HomeMy WebLinkAboutPlanning and Zoning Commission-Minutes-5/10/2010'";,~ City of Colleyville
Minutes -Final
~~:~:;.
Planning and Zoning Commission
City Hall
100 Main Street
Colleyville, Texas 76034
817. 503.1000
www.colleyville.com
Monday, May 10, 2010 6:00 PM City Council Chambers
LEGAL BRIEFING BY CITY ATTORNEY REGARDING PLANNING, ZONING,
PLATTING, AND LAND USE
REVIEW OF REGULAR AGENDA ITEMS
DISCUSSION OF PREVIOUS MEETING MINUTES
7:00 P.M. -REGULAR MEETING
1. CALL TO ORDER
The Planning and Zoning Commission meeting of the City of Colleyville
was called to order by Chairman Byerly on May 10, 2010 at 7:00 p.m.
2. ROLL CALL
Present: Commissioners Larry Knox, Dave Dudziak, Scott Redfearn,
Michael Clardy, David Phelps and Jeff Byerly
Absent: Commissioner Rotthaus
Staff Present: Jeremy Hutt, Rob McKeown, Marty Wieder, Ron Ruthven
and Amy Shelley
3. INVOCATION
The invocation was given by Commissioner Knox.
4. PLEDGE OF ALLEGIANCE
5. APPROVAL OF MINUTES
Commissioner Knox moved to approve the April 26, 2010 meeting
minutes as written. Commissioner Phelps seconded.
The motion carried by the following vote:
Aye: 6 -Knox, Dudziak, Redfearn, Clardy, Phelps, Byerly
Absent: 1 -Rotthaus
6. CITIZEN COMMENTS REGARDING ITEMS NOT ON THE AGENDA
None
City of Colleyville Page 1 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final May 10, 2010
The Commissioners chose to arrange the public hearing items so that
item 8a was held as the last public hearing item.
7. REGULAR AGENDA ITEMS
7a Approval of amendments to the Future Land Use map of the Colleyville
Master Plan, Case GC10-003
Ron Ruthven presented the case and briefed the Commissioners.
Commissioner Phelps questioned staff regarding if this update will reflect
the zoning changes that have been made from past decisions that go
against the current plan. Ron Ruthven replied correct and he stated in
the future if any zoning requests are made that may go against the
Master Plan, a future land use map update would be presented at the
same time.
Commissioner Phelps moved to approve case GC10-003.
Commissioner Clardy seconded.
The motion carried by the following vote:
Aye: 6 -Knox, Dudziak, Redfearn, Clardy, Phelps, Byerly
Absent: 1 - Rotthaus
8. PUBLIC HEARING AGENDA ITEMS
8a Approval of a request for a Special Use Permit for a gas well site on 53.2
acres in the Hall Medlin and William E. Crooks Surveys located at 7612
Pleasant Run Road, Case ZC10-003
Commissioner Knox and Commissioner Byerly recused themselves from
this item and signed affidavits for the file.
Commissioner Dudziak chaired this item.
Ron Ruthven presented the case and briefed the Commissioners.
Commissioner Phelps questioned staff regarding the improvement of the
water main, what is the rationale for requiring that being increased from
6 to 8 inches? Ron Ruthven replied given the impact of the service
delivery for that area, staff has the authority to require an upgrade. He
stated the applicant will be required to upgrade to an 8 inch main or pay
into escrow in lieu of completing the upgrade. Commissioner Phelps
stated to just bring it up to minimum standards. Ron Ruthven concurred.
Commissioner Phelps questioned staff regarding if the water usage
begins to encroach upon service levels, what is the process for bringing
that back into line if there is disruption in service? Ron Ruthven stated
City of Colleyville Page 2 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final May 10, 2010
the city will ensure that there is no disruption or change in service that
residents already receive. He stated approximately 2.2 billion gallons of
water is used by the city each year. He stated the impact on this site at
any given time would be .01 %. He stated staff will ensure that there is
no disruption in service. He stated the applicant can drill a fresh water
well if they need to utilize more water usage to service the site.
Commissioner Phelps questioned whether the proposed depth of the
well would be below the local residents. Ron Ruthven replied yes, it
would be a tap deeper than a residential well use.
