HomeMy WebLinkAboutOrdinances (O-09-1723)-08/04/2009ORDINANCE 0-09-1723
AN ORDINANCE REPLACING ORDINANCE 0-00-1256 AMENDING CHAPTER 50,
ARTICLE II, FLOOD HAZARD REGULATIONS, OF THE COLLEYVILLE CODE, AND
PROVIDING A PENALTY OF TWO THOUSAND DOLLARS ($2,000.00) FOR EACH
VIOLATION
WHEREAS, the City Council deems it is in the best interest of the City to modify its flood
area hazard regulation as provided herein.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
COLLEYVILLE, TEXAS:
Sec. 1. THAT the effective date of this ordinance shall be September 25, 2009.
FLOOD DAMAGE PREVENTION ORDINANCE
ARTICLE 1
STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND METHODS
SECTION A. STATUTORY AUTHORIZATION
The Legislature of the State of Texas has in the Flood Control Insurance Act, Texas Water
Code, Section 16.315, delegated the responsibility of local governmental units to adopt
regulations designed to minimize flood losses. Therefore, the City Council of the City of
Colleyville, Texas does ordain as follows:
SECTION B. FINDINGS OF FACT
(1) The flood hazard areas of the City of Colleyville are subject to periodic inundation,
which results in loss of life and property, health and safety hazards, disruption of
commerce and governmental services, and extraordinary public expenditures forflood
protection and relief, all of which adversely affect the public health, safety and general
welfare.
(2) These flood losses are created by the cumulative effect of obstructions in floodplains
which cause an increase in flood heights and velocities, and by the occupancy of flood
hazard areas by uses vulnerable to floods and hazardous to other lands because they
are inadequately elevated, flood proofed or otherwise protected from flood damage.
SECTION C. STATEMENT OF PURPOSE
It is the purpose of this ordinance to promote the public health, safety and general welfare
and to minimize public and private losses due to flood conditions in specific areas by
provisions designed to:
(1) Protect human life and health;
(2) Minimize expenditure of public money for costly flood control projects;
Ordinance 0-09-1723
Page 2 of 20
(3) Minimize the need for rescue and relief efforts associated with flooding and generally
undertaken at the expense of the general public;
(4) Minimize prolonged business interruptions;
(5) Minimize damage to public facilities and utilities such as water and gas mains, electric,
telephone and sewer lines, streets and bridges located in floodplains;
(6) Help maintain a stable tax base by providing for the sound use and development of
flood-prone areas in such a manner as to minimize future flood blight areas; and
(7) Insure that potential buyers are notified that property is in a flood area.
SECTION D. METHODS OF REDUCING FLOOD LOSSES
In order to accomplish its purposes, this ordinance uses the following methods:
(1) Restrict or prohibit uses that are dangerous to health, safety or property in times of
flood, or cause excessive increases in flood heights or velocities;
(2) Require that uses vulnerable to floods, including facilities which serve such uses, be
protected against flood damage at the time of initial construction;
(3) Control the alteration of natural floodplains, stream channels, and natural protective
barriers, which are involved in the accommodation of flood waters;
(4) Control filling, grading, dredging and other development which may increase flood
damage;
(5) Prevent or regulate the construction of flood barriers which will unnaturally divert flood
waters or which may increase flood hazards to other lands.
ARTICLE 2
DEFINITIONS
Unless specifically defined below, words or phrases used in this ordinance shall be
interpreted to give them the meaning they have in common usage and to give this
ordinance it's most reasonable application.
ALLUVIAL FAN FLOODING -means flooding occurring on the surface of an alluvial fan or
similar landform which originates at the apex and is characterized by high-velocity flows;
active processes of erosion, sediment transport, and deposition; and unpredictable flow
paths.
Ordinance 0-09-1723
Page 3 of 20
APEX - means a point on an alluvial fan or similar landform below which the flow path of
the major stream that formed the fan becomes unpredictable and alluvial fan flooding can
occur.
APPURTENANT STRUCTURE - means a structure which is on the same parcel of
property as the principal structure to be insured and the use of which is incidental to the
use of the principal structure
AREA OF FUTURE CONDITIONS FLOOD HAZARD- means the land area that would be
inundated by the 1-percent-annual chance (100 year) flood based on future conditions
hydrology.
AREA OF SHALLOW FLOODING - means a designated AO, AH, AR/AO, AR/AH, or VO
zone on a community's Flood Insurance Rate Map (FIRM) with a 1 percent or greater
annual chance of flooding to an average depth of 1 to 3 feet where a clearly defined
channel does not exist, where the path of flooding is unpredictable and where velocity flow
may be evident. Such flooding is characterized by ponding or sheet flow.
