HomeMy WebLinkAboutOrdinances (O-84-531)-09/04/1984
q~L/~
AN ORDINANCE AMENDING CHAPTER 3, SECTION 1D OF THE BUILDING CODE
OF THE COLLEYVILLE CODE OF ORDINANCES BY INCREASING BUILDING
PERMIT FEES: AMENDING CHAPTER 3, SECTION 4E OF THE PLUMBING CODE
OF THE COLLEYVILLE CODE OF ORDINANCES BY INCREASING THE PERMIT
FEES; AMENDING CHAPTER 3, SECTION 5D OF THE MECHANICAL CODE OF
THE COLLEYVILLE CODE OF ORDINANCES BY INCREASING THE PERMIT FEES;
IAMENDING CHAPTER 5, SECTION 6C OF THE ELECTRICAL CODE OF THE
!COLLEYVILLE CODE OF ORDINANCES BY INCREASING ELECTRICAL PERMIT
IFEES AND PROVIDING FOR EFFECTIVE DATES.
I
I WHEREAS,
1
2
3
4
5
6
7
8
9
P~f111
Or (Jt)(f'ft.>
ORDINANCE NO. 0-84-531'/
the current building code, plumbing code, mechanical
code, and electrical code permit fees are substantially
less than the cost of city inspection; and,
10
WHEREAS, the Ci ty Council deems it is in the best interest of the
City that said permit fees be increased to more closely
reflect the cost of inspection; NOW, THEREFORE,
26 I
J
11
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COLLEYVILLE,
TEXAS:
THAT Section 1D of Chapter 3 of the Building Code be
amended to read as follows:
"D. BUILDING,PEIU-1I'I' FEES
The schedule of permit fees contained in said building
code is hereby superseded by the following schedule:
Total Valuation
F.ee
12
13
; I Sec. 1.
II
II
II
I!
I
I
$1.00 to $500.00
$501.00 to $2,000.00
$10.00
14
15
16
17
18
I
i
I
II
II
;1
II
II
i
$10.00 for the first
$501.00 plus $1.50 for
each additional $100.00
or fraction thereof, up
to and including
$2,000.00
$2,001.00 to $25,000.00
$30.00 for the first
$2,001.00 plus $6.00 for
each additional $1,000.00
or fraction thereof, up
to and including
$25,000.00
19
20
21
22
23
24
$25,001.00 to $50,000.00
$168.00 for the first
25 1
)
1
$25,001.00 plus $4.50 for
each additional $1,000.00
or fraction thereof, up
to and including
$50,000.00
2
3
4
5
$300.00 for the first
$50,001.00 plus $3.00 for
each additional $1,000.00
or fraction thereof, up
to and including
$100,000.00
$50,001.00 to $100,000.00
6
7
8
$100,001.00 to $500,000.0
$500.00 for the first
$100,001.00 plus $2.50
for each additional
$1,000.00 or fraction
thereof, up to and
including $500,000.00
$1,600.00 for the first
$500,001.00 plus $2.00
for each additional
$1,000.00 or fraction
thereof."
9
10
11
$500,001.00 and up
12
13
14
Sec. 2. THAT Section 4E of Chapter 3 of the Plumbing Code be
amended to read as follows:
15
"E. PERMIT ~EES.
16
The schedule of plumbing permit fees contained in said
Plumbing Code is hereby superseded by the following
schedules:
17
Permit Issuance
18
$10.00
$ 6.00
19
(1) For issuing each permit. . . . . . .
