Loading...
HomeMy WebLinkAboutOrdinances (O-89-721)-07/25/1989 1 2 3 4 5 6 " 7 II 8 II !i 9 I' II II 'I 10 Ii d II 11 II 12 II 13 II 14 II I' 15 II 16 I I I 17 II 'I 18 19 20 21 II 22 23 24 I 25 II I 26 ORDINANCE 0-89-721 ~q 5-gq '1-J 1 Ar AN ORDINANCE AMENDING CHAPTER 11, IIAPPENDIX All OF THE WATER AND SEWER POLICY: AND PROCEDURE MANUAL FOR THE CITY OF COLLEYVILLE BY PROVIDING FOR REVISIONi OF SEWER EXTENSION POLICIES OF THE CITY BY ADDING AN OPTIONAL SEWER EXTENSIONl PROCEDURE. ' Whereas, the City of Colleyville operates and maintains sanitary sewer system for the collection and removal of raw sewage, and Whereas, areas of the City exist with malfunctioning septic systems creating; an unacceptable health hazard which degrades the quality of life and property values of citizens and the City's tax base, and Whereas, a policy and procedure is needed to allow for the prompt elimination of unsanitary and malfunctioning septic systems by extending the City's sanitary sewer systems to service sewer customers, and Whereas, the cost of such should be shared in a manner determined by the City to be equitable between the rate payers and the individual customers, Now, therefore, be it ordained by the City of Colleyville: Section 1: That, Section 5 is amended by the addition of the following: E. ALTERNATE EXTENSION PROCEDURE AVAILABLE TO PERMIT THE EXTENSION OF SANITARY SEWER MAIN(S) TO SERVE EXISTING RESIDENCES. The City may extend sanitary sewers to service new areas previously not served when the City determines that such extension is in the best interest of the public and the City. i. Conditional Requirements The City may require as a condition, the following: 1) A petition signed and submitted by 60% of the property owners requesting sewer service and/or; 2) Acceptable binding commitments and/or deposit(s) of funds sufficient to pay for 60% of the extensions cost (as estimated by the City IS consulti ng engi neer) before authorization of the extension. 1 2 3 4 5 I 6 II 7 8 I 9 I I 10 Ii 11 'I 12 13 14 15 16 17 18 19 20 I 21 I I 22 'I 23 24 25 I 26 II II D --g9 - I:J./ L~) ii. Access Charges Access fees will be charged as follows: 1) Per tap available to all property.s affected by the line extension and not otherwise served by sanitary' sewer, limited to one tap per platted lot or tract. 2) Per tap access fee shall be computed by one of the following two methods: A) $10 per front foot (as defined in Section 1, hereof for IIfront footagell) and as may be revised hereafter by resolution necessary to address changes in construction costs. Provided further that the front footage fee shall not be less than $1000 nor more than $2000. Additional taps for system access requested after the original computation as determined herein shall be the same as would have been charged otherwise. B) Where lots are uniform in front footage and the equity of the individual case indicate that a si ng1 e fee may be the most appropri ate and efficient method of assessment, the City Counci 1 may act to adopt a per tap access fee based on an equal di stri buti on of cost to be assessed to property owners for the extension project. The formula per tap access fee shall be the number of IIfront footage(s)1I x $10 divided by the number of lots or tracts abutti ng the sewer line. # of IIfront footage(s) x $10 Total # of Lots/Tracts = Per tap Access fee 3) Subsequent additional taps within the line extension 1 imits shall be charged the same access fees as apply to those initially receiving sewer service as a result of a sewer extension. iii. Payment method: 1 2 3 4 5 6 7 8 I 9 II !I 10 Ii 11 'I I 12 I 13 I 14 I I 15 I 16 17 18 19 20 21 22 23 24 25 26 () -/1- 7c:l1 (3) Customers shall be requi red to pay thei r per tap access fee, in full, prior to connecting the customer's service line to the City sewer main unless otherwise allowed as provided for herein. Customers, unable to pay in full prior to accessing the City's sewer main, may be allowed to payout their access charge when: 1) An application for such payment method is completed; and submitted on forms provided and approved by the! City Manager or his designee; 2) An interest charge of 9.5% per annum shall be charged for the payment period required; and 3) Maximum payment period offered shall be sixty (60) months. 4) The City reserves the opti on under such approved time payment method to bill with utility bills, by separate statement, or with authorized bank drafts executed by the sewer customers. Provided further that the City Manager is authorized to waive and/or revise payment methods in case of financial hardship when adequate verification of need is provided. First Reading and Public Hearing on the __~O~aY of Second Reading and Public Hearing on the ~ + / day of Third Reading and Public Hearing on the ~~ day of ATTEST: ti.~i2- ,1989. ,1989. ,1989. ~ - ~~,~/ ~1w!f~ -~ Mayor City Secretary Approved as to form and legality _i::~-}J.) Ross T. !oste - City Attorney