HomeMy WebLinkAboutTax Increment Finance (TIF)-Agenda Packets-07/24/2017City of Colleyville Page 1
City of Colleyville
Tax Increment Financing
District Board
Agenda
City Hall
100 Main Street
Colleyville, Texas 76034
817. 503.1000
www.colleyville.com
Monday, July 24, 2017
12 Noon
Executive Conference Room
Third Floor, City Hall
1.CALL TO ORDER
2.CONSENT: READING AND PUBLIC HEARING Resolution R1701
2a Approval of the minutes of the Tax Increment Financing District Board of
Directors meeting of July 25, 2016
3.PRESENTATION AND DISCUSSION
3a Review and discuss the status of the Colleyville Tax Increment Financing
District
4.ADJOURNMENT
I hereby certify this agenda was posted on City Hall bulletin boards Thursday, July 20,
2017, by 5:00 p.m.
Amy Shelley, TRMC
City Secretary
A quorum of the Colleyville City Council and/or any other Colleyville Board, Commission, or
Committee may be in attendance at this meeting.
Any matter on this agenda may, at the discretion of the governing body, be opened for
public comment and discussion.
If you plan to attend this public meeting and have a disability that requires special
accommodations, please advise the Executive Secretary at least 48 hours in advance at
817.503.1110, and reasonable accommodations will be made to assist you.
RESOLUTION R-17-01
A RESOLUTION APPROVING MINUTES OF THE TAX INCREMENT
FINANCING DISTRICT BOARD OF DIRECTORS MEETING
WHEREAS,the Colleyville Tax Increment Financing District Board of
Directors held a meeting on July 24, 2017.
NOW, THEREFORE, BE IT RESOLVED BY THE TAX INCREMENT
FINANCING DISTRICT BOARD OF DIRECTORS OF THE CITY OF
COLLEYVILLE TEXAS:
Sec 1. THAT the minutes of the Tax Increment Financing District
Board of Directors meeting held July 25, 2016 are hereby
approved.
AND IT IS SO RESOLVED.
APPROVED BY A VOTE OF ___ AYES, NAYS, AND ABSTENTIONS ON
THIS THE 24TH DAY OF JULY 2017.
ATTEST: COLLEYVILLE TAX INCREMENT
FINANCING DISTRICT BOARD
Amy Shelley, TRMC Richard Newton
City Secretary Chairman
City of Colleyville Page 1
City of Colleyville
Tax Increment
Financing District Board
MINUTES - DRAFT
City Hall
100 Main Street
Colleyville, Texas 76034
817. 503.1000
www.colleyville.com
Monday, July 25, 2016
12:30 p.m.
Executive Conference Room
Third Floor, City Hall
The Tax Increment Financing District Board of Directors meeting was called to
order by Chairman Richard Newton on July 25, 2016, at 12:30 p.m.
ROLL CALL: Chairman Richard Newton, Vice Chairman Mike Taylor, Directors
Bobby Lindamood, Jody Short, Tammy Nakamura, Mark McClendon, Scott Rule,
John Eubanks, and Rebecca Barksdale
City Manager Jennifer Fadden, Deputy City Manager Chris Fuller, Assistant City
Manager / Director of Public Safety Mike Holder, Public Works Director Jeremy
Hutt, Strategic Services Manager Adrienne Lothery, Chief Financial Officer Brian
Hogan, Accounting Manager Karen Hines, and City Secretary Amy Shelley
2. CONSENT: READING AND PUBLIC HEARING- Resolution R-16-01
2a Approval of the minutes of the Tax Increment Financing District
Board of Directors meeting of July 27, 2015
Chairman Newton read Resolution R-16-01 in its entirety.
Chairman Newton opened the public hearing at 12:34 p.m.
There was no one present wishing to speak and Chairman Newton closed the
public hearing at 12:34 p.m.
Vice Chairman Taylor moved to approve Resolution R-16-01. Director Short
seconded the motion.
The motion to approve carried by the following vote:
Aye: 9 - Chairman Richard Newton, Vice Chairman Mike Taylor, Directors Bobby
Lindamood, Jody Short, Tammy Nakamura, Mark McClendon, Scott Rule, John
Eubanks, and Rebecca Barksdale
3. PRESENTATION AND DISCUSSION
3a Presentation of the Annual Tax Increment Financing District Report
Strategic Services Manager Adrienne Lothery presented this item and briefed the
Board.