(2) For issuing each supplemental permit
20
Unit Fee. Schedule (in addition, to, .(1) and (2). above)
21
(1) For each plumbing fixture or trap or
set of fixtures on one trap (includ-
ing water, drainage piping, and
backflow protection therefor) . . $ 3.00
(2) For each building sewer and each
trailer park sewer. . . .. ... $ 7.50
(3) Rainwater systems - per drain
(inside building) .......... $ 3.00
22
23
24
25
2
26
1
2
3
Ii
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
(4) For each cesspool . . . . . . . . . . . $20.00
(5) For each private sewage disposal system $20.00
(6) For each water heater and/or vent.. $15.00
(7) For each gas piping system of one to
five outlets . . . . . . . . . . . . . $10.00
(8) For each gas piping system over five
outlets, per outlet. . . . . . . . . . $ 1.50
(9) For each industrial waste pretreatment
interceptor including its trap and
vent, excepting kitchen-type grease
interceptors functioning as fixture
traps. . . . . . . . . . . . . . . .
(10) For installation or repair of water
piping and/or water treating equip-
ment, each . . . . . . . . . . . . .
(11) For repair or alteration of drainage
or vent piping, each fixture . . . .
(12) For each lawn sprinkler system on any
one meter including backflow
protection devices therefor . . . .
(13) For atmospheric-type vacuum breakers
not included in item 2, one to five.
Over five, each . . . . . . . . . . .
(14) For each backflow protective device
other than atmospheric-type vacuum
breakers; two inches (2") or smaller
Over two inches (2") . . . . . . . . .
i (,
f ,--/
/'
/., I
c;,;.:.l <
. $10.00
. $ 5.00
. $ 5.00
. $15.00
. $ 5.00
. $ 1.00
$ 7.50
. $ 7.50
Other Inspections,an~rees
(1) Inspections outside of normal business
hours (minimum charge two (2) hours) . $30.00
per hour
(2)
Reinspection fee assessed under
provisions of Section 305(g) . .
( 3 )
Inspections for which no fee is
specifically indicated (minimum
charge one-half (1/2) hour)
( 4 )
Additional plan review required by
changes, additions, or revisions
to approved plans (minimum charge
one-half (/2) hour) .......
. $15.00
each
. $15.00
per hour
. . $15.00
per hour"
Sec. 3. THAT Section 5D of Chapter 3 of the Mechanical Code be
amended to read as follows:
liD. PERMIT F;EES
3
'!
1
2
3
The schedule of mechanical permit fees contained in said
Mechanical Code is hereby superseded by the following
schedule:
4
5
Issuance of permit . . . . . . . . . . . . . $10.00
Forced air heat: appl., incl. ducts, vents
to and incl. 100,000 BTU's input . .. $10.00
Over 100,000 BTU's input. . . . . . .. $10.00
OVer 400,000 BTU's input. . . . .. .. $10.00
Capacity to and incl. 20 kw . . . . .. $10.00
Capacity over 20 kw . . . . . . . .. . $10.00
Gas wall heater, gas floor furnace, gas
infra-red heating unit. . . . . . . $ 6.00 ea.
Electric strip heaters for fan and coil. . . $ 2.00 ea.
Low 7 high press steam boilers per
1,000 BTU input . . . . . . . . . . . . . . $ .50 ea.
Per boiler HP output . . . . . . . . . . . $ 2.00 ea.
Absorber, E1ec. Reciprocating: Centrifugal,
or rotary norm cap up to and incl. 2 tons . $ 5.00
Over 2 and incl. 3 tons.. .... $ 7.00
Over 3 and incl. 5 tons. . . . . . . . . . $10.00
Over 5 and incl. 7 1/2 tons. . . . . . . . $15.00
Over 7 1/2 and incl. 10 tons . .. .. $20.00
Over 10 and incl. 30 tons (per ton) .. $ 2.00
Over 30 and incl. 100 tons (per ton) . . . $ 1.40
Over 100 and incl. 320 tons (per ton) . $ 1.70
Over 320 and incl. 520 tons (per ton) . . . $ 1.50
Over 520 tons (per ton) . . . . . .. . $ 1.30
Cooling tower, evap. or air-cooled
condensors (per ton) ......... $ 1.00 ea.