Commissioner Clardy questioned staff regarding the 4.2 million gallons
of water used for the frac process, (2) to (3) wells at a time, (8) hours per
stimulation, potentially 8.4 to 12.6 million gallons of water potentially
over a short period of time. Can our system handle this much water
usage over a potential (3) day period of time? Ron Ruthven replied the
city Utility Department will not allow the applicant to have water usage
that would affect the residents.
Commissioner Dudziak questioned staff regarding what is the baseline
for the condition of the roads for which the route has been selected. Ron
Ruthven replied the city has a road remediation fee in place that the
applicant will have to pay up front.
City Engineer Jeremy Hutt came forward to present the information
regarding the current condition of the roads. He stated they will evaluate
the initial condition of the roads.
Commissioner Dudziak questioned staff regarding if the roads were
going to be replaced. Jeremy Hutt replied, eventually. He stated they
will evaluate the roads before the applicant begins drilling. He stated
any additional impact other than what is considered standard or
expected, the applicant will be responsible for the damage.
Commissioner Dudziak questioned staff regarding how an assessment
number is calculated. Jeremy Hutt replied it would be done at the time
of road remediation.
Commissioner Dudziak questioned staff regarding what happens if the
damage exceeds that number? Jeremy Hutt replied anything above and
beyond standard impact would be reevaluated and the applicant would
be required to repair the damage or the city would repair the damage
and invoice the applicant for those damages.
Commissioner Clardy questioned staff regarding the roundabout planned
for John McCain and Pleasant Run Road. Jeremy Hutt stated there
have been improvements discussed for this intersection; however the
City of Colleyville Page 3 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final
May 10, 2010
actual design has not been completed.
Commissioner Phelps questioned staff regarding what the time frame is
for those improvements versus the drilling operation and equipment.
Jeremy Hutt replied if everything goes as planned for this request, the
first stages of drilling will be complete before the intersection
improvements begin. He stated they will coordinate with the drilling
company.
Commissioner Phelps stated the roundabout can handle the truck traffic.
Jeremy Hutt concurred. Commissioner Phelps questioned if, in the
future, a completed circle is engineered to handle this type of traffic.
Jeremy Hutt replied whatever the intersection design, the improvements
will be able to handle this type of traffic. Jeremy Hutt stated the
intersection will remain open at all times to ensure traffic flow and
emergency access.
Commissioner Dudziak questioned City Attorney Kallas regarding
projected road damages; is there room to ask for more than what is
projected? City Attorney Kallas replied, if the applicant causes more
damage to the road because of the drilling, then the applicant would be
responsible for those damages. He stated the Commission may make a
more specific direction in the ordinance.
Commissioner Dudziak questioned staff regarding Section 4, Phase 3,
Section A, what is being exempted? Ron Ruthven replied an SUP, if
abandoned for more than 6 months, the SUP shall automatically expire.
He stated staff wanted the ordinance to clearly state the expiration
provision. He stated the ordinance also states that if no drilling takes
place within two years of the approval of the SUP, the SUP shall
automatically expire.
Commissioner Dudziak questioned staff regarding if the applicant will still
be responsible for the clean-up and any additional costs associated with
that. Ron Ruthven replied the applicant would be required to pull an
indemnity policy; simply an insurance policy that covers any type of
damage or site clean-up. He stated if there is any breach within the
ordinance, the applicant will be required to pay fees up to $2,000 a day
for the code violation.
Commissioner Dudziak stated there is Titan and there is the drilling
company, two separate companies. Ron Ruthven replied for the
purposes of the ordinance, Titan is the drilling company and operator.
City Attorney Kallas concurred unless there is something put in place
after this.
Commissioner Dudziak questioned staff regarding the fresh water pond,
City of Colleyville Page 4 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final
May 10, 2010
with regards to the Land Development Code, if this is going to be a
permanent pond, will they be required to have an aeration device in it or
will it be required to be drained after completion? Ron Ruthven replied
that the applicant has not stated with this request whether the pond
remain in place; however if the pond does remain in place, the Land
Development Code does require an aeration device. He stated during
the drilling operations, the applicant is going to stock the pond with fish
to help with the mosquito population.
Commissioner Phelps stated this pond will only be filled with fresh water
and the used water from the frac process will be shipped off site. Ron
Ruthven concurred.
Commissioner Dudziak questioned staff at what point in the process will
the fencing and the landscaping be required to be installed. Ron
Ruthven replied the 8 foot masonry wall and landscaping will be required
to be installed after the first phase of drilling and completion and before
going into production.