City of Colleyville Page 2
TIF MINUTES - DRAFT July 25, 2016
Director Eubanks asked staff, with respect to revenue, how were the revenues
arrived at, given the rate of .3559 times the incremental value; however, the
GISD did not calculate out. Manager Lothery explained the calculations for the
GCISD payments, and the $1.9 million is the 74 percent received from GCISD,
and second payment of $820,000 is to make up the difference in the tax rate.
Director Eubanks asked staff how the $1,904,000 was calculated. Manager
Lothery explained that the total payment from GCISD is $2.5 million, and the
arrangement is that Colleyville returns about 26 percent of that payment being
$669,000 which means the TIF district nets the $1,904,000.
Director Eubanks asked Mr. McClendon about the college rate. Mr. McClendon
replied the rate used is .19500, which is the 2015-2016 rate.
Director Eubanks stated the packet indicates the 2016 rate. Manager Lothery
concurred, and stated the annual report shows what has already occurred for the
year ended September 2015. Mr. McClendon added the revenue is set based on
the prevailing rate, with the billing taking place in March with payments May 1.
Accounting Manager Karen Hines added the rate used to calculate the $387,780
was .1495.
3b Review and discuss the status of the Colleyville Tax Increment
Financing District
Strategic Services Manager Adrienne Lothery presented this item and briefed the
Board.
Chairman Newton asked staff if the annual report is mailed to everyone. Manager
Lothery replied yes.
Chairman Newton stated the board can meet whenever it is useful to the board.
Director Eubanks asked staff if the cash balances are restricted to certain
programs with no co-mingling. Manager Lothery replied ultimately yes, these
funds will need to have been spent in accordance the original amounts outlined in
the original project plan. She stated it is not to say that if one category has more
cash than the other, and it could be paid back on an annual basis. She stated the
actual category total authorization over the lifetime. City Manager Jennifer stated
the TIF grant category funds could be utilized for other projects as deemed
appropriate by City Council.
Director Eubanks asked about funding projects from the $2.6 million on a cash
basis. City Manager Jennifer Fadden replied currently the plan, for the
expenditure of these funds, is on a cash a basis. She added the board and the
City of Colleyville Page 3
TIF MINUTES - DRAFT July 25, 2016
City Council could look at issuing debt, in the future, should they desire to do so,
and it would have to be in accordance with the structure of the TIF.
Director Eubanks asked Chairman Newton if Glade Road is currently around $20
million. Chairman Newton stated it is going to be revisited next month to discuss
the Glade Road project, all phases.
Director Eubanks asked staff about the length of time to complete the Glade
Road project, from start to finish. Public Works Director Jeremy Hutt replied the
project is currently four phases, with an anticipated completion by 2023.
Director Eubanks asked Chairman Newton about the funding for the project.
Mayor Newton replied currently it is to be completed on a pure cash basis, no
bonds.
Director Lindamood asked Chairman Newton if there are other projects that could
be completed with the TIF funds. Chairman Newton replied it has to be used
within the TIF geographic boundaries.
Director Lindamood asked Chairman Newton how those numbers could be
adjusted for other projects. Chairman Newton replied the board and City Council
would take action within the project list.
Director Eubanks asked Chairman Newton about the Village at Colleyville.
Chairman Newton replied it is done, with about $2.9 million being spent, but
there may be a remaining balance. City Manager Jennifer Fadden explained the
Village was entitled to $643,000 of the remaining $2.2 million in the assets that
they had submitted.
Director Eubanks asked Chairman Newton about Town Center and if it will likely
to be paid out. Chairman Newton replied it depends, as they would have to build
something else, and the agreement is still active, but nothing has happened.
Director Eubanks asked staff how much money will be taken in between now and
2030. Manager Lothery replied she did not have that number prepared, but it is
certainly enough to cover the category from the original project plan.
4. ADJOURNMENT
There being no further business before the Tax Increment Financing District
Board, Chairman Newton adjourned the meeting at 1:10 p.m.
APPROVED BY A VOTE OF ___ AYES, ___ NAYS, AND ___ ABSTENTIONS, ON
THIS THE 24TH DAY OF JULY 2017.