Roof top unit incl. ducts and drains: Cool Heat
up to and incl. 3 tons . . . . . . $15.00 $20.00
Over 3 and incl. 5 tons. .. . $18.00 $24.00
Over 5 and incl. 7 1/2 tons . . $21.00 $32.00
Over 7 1/2 and incl. 10 tons. . $24.00 $32.00
Over 10 tons (per ton) ... . $ 4.00 $ 5.00
Cooling Heating Coils:
Up to 3 ton D.E. or water fur. coil. . . . $ 2.50 ea.
Over 3 ton D.E. or water fur. coil
(per ton) . . . . . . . . . . . . . . . . $ 2.50
Water or steam coil (per 1,000 BTU) . . . . $ .10
Direct expansion, water or steam fan or
coil units, including drain up to and
including 3 tons . . . . . . . . . . . . . $ 2.50
Elec. strip htrs. for above unit . . . $ 2.50
Over 3 ton cool and/or cooling and heating
unit (per ton) ....... ...
Mechanical roof ventilator
Hoods, commercial . . . . . . . .
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
. $ 1.50
. $ 7.50
. . $ 7.50
24
25
4
26
I ~.-"l
1
2
3
4
5 I;
6
7 II
8 I!
ij
9 I 4.
I Sec.
10
Ii
11 II
12 I
i
I
13 I
i
j
14 I
15 i
,
I
16 I
I
17 I
I
18 I
,I
19
il
20 I.
.1
21 II
II
22 II
I
23 II
I
24 i
25
26
I
II
L
I
Range hood, "H" occup . . . . . . . . . . . . $ 2.50
ventilation, exhaust and cov. system:
Input ventil. system . . . . . . . . . . . $
Toilet exhaust fan and system . . . . . . . $
Exhaust fan connect to 1 duct . . . . . . . $
Conveyor exhaust fan . . . . . . . . . . . $
Appliance Vent inst. and not incl. in
appliance permit . . . . . . . . . . . . $ 7.50
Appliance or equipment not incl. in other
fee s . . . . . .. .... . . . .
French drain . . . . . .. . . . . .
Add to exit duct system . . . . . .
For third and each inspection of
rejected work . . . . . . . . . .
7.50
2.50
7.50
7.50
. $ 7.50
. $ 2.50
. $ 7.50
. $15.00"
THAT Section C(l) of Chapter 5 of the Electrical Code be
amended to read as follows:
"c. E~ECTRIC~L, PERMIT, FEES
(1) Any person granted a permit under this section
shall pay to the City of Co11eyvi11e, a fee therefor to
cover the cost of inspections under this chapter. If
the subject of the permit issued under this section is a
new single-family residence, the person granted such
permi t shall pay to the Ci ty of col1eyvi11e a fee of
thirty dollars ($30.00); in the event the subject new
single-family residence shall contain more than one
thousand (1,000) square feet of area, said thirty dollar
($30.00) fee shall be increased at the rate of three
cents ($.03) per additional square foot of area
contained. Fees for other buildings and housing shall
be in the following amounts:
Permit fee . . . . . . . . . . . . . . . .
First 10 outlets for lighting fixtures,
switches, or receptacles . . . . . . .
For each additional outlet for lighting
fixtures, switiches, or receptacles
For the first 10 lighting fixtures . . . .
For each additional lighting fixture . . .
Ceiling fans, each . . . . . . . . . .
Motor, including motor controls; up to and
including 3/4 h.p., each. . . . . . . .
Over 3/4 h.p. and less than 5 h.p. . .
Over 5 h.p. and less than 15 h.p. ...
Over 15 h.p. and less than 50 h.p. . . . .
Over 50 h.p. and less than 100 h.p. ...
Electric generator up to and including
10 kilowatts, each . . . . . . . . . .
. .$10.00
.$ 5.00
. .$ 0.30
. .$ 5.00
. .$ 0.30
. .$ 0.30
. .$ 2.00
. .$ 4.00
.$ 8.00
. .$10.00
. .$24.00
.$20.00
5
1
2
3
4 I
I
5 i
I
6 I
,
I
7 II
8 II
II
II
9 II
'I
Ii
10 II
I
11 I
I,
12 !I
Ii
13 !I
I!
