HomeMy WebLinkAboutCommuter Rail Committee-Agenda Packets-10/27/2008Lity ot,
------._
-' __ --_ _
Texas
PUBLIC NOTICE
COMMUTER RAIL COMMITTEE
Monday, October 27, 2008 6:00 P.M.
Colleyville Center, 5301 Riverwalk Drive
The agenda for this meeting will be as follows:
1. Call to Order
2. Approval of Minutes: October 13, 2008
3. Discussion of Environmental Impact Statement
4. Committee Members Recommendations
5. Preparation of Final Report
6. Discussion for Final Meeting -Recommendations to City Council
7. Adjournment
1 certify that Phis notice was posted on the City Hall Bulletin Board on Thursday, October 23, 2008, by 5:00 pm.
Joyceinne Williams
Office Assistant
r;t ~~ c~/
~~ -
-1~ i~.
~~1~ ~ ~~
f
~_<~ X ~5
COMMUTER RAIL COMMITTEE Minutes -October 13, 2008
1. Call to Order
Chairman John Gooding called the meeting to order at 7:05 p.m.
Present: John Gooding, Fred Mills, Paul Vigiletti, Linda Baker, Joyce Hammill,
John Leeper, Urmesh Shah, John Paul Burnett, Clif Davis
Absent: Kristen O'Regan, Roger Nelson, Rich Hendler, Mike Muhm, James
Day, Keath Hance, Bart Butler, David Grimes
Staff: Mike Johnston, Joyceinne Williams
2. Approval of Minutes: September 25, 2008
Paul Vigiletti made a motion to approve the September 25, 2008 minutes. Clif
Davis seconded the motion, the motion carried.
3. Presentation
Fred Mills, Co Chair, presented to the Committee a concise version of the
slide presentation that was presented at the September 25, 2008 meeting by
North Central Texas Council of Governments. The presentation was for
consideration to be used as a model presentation to the City Council and
other organizations.
4. Committee Discussion
There was extensive discussion, by the committed, regarding what
information was really needed to be presented, proposed site plan needed
updating, how much parking needed, type of sound barriers, and how much
area would be left for economic development.
Mike Johnston advised the Committee to refer back to what the committee's
goal was and questioned how much additional information could/should be
gathered to submit their final recommendation to the City Council.
Linda Baker expressed concern regarding the necessity of conducting public
polls since a lack of new information was not available to be presented.
A motion was made by Linda Baker not to go out and do any additional public
polls. The motion was seconded by Clif Davis, the motion was carried.
5. Committee Next Steps
The Committee agreed that their next steps would include a special meeting
to be held October 27, 2008 at 6:00 p.m. The purpose of the meeting would
be preparation of a final report and recommendations to the City Council.
Each Committee member is encouraged to review all information that has
been presented and list all pros and cons regarding the rail system and
should incorporate all citizen feedback previously discussed, along with their
own opinions. Each Committee member will have three minutes to voice their
points. All points would be gathered and summarized.
The committee will meet again on November 10, 2008, to review and approve
the presentation and recommendations to the City Council, which will then
conclude the committee's work.
6. Citizen Comment
No citizen comments were made.
7. Adjournment
A motion was made by John Gooding to adjourn the meeting and seconded
by Linda Baker. The motion was approved and the meeting adjourned at
9:00 p.m.
Minutes taken and prepared 6y Joyceinne Williams
Draft Environmental Impact Statement for the
Southwest-to-Northeast Rail Corridor
l5
Ta61e ES-6: Locally Preferred Alternative
Fulfillment of Purpose and Need Statement
.. _.
Provide multimodal 'The Locally Prefer"red Alternative provides affixed-guideway passenger rdil
solutions for mobility in the systenicombined with, significant improvements to local and feeder bus service
corridor that help mitigate to, provide a multimodal transportation network to assist with mobility in
congestion and improve air 2030, when. regional roadways are forecast to be congested. The Preferred
quality. Alternative also provides reductions in vehicle miles traveled (VMT) and
corresponding reductions in greenhouse gases, and it encourages compact
growth through ahe provision of infrastructure that is supportive of transt-
o~iented developmenf ~TODj.
t Provide a""transportatron;. ~ ~T<e.,aoca:fy P'e~erre, A~Itern~tve interacts wsth other maloi existing,and t- y ~~~
ir'~°;~`~ . ~ ~~ '~-~.` ~r`-~ 'mks
solution t at ,enacts; ~ Q~p.af~''ne tra,spoGtationsysterns and facilites~~n~tlieAregion; rncl'uding t 3;n ity
Sustained'~~esidential The'Localfy Preferred Alternative provides increased capacity'and improved
growth within the Corridor multimodal mobility options to congested roadways. It provides transit service
boundaries has resulted in to 14,060 new riders region-wide,"compared with 9,830 fog the Baseline/
- ~_
increasing travel demands ,-': TSM Alternative.
along the`~majo~.'roadwdys.` ~ .. ~__
`ESk { 1,3.,4
.,. .,
Continued employinerit The Locally Preferred Alternative provides a`relidble travel-time mobility.option
growth within the Corridor between' oriel cimongmajor employment centers and other activity centers
is attracting increasing throughout the corridor.'
levels of intro-coi-ridor
journey-to-work trips.