City of Colleyville Page 4
TIF MINUTES - DRAFT July 25, 2016
Minutes taken and prepared by:
Amy Shelley, TRMC
City Secretary
City of Colleyville Page 1
City of Colleyville
Tax Increment Financing
District Board
Agenda Briefing
City Hall
100 Main Street
Colleyville, Texas 76034
www.colleyville.com
Agenda Number 3a Agenda Date 07/24/2017 Number
Type Presentation and Discussion
Department City Manager
Title
Review and discuss the status of the Colleyville Tax Increment Financing District
Strategic Plan
Explanation
Adrienne Lothery, City of Colleyville Strategic Services Manager, will provide an update
of the Fiscal Year 2017 status of the Colleyville Tax Increment Financing (TIF) District.
Attachments
1.Colleyville TIF Fiscal Year 2017 Update Presentation
2.TIF Annual Report - FY 2016
2.4 Demonstrate stewardship of public resources
Colleyville Tax Increment
Financing (TIF) District
Fiscal Year 2017 Update
July 24, 2017
Background: Purpose of a TIF
•Chapter 311 of the Texas Tax Code
•To accelerate commercial development in an underdeveloped
area (geographic zone) or to renovate existing blighted
development in an area
•Entities contribute ad valorem taxes received from the
incremental value increase on property within the zone
•Provides for debt issuance for infrastructure improvements
within the zone
Background: Colleyville TIF History
Nov. 1998
•Creation
Ordinance O-
98-1124;
boundaries are
633 acres
along SH26
Nov. 1998
•Creation
Ordinance
amended by O-
98-1131,
termination
date moved to
12/31/2030
Dec. 1998
•Project and
Financing Plan
Adopted
Feb.
2002
•Project and
Financing Plan
Amendment
adjusting project
costs categories
(no increase in
total)
Apr.
2003
•Project and
Financing Plan
Amendment
adjusting project
costs categories
(no increase in
total)
Nov.
2012
•Boundary of
Zone
expanded
and added
additional
projects by
Resolution
R-12-04
–Original estimation of incremental taxable value at
termination: $246,667,800
TIF Map
TIF #1 1998 BaseValue: $75,821,735
TIF #1A 2012 BaseValue: $30,796,078
Background: FY 2017 Timeline
Dates Action
Summer 2016 Taxing entities adopt a tax rate
July 25, 2016 TAD certifies AV values
December 2016 City of Colleyville submits annual report for Fiscal Year
ended Sept. 30, 2016 (FY 2016) –due 90 days after FYE
March 2017 Final Updates to 2016 AV values received from TAD;
City of Colleyville invoices TIF partners
May 1, 2017 TIF payments due
July 2017 Annual TIF Board meeting -in July per bylaws
TIF Participation
Entity Rate
City of Colleyville 100%
Grapevine Colleyville ISD 100% M&O*
Tarrant County 100%**
Tarrant County College District 100%
Tarrant County Hospital District 100%***
* 74% dedicated to $27 million in general public improvements and remaining 26%
dedicated to GCISD school improvements
** Participation capped at $4.35 million, cap reached in 2012
*** Participation capped at $3.85 million, cap reached in 2012
FY 2016 TIF Revenue (based on 2015 values)
Tax Increment Revenues TIF #1
City of Colleyville $942,549
Tarrant County College District $397,577
Grapevine Colleyville ISD-Total Payment* $2,620,216
Grapevine Colleyville ISD**($681,256)
Grapevine Colleyville ISD***$835,692
Tarrant County #$0
Tarrant County Hospital District #$0
TOTAL $4,114,778
Tax Increment Revenues TIF #1A
City of Colleyville $14,075
Tarrant County College District $5,900
TOTAL $19,975
*This is calculated based on the compressed M&O tax rate, as stipulated by State Law (H.B. 3646 [81])