Commissioner Dudziak questioned staff regarding how long
maintenance will be required for the landscaping. Ron Ruthven replied
for the life of the well. He stated any landscaping will be required by
code to be irrigated.
Commissioner Dudziak questioned staff regarding the selection of the
testing company; is there a process in place and how will the citizens
know about this process? Ron Ruthven stated that there are no
specifics in place. He stated the city wants to use an independent
company who is not affiliated with the drilling company, nor paid for by
the gas industry. He stated the city wants someone who has the
credentials, who is certified and who has already done testing in other
cities.
Commissioner Dudziak questioned staff regarding when is there going to
be a baseline, the ambient conditions as they are today. Ron Ruthven
stated the readings would be required before any activities begin on the
site.
Commissioner Dudziak questioned staff if the readings should be done
more often, even now in the summer time, how quickly would this testing
start. Ron Ruthven replied as soon as this gets approved by City
Council, the city should have a consultant on board quickly so that the
baseline could be started.
Commissioner Dudziak questioned staff regarding if there are any
federal limits on the economic damages that could occur as the result of
a disaster that might occur on this site. City Attorney Kallas replied that
City of Colleyville Page 5 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final May 10, 2010
he did not know at this time.
Commissioner Redfearn questioned staff regarding if there is a practical
limit on the number of gas well sites that could be within the city limits;
could this be the first of ten or the first of two, for the city? Ron Ruthven
stated as far as the 1,000 foot requirement, there are not many sites
available since this is an urban setting. He stated according to the tax
rolls, there are two other properties in the city which are owned by XTO
and Chesapeake.
Commissioner Redfearn questioned staff regarding what the nearest
other potential gas well developments sites with regards to this site were.
Ron Ruthven replied not having a specific location. He stated there are
no sites in Southlake or in the city of Colleyville.
Commissioner Dudziak opened the public hearing at 7:54 p.m.
Aric Head, 5751 Kroger Drive, Keller, on behalf of Titan, came forward to
present the case and brief the Commissioners.
Commissioner Clardy questioned Mr. Head regarding the pipeline plan;
what is the timeline for it with regards to the first drill? Mr. Head replied
that Energy Transfer is working toward a pipeline plan for this area and
staff has been presented a preliminary plan. He stated ideally the
pipeline would be on site upon completion of the first wells.
Commissioner Clardy stated if this request is approved essentially by the
fall, a pipeline plan would have to be approved. Mr. Head stated ideally
the pipeline would be on location at the time of the production of the first
wells. He stated work can be done before the pipeline reaches the
location. He stated the wells can be drilled and completed before the
pipelines are in place.
Commissioner Clardy questioned Mr. Head regarding whether there are
plans to have a compression station on this site. Mr. Head replied no
there is not. He stated a compression station is not a part of this SUP.
Commissioner Dudziak questioned Mr. Head regarding if in the future
there may be a compression station in Colleyville or other nearby
locations. Mr. Head stated that was not a request by Titan.
Commissioner Dudziak stated for clarity that Energy Transfer is the
pipeline. Mr. Head concurred they are separate from Titan. He stated
the need for a compression station would be a request made by Energy
Transfer.
Commissioner Dudziak questioned Mr. Head regarding the location of
City of Colleyville Page 6 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final
May 10, 2010
the nearest compression station. Mr. Head replied not knowing.
Commissioner Phelps questioned Mr. Head regarding what the need is
for a compression station. Mr. Head replied some pipelines will require
the installer to install a compression station; however this is believed to
be a low pressure pipeline that will not require a compression station
from Titan.
Commissioner Clardy questioned Mr. Head regarding the installation of
permanent dehydrators; is that considered a closed loop system? Mr.
Head replied the term closed loop system is for the fracturing pits and in
this case Titan will use a closed loop system for the mud circulating pits.
Commissioner Clardy questioned Mr. Head regarding condensation
tanks. Mr. Head replied there are no plans for a closed loop ventilation
system. However, there is no anticipation of any condensation. Mr.
Head replied there will be tanks on site to hold the salt water and tanks
will come and remove that water from the site. Those tanks are holding
tanks.
