HomeMy WebLinkAboutOrdinances (O-10-1779)-12/06/2010ORDINANCE 0-10-1779
~ AN ORDINANCE OF THE CITY OF COLLEYVILLE, TEXAS, AMENDING THE
I COMPREHENSIVE ZONING ORDINANCE OF THE CITY OF COLLEYVILLE, TEXAS,
AS HERETOFORE AMENDED; BY AMENDING THE OFFICIAL ZONING MAP BY
i AUTHORIZING A SPECIAL USE PERMIT FOR A GAS WELL ON 13.2 ACRES
"' LOCATED IN THE WILLIAM E. CROOKS SURVEY, ABSTRACT NUMBER 295 AND
LOT 1, BLOCK 1, PARK PLACE ESTATES; PROVIDING A SAVINGS CLAUSE;
'i PROVIDING FOR INJUNCTIVE RELIEF; PROVIDING A SEVERABILITY CLAUSE;
~' PROVIDING A PENALTY OF FINE NOT TO EXCEED THE SUM OF TWO
; THOUSAND DOLLARS ($2,000.00) FOR EACH OFFENSE; AND PROVIDING AN
; EFFECTIVE DATE
` WHEREAS, the City of Colleyville has received an application for a Special Use Permit
under Case No. ZC10-022; and
' WHEREAS, the City of Colfeyville deems it necessary, for the purpose of promoting the
' health, safety, morals, or general welfare of the City to enact a new zoning
ordinance; and
, WHEREAS, the City Council has appointed a Planning and Zoning Commission to
recommend the boundaries of the various original zoning districts and
appropriate regulations be enforced therein and to recommend a new
zoning ordinance; and
WHEREAS, the Planning and Zoning Commission has divided the City into districts
and has prepared regulations pertaining to such districts in accordance
with a comprehensive plan, designed to lessen congestion in the streets;
to secure safety from fire, panic, and other dangers; to promote health,,
general welfare; to provide adequate light and air; to prevent the'~
overcrowding of land; to avoid undue concentration of population; to
facilitate the adequate provision of transportation, water, sewerage,
schools, parks and other public requirements; and
' WHEREAS, the Planning and Zoning Commission, has given reasonable consideration
to, among other things, the character of the districts and their peculiar
suitability for particular uses, with a view to conserving the value of
buildings and encouraging the most appropriate use of land throughout
the City; and
WHEREAS, the Planning and Zoning Commission of the City of Colleyville and the City
' of Colleyville City Council, in compliance with the Charter of the City of
Colleyville, and State Law with reference to changes to zoning',
j classifications under the Zoning Ordinance Regulations and Zoning Map,',
j having given the requisite notices by publication and otherwise, and after'~,
~ holding due hearings and affording a full and fair hearing to all the !
property owners generally, and to the persons interested and situated in
Ordinance 0-10-1779
Page2of6
the affected area and in the vicinity thereof, the governing body of the City
~~ of Colleyville is of the opinion that said change in zoning should be made.
i' NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
'~ COLLEYVILLE, TEXAS:
Sec. 1. THAT all the foregoing premises and findings are found to be true and
correct and are incorporated into trie body of this ordinance as if copied in
; ; their entirety.
Sec. 2. THAT the Comprehensive Zoning Ordinance of the City of Colleyville,
Texas, be, and the same is herehy amended by amending the official
zoning map by authorizing a Special ~Jse Permit for a Gas Well on 13.2
acres located in the William E. Crooks Survey, Abstract Number 295 and
the Lot 1, Block 1, Park Place Estates, shown on Exhibit "A" and described
in Exhibit "B".
Sec. 3. THAT the above described tract of lard shown on Exhibit "A" and described
in Exhibit "B" shall be used only in the manner and for the purposes
provided by the Comprehensive Zoning Ordinance of the City of Colleyville
as heretofore amended and as amended herein.
Sec. 4. THAT the above described tract of iand shall be subject to the following
conditions:
1. General
a. This Special Use Permit (SUP) shall be for a gas well to include drilling ;
and production as described in Exhibit "C". ~
~
b. The gas well authorized by this ~UP shall meet all requirements of the
Land Development Code except where amended herein. Additionally,
the gas well shall meet all related regulatory requirements of the State of
Texas and the Federal Government.
c. Effective on the approval date of this ordinance, all provisions of
Chapter 3.1-Oil and Gas Well Drilling and Production in the Land
Development Code as they exist on said date are hereby adopted by
reference through the passage of this ordinance.
d. All wells approved by this ordinance shall be drilled no later than five
years from the date of approval of this ordinance.
Ordinance 0-10-1779
Page3of6
2. Site Plan
a. The layout of all equipment, tanks and access roads shall be consistent
with the site plans labeled as Exhibits "D" and "E".
b. The well drilling and production site shall contain no more than 2 acres
as shown on Exhibits "D" and "E".
