HomeMy WebLinkAboutParks and Rec Advisory Board-Minutes-01/08/2018 City of Colleyville Page 1
City of Colleyville
Parks and Recreation
Advisory Board
DRAFT MINUTES
City Hall
100 Main Street
Colleyville, Texas
76034
817.503.1000
www.colleyville.com
Monday, January 8,
2018
6:00 p.m.
Colleyville Public Library
110 Main Street - 2nd Floor Meeting Room
1. CALL TO ORDER
Chair Hillary Schwanbeck called the meeting of the Parks and Recreation Advisory
board to order on January 8, at 6:02 p.m.
Present: Chair Hillary Schwanbeck, Vice Chair Mitali Mandlekar, Board Members
Rich Hendler, Natalie Genco, Ajit Purandare, Jim Hasenpflug, and John Hillebrand.
City staff: Mayor Richard Newton, Assistant City Manager, Adrienne Lothery, Parks
Manager Heather Dowell, Senior Center and Recreation Manager Lisa Escobedo.
Absent: Board member Cliff LeBlanc.
2. APPROVAL OF MINUTES
October 2, 2017 and December 6, 2017
Board member Jim Hasenpflug moved to approve the October 2, 2017 and
December 6, 2017 joint meetings. Board Member John Hillebrand seconded
the motion. The motion carried unanimously.
3. REGULAR AGENDA ITEMS
3a Update on Future Use Options for the Bidault House & Webb House
Assistant City Manager, Adrienne Lothery presented a property
assessment presentation for the Bidault House and Webb House that was
previously shared with the City Council and the Historical Preservation
Committee but wanted citizen feedback from the Committee. The
information in the presentation was recommendations presented by Hidell
Associates Architects, Inc. Hidell Associates Architects, Inc. performed a
thorough investigation of the Bidault House and Webb House and
presented their findings to City Staff. The presentation provided
assessments of the properties’ Current Conditions, Structural Integrity,
Building Systems, Finishes, and Layout. Estimated cost of repairs and
Parks and Recreation Advisory
Board DRAFT MINUTES January 8, 201 8
City of Colleyville Page 2
different scenarios associated public use of these structures were
provided.
BIDAULT HOUSE:
There were two scenarios presented for usage:
• Museum for public education
• Tea Room (private owner – commercial use)
• Small Parties
Requirements for repairs and modifications for usage for public occupancy
will require specialized attention in the following areas (Details in
presentation package that Adrienne Lothery presented):
• Plumbing
• Parking – Presently no parking available
• Historical Designation Requirements
• Zoning (SUP)
• Buffer Wall
• Landscape
• ADA Requirements
The Cost: Site Cost - $98,950
Structure Cost - $121,660
Engineering Fees - $20,000
Total Estimated Project Cost - $240, 610
Several questions were asked by the Committee:
• How long have they owned the property? Mayor Newton – Approx.
2011
• Why did the City purchase the property? Adrienne Lothery – It
belonged to a citizen of Colleyville and the Historical Preservation
Committee and City Council voted to keep it for historical
purposes. Texas Historical Designation in 1980.
• What is it used for now? Adrienne Lothery - Nothing at the
present. Preserved for family photos, etc. Looking for
recommendations for future usage from citizens.
Parks and Recreation Advisory
Board DRAFT MINUTES January 8, 201 8
City of Colleyville Page 3
• Why do you need an 8 ft. masonry wall? Adrienne Lothery –
Requirement from the land development code when a commercial
usage is in a residential area.
• Why don’t we let the interested party purchase the land? Mayor
Newton - Mayor and Council wants to keep for historic reasons.
One of the ideas for usage is, we have a Colleyville Citizen with a
large collections of great historic pieces that potentially can be
used in the Museum. Adrienne Lothery – the interested party
added stipulations to the purchase that would be a cost to the City
and a minimum of 20 parking spaces would be required (which will
not fit in the building area).
• Can we use the facility to rent out for small parties? Mayor
Newton – Yes, this is one of the ideas for this facility.
• What is the square ft. of the building? Adrienne Lothery – 1200
sq. ft. –occupancy of 38-48 people.
• What is the acreage of the facility? Adrienne Lothery - .8 Acres
• Is there any other place for historical education? - Adrienne
Lothery - Not at the present.
WEBB HOUSE:
Webb House is connected to the Cotton Belt Trail. The building is in
relatively good condition.
Suggestions for usage:
• Trail Stop
• Public Meetings
• Small Parties
Modification and repair requirements include (details included in
package Adrienne Lothery presented):
• Lead based paint handling
• ADA Requirements
• Fencing
Parks and Recreation Advisory
Board DRAFT MINUTES January 8, 201 8
City of Colleyville Page 4
• Restrooms Modifications
• Cost – Two cost associated with this property includes:
Trail Stop - Site Cost - $33,000
Structure Cost - $152,426
Engineering Fees - $20,000
Total Estimated Cost - $205,426
Public Use & Meetings – Site Cost - $33,000
Structure Cost - $110,426
Engineering Fees - $15,600
Total Estimated Cost - $159,026
Adrienne Lothery discussed in detail the present restroom usage inside
and outside the building. “The restroom is located at grade, below the
finished floor of the existing home structure. To use the restroom, the
public is required to exit the structure, and walk, without benefit of a
cover (canopy roof) to the restroom. For many public occupancy uses,
this path of travel to a restroom violates code requirements.” Suggested
options from Hidell Associates Architects, Inc. included a new ADA unisex
restroom (one design included one and the other 2). Also, a cost to demo
the existing detached restroom (safety reasons).