Commissioner Redfearn questioned Mr. Head regarding whether the
condensation tanks are needed because of the geology of the shale and
how far east Colleyville is located. Mr. Head replied correct, in this area
a dry gas is produced. He stated if condensation tanks were necessary,
they would be requested in this SUP request.
Commissioner Redfearn questioned Mr. Head regarding if the site plan
would change significantly requiring them to come back for approval. Mr.
Head replied they would not look much different than the holding tanks
that are currently on the site plan.
Commissioner Redfearn questioned staff if the addition of condensation
tanks would require the applicant to come back for approval. Ron
Ruthven stated the tanks being proposed for this request are water
holding tanks, therefore condensation tanks are for a wetter gas or oil
which would require them to come back for approval. He also added
that the air quality issues are usually around the condensation tanks.
Commissioner Redfearn questioned Mr. Head regarding how many gas
well drilling sites could you expect to see in Colleyville or that could be
located in Colleyville. Mr. Head replied not knowing.
Commissioner Redfearn questioned Mr. Head regarding what the
nearest drilling sites are in relation to this one. Mr. Head replied not
knowing. He stated this location is designed to service a very large
location which is a efficient use of the surface at the present state.
City of Colleyville Page 7 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final May 10, 2010
Commissioner Clardy questioned Mr. Head regarding if the frac pond will
have to have a plastic liner? Mr. Head replied not knowing if it is
required to be plastic or clay lined.
Commissioner Clardy questioned Mr. Head regarding how the fish would
stay alive when during the frac process, when the tanks are drained. Mr.
Head replied the tanks are not completely drained.
Commissioner Clardy questioned Mr. Head regarding the volume for the
frac pond. Mr. Head replied around 500,000 to 700,000 gallons.
Commissioner Clardy stated it would become necessary to pull from
another water source. Mr. Head replied the frac operations are drawn
out over a period of time; the tanks are being replenished.
Commissioner Clardy questioned Mr. Head regardingwhether the 4.2
million gallons is used to frac an entire line. Mr. Head replied one lateral.
Commissioner Clardy questioned Mr. Head regarding the life of the well?
Mr. Head replied typically a well, horizontal lateral, is done in several
years; it is not something that occurs frequently.
Commissioner Phelps questioned Mr. Head regarding site or well safety,
the emission concerns around certain pieces of equipment and during
operations, what is on the site that could come out of an open hole and
how would it be contained. Mr. Head replied the gas would vent to the
atmosphere. He stated if there were liquids that were released,
unscheduled, a berm would be installed to contain those liquids until a
response crew can clean up. He stated this liquid would be primarily
water. He stated the water tanks require a berm to be constructed
around them.
Commissioner Clardy questioned staff regarding dust mitigation, what is
the frequency for a periodic clean up and who will be responsible for that
clean up? Ron Ruthven replied they will be responsible for periodic
clean up; however, if the city does the clean up, then the city will invoice
them, Titan, for the clean up of the roads. Mr. Head replied the access
road will be concrete with the location of the site itself to be gravel.
Commissioner Dudziak questioned Mr. Head regarding the water from
the frac process; are there any chemical worries for what the water
contains? Mr. Head replied the water is removed from the tanks to the
tanker trucks, therefore, there should be no exposure.
Commissioner Dudziak questioned Mr. Head regarding if there are any
hazardous designations required for the site. Chris Hammack, Titan
Operating, stated there are no hazardous chemicals. He stated the
chemicals are extremely diluted.
City of Colleyville Page 8 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final
May 10, 2010
Commissioner Phelps questioned Mr. Hammack regarding the sound
buffering; there will be a 16 foot sound buffer at the initial drilling phase,
correct? Mr. Hammack replied yes. Commissioner Phelps questioned
Mr. Hammack regarding will there be any additional sound buffering. Mr.
Hammack replied yes, the engines will be enclosed with buffering around
the generators.
Commissioner Dudziak questioned Fire Marshal Rob McKeown
regarding if he is satisfied with the safety requirements. Rob McKeown
replied yes and added that the fire department is working with another
company with drill site experience to get additional training related to
drilling.
Commissioner Dudziak questioned Rob McKeown regarding how soon
would it take a hazmat crew to get on site. Rob McKeown replied within
an hour. He stated those issues are required to be in their emergency
operations plan as well as points of contact.
