Loading...
HomeMy WebLinkAboutE-News-City Publications-01/19/20181 HAPPENING THIS WEEK Winter Reading Club Children ages 0-12 can join the Reading Club at the Library. Participants can begin tracking the number of books they check out and receive a sneaker to add to the Groovy Reader Wall. Participants may also earn a prize by attending registered story times. The more a child reads the more opportunities they have for prizes. Get the details Tuesday, January 23 Yoga Flow Basics Each month, the class begins by teaching basic alignment of selected poses, breath work, and meditation. This class meets from 11 a.m. to noon on Tuesdays and Thursdays through Jan. 25 and starts again on Feb. 1. Registration for a month of classes is $40 or drop in a class for $10. Register today Colleyville sees drop in crime in 2017 Colleyville Police continue a standard of safety after seeing a 2-percent drop in crime in 2017. Interim Police Chief Robert Hinton presented the annual Crime Report to City Council at a Jan. 16 worksession, which highlighted trends in crime in the city that occurred in the past year. Data shows Colleyville saw a drop in Part 1 crimes, which include violent crimes such as aggravated assault and robbery and property crimes such as burglaries and thefts. The reduction came in a decrease of burglaries and thefts. The city saw 37 reported burglary cases in 2017 compared 2 Saturday, January 27 Organization: Keep It Simple with Rochelle Ross of a Simplified Space This program is part of the New Year, New You Series. Learn how to better organize at your home at this program from 11 a.m. at the Library. Saturday, January 27 Family Movie Enjoy a movie on the Library's big screens starting at 12:30 p.m. Popcorn and drinks are complimentary. For more information call 817.503.1154. COMING SOON Sunday, January 28 New Year's Restorative Yin & Yoga Nidra Restore, gently stretch, and relase those tight, tense muscles using lots of comfy props as you're guided into a review of the past year, realigning to your deepest heartfelt desires and intentions for 2018. This program meets from 2- 4 p.m. at the Senior Center. Registration cost $26 before 5 p.m. on Jan. 26 and $30 after. Register today Join Our Mailing List!    to 45 in 2016, and 34 burglary of vehicle cases in 2017 compared to 41 in 2016. One issue that persisted in 2016 and 2017 was residential shed burglaries, which accounted for 29 offenses across both years. In 2017, Colleyville Police were able to clear those incidents with the arrest of a suspect connected to all 29 residential shed burglaries. Get the details Pleasant Run construction delayed, substantial completion now targeted for May Pleasant Run Road reconstruction is delayed and may reach substantial completion in May, after a series of issues. The City knows this is a corridor community members use for their daily commute and that this construction has disrupted that traffic. The City apologizes for the inconvenience and thanks motorists for their patience. City staff presented a project update to City Council at a Jan. 16 worksession. The project consists of rebuilding the road from Shelton Road to John McCain Road with the addition of ribbon curb, sidewalks and trails, upsizing of the existing water line, the addition of sanitary sewer, and improvements to the drainage system along the corridor. The project, which was originally slated for substantial completion in April, is now on a May completion timeline after overcoming a series of hurdles and errors. Public Works Director Jeremy Hutt identified some of those hurdles including adjustments to the traffic control plan, breaks to the old existing waterline that would flood the construction site, and franchise utility conflicts. The City also had to work with the contractor after the asphalt it placed did not meet City standards. The contractor must now remove and replace the asphalt, which will require more time. This work will be done at no cost to the city. City staff remains on-site regularly to ensure the product delivered by the contractor meets Colleyville standards. If this project goes beyond the allotted work days, the contractor could be responsible for liquidated damages. To offset the delays, the contractor will work six days a week for the remainder of the project and is looking at opportunities within the construction schedule to reduce overall project time. 3 Forward To A Friend      Get the details SH26 PROJECT UPDATE FOURTHER GRADER WINS MAYOR FOR A DAY LOCAL CONSTRUCTION PROJECT UPDATES The contractor plans to transition traffic into Phase 2 configuration on Friday, Jan. 26, from Brown Trail to Centerpark Drive. Get the details Heritage Elementary fourth grader Sydney Ellis is this year's Mayor for a Day contest winner. She wrote an essay about how she would make Colleyville a better place to live. Read her essay Crews will resurface Glade Road from Bedford Road to Bluebonnet Road on Saturday, Jan. 20. Through traffic will be detoured and businesses in the work zone will still have access. Current project updates City of Colleyville, 100 Main Street, Colleyville, TX 76034