3. Drillinq Activities
a. The primary drilling apparatus shall not exceed 160 feet in height.
c. A 1.4 acre fresh water pit shall be installed during the drilling process
and shall be stocked with fish in order to mitigate for any mosquito
breeding.
d. Prior to the commencement of drilling activities, the existing six (6) inch
water line that services the property shall be upgraded to a minimum
eight (8) inch water line. In lieu of installation, funds equaling the cost of
installation may be placed into escrow with the City for future installation.
e. Any equipment or well leaks shall be reported to the administrative
officer immediately and shall be posted on the City's website within 24 I
hours.
f. The Fire Marshal shall be provided with any state of the art equipment ~~
necessary in order to determine equipment leakage; either airborne or ~;
waterborne. '
4. Production '~
a. The production pad shall contain no more than 14 water storage tanks. '
The tanks shall be no larger than 16 feet in diameter and eight (8) feet in
height. The production site shall generally be laid out per Exhibits "D" I'
and "E". '',
5. Access and Transportation I'~
a. The truck transportation route for all trucks over one-ton that will access'
this site be as follows: Southbound State Highway 26 to Tinker Road,
thence west on Tinker Road to Pleasant Run Road, thence north on !
Pleasant Run Road to the site entrance. The route exiting the site shall'
follow the route to the site in reverse. ~
~
b. During drilling operations there shall be no more than 35 truckloads over'~'
Ordinance 0-10-1779
Page 4 of 6
a three-day period befinreen the hours of 7:00 a.m. and 7:00 p.m. with an
average of 1.5 trucks per hour for both move-in and move-out.
Otherwise, there shall be no more than ten personal vehicles entering
and leaving the site for 10 workers on a daily basis.
c. During the fracturing (completion) process, there shall be no more than
20 truckloads per day over a maximum 11-day period between the hours
of 7:00 a.m. and 7:00 p.m. with an average of 1.5 trucks per hour.
d. During the production phase, there shall be no more than 0.5 trucks per
day per wefl.
e. The access road to the well site shall be composed of an all-weather, 25
foot wide, concrete surface. There shall be adequate space provided for
emergency vehicles to turnaround on the pad site at all times. The
turnaround dimensions shall meet the minimum requirements of the
Land Development Code.
The gate for the site shall be composed of decorative wrought iron and
shall be located 85 feet back from Pleasant Run Road. At a minimum '
the gate shall meet the minimum requirements for gates in Chapter 14- '
Engineering Design of the Land Development Code.
6. Landscapinq
a. All landscaping shall be installed as shown and described in the
attached Exhibit "F" and as required in Chapter 3.1 of the Land
Development Code prior to the commencement of any well production.
7. Liqhtinq
a. All site lighting shall illuminate onto the site and shall not directly
illuminate onto any surrounding properties or onto the property owner's
residence. Drilling rig lighting shall not be a nuisance and shall
illuminate at the minimum level of lighting allowed by the State of Texas
for drilling rigs.
8. Environmental Impact
a. All erosion control shall, at a minimum, meet the erosion control plan
attached as Exhibit "G". Additionally, all stormwater run-off from the pad
site shall contain no pollutants. There shall, at a minimum, be spill
berms and containment rings surrounding all drilling and production
equipment in order to mitigate point-source pollution from all surrounding
watersheds.
Ordinance 0-10-1779
Page5of6
b. At a minimum, airborne emissions of pollutants shall be mitigated per the '.
emission control plan described in Exhibit "H".
c. In order to insure compliance with all state and federal air quality
standards an independent, third-party air quality inspection company
shall perform periodic air-quality inspections, including measurements of
airborne volatile organic compounds, at the site area prior to drilling
operation and during all phases of drilling and production operations.
The determination of ineasurement points, compounds to be measured,
the frequency of inspections, threshold limits, as well as baseline
measurements of pre-drilling ambient air quality shall be performed by
the inspection company. The company shall be chosen and contracted
by the City of Colleyville. The gas well operator shall reimburse the City
of Colleyville for said contracted services upon receipt of invoice from
the City of Colleyville. At a minimum, in the event that a measurement',
exceeds an established threshold, the appropriate state and/or federal ;
air-quality enforcement agency shall be notified of the measurement I
within 24 hours of the observation. ;
d. There shall be no mud or dirt laid upon any City street as a result of the
activity authorized by this SUP. Any mud or dirt created shall be
removed by the operator from streets immediately.
9. Pipeline. The planned pipeline route is shown on Exhibit "I". Changes
to the portion of the route within the City's corporate limits will be
addressed through the pipeline permitting process, and shall not require
an amendment to this ordinance. The portion of the pipeline within the
City's corporate limits will be regulated by the City's pipeline ordinance
and other applicable local, state, and federal regulations in effect at the
time the pipeline operator files an administratively complete application
for a pipeline permit. Approval of this ordinance confers no vested rights
or other rights on the pipeline operator with respect to the construction of
the pipeline. If changes are proposed to the portion of the pipeline
within the City's corporate limits, the gas well operator will cooperate
with the City and the pipeline operator, if requested, to assist in selecting
a mutually acceptable route within the City's corporate limits.
10.Waivers. The well bore setback requirements for all structures within
1,000 feet of the gas well bores approved by this ordinance are hereby
waived. This waiver shall only apply to all structures existing as of the
date of approval of this ordinance.