** 26% of the payment is returned to GCISD per contract
*** Supplemental payment for difference in current M&O tax rate of $1.04 and $1.471 2005 M&O tax rate
# Contractual obligation for payment of incremental revenues met in 2012
TIF Taxable Value Update
1998 Taxable Base Value:$75,821,735
2015 Taxable Value (3/1/16):$340,657,008
2016 Taxable Value (3/15/17):$384,869,207
Incremental Value Increase:$309,047,472
2016 New Construction (3/15/17):$9,041,624
Expanded TIF Area Base Value:$30,796,078
2015 Taxable Value (3/1/16): $34,750,725
2016 Taxable Value (3/15/17): $38,839,096
Incremental Value Increase:$8,043,018
2016 New Construction (3/15/17):$0
Outstanding Debt
SERIES 2016 TAX INCREMENT REVENUE AND REFUNDING BONDS
FISCAL YEAR PRINCIPAL INTEREST TOTAL INTEREST RATE
2017 $600,000 $55,781 $655,781 2%
2018 $610,000 $44,200 $654,200 2%
2019 $625,000 $28,725 $653,725 3%
2020 $645,000 $9,675 $654,675 3%
TOTAL $2,480,000 $138,381 $2,618,381
Original Project Plan
Colleyville TIF Project Plan Total
Village at
Colleyville
Revised
Agreement
Unallocated
Project Plan
balance
Roadway
Improvements
SH26
Matching
School
Improvements City Hall Library Fire
Station
Town Center
Agreement
Downtown Improvements $2,200,000 $1,700,000 $500,000
Plaza $1,595,000 $875,000 $200,000 $520,000
Professional Services $650,000 $400,000 $250,000
Public Parking, land,
engineering $4,371,500 $700,000 $500,000 $980,000 $734,000 $1,457,500
Storm Drainage $200,000 $125,000 $75,000
Library $240,000 $240,000
Hall-Johnson Road $1,900,000 $1,900,000
Bluebonnet Drive $670,000 $670,000
SH 26 $4,850,000 $4,850,000
Tinker/Sanders Intersection $220,000 $220,000
Bogart $600,000 $600,000
Church Street $2,150,000 $1,100,000 $1,050,000
Riverwalk Drive $250,000 $250,000
Public Parking Structure $1,800,000 $1,800,000
Main Street $700,000 $700,000
City Hall $3,500,000 $3,500,000
Fire Station $867,500 $867,500
John McCain Road $626,000 $626,000
School Improvements $7,938,690 $7,938,690
Total $35,328,690 $4,500,000 $3,000,000 $5,146,000 $5,070,000 $7,938,690 $5,250,000 $974,000 $867,500 $2,582,500
Original Project Plan-Current
Colleyville TIF Project Plan Total
Village at
Colleyville
Revised
Agreement
Unallocated
Project Plan
balance
Roadway
Improvements
SH26
Matching
School
Improvements City Hall Library Fire
Station
Town Center
Agreement
Downtown Improvements $2,200,000 $998,875 $1,201,125
Plaza $1,595,000 $1,075,000 $520,000
Professional Services $650,000 $400,000 $250,000
Public Parking, land,
engineering $4,371,500 $700,000 $500,000 $980,000 $734,000 $1,457,500
Storm Drainage $200,000 $125,000 $75,000
Library $240,000 $240,000
Hall-Johnson Road $1,900,000 $1,900,000
Bluebonnet Drive $670,000 $670,000
SH 26 $4,850,000 $4,850,000
Tinker/Sanders Intersection $220,000 $220,000
Bogart $600,000 $600,000
Church Street $2,150,000 $1,100,000 $1,050,000
Riverwalk Drive $250,000 $250,000
Public Parking Structure $1,800,000 $1,800,000
Main Street $700,000 $700,000
City Hall $3,500,000 $3,500,000
Fire Station $867,500 $867,500
John McCain Road $626,000 $626,000
School Improvements $7,938,690 $7,938,690
Total $35,328,690 $2,923,875 $4,576,125 $5,146,000 $5,070,000 $7,938,690 $5,250,000 $974,000 $867,500 $2,582,500
To Date:
•Bluebonnet Drive
•Bogart Drive
•Church Street
•Hall-Johnson Road
•John McCain Road
•Riverwalk Drive
•City Hall
•Central Fire Station
•Library
•School Improvements
•State Highway 26 Phase I
•Developer Asset Repurchase Agreements -
Village at Colleyville and Town Center
Recent/In Progress
•Phase II SH26 project
•Tinker/Sanders Intersection