AREA OF SPECIAL FLOOD HAZARD - is the land in the floodplain within a community
subject to a 1 percent or greater chance of flooding in any given year. The area may be
designated as Zone A on the Flood Hazard Boundary Map (FHBM). After detailed rate
making has been completed in preparation for publication of the FIRM, Zone A usually is
refined into Zones A, AO, AH, Al-30, AE, A99, AR, AR/A1-30, AR/AE, AR/AO, AR/AH,
AR/A, VO, V1-30, VE or V.
BASE FLOOD -means the flood having a 1 percent chance of being equaled or exceeded
in any given year.
BASE FLOOD ELEVATION (BFE) -The elevation shown on the Flood Insurance Rate
Map (FIRM) and found in the accompanying Flood Insurance Study (FIS) for Zones A, AE,
AH, Al-A30, AR, V1-V30, or VE that indicates the water surface elevation resulting from
the flood that has a 1 % chance of equaling or exceeding that level in any given year -also
called the Base Flood.
BASEMENT -means any area of the building having its floor subgrade (below ground
level) on all sides.
BREAKAWAY WALL - means a wall that is not part of the structural support of the
building and is intended through its design and construction to collapse under specific
lateral loading forces, without causing damage to the elevated portion of the building or
supporting foundation system.
Ordinance 0-09-1723
Page 4 of 20
CRITICAL FEATURE - means an integral and readily identifiable part of a flood protection
system, without which the flood protection provided by the entire system would be
compromised.
DEVELOPMENT -means any man-made change to improved and unimproved real estate,
including but not limited to buildings or other structures, mining, dredging, filling, grading,
paving, excavation or drilling operations or storage of equipment or materials.
ELEVATED BUILDING -means, for insurance purposes, anon-basement building, which
has its lowest elevated floor, raised above ground level by foundation walls, shear walls,
posts, piers, pilings, or columns.
EXISTING CONSTRUCTION -means for the purposes of determining rates, structures for
which the "start of construction" commenced before the effective date of the FIRM or
before January 1, 1975, for FIRMs effective before that date. "Existing construction" may
also be referred to as "existing structures."
EXISTING MANUFACTURED HOME PARK ORSUBDIVISION - means a manufactured
home park or subdivision for which the construction of facilities for servicing the lots on
which the manufactured homes are to be affixed (including, at a minimum, the installation
of utilities, the construction of streets, and either final site grading or the pouring of
concrete pads) is completed before the effective date of the floodplain management
regulations adopted by a community.
EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION -
means the preparation of additional sites by the construction of facilities for servicing the
lots on which the manufactured homes are to be affixed (including the installation of
utilities, the construction of streets, and either final site grading or the pouring of concrete
pads).
FLOOD OR FLOODING - means a general and temporary condition of partial or complete
inundation of normally dry land areas from:
(1) the overflow of inland or tidal waters.
(2) the unusual and rapid accumulation or runoff of surface waters from any source.
FLOOD ELEVATION STUDY -means an examination, evaluation and determination of
flood hazards and, if appropriate, corresponding water surface elevations, or an
examination, evaluation and determination of mudslide (i.e., mudflow)and/orflood-related
erosion hazards.
FLOOD INSURANCE RATE MAP (FIRM) -means an official map of a community, on
which the Federal Emergency Management Agency has delineated both the special flood
hazard areas and the risk premium zones applicable to the community.
Ordinance 0-09-1723
Page 5 of 20
FLOOD INSURANCE STUDY (FIS) -see Flood Elevation Study
FLOODPLAIN OR FLOOD-PRONE AREA -means any land area susceptible to being
inundated by water from any source (see definition of flooding).
FLOODPLAIN MANAGEMENT -means the operation of an overall program of corrective
and preventive measures for reducing flood damage, including but not limited to
emergency preparedness plans, flood control works and floodplain management
regulations.
FLOODPLAIN MANAGEMENT REGULATIONS -means zoning ordinances, subdivision
regulations, building codes, health regulations, special purpose ordinances (such as a
floodplain ordinance, grading ordinance and erosion control ordinance) and other
applications of police power. The term describes such state or local regulations, in any
combination thereof, which provide standards for the purpose of flood damage prevention
and reduction.
FLOOD PROTECTION SYSTEM -means those physical structural works for which funds
have been authorized, appropriated, and expended and which have been constructed
specifically to modify flooding in order to reduce the extent of the area within a community
subject to a "special flood hazard" and the extent of the depths of associated flooding.
Such a system typically includes hurricane tidal barriers, dams, reservoirs, levees or dikes.
These specialized flood modifying works are those constructed in conformance with sound
engineering standards.
