:
Board member Cliff LeBlanc motioned that the January 6, 2020 meeting is moved
to January 13, 2020. Vice Chair Mitali Mandlekar seconded the motion. The
motion carried unanimously.
ADJOURNMENT
Board member Eric Presson moved to adjourn the meeting, and Board member
Cliff LeBlanc seconded. Motion carried unanimously. Chair Rich Hendler adjourned
the meeting at 7:36 p.m.
Minutes prepared by:
Joyceinne Williams
Administrative Secretary
City of Colleyville Page 1
City of Colleyville
Parks and Recreation
Advisory Board
Agenda Briefing
City Hall
100 Main Street
Colleyville, Texas 76034
www.colleyville.com
Agenda Number 3a Agenda Date 1/13/2020 Number
Type Regular Agenda Items
Department City Secretary
Title
Update on Park Restroom Projects
Explanation
Attachments
1.COLLEYVILLE PARK FACILITY PRESENTATION 12.17.19
PREPARED BY HIDELL ARCHITECTS 2018
COLLEYVILLE PARKS Nature Center Park Restroom
Reagan Park Restroom
City Park Facility Renovations
City Council Presentation
December 17, 2019
COLLEYVILLE PARKS
Existing
playground
PREPARED BY HIDELL ARCHITECTS 2019
Nature Center Park Restroom
Project Scope
New restroom
structure
Existing tree
Existing
parking
Existing covered
shelter
New Blue Light
Tower along existing
trail
QUICK FACTS:
•Existing playground to remain
•Existing parking to remain
•Existing covered shelter to remain
•Two new unisex restrooms
•New blue lights along trail
Estimate of construction cost -$351,000
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
Nature Center Park Restroom
Preliminary Plan
Dashed line indicates
covered roof area
New unisex restroom
New drinking fountain
New unisex restroom
New janitor’s /
mechanical room
JANITORUNISEX UNISEX
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
Nature Center Park Restroom
Concept Renderings
NORTH ELEVATION
Steel doors (painted)
Exposed truss
Drinking fountains
Stone veneer columns
Metal roof
Stone veneer
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
Reagan Park Restroom
Material Finishes
INTERIOR MATERIALS
Painted CMU
Metal roof
EXTERIOR MATERIALS
Stone Veneer
Sealed Concrete
COLLEYVILLE PARKS
Existing water tower
PREPARED BY HIDELL ARCHITECTS 2019
Reagan Park Restroom
Project Scope
New restroom
structure
Existing tree
Existing field
Existing batting cages
Existing Parking
QUICK FACTS:
•Existing fields to remain
•Existing batting cages to remain
•Existing parking to remain
•New unisex restroom
•Covered seating area
Estimate of construction cost -$235,500
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
Reagan Park Restroom
Preliminary Plan
Dashed line indicates
covered roof area
New unisex restroom
New drinking fountain
New janitor /
mechanical room
Covered area for new
picnic tables
SEATING
JANITORUNISEX
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
Reagan Park Restroom
Concept Renderings
SOUTH ELEVATION
Exposed truss
Drinking fountains
Stone veneer columns
Metal roof
Steel doors (painted)
Picnic tables
INTERIOR MATERIALS
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
Reagan Park Restroom
Material Finishes
EXTERIOR MATERIALS
Painted CMU
Metal roof Stone Veneer
Sealed Concrete
COLLEYVILLE PARKS
Existing Concession and
Restroom building renovated
PREPARED BY HIDELL ARCHITECTS 2019
City Park Facility Renovations
Project Scope
Existing Parking
Existing Tennis Center
restroom building renovated
Existing Fields
Existing tennis courts
Concession and Restroom Building
Tennis Center Restroom Building
QUICK FACTS:
•New plumbing fixtures in restrooms
•Restrooms heated and cooled
•New tile on walls and floor
•New restroom doors
•Façade updates with new stone veneer
Estimate of construction cost -$503,000
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
Preliminary Plan Concession and Restroom Building
New ceiling and
lighting
City Park Facility Renovations
New toilets, sinks
and urinals
New partition doors
Restrooms shall be heated
and cooled
New floor and wall tile
New restroom doors
CONCESSION MECHANICAL
WOMEN
MEN
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
New floor tile
City Park Facility Renovations
New partition doors
(painted)
New water closets
New urinals
Preliminary Restroom Finishes
RESTROOM INTERIOR
New wall tile over
existing masonry walls
New stone cap at partition
wallsNew sink and mirror
Existing masonry walls
to be painted above tile
New ADA grab bars
New urinals screens
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
City Park Facility Renovations
Material Finishes
INTERIOR MATERIALS
EXTERIOR MATERIALS
Painted CMU