Ordinance 0-10-1779
Page 6 of 6
Sec. 5. THAT any person, firm or corporation violating any of the provisions or
terms of this ordinance shall be subject to the same penalty as provided for
in the Comprehensive Zoning Ordinance of the City of Colleyville, and upon
conviction shall be punishable by a fine not to exceed the sum of Two
Thousand Dollars ($2,000.00) for each offense.
Sec. 6. THAT if any section, paragraph, subdivision, clause, phrase or provision of
this ordinance shall be judged invalid or unconstitutional, the same shall not
affect the validity of this ordinance as a whole or any portion thereof other
than that portion so decided to be invalid or unconstitutionaL
Sec. 7. THAT in addition to and accumulative of all other penalties, the City shall '
have the right to seek injunctive relief for any and all violations of this
ordinance.
Sec. 8. THAT it has been found that there has been a change in conditions in the
above described property, it is now necessary that it be given the above
zoning classification in order to permit its proper development and in order
to protect the public interest, comfort and general welfare, and requires that
this ordinance shall take effect immediately from and after its passage.
AND IT IS SO ORDERED.
The first r ading and p blic hearing being conducted on the ~'~~~ day of
2010.
o readin and ublic hearin being conducted on the /~ day of
e sec g p 9 --~ -
~ i 2010.
ATTEST• •
R Un~
~
Cynthia Singleton, TRM , CMC
City Secretary
CITY OF COLLEYVILLE
~-~~ °
~~~'-~
David Kelly
Mayor
APPROVED AS TO FORM AND LEGALITY:
VJ•
Matthew C. G. Boyle
City Attorney
Exhibit A- Zoning and Location Map
2244\007\16659.1
Exhibit B - Legal Description
T~cr i
BEING all of Lot 1, Biock 1, Paxk Piace Estates, ~s i~ecordecl iiz I~'oliime 3~8-17~, Pa~e 1~, Plat Recards,
Tai7~it C'c~u~Ity, Tex~s arid being 275,051 sqtiare feet> ar G.31 > acres af land mare or less.
~~cr ~
BEIIl~G a t~~act of laiid sit~iated ii~ tlie t~~'.E. Craoks Siu~~e~~', :~.l~str~ct NtuuUei~ ?9i, Tar7~irt Coiiuty. Texas.
a~d being ~~~ortiou af ihat c:ert~ui tract of land ci~sciitrecl Uy deed tc~ Ti~iiuh= Clu~istia~ Cei~ter of Sa~ita
Aua, I~1c.. as r~cord~d in ~'al~iuie 9;25, Page lf}0~, Catit~ty Recotds, TaiY~~nt Cotuinr> T~x~s, ~tid beiYi~
iuoi~e paitici~larlv desc~Yl~ed l~y the ilietes ~~id boii~lds as fc~ilo~~~s:
BEGINNING ~t a 3~8 iiicli iron ~~od fc~~i~icl at tl~e iiortln~e~t ccat~er of said Triiiitv C`lu~istiau Cer~ter Tract:
TI-IE~1CE I~7 8~ de~. 38 iiun. j3 sez. E> G51.64 feet;
THE~1C'E S UO ciea. 43 t~iin. ?1 sec. E, 41G.7? fe~t;
THE:vCE S 75 t3ey. ~; i~~in. a3 sec. ~~%, G57.74 feet;
THE'vFC'E N O1 de~. >0 t~iiu~. 17 sec. ~j, 51 g.16 feet to the POI~1T OF BEGII~`~L'~1G, ~ncl containing
a01,67~ sqc~are feet, ar G.926 acre~ c~f laud niare ar Iess.
Tot~l 4rea= Tract 1~nci 2: 1~.24I :~cre~ of la~id Tr7ore or less_
2244\007\166591
Exhibit C- Statement of Planning Objectives
STATEMElVT OF PLANNING OBJECTIVES
TITAN CIPERATIhIG, LLC
TCC SUP
PLAh1NING ~BJECTIVE
The purpase of this SUP is ta establish a wel3 site, a#rac pond, and access road for the drilling,
completion, and operating of multiple gas wells within the areas designated by the SUP Site Pfan.
WELL SITE LOCATI~N
The well site [ocstion for #he Titan TCC wells is identi#ied on the SUP Site Plan. Tifan will drill
multiple horizontal wells from the proposed weU site tn develop appraximately 1300 acres ofi T'rtan
ieases. The proposed gas development will focus on the Barnett Shale, encountered at
subsurtace depths at approximately 8,900 feet.
VEHICULAR ACCESS T4 THE WELL SITE LOCATION
Vehicular access to the well site wili be from SH 26, west on Tinker, north on Pleasant Run Rc~ad,
to the well site entrance.
The drive appraach from Pleasent Run Road will be constructed of concrete. At the entry, a
double gate will be recessed into the property to accommodate truck movements from the
raadway onto the lease road. Fire access wili be provided and the road will be maintained in
accordance with all local, state and federal requirements.
DEVE~OPMENT PHASING
Titan Operating anticipates fhe initial construciian on the TCC pad si#e to begir~ January, 2011.