FLOOD PROOFING -means any combination of structural and non-structural additions,
changes, or adjustments to structures which reduce or eliminate flood damage to real
estate or improved real property, water and sanitary facilities, structures and their contents.
FLOODWAY -see Regulatory Floodway
FUNCTIONALLY DEPENDENT USE - means a use, which cannot perform its intended
purpose unless it is located or carried out in close proximity to water. The term includes
only docking facilities, port facilities that are necessary for the loading and unloading of
cargo or passengers, and ship building and ship repair facilities, but does not include long-
term storage or related manufacturing facilities.
HIGHEST ADJACENT GRADE -means the highest natural elevation of the ground surface
prior to construction next to the proposed walls of a structure.
Ordinance 0-09-1723
Page 6 of 20
HISTORIC STRUCTURE -means any structure that is:
(1) Listed individually in the National Register of Historic Places (a listing maintained by
the Department of Interior) or preliminarily determined by the Secretary of the Interior
as meeting the requirements for individual listing on the National Register;
(2) Certified or preliminarily determined by the Secretary of the Interior as contributing to
the historical significance of a registered historic district or a district preliminarily
determined by the Secretary to qualify as a registered historic district;
(3) Individually listed on a state inventory of historic places in states with historic
preservation programs which have been approved by the Secretary of the Interior; or
(4) Individually listed on a local inventory or historic places in communities with historic
preservation programs that have been certified either:
(a) By an approved state program as determined by the Secretary of the Interior or;
(b) Directly by the Secretary of the Interior in states without approved programs.
LEVEE - means a man-made structure, usually an earthen embankment, designed and
constructed in accordance with sound engineering practices to contain, control, or divert
the flow of water so as to provide protection from temporary flooding.
LEVEE SYSTEM - means a flood protection system which consists of a levee, or levees,
and associated structures, such as closure and drainage devices, which are constructed
and operated in accordance with sound engineering practices.
LOWEST FLOOR -means the lowest floor of the lowest enclosed area (including
basement). An unfinished or flood resistant enclosure, usable solely for parking or
vehicles, building access or storage in an area other than a basement area is not
considered a building's lowest floor; provided that such enclosure is not built so as to
render the structure in violation of the applicable non-elevation design requirement of
Section 60.3 of the National Flood Insurance Program regulations.
MANUFACTURED HOME - means a structure transportable in one or more sections,
which is built on a permanent chassis and is designed for use with or without a permanent
foundation when connected to the required utilities. The term "manufactured home" does
not include a "recreational vehicle".
MANUFACTURED HOME PARK OR SUBDIVISION - means a parcel (or contiguous
parcels) of land divided into two or more manufactured home lots for rent or sale.
MEAN SEA LEVEL -means, for purposes of the National Flood Insurance Program, the
Ordinance 0-09-1723
Page 7 of 20
North American Vertical Datum (NAND) of 1988 or other datum, to which base flood
elevations shown on a community's Flood Insurance Rate Map are referenced.
NEW CONSTRUCTION -means, for the purpose of determining insurance rates,
structures for which the "start of construction" commenced on or after the effective date of
an initial FIRM or after December 31, 1974, whichever is later, and includes any
subsequent improvements to such structures. For floodplain management purposes, "new
construction" means structures for which the "start of construction" commenced on or after
the effective date of a floodplain management regulation adopted by a community and
includes any subsequent improvements to such structures.
NEW MANUFACTURED HOME PARK ORSUBDIVISION - means a manufactured home
park or subdivision for which the construction of facilities for servicing the lots on which the
manufactured homes are to be affixed (including at a minimum, the installation of utilities,
the construction of streets, and either final site grading or the pouring of concrete pads) is
completed on or after the effective date of floodplain management regulations adopted by
a community.
RECREATIONAL VEHICLE - means a vehicle which is (i) built on a single chassis; (ii) 400
square feet or less when measured at the largest horizontal projections; (iii) designed to be
self-propelled or permanently towable by a light duty truck; and (iv) designed primarily not
for use as a permanent dwelling but as temporary living quarters for recreational, camping,
travel, or seasonal use.
REGULATORY FLOODWAY -means the channel of a river or other watercourse and the
adjacent land areas that must be reserved in order to discharge the base flood without
cumulatively increasing the water surface elevation more than a designated height.
RIVERINE -means relating to, formed by, or resembling a river (including tributaries),
stream, brook, etc.
SPECIAL FLOOD HAZARD AREA- see Area of Special Flood Hazard
START OF CONSTRUCTION - (for other than new construction or substantial
improvements under the Coastal Barrier Resources Act (Pub. L. 97-348)), includes
substantial improvement and means the date the building permit was issued, provided the
actual start of construction, repair, reconstruction, rehabilitation, addition placement, or
other improvement was within 180 days of the permit date. The actual start means either
the first placement of permanent construction of a structure on a site, such as the pouring
of slab or footings, the installation of piles, the construction of columns, or any work beyond
the stage of excavation; or the placement of a manufactured home on a foundation.