Jeanna Griffin, 803 Potomac Place, Southlake, spoke in opposition to
the request with concerns for the setback requirements and with regards
to the floodplain and private residence.
David Adams, 165 Creekway Bend, Southlake, spoke in opposition to
the request with concerns for water usage and the toxins in the water
that is being shipped off site.
Chris Monroe, 1500 S. White Chapel Blvd., Southlake, spoke in
opposition to the request with concerns for safety issues, quality issues,
pollution, and noise and with it being located in a residential area.
Grady Walker, 7309 John McCain, Colleyville, spoke in support of the
request.
Beth Adams, 165 Creekway Bend, Southlake, spoke in opposition to the
request and stated TCEQ and EPA have not completed their studies with
regards to air quality testing. She stated the city should not rush into
approving this request.
Kevin Townson, 175 Creekway Bend, Southlake, spoke in opposition to
the request and stated this request is not in the best interest of either of
the communities.
Stuart Johnson, 7504 Monroe Court, Colleyville, spoke in opposition to
the request and stated that there are too many unanswered questions
with regards to public safety.
Diane Grillo, 7502 Monroe Court, Colleyville, spoke in opposition to the
City of Colleyville Page 9 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final May 10, 2010
request and would like the city to consider a moratorium on drilling
because of the safety issues related with drilling.
David Rea, 1640 Bent Creek Drive, Southlake, spoke in opposition to the
request with concerns for the safety issues and unanswered questions
and discrepancies with the numbers of water usage.
Wesley Quenichet, 5005 Oak Timbers Court, Colleyville, the property
owner's son, spoke in favor of the request and stated the family has
taken a considerable amount of time deciding about the drilling on their
property.
Lynn Buffington, 1400 S. White Chapel Blvd., Southlake, spoke in
opposition to the request with concerns for the safety of the site and the
unanswered questions and findings by TCEQ and EPA.
David Buffington, 1400 S. White Chapel Blvd., Southlake, spoke in
opposition to the request with concerns for the TCEQ and EPA findings
as well as the safety issues of this site, and the truck traffic to and from
the site.
There being no one wishing to speak, the public hearing was closed at
9:11 p.m.
Mr. Head and Mr. Hammack came forward to address the comments of
the speakers and stated Titan is willing to provide factual documents to
anyone wishing to see them.
Commissioner Phelps questioned Mr. Hammack regarding what the
timing is with regards to the construction of the fencing and/or
landscaping be in place, before the first well is drilled. Mr. Hammack
replied yes and stated shortly after the completion phase.
Commissioner Dudziak questioned Mr. Hammack regarding what is the
definition of a mud pit. Mr. Hammack replied the correct word is a closed
loop system, which is a series of steel tanks that sit on the surface to
capture any of the drilling mud or products. These products are
contained in a steel tank and disposed of off site. He stated there is a
process that separates the solids from the liquids and those are also
stored and disposed of off site as well. He stated there are no liquids
that hit the ground.
Commissioner Dudziak questioned Mr. Hammack regarding whether
there is a hazmat plan in place and would Titan participate in this plan if
something were to happen on the site. Mr. Hammack replied it is a
collaboration of all departments, fire department, the municipalities, as
well as Titan. He stated they have a company that will be called in the
City of Colleyville Page 10 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final
May 10, 2010
event of a disaster.
Commissioner Dudziak questioned Mr. Hammack if the Railroad
Commission would get involved. Mr. Hammack replied yes all parties,
Railroad and TCEQ, would be involved and Titan would take the
leadership regarding how the event is handled. He stated the
emergency notification plan has all of the important contact information.
Commissioner Clardy questioned Mr. Hammack regarding why the
potential pipeline is not being viewed at the same time as this request.
Mr. Hammack replied that he believed staff has met with Energy
Transfer on a preliminary basis. He stated as far as he knows the right
of ways have not been acquired. Commissioner Clardy stated he
thought that information should be available for public content before
those right of ways are purchased.
Commissioner Clardy questioned staff regarding if staff has a tentative
time frame regarding the pipelines. Ron Ruthven replied the pipeline
application will be submitted upon approval of the gas drilling request.
He stated there is not a written process for a pipeline permit, therefore,
the city can not require the applicant to submit a pipeline plan as part of
this request. He further stated, legally, the Commission can not consider
pipeline routes as part of the consideration of the gas well SUP.