After canstruction of the pad' site Titan anticipates the drilling of 3 wells; each of which will take
approximately 30 days. Aftee t~e €nitial test Titan anticipates drilling a total of approximately 14
wells off #he si#e aver the next 5 to 7 years. All producing wells will be plugged at the end of their
economic life. All plugging will be in aceordance with applicable Texas Railroad Commission
regulations.
ACGESSt7RY STRUCTURES
Aceessory uses far #he proposed gas deveiopment will include well heads, starage tanks,
separation facilities, and other uses necessary and customary to gas development.
During drilling operations, all equipment will be secured by a chain link fence with a secured
entrance gate. A reflective sign will be posted at the dril! site and operations site identifying the
entrance ta the site and include the well names and numbers, name of the operator, emergency
911 number, and the telephone numbers for 24 haur emergency cantacts.
No refining, except far gas dehydrating and physical phase separation will take place on this site.
Temporary diesel fuel tanks, genera#ors, construction trai(ers, steel mud pits, pipe racks, and
drilling rig ru~i41 be located within the drilling pad site. The drilling rig and associated drilling
2244\007\16659.1
Exhibit C- Statement of Planning Objectives (Cont.)
equipmen# sl~all be remaved fram the we11 site as soon as practicat after completion of the well or
drilling activities.
WATER C(7NSUMPTION
Once well permits have been obtained from the Texas Railroad Commission and the road and
drill site are constructed, drilling can commence. The drillEng of each well will require
approximately 420,000 gallons af water over a three (3) week periad.
Once a well has been dri8ed and determined to have the potential for commercial production, the
completian process will begin. In order for fhe BarneiE Shale to be commercially productive it
must be fracture stimulated. This involves pumping a large amount of water at high pressure into
the formation to create a fracture in the rock. A small amount of sand is mixed with the wa#er to
hold tt~e fracture open once the procedure is complete. This permits the gas to flow more easily
from the rock into the well bore. Each fracture stimulation requires approximately 4.2 million
gallans af water. Once the vvaier is in plaee, the actual stimuEation process will take
approximately eight (8) haurs.
Water for the drilling, as wefl as the fracture stimulatian, will come from a proposed firac pond ofi
approximateiy 1.4 acres to be constructed by the aperator, with water purchas~d from the City or
well water. The water stared in this pond will service muftiple +,vells.
WASTE CC}NTROL
Water and drilling mud utilized during the drilling of the wells wi11 be initiatly stored in closed-loop
drilling fluid systems located on the pad site. Ultimately, the water and drilling mud will be
removed by truck and disposed of in accordance with the requirements of the Texas Railroad
Commission.
Produced water from gas production will be stored in 250 - barrel (bbl) tanks within the well site
location. The tanks will be located within a secondary containment ring with a non-permeable
berm or liner capable of holding one and one-half (1-1t2) times #he capacity of the largest tank.
Drip pots will be located ai pump out connections to contain the liquids frorn the storage tank_
The tanks wil( also be equipped with a sensing device that will shut off the well should the tank
become fufl. The contents of the tank will be emptied by a commercial operator and disposed of
in accordance with the requirements of the Texas Railroad Commission.
FIRE PROTEC710N
All fire suppression and prevention equipment required by an applicable federa~ state or local la4v
wi11 be provided and maintained by the Operator.
All contractors will have partabla fire extinguishers at the drill site and fire extinguishers will be
located at various locatians at the drill site.
The tank battery facility will be equipped with a remote foam line utilizing a fwo and one-half {2.5}
inch National Standard Hose Thread female inlet cannecfion in locations approved by the Fire
Department.
A lightning arrestor system will be instaNed according to the most current edition af the National
Electrica! Code.
At any gate enclosure, the City Fire Marshal will be provided a knox box with a key for emergency
access.
2244\007\166591
Exhibit C- Statement of Planning Objectives (Cont.)
~RAINA~E
Wel1-he~ds, metsrs, storage tanks, separatian facilities, or vther past drilling and camp[etion
permanent abave graund faci[ities will be located on a drilf site that is gra~ted in such a manner to
be elevated above the 'f p0-year floodpfain. Erosion car~trol shall eompEy with the erosion cantrol
plan apprvued by tkte City.
ENV1Rt7NMENTA-L
The proposed gas development wil[ !~e in compliance with all state and federal environmental
regulations and will not adversely affect the floodplain, drainage patterns, ar water quality.
Damage to public thoroughfares adjacent to this lease area directly caused by the proposed gas
d~velopment will be restared to city standards, as applicable, as each wel( is completed. Any
damage that poses a safety hazard wi!! be repaired immediately. Any substantial accumuiatians
af dirt, dust, or other debris deposited on pubiic thoroughfares by ga~ development will be
remaved. Dt~st, if significant, will be suppressed by using water or other dust suppressants.
Drilfing and productian aperations shall be conducted in a manner to minimize noise tevels.