Permanent construction does not include land preparation, such as clearing, grading and
filling; nor does it include the installation of streets and/or walkways; nor does it include
excavation for basement, footings, piers or foundations or the erection of temporary forms;
Ordinance 0-09-1723
Page 8 of 20
nor does it include the installation on the property of accessory buildings, such as garages
or sheds not occupied as dwelling units or not part of the main structure. For a substantial
improvement, the actual start of construction means the first alteration of any wall, ceiling,
floor, or other structural part of a building, whether or not that alteration affects the external
dimensions of the building.
STRUCTURE -means, for floodplain management purposes, a walled and roofed
building, including a gas or liquid storage tank that is principally above ground, as well as a
manufactured home.
SUBSTANTIAL DAMAGE -means damage of any origin sustained by a structure whereby
the cost of restoring the structure to its before damaged condition would equal or exceed
50 percent of the market value of the structure before the damage occurred.
SUBSTANTIAL IMPROVEMENT -means any reconstruction, rehabilitation, addition, or
other improvement of a structure, the cost of which equals or exceeds 50 percent of the
market value of the structure before "start of construction" of the improvement. This term
includes structures which have incurred "substantial damage", regardless of the actual
repair work performed. The term does not, however, include either: (1) Any project for
improvement of a structure to correct existing violations of state or local health, sanitary, or
safety code specifications which have been identified by the local code enforcement official
and which are the minimum necessary to assure safe living conditions or (2) Any alteration
of a "historic structure", provided that the alteration will not preclude the structure's
continued designation as a "historic structure."
VARIANCE - means a grant of relief by a community from the terms of a floodplain
management regulation. (For full requirements see Section 60.6 of the National Flood
Insurance Program regulations.)
VIOLATION -means the failure of a structure or other development to be fully compliant
with the community's floodplain management regulations. A structure or other
development without the elevation certificate, other certifications, or other evidence of
compliance required in Section 60.3(b)(5), (c)(4), (c)(10), (d)(3), (e)(2), (e)(4), or (e)(5) is
presumed to be in violation until such time as that documentation is provided.
WATER SURFACE ELEVATION -means the height, in relation to the North American
Vertical Datum (NAND) of 1988 (or other datum, where specified), of floods of various
magnitudes and frequencies in the floodplains of coastal or riverine areas.
Ordinance 0-09-1723
Page 9 of 20
ARTICLE 3
GENERAL PROVISIONS
SECTION A. LANDS TO WHICH THIS ORDINANCE APPLIES
The ordinance shall apply to all areas of special flood hazard with thejurisdiction of the City
of Colleyville, Texas.
SECTION B. BASIS FOR ESTABLISHING THE AREAS OF SPECIAL FLOOD
HAZARD
The areas of special flood hazard identified by the Federal Emergency Management
Agency in the current scientific and engineering report entitled, "The Flood Insurance Study
(FIS) for Tarrant County, Texas and Incorporated Areas", dated September 25, 2009, with
accompanying Flood Insurance Rate Maps dated September 25, 2009, and any revisions
thereto are hereby adopted by reference and declared to be a part of this ordinance.
SECTION C. ESTABLISHMENT OF DEVELOPMENT PERMIT
A Floodplain Development Permit shall be required to ensure conformance with the
provisions of this ordinance.
SECTION D. COMPLIANCE
No structure or land shall hereafter be located, altered, or have its use changed without full
compliance with the terms of this ordinance and other applicable regulations.
SECTION E. ABROGATION AND GREATER RESTRICTIONS
This ordinance is not intended to repeal, abrogate, or impair any existing easements,
covenants, or deed restrictions. However, where this ordinance and another ordinance,
easement, covenant, or deed restriction conflict or overlap, whichever imposes the more
stringent restrictions shall prevail.
SECTION F. INTERPRETATION
In the interpretation and application of this ordinance, all provisions shall be; (1) considered
as minimum requirements; (2) liberally construed in favor of the governing body; and (3)
deemed neither to limit nor repeal any other powers granted under State statutes.
SECTION G. WARNING AND DISCLAIMER OR LIABILITY
The degree of flood protection required by this ordinance is considered reasonable for
regulatory purposes and is based on scientific and engineering considerations. On rare
Ordinance 0-09-1723
Page 10 of 20
occasions greater floods can and will occur and flood heights may be increased by man-
made or natural causes. This ordinance does not imply that land outside the areas of
special flood hazards or uses permitted within such areas will be free from flooding or flood
damages. This ordinance shall not create liability on the part of the community or any
official or employee thereof for any flood damages that result from reliance on this
ordinance or any administrative decision lawfully made hereunder.
