Loading...
HomeMy WebLinkAboutE-News-City Publications-10/13/20171 HAPPENING THIS WEEK Monday, October 16 Jo-Ann's Little Dancers Jo-Ann helps children develop poise and coordination while teaching the fundamentals of ballet and tap. The class meets on Mondays through Nov. 6 at the Senior Center. Children ages 3-5 meet from 4:30-5:15 p.m. and children ages 6-12 meet from 5:15-6 p.m. Registration cost $44. Register today Thursday, October 19 Halloween Senior Dance Party Enjoy a thrilling evening of great music, dancing, refreshments, door prizes, and a costume contest from 7:15-9:30 p.m. at the Senior Center. Costumes are encouraged but not required. Admission is $5 at the door. Saturday, October 21 Games for Grown Ups Come to the Library and check out new and trendy games for ages 16-and-up from 11 a.m. to 1:30 Glade Road phases altered to lower time, costs In order to improve the timing and cost of Glade Road, the city will reconstruct the road from SH26 to Pool Road as one project, combining phases 1 and 2. The City Council agreed to this change at its Oct. 10 worksession. Doing so will improve bidding for the work, reduce overall construction time, reduce overall cost, and improve constructability. "Glade Road is an important thoroughfare for Colleyville," Mayor Richard Newton said. "This change allows us to complete necessary improvements faster and cheaper." Phase 1 originally included work from Bransford Road to Manning Drive with work on Bransford Road to SH26 2 p.m. Whether you're looking for a game to test your strategy and social deduction skills or you're just looking for a social trivia game, we've got you covered. You are also free to bring your own games to play or group to play with. Snacks and drinks will be provided. There will also be a chance to win a door prize. Register in-person or online. Register today Saturday, October 21 Haunted Trail Fest Come dressed up to Haunted Trail Fest from 6-9:00 p.m. on Saturday, Oct. 21, at Colleyville Nature Center, 100 Mill Wood Drive. This all-ages event allows families to walk through a wooded path filled with scary creatures, spooky sounds, and ghostly special effects. The trail's fright factor intensifies after 7:30 p.m. Join Our Mailing List!    Forward To A Friend      nearing completion this fall. In order to expedite the remaining portion of Phase 1, the city will pursue this work in conjunction with Phase 2. Phase 2 originally stretched from Manning Drive to Pool Road. The City will now work on the road west of SH26 as one phase, which improves bidder interests, allows the contractor to work along the roadway simultaneously, and creates savings in mobilization and material costs. The city is currently acquiring right-of-way and utility relocation will begin once that is complete. Work on the roadway can begin once that process is complete, possibly in spring 2019. The improvements include new pavement with left-turn lanes where warranted, a roundabout at the Riverwalk Drive intersection, the lowering and removal of stop signs at the Bluebonnet Drive intersection, and pedestrian elements. From SH26 to Montclair Drive the design includes curb and gutter, an underground storm drainage system, left-turn lanes, a trail on the north side of the roadway and a sidewalk on the south. Montclair to Summerbrook Drive will feature a ribbon curb. "The City Council held numerous public work sessions and spent many hours working on a design for Glade Road from Manning Drive to Pool Road that resolved all of the community's issues," Mayor Newton said. "The road we will build improves traffic conditions on Glade while keeping the road's residential character and charm." City treats site with larvacide for West Nile Virus The City of Colleyville will conduct street-level truck and localized ATV-mounted adulticide fogging after mosquito sample sites tested positive for West Nile Virus. Tarrant County Public Health notified city staff on Oct. 11 of positive mosquito samples taken from the 1600 block of Hall-Johnson Road and the 200 block of McDonwell School Road. In accordance with the city's Integrated Mosquito Management Program policies and Tarrant County Public Health recommendations, truck mounted and ATV fogging will take place from 9:00 p.m. to 5:30 a.m. on Friday, Oct. 13, within a quarter-mile of the Hall-Johnson Road test site because this is the fourth positive at this location. The McDonwell School Road location will be treated with localized, ATV-mounted fogging. For concerns or questions about this application, please contact Public Works at 817.503.1090 or Randy Bright, 3 Environmental Compliance Officer at 817.503.1092. Get the details CITY EARNS SCENIC CITY CERTIFICATION COUNCIL RECOGNIZES EAGLE SCOUT LOCAL CONSTRUCTION PROJECT UPDATES Colleyville received a Silver Scenic City Certification recognizing its responsible and forward-looking vision for public roadways and public spaces. Get the details The City Council honored Michael Kinsey for obtaining the rank of Eagle Scout with a proclamation at this week's meeting. Bedford Road rehabilitation from Cheek-Sparger Road to Little Bear Creek Bridge will begin the week of Oct. 23. This work will be done under flaggers. Current project updates City of Colleyville, 100 Main Street, Colleyville, TX 76034