Naise from drilling, completion and rework operatians are limited in time from a few days #a a few
weeks. Noise from dril[ing acti~ities will not exceed sixty five (65) decibels at any point three
hundred (300) feet fram the boundary of the drill site. Naise fram fracturing 4perafions wi11 nat
exceed eighty five (8~} decibels at any point three hundred {300} feet from the boundary of the
drill site. Noise fram the operation site will not exceed fifty five {55) decibels beyond the
boundaries shawn on fhe associated site plan.
Lighting will be shielded and directional taward the well site so that it wiB not disturb, be a
n~isance, or safety hazard to adjacent properties, residential are~s, ar public thoroughfares.
SCl~EENING
Per City ardinance, the equipment on the operation site will be screened frorn public view by a
combinatian of screerring shrubs that will be instafEed completely around the well site and the
required screen fence. Irrigatian will be installed as necessary. A11 plant materia! will be kept in
an attractive state and in goad candition.
2244\007\ 16659.1
Exhibit C- Statement of Planning Objectives (Cont.)
~EVELOPMENT SCHEDULE
Titan Operating anticipates the initial constructian on the TCC pad site to begin the 4~h quarter of
2010. After constructian of the pad site Titan anticipates the drilling of 2 to 4 wells; each of which
will take appraximately 30 days. After the initial test Titan anticipates drilling a total of
approximately 14 wells off the site over the next 5 tc~ 7 years.
ECCtNt3MIC C~EVELC?PMEIVT lhIFtJRWtATION
Titan aperating has spent approximately $1 Q8,300,000 in lease banus dollars in the City af
Ce~lleyville to date. Titan has a~so donated approximately $340,Odfl to lacal cYrarities. Titan
estimates that a typical well drilled off the pad site will generate approximately $23Q,000 per well
in ad valorem taxes for the city over a 15 year period.
2244\007\166591
N
A
A
O
O
v
~
T
~
~
__ -
_......_ ..__.__.. _ . _... _._.___. _.._ _ _..._.._.._ ._.
_ _ _ - --
_.~..,
~ _..~_..._~......v.. ~ ~.~.;:~~ 4 ~° ~, T~SITE ~
3 , ~~ ~~ ~~ a
,,~'~~~ ~ ~F'' E1~~-s*~}~ ~,s,.~-~vw.•a.°..f CttY#Cb:tEw~l£.TEYAS
s : . . .... `'~ ~-`
.
..
r'
~
,-
~ > _ -
• ~ -- ~.
. . . _ -. ~
,, .
° ~( ~~"f
~ _ ~,~~ ~ ~ }0 ~~
~
_
. ~.: -~ , ~ `~ ~
: ~,; ~_ , ~~ .. ~.~ ~~
~, f .~a,se ~~ i -~ ~ es,~~,~
,
; ; '• ~ ~ ~ ~,.~
, :` i ^NAIYER) ~' .
,.~ ,
_
. ; ~ --
: . ~ _
~ ~--~-= > ,_. < PEt.OTON LAhiD
, ~~ ~• ~ ~ ~ SO~UTI~NS
.~
.x.,,,,~. . ~.:,, .. ~
;'' ~,~ ~~.
; u~`~s'.'A''~.; ~~
, u~
. ~. ~
: ~~o~~ : ~~~ ~ ~,r~ , ~ ~~~,~~
i . .
.. :r~~.ant-aer. ssva
, •
: , ~
~ • ~t ,
' . ~' '~, . ~it~~..n~ - wact
{ 1 1.
• SUP 6043UOARY -=. ; ~ ~~~ ;
i ; 4 TAI# ' '~ ,- ~ARtti ~ ' ~
; : t ar.t r~xr ._, , r , o ~~~. ' ~~ x`a~++i.x ~:~.
:
...
`
.
: , _E ~ .~_ __ ~-z, .. .-
.
. '
.
~ . ~... • ~:y4.... .... ,..... r- _ ~~.z'~. u.~s~s~~n
. ..
, ~~ ~~ , ,
_ , • ~
,
. ~
, ,
~ ~ ~ ~fr , m ~5~ ~ ~
, , ` ~ ~
1
; • . ~ _ ` w~~~~~
f :
.
~ ; ~ . _ wctL3 ~# '~.e ~t~r~.~
, •
I .... : ~u , oF~'v~.~ ; t 't .~; ~DHILL SIPx: _se s ~~ ~~.
# r i
; z.~~, w x ~Cxm ~ i :
f.
, _
.
~ ',~aa~nsy--' ~
, f , , ~
. ~~ ! 3 I -~ Y J ~ ~} ~„\ 3 ~
. . ..... ....... . l . ~
3 ,..> ... ; .... . 5~~ ..~ ~.~.,..JJf°"°_! ~ .., ~„8~~'~..ti y ~ . ~-=....~F ~~--~--"
. , .
..---... ~.
' ~ ` ~~
:
. , .
., '
. . „~. . . , ua...ecea.e.
- ....__...........~'`
, s
: ~. ~ l _...}:...«• • •~.
. ..,... ~ , . ..e-..~-.
Y f, ~ ~ • +r ,~ ~ . _ _'_ ~ ' . :z~Enl.: it;~. F-E:`trr;
~. ..~> . . \ ~~~~ ~ , ,
~ ~ ~ .