ARTICLE 4
ADMINISTRATION
SECTION A. DESIGNATION OF THE FLOODPLAIN ADMINISTRATOR
The City Engineer or designee is hereby appointed the Floodplain Administrator to
administer and implement the provisions of this ordinance and other appropriate sections
of 44 CFR (Emergency Management and Assistance -National Flood Insurance Program
Regulations) pertaining to floodplain management.
SECTION B. DUTIES & RESPONSIBILITIES OF THE FLOODPLAIN
ADMINISTRATOR
Duties and responsibilities of the Floodplain Administrator shall include, but not be limited
to, the following:
(1) Maintain and hold open for public inspection all records pertaining to the provisions of
this ordinance.
(2) Review permit application to determine whether to ensure that the proposed building
site project, including the placement of manufactured homes, will be reasonably safe
from flooding.
(3) Review, approve or deny all applications for development permits required by
adoption of this ordinance.
(4) Review permits for proposed development to assure that all necessary permits have
been obtained from those Federal, State or local governmental agencies (including
Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33
U.S.C. 1334) from which prior approval is required.
(5) Where interpretation is needed as to the exact location of the boundaries of the areas
of special flood hazards (for example, where there appears to be a conflict between a
mapped boundary and actual field conditions) the Floodplain Administrator shall make
the necessary interpretation.
Ordinance 0-09-1723
Page 11 of 20
(6) Notify, in riverine situations, adjacent communities and the State Coordinating Agency
which is the Texas Water Development Board (TWDB) and also the Texas
Commission on Environmental Quality (TCEQ), prior to any alteration or relocation of
a watercourse, and submit evidence of such notification to the Federal Emergency
Management Agency.
(7) Assure that the flood carrying capacity within the altered or relocated portion of any
watercourse is maintained.
(8) When base flood elevation data has not been provided in accordance with Article 3,
Section B, the Floodplain Administrator shall obtain, review and reasonably utilize any
base flood elevation data and floodway data available from a Federal, State or other
source, in order to administer the provisions of Article 5.
(9) When a regulatory floodway has not been designated, the Floodplain Administrator
must require that no new construction, substantial improvements, or other
development (including fill) shall be permitted within Zones Al-30 and AE on the
community's FIRM, unless it is demonstrated that the cumulative effect of the
proposed development, when combined with all other existing and anticipated
development, will not increase the water surface elevation of the base flood more than
one foot at any point within the community.
(10) Under the provisions of 44 CFR Chapter 1, Section 65.12, of the National Flood
Insurance Program regulations, a community may approve certain development in
Zones Al-30, AE, AH, on the community's FIRM which increases the water surface
elevation of the base flood by more than 1 foot, provided that the community first
completes all of the provisions required by Section 65.12.
SECTION C. PERMIT PROCEDURES
(1) Application for a Floodplain Development Permit shall be presented to the Floodplain
Administrator on forms furnished by him/her and may include, but not be limited to,
plans in duplicate drawn to scale showing the location, dimensions, and elevation of
proposed landscape alterations, existing and proposed structures, including the
placement of manufactured homes, and the location of the foregoing in relation to
areas of special flood hazard. Additionally, the following information is required:
(a) Elevation (in relation to mean sea level), of the lowest floor (including basement) of
all new and substantially improved structures;
(b) Elevation in relation to mean sea level to which any nonresidential structure shall
be flood proofed;
Ordinance 0-09-1723
Page 12 of 20
(c) A certificate from a registered professional engineer or architect that the
nonresidential flood proofed structure shall meet the flood proofing criteria of Article
5, Section B (2);
(d) Description of the extent to which any watercourse or natural drainage will be
altered or relocated as a result of proposed development;
(e) Maintain a record of all such information in accordance with Article 4, Section (B)
(1);
(2) Approval or denial of a Floodplain Development Permit by the Floodplain
Administrator shall be based on all of the provisions of this ordinance and the
following relevant factors:
(a) The danger to life and property due to flooding or erosion damage;
(b) The susceptibility of the proposed facility and its contents to flood damage and the
effect of such damage on the individual owner;
(c) The danger that materials may be swept onto other lands to the injury of others;
(d) The compatibility of the proposed use with existing and anticipated development;
(e) The safety of access to the property in times of flood for ordinary and emergency
vehicles;
(f) The costs of providing governmental services during and after flood conditions
including maintenance and repair of streets and bridges, and public utilities and
facilities such as sewer, gas, electrical and water systems;
(g) The expected heights, velocity, duration, rate of rise and sediment transport of the
floodwaters and the effects of wave action, if applicable, expected at the site;
(h) The necessity to the facility of a waterfront location, where applicable;
(i) The availability of alternative locations, not subject to flooding or erosion damage,
for the proposed use.