Adrienne Lothery stated that the current fencing that is up now seems to
create an indication that you can’t enter into the Webb House. Property
yard adjustment need to be done.
Questions asked by the Committee:
• Is there a kitchen? Heather Dowell – There is a small kitchen
(not a full kitchen).
• Is it open when there is no function? Heather Dowell – No,
the building is locked.
• What is the occupancy of the Webb House? Adrienne Lothery
– Approx. 30-40.
• Will there be additional annual cost for maintenance?
Adrienne Lothery – operating cost will be minimal. The
property will not be staffed on a regular basis. Heather Dowell
– currently landscaping upkeep, climate control to make sure
everything is working.
Parks and Recreation Advisory
Board DRAFT MINUTES January 8, 201 8
City of Colleyville Page 5
• What are some of your ideas for the future of the Webb
House? Adrienne Lothery - Hopefully, in the future, there will
be a Bransford Trail to the Cotton Belt?
• Ideas include – Pumpkin Patch, Garden, Programming
Opportunities, Christmas lighting, Farmers Market (one is
already coming to Colleyville).
• Heather – right now the Webb House is being used for bridal
shots, family pictures, group pictures, etc.
• What about the budget? Mayor/Adrienne – consideration
already in the anticipated in the 2018 budget.
• What are the next steps? Adrienne – City Council will
schedule a worksession for further discussion. We were trying
to get as much citizen input as possible.
3b Discussion of Future Meeting Dates
Rich Hendler discussed the proposed 2018 Parks Schedule:
• March 5, 2018
• May 7, 2018
• August 6, 2018
• October 1, 2018
• December 3, 2018
Rich Hendler also presented “Ideas for Further Discussions” stating that
Parks and Recreation need to continue to stay focus and not lose their
efforts.
Mayor Newton expressed his appreciation for the Committee and stated
that the staff and Council is in full support and will be engaged more
often. He advised that it is important that everyone is fully educated and
that everyone should be fully educated on the scope of the Committee.
Heather Dowell indicated that everyone should have received the by-laws
upon appointment to the Committee, but that they will be sent out again.
Rich Hendler stated that the Committee must stay focus on the agenda
and accomplishments from the items.
Heather Dowell reminded everyone that the Committee are the ones that
make up the agenda.
Parks and Recreation Advisory
Board DRAFT MINUTES January 8, 201 8
City of Colleyville Page 6
Rich Hendler moved to approve the 2018 future Board dates. Ajit
Purandare seconded the motion.
4. REPORTS
4a Recreation, Athletics, and Senior Center Report
Lisa Escobedo, started her update with recapping the events that has
taken place since the last meeting:
• Winter Ball was held on January 26, 2018. It was a sale out and a
success. The theme was “Hollywood” (without the “Hollywood
Drama” per Committee member). There was a DJ, limousine ride,
and pictures taken.
• The Spring Season practices began. Girls’ volleyball registration
began on January 2 and ended February 9, 2018. Practice will
began February 26. We have thirty eight (38) teams signed up and
they will be using the facility of two schools, Colleyville Middle
School and Heritage Middle School. The first game will be held on
March 3, 2018.
• There are 13 teams registered for tennis. The winter spring classes
are from January through April. Spring class registration began late
February through early March
• Senior Center – held their Annual Holiday Party December 13,
2017. Dinner along with a Jazz music played, picture taking, and
the white elephant gift exchange. Sixty (60) seniors attended.
• Parks painted the interior of the Senior Center. Parks personnel
was used on the extremely cold days.
• AARP is offering tax help for seniors are scheduled from February 6,
2018 through April 17, 2018. Appointments are required.
• Colleyville Clean Sweep will be held on April 7, 2018 from 9-11 a.m.
at Colleyville Heritage parking lot. Items collected will include bulk
trash, electronics, shredding, old tires, hazardous waste, etc. In
the past there was a line for hazardous waste but last year it went
exceptional well thanks to the help of out Council getting the word
out and along with the social media (and per Heather Dowell –
because she worked on the line for hazardous material).
Parks and Recreation Advisory
Board DRAFT MINUTES January 8, 201 8
City of Colleyville Page 7
• Easter Brunch will be held on March 24, 2018. This event is usually
an early sale out. It will be held at Colleyville Center from 10 a.m.
to Noon.
4b Parks Report
• Heather Dowell reported that parks is current working on all spring
contracts for softball, baseball, etc.
• The new properties south of city hall and across from Library has a
new irrigation system.
• There are continued improvements being done around the city hall
and village area. The pots in front of city hall will be changed with
seasonal plants and down Main Street.
• Adrienne Lothery is working on new art figures that will be
purchased to be added around this area. More information will be
announced as it come to the forefront for the public.
• Many new programs with the green space.
• The Christmas lighting around the city hall and the first movie
night was a success.
• Plans for a Farmer’s Market are underway. Adrienne Lothery –
Tentative date is March 24, 2018.
• Hero Park working with public works to make minor improvements
to the fountain and replacement of shrubs and future
improvements to come.
5. CITIZEN COMMENTS/PRESENTATIONS REGARDING ITEMS NOT ON
THE AGENDA
No citizen comments.
6. ADJOURNMENT
Board member Ajit Purandare moved to adjourn the meeting, and board
member Rich Hendler seconded. Motion carried unanimously. Chair Hillary
Schwanbeck adjourned the meeting at 7:30 p.m.
Parks and Recreation Advisory
Board DRAFT MINUTES January 8, 201 8
City of Colleyville Page 8
APPROVED BY A VOTE OF 6 AYES, 0 NAYS, AND 0 ABSTENTIONS ON MARCH 5,
2018
Prepared by:
Joyceinne Williams
Administrative Secretary