.r c 7
~ ~ 5a4! ~~.,a~Y.tw4 t ~ .... ~~~ `~ ~. i
~ .P.-Stifa.. . i ~ ~\ ~~
; ... H ~ ~ a ~'., w.z '~~'T ~~j~.TRp . ` ~ :
1 ~-ai -
.... ~VrA1VE2} ~ ' ..' } - ~ r
~rx w' ur~co~aa .. . [~ Hfl SE . ~-
? ~~~ ~~ trta u~ ~ ~ i t+e ~se
i W t HI s~~~. . CffAYE~i
~ . F
. 1
~ '~~, .a.W,~?S W. ., ..... ....~L~. aW tlfvl... . it4"'^e..
.,. ... : +r .
~
% , v`.~'EK`.1.: ' ~ ` "~
`. r t ~---.. .
....,. > . : . ..
~ ~ ~~. .... ~
* ..~. ...._ : ~ .
,~4 ~ ., , f~ raA'tu~.~xt°teEig~~r~, ~.7~5"
~ '., ; .~" C~'xbhA~M.YC ~.
~~ ~ae ~,~~~,~
' - ., ,~ ' "" ` ~""~' SITE PLAN
->._o,.~ rrrn~~~~ _~~ ~A~
~
_ r` .<,
i •~.,, ; f _<a~w~~ ~i~
; `•~ ~'~ ~ ~
. ._. ~ .. ~ .. ._., .awava isr,wxi~w . . ... ~ r~ti.~a.~~.r~,~. w.~
~ ~.-.... ~ ,.. _ . ` ,.
.~._:.~rnre ~,s • .' .~q,~~, =w" < ". :
: , i a..,w. -•~,.--°• ~.... : g ~ ~ -~arrxqor~`'a~`a5++..m.ro
...__~.. ~ . ..
!. ', ' .i.~u~ r ^1 _.r 'E.ar~~krcr~r.:crc"
: ... . ' HCUSF ~.- ~ •~ -.._. .
: . ~ x .,u.. u .. . t;,~ .,i ... .._.. , , ~~,__ `
. F>~ ...> ~S/" s+~r r~a. 2 0= 7
"wvis~~; r~avEa~
~
~
~
v
V•
~
~
~
/
~
~
~
~
~
0
0
~
~
N
~
'o
0
~
rn
rn
~
~
.~
~..
! :
` f;
_ ~,. ~ ... ~ . . . . '.
.
t ~
a ' , e" , r _
' . t : .... ~,'.
'. . + ~
~ ~~ ~~.~ ~ ~~.~.,.~~
_ ~.~,~~7~~~,~;~~;, .,:.
PL.ANT SCHE~ULE
~.6YMv!k U~IY 'A.^_5~~1CNrJK CCaUCNKN.Ui 312L+ Cahz1 ~ RlXd1L't3 I
~~~s
'
~
~ ~; »~._ ,~~, ~,,.~w:~ ~a.K.~;-- _~_ ,~:~~~>,..~~E~
kh~iPl?'Y ;ael~'f
~ n .,.W<.,.a.zw.,.. ~-_.._....., r....awek e ~v+~i.~n~wr.r
~ .wrtse`.n~Arltn pc«E`KTx.~4~e bi,°~..p~YSY iAU . AeYIJM~ria.hl'r I
j
a~ -
~aJ*~+sa.+„+:R~.,t~
.v.s,..rs
. ..t..4~:1'~ c.
"et1Mt641`41H I
1
- xusi~ttu .o-e.x t._~..i~. ~c6 ~~.hi~fmn~Kt I
TCC PA~D
SITE
G7lY dK CL1liEYY~~.:{E 7EY.J5
"e 34.dY St~.'9VRF 14'.
~GitYttS~l`H ":cX44'W.T4`.
~z:+s:~:c~e.ees~
PELOTflIJ LAND
S~t~~~~5
~~~~u~
$~.~
~~~,;:~~
?b'etiT'C~:'r.IN3T1Ni x~~
O~~ Sh~(~In R~N W,;.
N+~~.i Ik~~:v4ia.i.3kN6
'1~15.9N..~A~~.~'-ts.'u=!.4k2k'1
~
~
~,:«~.
LEGENP
~~.~3~
~
SUP
LANDSCA~E
PLAN
1Y Ngi~~fzd~~~E
~I'Y~F~~.,.8, '~~IY~Nlf
lMpyNi f. TEYAS
l~.eLK2u~4
2dNitt~(~S G~ 9 ~T~
~ M/~:~v'~Y
~ 5HtE7 l~p. ~ 9IF 7
m
~
~
a~
~
~
'
r
~
~
~
N
C~
~
~
~
~
~
~
N
N
a
'o
0
~
rn
rn
~
~
rl"""-• - . '-,-~ E i {~ r"`' . ~'~-~~n~vEttnv '""i ~ ~
3 . ~ , .,.. ~~" ~~ T_ }' b
~ ~ ~
K
z
. NOVF_vve9ta5t^EkT~+UtGS'~f~
,~. ~-~,,~~.~,~,~~
f AIA.<Q.drUCE
r
~
..~~~~
M.7TE; RENLfi'E Si;,':'N±£il (iER7N
~ faJL.w~6 ~.ti.dH`w
~ x'-b'tiOA~.~'Eti't`'
Y~ ,y ~~k~{ i~f ~+a~~
3"r .~''kn(.~~..
sr:rn~ x
~ ~ocK c~~c~c c~Ar~
'M °•~r:0...' E
TCG PAD
siTE
~~~.~~~~ ~~
...~.,,~~;s,~
~ PELC7TON
~ .. c. ta~~,~.~s+r
'.
j , • _..... .