Ordinance 0-09-1723
Page 13 of 20
SECTION D. VARIANCE PROCEDURES
(1) The Appeal Board, as established by the community, shall hear and renderjudgment
on requests for variances from the requirements of this ordinance.
(2) The Appeal Board shall hear and render judgment on an appeal only when it is
alleged there is an error in any requirement, decision, or determination made by the
Floodplain Administrator in the enforcement or administration of this ordinance.
(3) Any person or persons aggrieved by the decision of the Appeal Board may appeal
such decision in the courts of competent jurisdiction.
(4) The Floodplain Administrator shall maintain a record of all actions involving an appeal
and shall report variances to the Federal Emergency Management Agency upon
request.
(5) Variances may be issued for the reconstruction, rehabilitation or restoration of
structures listed on the National Register of Historic Places or the State Inventory of
Historic Places, without regard to the procedures set forth in the remainder of this
ordinance.
(6) Variances may be issued for new construction and substantial improvements to be
erected on a lot of 1/2 acre or less in size contiguous to and surrounded by lots with
existing structures constructed below the base flood level, providing the relevant
factors in Section C (2) of this Article have been fully considered. As the lot size
increases beyond the 1/2 acre, the technical justification required for issuing the
variance increases.
(7) Upon consideration of the factors noted above and the intent of this ordinance, the
Appeal Board may attach such conditions to the granting of variances as it deems
necessary to further the purpose and objectives of this ordinance (Article 1, Section
C).
(8) Variances shall not be issued within any designated floodway if any increase in flood
levels during the base flood discharge would result.
(9) Variances may be issued for the repair or rehabilitation of historic structures upon a
determination that the proposed repair or rehabilitation will not preclude the structure's
continued designation as a historic structure and the variance is the minimum
necessary to preserve the historic character and design of the structure.
Ordinance 0-09-1723
Page 14 of 20
(10) Prerequisites for granting variances:
(a) Variances shall only be issued upon a determination that the variance is the
minimum necessary, considering the flood hazard, to afford relief.
(b) Variances shall only be issued upon: (i) showing a good and sufficient cause; (ii) a
determination that failure to grant the variance would result in exceptional hardship
to the applicant, and (iii) a determination that the granting of a variance will not
result in increased flood heights, additional threats to public safety, extraordinary
public expense, create nuisances, cause fraud on or victimization of the public, or
conflict with existing local laws or ordinances.
(c) Any application to which a variance is granted shall be given written notice that the
structure will be permitted to be built with the lowest floor elevation below the base
flood elevation, and that the cost of flood insurance will be commensurate with the
increased risk resulting from the reduced lowest floor elevation.
(11) Variances may be issued by a community for new construction and substantial
improvements and for other development necessary for the conduct of a functionally
dependent use provided that (i) the criteria outlined in Article 4, Section D (1)-(9) are
met, and (ii) the structure or other development is protected by methods that minimize
flood damages during the base flood and create no additional threats to public safety.
ARTICLE 5
PROVISIONS FOR FLOOD HAZARD REDUCTION
SECTION A. GENERAL STANDARDS
In all areas of special flood hazards the following provisions are required for all new
construction and substantial improvements:
(1) All new construction or substantial improvements shall be designed (or modified) and
adequately anchored to prevent flotation, collapse or lateral movement of the
structure resulting from hydrodynamic and hydrostatic loads, including the effects of
buoyancy;
(2) All new construction or substantial improvements shall be constructed by methods
and practices that minimize flood damage;
(3) All new construction or substantial improvements shall be constructed with materials
resistant to flood damage;
Ordinance 0-09-1723
Page 15 of 20
(4) All new construction or substantial improvements shall be constructed with electrical,
heating, ventilation, plumbing, and air conditioning equipment and other service
facilities that are designed and/or located so as to prevent water from entering or
accumulating within the components during conditions of flooding;
(5) All new and replacement water supply systems shall be designed to minimize or
eliminate infiltration of flood waters into the system;
(6) New and replacement sanitary sewage systems shall be designed to minimize or
eliminate infiltration of flood waters into the system and discharge from the systems
into flood waters; and,
(7) On-site waste disposal systems shall be located to avoid impairment to them or
contamination from them during flooding.