Commissioner Redfearn questioned Mr. Hammack regarding what
additional regulations around environmental standards might be
forthcoming from federal and state agencies. Mr. Hammack replied that
he is not qualified to answer that question. He stated the TCEQ and
EPA would be the ones to bring forth those recommendations or
additional standards at which Titan would have to adhere.
Commissioner Dudziak questioned Mr. Hammack regarding whether
newer standards or regulations are developed, if Titan will adhere to
those standards? Mr. Hammack replied yes, that is his understanding.
Commissioner Phelps questioned City Attorney Kallas regarding what
fine or penalty would occur if those standards were not adhered to, is the
city tied to what they can limit? City Attorney Kallas concurred and
stated the city can not go above and beyond what the federal and state
regulates. He stated there is a $2,000 fine and penalty.
Commissioner Phelps questioned Mr. Hammack regarding what is the
anticipated maximum pressure for the lines is. Mr. Hammack replied as
proposed 200 pounds, a low pressure system. He stated a sustained
pressure.
Commissioner Phelps questioned Mr. Hammack regarding if the
City of Colleyville Page 11 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final
May 10, 2010
pipelines are being put in place with the anticipation that the lines could
be higher pressure. Mr. Hammack replied he would have to refer to
Energy Transfer for their specific design standards.
Commissioner Clardy stated there are things that still need to be
addressed; he stated it appears that this needs to be held again at a
later date.
Commissioner Redfearn concurred and stated the challenge is how local
law fits into the federal and state regulations. He stated it is very difficult
to move forward with so many concerns with the environmental issues,
air and water being the primary ones.
Commissioner Phelps concurred and stated he appreciated the fact that
Titan and staff have addressed most of these issues. He stated it would
be nice to have some insight on what the federal and state regulations
are going to do. He stated not wanting to rush this process and to
address some of those unanswered questions.
Commissioner Dudziak somewhat concurred and stated there are risks;
however, there is more research to be done. He stated he would like
some more clarity before moving forward.
Commissioner Dudziak moved to table case ZC10-003. Commissioner
Redfearn seconded.
City of Colleyville Page 12 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final May 10, 2010
The motion failed by the following vote:
Aye: 3 -Dudziak, Redfearn, Phelps
Nay: 1 -Clardy
Absent: 1 -Rotthaus
Excused: 2 -Knox, Byerly
Commissioner Clardy suggested moving this to a date later than
the next Planning and Zoning Commission meeting. He stated two
weeks is not enough time for the questions to get answered.
City Attorney Kailas suggested tabling to a date specific.
Commissioner Dudziak stated it would be good to have public input
at the meetings to move this along.
Ron Ruthven reminded the Commissioners that there will be a
meeting on May 24, 2010 because of the tabled item.
Commissioner Clardy suggested the June 14, 2010 date since he
will not be available for the May 24, 2010 meeting because of travel
issues. He stated with him being gone and two Commissioners
recusing themselves, the minimum would be four Commissioners
again.
Ron Ruthven stated if the Commissioners have specific items they
would like to have addressed, to please meet with staff regarding
those issues or state it here.
Commissioner Redfearn stated regardless of the vote, the applicant
can still take this to City Council. Ron Ruthven stated if the
Commission denies the request, yes, the applicant can appeal the
request to City Council, however, it would require a supermajority
vote.
Commissioner Clardy moved to table case ZC10-003 until the June
14, 2010 meeting. Commissioner Phelps seconded.
The motion carried by the following vote:
Aye: 4 -Dudziak, Redfearn, Clardy, Phelps
Absent: 1 -Rotthaus
Excused: 2 -Knox, Byerly
8b Approval of a request for a Special Use Permit for an auto repair shop
on Lot 1, Block 1 of the Highway 26 Industrial Addition located at 6804
City of Colleyville Page 13 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final
May 10, 2010
Colleyville Boulevard, Case ZC10-007
Ron Ruthven presented the case and briefed the Commissioners.
Commissioner Clardy questioned staff regarding the SUP which was
approved adjacent to this property, were they allowed to have a trailer
parked at the back portion of their property? Ron Ruthven replied yes,
they were allowed to have a trailer for the business parked on the back
portion of their property.
Commissioner Clardy stated staff is denying this request to park a trailer
on this property. Ron Ruthven stated staff is recommending denial
specifically for the parking of personal trailers on the subject property.