~r. . ;~ ~ _ ... ,,
..... . - , . .w~ .. ~ .
~ r.~€a-raKua+vz:rw,m,+ecct~
Y M'YLaM~"" R'P ~.._
ssr€r uu.
V _ ss,.} _a.s+
~Yf!.CXC+3kYN4TM..
` ~ ~S
~
~
LEGEND
SUP
EROSI~N
CdNTROL
PLAN
tlaEs° KL_SQI:T~ T1f
I W S~~ Y~M f~' ~e I t~~~- .
ra~r.siv ~~m~'~ass
:Oe.~~'~iy'•tri+, u"ra
5 aF 7
m
~
~
a
~
Y I
~
Y/
i~/
~
~
~
~
`
m
~
0
~
~•
~
` !
~
~
~
O
~
~
~
Exhibit H- Emission Control Plan
BRETTLING Ct~NSLILTINU, LLC
I~ <=0(~PER:-~T1C);ti 11'ITH PEL(~Tt~~( L:~'~D S(~LUTlO'~S, LLLP
E1~~IIS~I(J1`~T REI~-Z~CTI01`~ /
~C~1`~TTR.C~L PL~l`~T
TCC WELL PAD
CO-LLEYVILLE, TARRANT C~LII~TTY, TEXAS
PREPARED FOR:
TTTAN OPERr1TING, LLC.
ill V4'. -~TH STREET, SLIITE 300
FORT ~1'ORTH, TEXAS 761023951
9/29/2010
P.U. BOA 969 BLIRLES<Jti. TE.k.~S 7GQ`17 ~ 817-68U-6956 ~ 1\'\1"11".~REITLI:~GCC>\SIILTI'~G.CU~I
2244\007\16659.1
Exhibit H- Emission Control Plan (Cont.)
Faeilitty ~~7eYC~tOr
TricliE~- ChrisEi~u1 Cer~ter (TC:C) ~~'elI Pad Tit~~ C~?er~tulg, LLC. ('Fit~~1)
C~Ile~~~ille, Tarraizt Cotult~~, Tex~~s 111 ~'~'. ~Eh Sh•eet, Stut~ 30t?
~ort ~~'orth, Tex~s 76102-3951
~ti'ell #1-H - 3H
Ik~ti tucie: 32.91 ~991
Lon~ Euc3e: -97.1tiQU09
Prc~c~rictic~rt Plrase Ec~i~~t~cent - r~ssur~rrti,~ 3 ic~ells
6 Proc~uced 4\Tater T~nks-25~ bbl capac~ty
111~Iot~ile Frac Tanlc-5W b1,1 cap~~cit~-
3 Hc~rizontal Se}~arators
1.0 Best Management Practices
Emissians sources at the TCC 4ti'ell Pad include t1~e equi~meiZt listed in Se~tit~lt T.f3 ~as well
as fu~itive canzpanents. T'he falla~a-ing Be~t M~ulageineilt Pracfiices (BMPs) ~vill t~e
uz~~lemented ss1 oi~der ta mu~ii~uze emissions to a le~~el that is technicall~- feasilile and
~onomir~~ilt~ reason~iUle. Even~ prac:tic~~l effort ~~ill L~e m~~de to monitc>r equipm~nt for
lealcs, un~~leineilt i~liat~le p~llution ~~ret•eiltion ~vark prac.tices, and reduce einissions.
C3perations
^ C?pe~rate~ a11 eqtii~~i~lent with the potenti~l to ernit au cont~minants ~t least 50 feet
frQn1 the nearest ~re~pert~,- line ar the ne~est recept~r (tirhirhever is clos~r),
excludulg any 1~al~~e th~t is iisec~ for i~olation ~i~td or safety= }~urposes.
^ E~~ch apen-e~~c~~ct ~-~~lre ar lule ~vill be ec~tu~~~ec-i ~c~th :.~ ca~.,, l~slind flange, ~+lug, ~r ~~
see~ncl ~-alre ko se~al tlle line sc~ that no Ie~ige o€ emissions cx.eurs unl~ss other~ti~is~
recluirec~ to maintaul safe o~,er<~Eini~~ in ~; ~~essel or ~,ipeline.
^ T~uilc l~~~trI1~5, n~t c-(~signed t~ be cnm~~letel;;- sealec~, ~rill reulain closed (but nat
eompletel~~ seale~l i~t ordex to rnault~3u~ safe design ftiulctionalit~-) exce~rt for sam~~lulg
or }~lai~lec~ ms~intenance ~icti~~ities.