14 I
I
I
I
15 I
II
II
16 II
17 II
18 !
I,
19 i!
II
20 II
21
22 I,
I
I
23 I
24 I
II
II
25 II
II
I!
26 II
II
/ (....
)
Billboard lighting - fees as provided herein
according to the number of openings and fixtures,
according to the size of the service . . . . .
Primary wiring to sign, each. . . . . . .$10.00
For each additional circuit . . . . . . . . .$ 2.00
Sign connection, each .. . . . . .. ..$ 4.00
Connection of sign to existing circuit ..$ 6.00
X-ray machine, each ......... .$30.00
Motion picture projection machine, each. .$20.00
Complete unit of motion picture sound
equipment including circuit pick-up
devices, sound panel, and speakers within
the building . . . . . . . . . . . . .
Each additional speaker outside building . .
Rectifier, each. . . . . . . . . . . . .
Domestic electric range, each
Commercial electric range, each . . . . .
Transformer type welder, each . . . . .
Generator type welders, according to size
of motor as provided herein, each:
Service, not exceeding 30 amperes . .. .$10.00
30-60 amperes . .. ...... .$14.00
60-100 amperes. . . . . . . . . . . . . .$14.00
Over 100 amperes . . . . . . . $14.00
Power transformer, each . .. . .. .$ 8.00
Bell type transformer, each . . . . . . .$ 1.00
Temporary service, T P pole . . . . . . . . .$15.00
Festoon lighting. . . . . . . . . . . . . . .$ 6.00
Kiln, each. . . . . . . . . . . . . . . . . .$ 6.00
Service to mobile home trailer ..... .$15.00
Room heater, each . .. . . . . . . . . .$ 2.00
Dryer, each . . . . . . . . . . . . .$ 6.00
Washing machine . . . . . .. . . . .$ 2.00
Electric water heater, each . . . . . . . . .$ 6.00
Floor Furnace, each . . . . . . . . .$ 6.00
Central heat, each. .. ...... .$ 6.00
Compactor, each . . . . . . .$ 2.00
Disposal, each .... . . . . . . .$ 2.00
Vent-A-Hood, each . .. .........$ 2.00
Dishwasher, each ......... .$ 2.00
Domestic precipitator, each . . . ..$ 3.00
Commercial or industrial precipitator . . . .$20.00
Window-type air-conditioner, each. .. ..$ 6.00
Low voltage switch, fees as provided
herein for similar equipment of high
voltage rating, each . . . . . . . .. .
Set of boiler controls, each. . . . . . .$ 8.00
Set of central air-conditioning controls .$ 1.00
Computing machine, each . . . . . . . . .$ 8.00
Swimming pool .. . . . . . . . . . . . . . .$30.00
.$20.00
.$ 1.00
.$ 6.00
. .$ 6.00
. .$ 8.00
.$ 4.00
6
1
[I
II
I
2
3
(2) If the office of the chief electrical inspector is
not notified within seventy-two (72) hours (Sundays and
legal holidays excepted) after a specific job is
started, an investigation fee of ten dollars ($10.00)
shall be charged.
4
5
6
(3) The permit fees prescribed herein shall include
the cost of the initial inspection and one (1)
reinspection as required by this chapter. If the
electrical inspector is required to make a second
reinspection, a fee of ten dollars ($10.00) shall be
charged to the electrical contractor for the second
reinspection and for each reinspection required
thereafter."
7
8
9
10
Sec. 5. THAT the foregoing amendments shall be effective upon
final passage hereof.
11
AND IT IS SO ORDERED.
12
13
14
conducted on the
15
CITY OF COLLEYVILLE
ATTEST:
c1i~9~
16
17
18
City Secretary
19
I
I ~vedfa~ Fl and
I R~ 'FOS~
City Attorney
Ii
I
I
I'
Legality:
20
21
22
23
24
25
7
26
I
lJ
~
qI(