HomeMy WebLinkAboutCity Council Resolutions (R-89-452)-06/06/1989
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
if 20
21
22
23
24
25
26
II
I
: II
3
4
RESOLUTION R-89-452
A RESOLUTION APPROVING COUNCIL ACTION
II WHEREAS, Section 3.13 of the City Charter states "Any official action
II by the Council not authori zed by ordi nance shall be authori zed
1'1 by resol uti on. II
II
Ii
!I
ij
;i
NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
COLLEYVILLE, TEXAS:
Sec. 1. THAT the Developer Agreement for Highland Meadows, Phase III
(see attached) is hereby approved.
CITY OF COLLEYVILLE
&N~
MAYOR
~
Ii
! I AND IT IS SO RESOLVED.
'I
Ii Passed by a vote of ~to ~ on the 6th day of June, 1989.
I'
II
il
L
Ii
!I
, ,
II
11
!:
'I
I,
Ii
II
Ii
II
I'
Ii 1 .
II VJ
II
I L/A/3
I
II
Ii
II
II
I'
,I
II
:1
I
I
Ii
II
II
II
II
!I
II
---
--1------'- ,- .__.u -- - --
'-'
CITY - DEVELOPER AGREEMENT
HIGHLAND MEADOWS - PHASE III
STATE OF TEXAS
COUNTY OF TARRANT
~
~
KNOW ALL MEN BY THESE PRESENT:
THAT Mike Sandlin Homes, Inc., Owner hereinafter called Developer, and
the City of COlleyville, Tarrant County, Texas, hereinafter called City enter
into the following contract:
In consideration of the mutual
Meadows, Pha se II I an Add it i on to
record in Volume , Page
Texas, the parties hereto do agree:
covenants herein contained and for Highland
the City of Colleyville, Texas as filed of
of the Plat Records of Tdrrant County,
1. The Owner/Developer agrees to provide the City with drawings of the
street construction plans for the development. It is further agreed that street
design will be in accordance with the City standards.
2. The Owner/Developer will provide a complete service connection at
each lot including water tap, service line, curb stop and a tap and riser for
sewer. The charge for the right to connect to the system shall be in accordance
wi th the Ci ty I S current Water and Sewer tap fees and wi 11 be charged and pa i d
at the time building permits are issued.
3. The Owner/Developer will negotiate and contract for street construction
plus drainage, water and sewer requirements with reputable contractors. All
contract documents shall be prepared under the supervision and bear the seal
of a Registered Professional Engineer who shall be licensed by the State of
Texas. Before acceptance of the project by the City, the contractor or
contractors wi 11 furnish a maintenance bond, or place in escrow a 10% cash
maintenance bond for a total of two (2) years.
4. The Owner/Developer will provide street lighting for Highland Meadows,
Phase III. All costs over standard poles and fixtures will be borne by the
Deve 1 oper.
5. The Owner/Developer will reimburse the City for the installation of
street name signs, "Stop" signs or any other traffi c contro 1 signs, material
and labor payable before installation.
6. The Owner /Deve 1 oper agrees to furn i sh a 11 permits, easements,
right-of-way or other sites necessary for the project at no cost to the acquired
by the City, and to abide by rules and regulations of the City of Colleyville.
7. All responsibility and liability for drainage to adjoining property
will accrue to the Developer.
8. The Owner/Developer further agrees the physical improvements shall
become the property of the City of Colleyville only after completion of the
~ work, a good title warranted free of any liens or encumbrances, final acceptance
issued by the City of Colleyville, submission of the aforementioned maintenance
bonds, and when all of the facilities are constructed.
9. The Owner/Developer understands that he has no authority to cancel
or amend the terms of the agreement without spec ifi c written authority of the
City.
10. If for a'ny reason the ownership of the property should change prior
to the final completion, it is agreed that these conditions will pass from
this Owner to the next and the City will require proper signatures of the new
Owners agreeing to the terms of this documents. These signatures will be
necessary before additional permits will be issued.
11. The Owner/Developer agrees to escrow with the City of Colleyville
the sum of $23,662,60 for the future improvements of Hall-Johnson Road in
accordance with the current perimeter street ordinances.
12. The Owner/Developer agrees to install a 10" water line (910' in length)
stubbed to the north property line of this project. This is oversized and
the City agrees to participate in the extra cost of $4,213.50.
IN WITNESS WHEREOF, the parties to these present have executed the Contract
in threey counterparts, e*lJvf>f which shall be deemed an original on this
day of _u~ /3, /1.%L .
,
Mike Sandlin Homes, Inc.
MW~
e an ln, reSl en
City of Colleyville
~-~
ris awkins, ayor