New Stone Veneer Existing Brick
Wall Tile Floor Tile
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
City Park Facility Renovations
Concept Renderings
SOUTH ELEVATION
New stone wainscot
New stone wainscot
BALL FIELD AND CONCESSION BUILDING -OPTION A
Existing brick
to remain
Existing glass block
to remainCast Stone to
remain
Existing brick to remain
Existing wood facia
to be painted
Existing dormers to
be painted
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
City Park Facility Renovations
Concept Renderings
Existing brick to remain
New stone veneer
SOUTH ELEVATION
Existing wood facia
to be painted
Existing dormers to
be painted
Existing cast stone
trim to remain Existing glass block
to remain
Existing brick to remain
BALL FIELD AND CONCESSION BUILDING -OPTION B
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
City Park Facility Renovations
Concept Renderings
New stone wainscot
New stone wainscot
Existing wood facia
to be painted
New stone veneer
Existing brick
to remain
Existing cast stone
trim to remain
SOUTH ELEVATION
Existing glass
block to remain
Existing dormers to
be painted
BALL FIELD AND CONCESSION BUILDING -OPTION C
Existing brick to
remain
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
New ceiling and
lighting
City Park Facility Renovations
New toilets, sinks
and urinals
New partition doors
Restrooms shall be
heated and cooled
New floor and wall tileNew restroom doors
SEATING
MECHANICAL
WOMEN
MEN
Preliminary Plan Tennis Center Restroom Building
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
City Park Facility Renovations
Concept Renderings
New stone wainscot
New stone wainscot
Existing wood facia
to be painted
Existing brick
to remain
Existing brick
to remain
Existing cast stone
trim to remain
NORTH ELEVATION
Existing glass
block to remain
Existing dormers to
be painted
TENNIS CENTER RESTROOM BUILDING -OPTION A
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
City Park Facility Renovations
Concept Renderings
Existing brick to remain
Existing brick to remain
Existing wood facia
to be painted
New stone veneer
Existing brick
to remain
Existing cast stone
trim to remain
NORTH ELEVATION
Existing glass
block to remain
Existing dormers to
be painted
TENNIS CENTER RESTROOM BUILDING -OPTION B
COLLEYVILLE PARKS
PREPARED BY HIDELL ARCHITECTS 2019
City Park Facility Renovations
Concept Renderings
New stone wainscot
New stone wainscot
Existing wood facia
to be painted
New stone veneer
Existing brick
to remain
Existing cast stone
trim to remain
NORTH ELEVATION
Existing glass
block to remain
Existing dormers to
be painted
TENNIS CENTER RESTROOM BUILDING -OPTION C
PREPARED BY HIDELL ARCHITECTS 2019
COLLEYVILLE PARKS Nature Center Park Restroom
Reagan Park Restroom
City Park Facility Renovations
City Council Presentation
December 17, 2019
City of Colleyville Page 1
City of Colleyville
Parks and Recreation
Advisory Board
Agenda Briefing
City Hall
100 Main Street
Colleyville, Texas 76034
www.colleyville.com
Agenda Number 3b Agenda Date 1/13/2020 Number
Type Regular Agenda Items
Department City Secretary
Title
Update on future projects from the 2018 Parks, Recreation and Open Space
Master Plan
Explanation
Attachments
1.Parks Capital Projects Priority Ranking
2.2018 Parks, Recreation, and Open Space Master Plan
City of Colleyville Page 1
City of Colleyville
Parks and Recreation
Advisory Board
Agenda Briefing
City Hall
100 Main Street
Colleyville, Texas 76034
www.colleyville.com
Agenda Number 3c Agenda Date 1/13/2020 Number
Type Regular Agenda Items
Department City Secretary
Title
2019 Citizen Survey update
Explanation
Attachments
1.2019 Citizen Survey Results Presentation 12-17-19
Results Report
December 17, 2019 City Council Worksession
City of Colleyville 2019 Citizen Survey
Parks and Recreation
Q9a. The City of Colleyville is currently evaluating the need for a Multi-purpose Recreation Facility and
whether such an amenity is desired by citizens. The proposed site would be 10 acres, currently home to
the 10,000 square foot senior center (2512 Glade Road). At a minimum, the existing Senior Center is in
need of renovation. All estimates for “cost to taxpayer” are based on average home values. There are
currently four options under consideration. The first two options would involve tearing down the existing
senior center building (a former church). The second two options involve renovating and/or adding on to
the existing building. All estimates assume a mid-level finish out (similar to the REC in Grapevine).