SECTION B. SPECIFIC STANDARDS
In all areas of special flood hazards where base flood elevation data has been provided as
set forth in (i) Article 3, Section B, (ii) Article 4, Section B (8), or (iii) Article 5, Section C (3),
the following provisions are required:
(1) Residential Construction -new construction and substantial improvement of any
residential structure shall have the lowest floor (including basement), elevated to 2
feet above the base flood elevation. A registered professional engineer, architect, or
land surveyor shall submit a certification to the Floodplain Administrator that the
standard of this subsection as proposed in Article 4, Section C (1) a., is satisfied.
(2) Nonresidential Construction -new construction and substantial improvements of
any commercial, industrial or other nonresidential structure shall either have the
lowest floor (including basement) elevated to 2 feet above the base flood level or
together with attendant utility and sanitary facilities, be designed so that below the
base flood level the structure is watertight with walls substantially impermeable to the
passage of water and with structural components having the capability of resisting
hydrostatic and hydrodynamic loads and effects of buoyancy. A registered
professional engineer or architect shall develop and/or review structural design,
specifications, and plans for the construction, and shall certify that the design and
methods of construction are in accordance with accepted standards of practice as
outlined in this subsection. A record of such certification which includes the specific
elevation (in relation to mean sea level) to which such structures are flood proofed
shall be maintained by the Floodplain Administrator.
(3) Enclosures -new construction and substantial improvements, with fully enclosed
areas below the lowest floor that are usable solely for parking of vehicles, building
access or storage in an area other than a basement and which are subject to flooding
shall be designed to automatically equalize hydrostatic flood forces on exterior walls
Ordinance 0-09-1723
Page 16 of 20
by allowing for the entry and exit of floodwaters.
Designs for meeting this requirement must either be certified by a registered
professional engineer or architect or meet or exceed the following minimum criteria:
(a) A minimum of two openings on separate walls having a total net area of not less
than 1 square inch for every square foot of enclosed area subject to flooding shall
be provided.
(b) The bottom of all openings shall be no higher than 1 foot above grade.
(c) Openings may be equipped with screens, louvers, valves, or other coverings or
devices provided that they permit the automatic entry and exit of floodwaters.
(4) Manufactured Homes -
(a) Require that all manufactured homes to be placed within Zone A on a community's
FHBM or FIRM shall be installed using methods and practices which minimize flood
damage. For the purposes of this requirement, manufactured homes must be
elevated and anchored to resist flotation, collapse, or lateral movement. Methods
of anchoring may include, but are not limited to, use of over-the-top or frame ties to
ground anchors. This requirement is in addition to applicable State and local
anchoring requirements for resisting wind forces.
(b) Require that manufactured homes that are placed or substantially improved within
Zones Al-30, AH, and AE on the community's FIRM on sites (i) outside of a
manufactured home park or subdivision, (ii) in a new manufactured home park or
subdivision, (iii) in an expansion to an existing manufactured home park or
subdivision, or (iv) in an existing manufactured home park or subdivision on which
a manufactured home has incurred "substantial damage" as a result of a flood, be
elevated on a permanent foundation such that the lowest floor of the manufactured
home is elevated to 2 feet above the base flood elevation and be securely
anchored to an adequately anchored foundation system to resist flotation, collapse,
and lateral movement.
(c) Require that manufactured homes be placed or substantially improved on sites in
an existing manufactured home park or subdivision with Zones Al-30, AH and AE
on the community's FIRM that are not subject to the provisions of paragraph (4) of
this section be elevated so that either:
(i) the lowest floor of the manufactured home is at 2 feet above the base flood
elevation, or
(ii) the manufactured home chassis is supported by reinforced piers or other
Ordinance 0-09-1723
Page 17 of 20 .
foundation elements of at least equivalent strength that are no less than 36
inches in height above grade and be securely anchored to an adequately
anchored foundation system to resist flotation, collapse, and lateral
movement.
(5) Recreational Vehicles -Require that recreational vehicles placed on sites within
Zones Al-30, AH, and AE on the community's FIRM either (i) be on the site for fewer
than 180 consecutive days, or (ii) be fully licensed and ready for highway use, or (iii)
meet the permit requirements of Article 4, Section C (1), and the elevation and
anchoring requirements for "manufactured homes" in paragraph (4) of this section. A
recreational vehicle is ready for highway use if it is on its wheels orjacking system, is
attached to the site only by quick disconnect type utilities and security devices, and
has no permanently attached additions.
SECTION C. STANDARDS FOR SUBDIVISION PROPOSALS
(1) All subdivision proposals including the placement of manufactured home parks and
subdivisions shall be consistent with Article 1, Sections B, C, and D of this ordinance.
(2) All proposals for the development of subdivisions including the placement of
manufactured home parks and subdivisions shall meet Floodplain Development
Permit requirements of Article 3, Section C; Article 4, Section C; and the provisions of
Article 5 of this ordinance.