•Land purchase (next to City Hall)
Original Project Plan Projects
Amended Project Plan
•November 2012 Amendment expanded TIF boundaries to include mostly
additional vacant, underutilized land and some commercial property
•Revenue from ISD participation may not be used on any project category added
by the 2012 amendment
•Projects funded include:
–Whole Foods Grant
–Glade Road Project
Added by Amendment in 2012
Economic Development TIF Grant Program $ 17,256,185
Roadway Improvements $ 20,000,000
Trails & Public Amenities $ 5,500,000
Administrative Expenses $ 1,700,000
TOTAL $ 44,456,185
FY 2018 & Forward
Renewed Focus:
–Maximize remaining life of the TIF to achieve greatest community benefit
–Transparency on planned projects
Next Steps:
–Complete an updated accounting of expenditures vs. project categories,
forecast of future revenues, and balances available for allocation
–Determine what currently planned City-funded projects might be eligible for
TIF funding
–Establish separate multi-year Capital Plan for TIF funded projects
–Plan with TIF Board and City Council for future intended use of TIF funds
Questions and Discussion
TAXABLE VALUE:
GCISD County & Hospital County College City of Colleyville
Colleyville TIF #1
TAX YEAR 2015 / FY 2016 TAXABLE VALUE $337,614,826 $341,710,227 $341,717,227 $340,657,008
1998 BASE VALUE $75,593,230 $75,772,230 $75,779,230 $75,821,735
INCREMENTAL VALUE INCREASE $262,021,596 $265,937,997 $265,937,997 $264,835,273
Colleyville TIF #1A
TAX YEAR 2015 / FY 2016 TAXABLE VALUE $34,757,825 $34,757,825 $34,750,725
2012 BASE VALUE $30,811,178 $30,811,178 $30,796,078
INCREMENTAL VALUE INCREASE $3,946,647 $3,946,647 $3,954,647
NOTE: Taxable value can vary slightly for each taxing entity based on differing exemptions
REVENUES:
Tax Increment Revenues TIF #1 -
CITY OF COLLEYVILLE (0.003559 x TIF#1 incremental value)$942,549
TARRANT COUNTY COLLEGE DISTRICT (0.001495 x TIF#1 incremental value)$397,577
GRAPEVINE COLLEYVILLE ISD -TOTAL PAYMENT* (0.001 x TIF#1 incremental value)$2,620,216
GRAPEVINE COLLEYVILLE ISD **(.26 x total payment)($681,256)
GRAPEVINE COLLEYVILLE ISD ***(.26 x payment difference from current vs. 2005 M&O tax rate)$835,692
TARRANT COUNTY #$0
TARRANT COUNTY HOSPITAL DISTRICT #$0
TOTAL $4,114,778
Tax Increment Revenues TIF #1A -
CITY OF COLLEYVILLE (0.003559 x TIF#1A incremental value)$14,075
TARRANT COUNTY COLLEGE DISTRICT (0.001495 x TIF#1A incremental value)$5,900
TOTAL $19,975
*THIS IS CALCULATED BASED ON THE COMPRESSED M&O TAX RATE, AS STIPULATED BY STATE LAW (H.B. 3646 [81])
** 26% OF THE PAYMENT IS RETURNED TO GCISD PER CONTRACT
*** SUPPLEMENTAL PAYMENT FOR DIFFERENCE IN CURRENT M&O TAX RATE OF $1.04 AND $1.471 2005 M&O TAX RATE
# CONTRACTUAL OBLIGATION FOR PAYMENT OF INCREMENTAL REVENUES HAS BEEN MET
EXPENDITURES:
Original Project Plan-
SERIES 2011 REFUNDING BOND PAYMENT $682,425
TEXAS DEPARTMENT OF TRANSPORTATION - SH 26 $1,318,251
SH 26 PHASE II DESIGN $195,881
Amended Project Plan-
GLADE ROAD DESIGN $593,295
GLADE ROAD ROW ACQUISITION $9,507
CITY HALL/LIBRARY GENERATOR DESIGN $13,230
TOTAL $2,812,589
OUTSTANDING DEBT SERVICE SCHEDULE
SERIES 2016 TAX INCREMENT REVENUE AND REFUNDING BONDS
FISCAL YEAR PRINCIPAL INTEREST TOTAL INTEREST RATE
2017 $600,000 $55,781 $655,781 2%
2018 $610,000 $44,200 $654,200 2%
2019 $625,000 $28,725 $653,725 3%
2020 $645,000 $9,675 $654,675 3%
TOTAL $2,480,000 $138,381 $2,618,381
TIF ANNUAL REPORT - CITY OF COLLEYVILLE
FISCAL YEAR ENDED SEPTEMBER 30, 2016 (FY 2016)