Loading...
HomeMy WebLinkAboutCity Council Resolutions (R-89-452)-06/06/1989 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 if 20 21 22 23 24 25 26 II I : II 3 4 RESOLUTION R-89-452 A RESOLUTION APPROVING COUNCIL ACTION II WHEREAS, Section 3.13 of the City Charter states "Any official action II by the Council not authori zed by ordi nance shall be authori zed 1'1 by resol uti on. II II Ii !I ij ;i NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COLLEYVILLE, TEXAS: Sec. 1. THAT the Developer Agreement for Highland Meadows, Phase III (see attached) is hereby approved. CITY OF COLLEYVILLE &N~ MAYOR ~ Ii ! I AND IT IS SO RESOLVED. 'I Ii Passed by a vote of ~to ~ on the 6th day of June, 1989. I' II il L Ii !I , , II 11 !: 'I I, Ii II Ii II I' Ii 1 . II VJ II I L/A/3 I II Ii II II I' ,I II :1 I I Ii II II II II !I II --- --1------'- ,- .__.u -- - -- '-' CITY - DEVELOPER AGREEMENT HIGHLAND MEADOWS - PHASE III STATE OF TEXAS COUNTY OF TARRANT ~ ~ KNOW ALL MEN BY THESE PRESENT: THAT Mike Sandlin Homes, Inc., Owner hereinafter called Developer, and the City of COlleyville, Tarrant County, Texas, hereinafter called City enter into the following contract: In consideration of the mutual Meadows, Pha se II I an Add it i on to record in Volume , Page Texas, the parties hereto do agree: covenants herein contained and for Highland the City of Colleyville, Texas as filed of of the Plat Records of Tdrrant County, 1. The Owner/Developer agrees to provide the City with drawings of the street construction plans for the development. It is further agreed that street design will be in accordance with the City standards. 2. The Owner/Developer will provide a complete service connection at each lot including water tap, service line, curb stop and a tap and riser for sewer. The charge for the right to connect to the system shall be in accordance wi th the Ci ty I S current Water and Sewer tap fees and wi 11 be charged and pa i d at the time building permits are issued. 3. The Owner/Developer will negotiate and contract for street construction plus drainage, water and sewer requirements with reputable contractors. All contract documents shall be prepared under the supervision and bear the seal of a Registered Professional Engineer who shall be licensed by the State of Texas. Before acceptance of the project by the City, the contractor or contractors wi 11 furnish a maintenance bond, or place in escrow a 10% cash maintenance bond for a total of two (2) years. 4. The Owner/Developer will provide street lighting for Highland Meadows, Phase III. All costs over standard poles and fixtures will be borne by the Deve 1 oper. 5. The Owner/Developer will reimburse the City for the installation of street name signs, "Stop" signs or any other traffi c contro 1 signs, material and labor payable before installation. 6. The Owner /Deve 1 oper agrees to furn i sh a 11 permits, easements, right-of-way or other sites necessary for the project at no cost to the acquired by the City, and to abide by rules and regulations of the City of Colleyville. 7. All responsibility and liability for drainage to adjoining property will accrue to the Developer. 8. The Owner/Developer further agrees the physical improvements shall become the property of the City of Colleyville only after completion of the ~ work, a good title warranted free of any liens or encumbrances, final acceptance issued by the City of Colleyville, submission of the aforementioned maintenance bonds, and when all of the facilities are constructed. 9. The Owner/Developer understands that he has no authority to cancel or amend the terms of the agreement without spec ifi c written authority of the City. 10. If for a'ny reason the ownership of the property should change prior to the final completion, it is agreed that these conditions will pass from this Owner to the next and the City will require proper signatures of the new Owners agreeing to the terms of this documents. These signatures will be necessary before additional permits will be issued. 11. The Owner/Developer agrees to escrow with the City of Colleyville the sum of $23,662,60 for the future improvements of Hall-Johnson Road in accordance with the current perimeter street ordinances. 12. The Owner/Developer agrees to install a 10" water line (910' in length) stubbed to the north property line of this project. This is oversized and the City agrees to participate in the extra cost of $4,213.50. IN WITNESS WHEREOF, the parties to these present have executed the Contract in threey counterparts, e*lJvf>f which shall be deemed an original on this day of _u~ /3, /1.%L . , Mike Sandlin Homes, Inc. MW~ e an ln, reSl en City of Colleyville ~-~ ris awkins, ayor