Commissioner Byerly opened the public hearing at 7:14 p.m.
Danny LaPier, the applicant, came forward to present the case and brief
the Commissioners.
Commissioner Dudziak questioned the applicant; is not being able to
park a motor home or boat on the property an impediment? Mr. LaPier
stated at this time he does not own such property but in order to be
compliant with the ordinance, if in the future he does own such property,
he would like to be able to park them on his property.
Commissioner Dudziak questioned Mr. LaPier if he wants to be open on
Saturdays? Mr. LaPier stated he did not want to push the issue with
being allowed. He stated he would like to be open on Saturdays.
Commissioner Byerly questioned Mr. LaPier regarding what hours would
he propose for Saturday; the same as during the week, 7 a.m. to 7 p.m.?
Mr. LaPier replied 8 a.m to 12 p.m.
Commissioner Clardy questioned Mr. LaPier if he has a trailer he uses
for his business? Mr. LaPier replied they have a car trailer but that is it.
He stated eventually he would like to park his daughter's heifer trailer
there.
There being no one wishing to speak, the public hearing was closed at
7:17 p.m.
Commissioner
amendment to
a.m. to 7 p.m.
seconded.
Redfearn moved to approve
the hours of the business be
and Saturday 8 a.m. to noon
case ZC10-007 with the
Monday through Friday, 7
Commissioner Dudziak
City of Colleyville Page 14 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final May 10, 2010
The motion carried by the following vote:
Aye: 6 -Knox, Dudziak, Redfearn, Clardy, Phelps, Byerly
Absent: 1 -Rotthaus
8c Approval of a request for a Special Use Permit for a private school on
Lot 1A, Block 1 of the First Assembly of God Addition located at 4309
Colleyville Boulevard, Case ZC10-008
Commissioner Phelps recused himself from this item and signed an
affidavit.
Ron Ruthven presented the case and briefed the Commissioners.
Commissioner Byerly opened the public hearing at 7:19 p.m.
There being no one wishing to speak, the public hearing was closed at
7:20 p.m.
Commissioner Redfearn questioned staff regarding what types of
licensing is required by the state for a private school. Ron Ruthven
replied not knowing at this time. He stated knowing that the state does
have standards for such facilities.
Commissioner Redfearn moved to table case ZC10-008 since the
applicant was not present. Commissioner Clardy seconded.
The motion carried by the following vote:
Aye: 5 -Knox, Dudziak, Redfearn, Clardy, Byerly
Absent: 1 -Rotthaus
Excused: 1 -Phelps
9. TABLED PUBLIC HEARING AGENDA ITEMS
9a Approval of a replat for 0.24 acres on Tract 3B1A, Abstract 936 of the M.
Looney Survey and 2.0 acres on Lot 44R, Block 1 of the Riverwalk at
Colleyville Addition located at 1206 Nueces Court and 1200 Riverwalk
Court, Case PC10-004
Commissioner Clardy moved to take item 9a case PC10-004 from the
table so that this item could be heard. Commissioner Dudziak
seconded.
The motion carried by the following vote:
Aye: 6 -Knox, Dudziak, Redfearn, Clardy, Phelps, Byerly
Absent: 1 -Rotthaus
City of Colleyville Page 15 Printed on 5/24/2010
Planning and Zoning Commission Minutes -Final
May 10, 2010
Ron Ruthven presented the case and briefed the Commissioners.
Commissioner Byerly questioned staff regarding whether the address
issue brought up in the previous meeting was discussed. Ron Ruthven
replied yes, the address had been discussed with the Riverwalk HOA
and they were in agreement that at the time of building permits, the
address would reflect 1120 Nueces Court.
Commissioner Byerly moved to approve case PC10-004. Commissioner
Knox seconded.
The motion carried by the following vote:
Aye: 6 -Knox, Dudziak, Redfearn, Clardy, Phelps, Byerly
Absent: 1 - Rotthaus
10. ADJOURNMENT
The meeting adjourned at 9:44 p.m.
I hereby certify the above agenda was posted on the bulletin boards at City Hall
on Friday, May 7, 2010 by 5:00 p.m.
Amy Shelley, Planning and Zoning Assistant
The meeting minutes were approved at the May 24, 2010 meeting.
City of Colleyville Page 16 Prlntea on aa4icvw