Are you interested in the City providing this type of facility?
67% -Yes
33% -No
New question in 2019 Citizen Survey
Parks and Recreation
Q9a. Comprehensive Option A.
New 45,000 square foot facility (Lifetime Fitness is 108,000 square feet--so about half the size). Includes a gymnasium, senior facilities,
fitness rooms, multi-use rooms, building support space, indoor aquatics, and additional parking. Membership fees could be charged to
offset costs or the cost could all be included and funded through property taxes.
Capital cost of $25-30M; $1.5M annual operating
Cost to taxpayer = $208 for capital + $208 for operating = $416 annual increase to property tax bill
(assumes 0% recovery through membership fees)
*assumes $25M in bonds paid over 20 years (annual debt service of $1.5M) + $5M cash
I am supportive of the City pursing this option:
6%
38%
26%
15%14%
0%
20%
40%
60%
80%
100%
Comprehensive Option A
Strongly Agree
Agree
Disagree
Strontly Disagree
No Opinion
New question in 2019 Citizen Survey
Q9a. Comprehensive Option B.
New 45,000 square foot facility (Lifetime Fitness is 108,000 square feet--so about half the size). Includes a gymnasium, senior facilities,
fitness rooms, multi-use rooms, building support space, indoor aquatics, and additional parking. Membership fees could be charged to
offset costs or the cost could all be included and funded through property taxes.
Capital cost of $25-30M; $1.5M annual operating
Cost to taxpayer = $208 for capital + $104 for operating = $312 annual increase to property tax bill
(assumes 50% recovery through membership fees; membership fees TBD)
*assumes $25M in bonds paid over 20 years (annual debt service of $1.5M) + $5M cash
I am supportive of the City pursing this option:
6%
27%
17%
29%
21%
0%
20%
40%
60%
80%
100%
Comprehensive Option B
Strongly Agree
Agree
Disagree
Strontly Disagree
No Opinion
New question in 2019 Citizen Survey
Parks and Recreation
New question in 2019 Citizen Survey
Parks and Recreation
Q9a. Alternative Option C.
New smaller facility at 30,000 square feet including a gymnasium, senior facilities, fitness rooms, multi-use rooms, building support space,
and additional parking. With this facility, there is reduced focus on the fitness facility and no aquatics. If membership fees were to be
charged, those fees would be less than those appropriate for a comprehensive facility (option 1).
Capital cost of $15-20M; $1.0M annual operating
Cost to taxpayer = $125 for capital + $138 for operating = $263 annual increase to property tax bill
(assumes 0% cost recovery through membership fees)
*Assumes $15M in bonds paid over 20 years (annual debt service of $900K) + $5M cash
I am supportive of the City pursing this option:
8%
38%
31%
16%
6%
0%
20%
40%
60%
80%
100%
Alternative Option C
Strongly Agree
Agree
Disagree
Strontly Disagree
No Opinion
Parks and Recreation
New question in 2019 Citizen Survey
Q9a. Alternative Option D.
New smaller facility at 30,000 square feet including a gymnasium, senior facilities, fitness rooms, multi-use rooms, building support space,
and additional parking. With this facility, there is reduced focus on the fitness facility and no aquatics. If membership fees were to be
charged, those fees would be less than those appropriate for a comprehensive facility (option 1).
Capital cost of $15-20M; $1.0M annual operating
Cost to taxpayer = $125 for capital + $110 for operating = $235 annual increase to property tax bill
(assumes 20% cost recovery through membership fees)
*Assumes $15M in bonds paid over 20 years (annual debt service of $900K) + $5M cash
I am supportive of the City pursing this option:
9%
33%
29%
20%
9%
0%
20%
40%
60%
80%
100%
Alternative Option D
Strongly Agree
Agree
Disagree
Strontly Disagree
No Opinion
Parks and Recreation
New question in 2019 Citizen Survey
Q9a. Option E –Renovation + Add Gymnasium
Includes renovating the existing building (10,000 square feet) and building a gymnasium addition (10,000 square feet). Will consist of
reconfiguring rooms, additional restrooms, and joining the annex building to the main building. As a facility focused on programming (as
opposed to a facility with fitness rooms and/or aquatics), membership fees would not be charged and are not charged currently.