~ Tl~e site ~~~i11 be eisited c-l~ul~~ b~r operatians personn~i ~vho i~rill conduct ~~ist~~l
ec7uipmealt cllecks.
^ The siEe w-'rll l~ ec~ui~+}~d with a renlot~l5- moYlitored alarnl si-stem th~~t ~ti-i11
x~utom~atic~allZ- shutc~to~vzl ke~~ e~~uipinent if si~lifiez~~t ieak~; or aper<~ti~3iu~1 ~~r~blentis
OCCLtY.
• All ec~iu}~ment wzth ~Ile poteiltial ta emit z~ir coilt~uiuil~~tts will be maint~~ine~i in ~ooci
~voikutg order ~u~a o~erated prt~~erl~~.
^ All seals ~utd gaske~ts ~~°ill l~ ulstalle~~, cherke~, ~~tc-1 ~~rc~perly> i~ti3ii~t~~iileci t~ prevent
Ie<ikulg.
Maintenance
BREITLI'~G CC~\SULTI~G. LLC
TCC ~1~ ELL P:=~D
2244\007\16659.1
Exhibit H- Emission Control Plan (Cont.)
^ A~ragram tc~ replace, repair, 3nc~Jor maint~in equipnient to keep then~ in ~ood
~~orkina c~rder will be est~xblished ~icl maintained, including: (1) n~nufacturar's
specifications afla recoliunenrlec~ prc~~rains ~~~~~licalil~ to ~c~ui~~rnent perfarmance
aizci effe~t an en~sssioi~s; {2} cle~~niilg an~i ins~~ectiarz of all equ'rpment; atld
(3) repla,cem~nt and re~.~air of equi~.~rnent an ScheciuIes whicll prei~e~nt equi~nz~il~t
faihrtres and rruaintain ~rerfarKn:.~nce.
• Dwrulg ~,lasutec~ clo~ti~ztiine af an}- rt~~,ture, r~o~-erS-, or canh,al device, ~as 4trearn5 ~h-i11
be reduected t~ anc~ther ccmhol or recoz-erv de~=ic~.
^ E~rertr reasoru~hle effort w~ill be n~c-~e to re~air a le~l:in~ cc~nl~,oi~ent. Initial arHon will
~ ta isvlate Ehe ie~ikul~; coinponenf ~~n~i concluct klle repau ~~thu1 48 hours. If the
lealcuzg c:am~onei~t cannot 1-~ i~~l~ater~ or the repair cannot be nk~~~e ~ti~itlYU1 =~8 hours,
then the ~7e11 ~~Till l~e sh~.~t in until r~~~airs c<u1 l~e made. If the repau~ af a companextt
would r~quire a ux~it slnrtL-~a~~~n, ~vluch ~~~ould r:re~te more en~-rssions th~n the repaair
~vould e~linvt~ate, the re~~t~ir c1~i11 lae ~ielaved until tlze n~xt ~lanneci shutc-loFm.
^ To the extent tllat ~aod engineering prae#ires ta=i11 ~errnit, ne~~ a11d rework~ci v~~ltTes
ant~ ~i~-~in; connectior-s will 1~ l~cated in a~.~lace that is re<~sanablyT accessi~sle for ie~~k
eherkui~ dtuulg ~~7~ll operations.
Volu~itary Leak Detection and Repair (LDAR) Pro~ram
^ All funitii~e cc~nl~~onent~ ~vill l~ inspected b~- ~iuclic~, visual, ~nd ~lfactor5- (r'~`=0)
obser~ration, ~~t intervals n~t exceedul~ 15 m~n~is, but at l~~~st csi~ce e~ch c~~lend~7r year.
Suc.h inspec.ti~ns ~~,-i11 ~Isa ulclude ntonitoring far le~~kirtg eomp~neilt~ usu~g either (1}
~11e EPt~i Test 11r~ethod 2'1 u,sing~ a porkal~le ~lyrzer set at 10,t~lCl ~~z1~~ leak ~~letection
limit or (2) the Alteri-tati~re Gtiark Pr~ctice for inailitari~g equipnlerlt for leaks founc~ in
=~4 CFR §(~t7."18(g}-(i) usuig ~3n optiral gas u~za~,ring iilsh-ument ~vith ~~ detec~ian
sensiti~~ik~ le~-r~1 c~f i1a greater tlk~n CiU ~;r~am~ ~aer hour.
^ D~~inaged or Ieaking ~~~l~fes, caiulect~rs, ~un~~.~s, cc~mpr~ssc~rs, ai~d agit~~tor seals
found to be enutting i'C?Cs i~~ excess ~f 10,00t1 ~-~~?n1~~ ~is deternained usiilg a portable
anaIyzer, fnu~lci b_yr A~<'C~ inspeckion to be leaking {e.g., dripping pr~cess fl~.~ic~s), or
f~und le~iking using tl~e At~rl' will 1ze ta~gec~ z;nd repla~ce~3 or re~~~ired.
2244\007\16659.1
EXHIBIT I- PLANNED PIPELINE ROUTE
2244\007\16659.1