(3) Base flood elevation data shall be generated for subdivision proposals and other
proposed development including the placement of manufactured home parks and
subdivisions which is greater than 50 lots or 5 acres, whichever is lesser, if not
otherwise provided pursuant to Article 3, Section B or Article 4, Section B (8) of this
ordinance.
(4) All subdivision proposals including the placement of manufactured home parks and
subdivisions shall have adequate drainage provided to reduce exposure to flood
hazards.
(5) All subdivision proposals including the placement of manufactured home parks and
subdivisions shall have public utilities and facilities such as sewer, gas, electrical and
water systems located and constructed to minimize or eliminate flood damage.
SECTION D. STANDARDS FOR AREAS OF SHALLOW FLOODING (AO/AH ZONES)
Located within the areas of special flood hazard established in Article 3, Section B, are
areas designated as shallow flooding. These areas have special flood hazards associated
with flood depths of 1 to 3 feet where a clearly defined channel does not exist, where the
path of flooding is unpredictable, and where velocity flow may be evident. Such flooding is
Ordinance 0-09-1723
Page 18 of 20
characterized by ponding or sheet flow; therefore, the following provisions apply:
(1) All new construction and substantial improvements of residential structures have the
lowest floor (including basement) elevated to 2 feet above the base flood elevation or
the highest adjacent grade at least as high as the depth number specified in feet on
the community's FIRM (at least 2 feet if no depth number is specified).
(2) All new construction and substantial improvements of non-residential structures;
(a) have the lowest floor (including basement) elevated to 2 feet above the base flood
elevation or the highest adjacent grade at least as high as the depth number
specified in feet on the community's FIRM (at least 2 feet if no depth number is
specified), or
(b) together with attendant utility and sanitary facilities be designed so that below the
base specified flood depth in an AO Zone, or below the Base Flood Elevation in an
AH Zone, level the structure is watertight with walls substantially impermeable to
the passage of water and with structural components having the capability of
resisting hydrostatic and hydrodynamic loads of effects of buoyancy.
(3) A registered professional engineer or architect shall submit a certification to the
Floodplain Administrator that the standards of this Section, as proposed in Article 4,
Section C are satisfied.
(4) Require within Zones AH orAO adequate drainage paths around structures on slopes,
to guide flood waters around and away from proposed structures.
SECTION E. FLOODWAYS
Floodways -located within areas of special flood hazard established in Article 3, Section B,
are areas designated as floodways. Since the floodway is an extremely hazardous area
due to the velocity of flood waters which carry debris, potential projectiles and erosion
potential, the following provisions shall apply:
(1) Encroachments are prohibited, including fill, new construction, substantial
improvements and other development within the adopted regulatory floodway unless it
has been demonstrated through hydrologic and hydraulic analyses performed in
accordance with standard engineering practice that the proposed encroachment
would not result in any increase in flood levels within the community during the
occurrence of the base flood discharge.
Ordinance 0-09-1723
Page 19 of 20
(2) If Article 5, Section E (1) above is satisfied, all new construction and substantial
improvements shall comply with all applicable flood hazard reduction provisions of
Article 5.
(3) Under the provisions of 44 CFR Chapter 1, Section 65.12, of the National Flood
Insurance Program Regulations, a community may permit encroachments within the
adopted regulatory floodway that would result in an increase in base flood elevations,
provided that the community first completes all of the provisions required by Section
65.12.
SECTION F. SEVERABILITY
If any section, clause, sentence, or phrase of this Ordinance is held to be invalid or
unconstitutional by any court of competent jurisdiction, then said holding shall in no way
affect the validity of the remaining portions of this Ordinance.
SECTION G. PENALTIES FOR NON COMPLIANCE
No structure or land shall hereafter be constructed, located, extended, converted, or
altered without full compliance with the terms of this court order and other applicable
regulations. Violation of the provisions of this court order by failure to comply with any of
its requirements (including violations of conditions and safeguards established in
connection with conditions) shall constitute a misdemeanor. Any person who violates this
court order or fails to comply with any of its requirements shall upon conviction thereof be
fined not more than $2,000.00 for each violation, and in addition shall pay all costs and
expenses involved in the case. Each day a violation occurs is a separate offense. Nothing
herein contained shall prevent the City of Colleyville from taking such other lawful action as
is necessary to prevent or remedy any violation.
AND IT IS SO ORDERED.
s t-
The first reading and public hearing being conducted on the o2,/ "" day of
2009.
The sec nd reading and public hearing being conducted on the 'S"' ~ day of
2009.
Ordinance 0-09-1723
Page 20 of 20