Capital cost of $7-12 M; $500k annual operating
Cost to taxpayer = $41 for capital + $69 for operating = $110 annual increase to property tax bill
*Assumes $5M in bonds paid over 20 years (annual debt service of $300k) + $5M cash
I am supportive of the City pursing this option:
7%
37%
27%
20%
9%
0%
20%
40%
60%
80%
100%
Option E –Renovation + Add Gym
Strongly Agree
Agree
Disagree
Strontly Disagree
No Opinion
Parks and Recreation
Q9a. Option F –Renovation Only
Includes renovating the existing building (10,000 square feet) and building a gymnasium addition (10,000 square feet). Will consist of
reconfiguring rooms, additional restrooms, and joining the annex building to the main building. No gymnasium would be added. As a
facility focused on programming (as opposed to a facility with fitness rooms and/or aquatics), membership fees would not be charged and
are not charged currently.
Capital cost of $2-4 M; minimal operating increase
Cost to taxpayer = $0 for capital + $0 for operating = No increase to property tax bill, no membership fees
*Assumes $4M cash
I am supportive of the City pursing this option:
9%
28%
21%
27%
15%
0%
20%
40%
60%
80%
100%
Option F –Renovation Only
Strongly Agree
Agree
Disagree
Strontly Disagree
No Opinion
New question in 2019 Citizen Survey
15%
9%
9%
6%
21%
14%
27%
20%
20%
16%
29%
15%
21%
27%
29%
31%
17%
26%
28%
37%
33%
38%
27%
38%
9%
7%
9%
8%
6%
6%
0%20%40%60%80%100%
Renovation Onlly - Option F
Renovation + Add Gym - Option E
Alternative Option D
Alternative Option C
Comprehensive Option B
Comprehensive Option A
Strongly Agree Agree Disagree Strongly Disagree No Opinion
Parks and Recreation
Q9a. Summary of Responses
New question in 2019 Citizen Survey
Parks and Recreation
Q9b. Please indicate your preference out of the options given:
4%
5%
29%
6%
6%
6%
29%
15%
0%5%10%15%20%25%30%35%
Other
None of the above
Renovation Only - Option F - no increase to property tax bill, no
membership fees
Renovation + Add Gym - Option E - add 10,000s.f. gymnasium, $110
annual increase to tax bill, no membership fees
Alternative Option D - new 30,000s.f. facility, $235 annual increase to
tax bill, 20% cost recovery of membership fees
Alternative Option C - new 30,000s.f. facility, $263 annual increase to
tax bill, no membership fees
Comprehensive Option B - new 45,000s.f. facility, $312 annual
increase to tax bill, 50% cost recovery of memvership fees
Comprehensive Option A - new 45,000s.f. facility, $416 annual
increase to tax bill, no membership fees
New question in 2019 Citizen Survey
Q9c. What additional amenities would you like to see to enhance our parks?
17%
8%
18%
24%
27%
33%
50%
0%10%20%30%40%50%60%
Other
Skate Park
Frisbee Golf
Fitness Equipment
Pickleball
Splash Pad
Dog Park
New question in 2019 Citizen Survey. Responses will add to more than 100% due to multiple answers allowed.
Parks and Recreation
Summary
ECONOMIC DEVELOPMENT
•The City should serve an active role regarding economic development. 91% indicated the City should be very or somewhat proactive in this effort.
•The role of economic development is to diversify the City’s tax base. 77% agree with this statement.
•71% are aware of the City’s efforts and promotions to incentivize shopping locally.
COMMUNITY EVENTS
•89% feel community events build a sense of community. Very satisfied and satisfied ratings were high
(88% to 97%) for all community events except Farmers Market which scored 67% satisfaction (very satisfied/satisfied).
INFRASTRUCTURE REPLACEMENT
•53% feel the city is providing the proper amount of road construction, while 24% feel there is not enough construction.
•Regarding road construction, 55% prefer shorter duration with greater frequency, while one-third prefer
longer duration with less frequency.
PARKS AND RECREATION
•A growing number of citizens are interested in the City providing a multi-purpose recreation center.
•The two options with strongest preference are Comprehensive Option B and Renovation only.
•Other park amenities citizens would like to see added (top four) dog park, splash pad, pickleball and fitness equipment.
City of Colleyville Page 1
City of Colleyville
Parks and Recreation
Advisory Board
Agenda Briefing
City Hall
100 Main Street
Colleyville, Texas 76034
www.colleyville.com
Agenda Number 3d Agenda Date 1/13/2020 Number
Type Regular Agenda Items
Department City Secretary
Title
Discussion of 2020 meeting dates
Explanation
Attachments
City of Colleyville Page 1
City of Colleyville
Parks and Recreation
Advisory Board
Agenda Briefing
City Hall
100 Main Street
Colleyville, Texas 76034
www.colleyville.com
Agenda Number 4a Agenda Date 1/13/2020 Number
Type Report
Department City Secretary
Title
Parks and Recreation report
Explanation
Attachments