~- fine ~.orr4aor iie~,w~rn~n a - one ~ocai4y°°€~r ter ~Hrt n atrveryprovdes~':eductions~~n~vet7ic~e mires tr vetedti
Non attainment area. jVMTj and correspon mg red~ctionsln most gree~in ~ouse gases, an rt.:''
encourva~ges coin act growth"throughthe provision~of infrastructure that is
supportive o~ trans~tonented development_jTOD~
Access to DFW Airport The Locally Preferred Alternative provides a.reliable travel-time mobility optjon
and major activity centers to and from DFW Airport and its direct and indirect employment.
beyond The T's service area
is limited due to lack of
-~ transit service.
SOURCE: URS CORPORATION, 2008.
PURPOSE & NEED* 30
,~
Vehicle Miles Traveled (VMT). It is estimated that
the Commuter Rail Alternative would reduce VMT
in the corridor by about 128,550 vehicle miles daily
compared to the No-Build Alternative, and by about
138,000 daily VMT compared to the Baseline/TSM
OW DOES THE
RECOMMENDED
ALTERNATIVE MEET THE
PROJECT'S PURPOSE
AND NEED?
Alternative.
HOW Wlll THE COMMUTER RAIL
SYSTEM AFFECT LOCAL TRAFFIC?
The Commuter Rail Alternative and the Baseline/
The Purpose and Need statement (described
earlier) was used to guide the development of
alternatives and to define the evaluation criteria
for comparing and selecting alternatives during the
earlier Alternatives Analysis portion of this project
TSM Alternative would both result in less peak- (completed in 2006). The alternative that best met
period roadway congestion in the corridor than the Purpose and Need, as well as the supporting
in the No-Build Alternative. However, under goals and objectives, was the Commuter Rail
the Commuter Rail Alternative, some localized Alternative and was selected as the preliminary
areas may experience limited increases in traffic
congestion due to the introduction of crossing gates
at Commuter Rail grade crossings: In addition, new
Commuter Rail stations, and. the traffic they would
attract, could have some limited impact on traffic
operations near those stations.
WILL THE COMMUTER RAIL SYSTEM REQUIRE
NEW GRADE SEPARATIONS AT LOCAL STREETS?
Locally Preferred Alternative to meet 2030 travel
demand in the project's study area. The preliminary
Locally Preferred Alternative has been supported
by The T's Board of Directors, the public, and
other stakeholders, and has not changed during
the DEIS process. Therefore, the results of this
DEIS reinforce that selection of the Commuter Rail
Alternative as the Locally Preferred Alternative.
The Commuter Rail Alternative introduces a new
Commuter Rail guideway that would cross 61
roadways at-grade in the corridor. An extensive
grade crossing analysis concluded no new grade-
separations would be needed for crossings and
nearby intersections to operate satisfactorily, though
additional signalization maybe needed in some
areas.
Transportation impacts are defined in greater detail
in Chapter 5 of the DEIS.
Table ES-6 on the following page summarizes the
Locally Preferred Alternative's fulfillment of the
Purpose and Need Statement.
29* PURPOSE & NEED
P
t
9.
HAT TRAFFIC &
TRANSPORTATION
IMPACTS ARE
ANTICIPATED?
WHAT KIND OF SERVICE WILL BE PROVIDED AND
HOW MANY RIDERS WILL THE SYSTEM CARRY?
While the bus system would evolve to better
accommodate future travel demand patterns in both.
$_-. the No-Build and Baseline/TSM Alternatives, buses
would still operate under unpredictable, mixed
traffic conditions on area roadways and highways.
The proposed Southwest-to-Northeast Commuter
Rail Alternative would provide an exclusive
guideway that would provide increased reliability
~~ and the potential for travel time savin s. When
g
L
connected to the existing THE system, with its
connections to DART and eventually the DCTA rail
system, the proposed Commuter Rail Alternative
would also provide increased transit mobility to
origins and destinations throughout the The T's
Service Area. The region's. transit network would
experience increased ridership; increased passenger
miles, and increased passenger hours with the
Commuter Rail Alternative compared to the No-
Build and Baseline/TSM Alternatives. These levels
of service measures are commonly used to assess
transit system performance.
percent over the Baseline/TSM Alternative). Total
region-wide transit passenger miles are estimated
to increase from 2.86 million in the No-Build
Alternative to 3.11 million in the Commuter Rail
Alternative (an increase of about 8 percent over the
No-Build Alternative and an increase of 3.4 percent
over the Baseline/TSM Alternative). Similarly, total
system-wide transit passenger hours would increase
about 6 percent in the Commuter Rail Alternative
over the No-Build Alternative.
HOW LONG Wlll IT TAKE TO
TRAVEL ON THE SYSTEM?
Travel times on the entire Commuter Rail
Alternative end-to-end (from Sycamore School
Road to DFW Terminal AB) are forecast to be 70.8
minutes in 2030, compared with approximately 90
minutes for single-occupant autos, and 99 to 115
minutes for buses in the Baseline/TSM Alternative
(depending on the direction of travel in the peak
period). Compared to the Baseline/TSM alternative,
the Commuter Rail Alternative would save 9 to
14 minutes for transit riders from the ITC to the
Sycamore School Road Station, and 19 to 30
minutes from the ITC to the DFWRirport-Terminal
A/B Station. In addition, the savings would be
even greater on days when the buses experience
additional congestion due to construction, weather,
or incidents on the highway.
The Southwest-to-Northeast Commuter Rail
i.
Alternative is forecast to have a 2030 weekday
ridership of about 15,500 riders per day, and total
region-wide transit usage would increase by about
14,000 trips daily (an increase of 5.2 percent over
the No-Build Alternative and an increase of 1.5
HOW WILL THE COMMUTER RAII SYSTEM AFFECT
REGIONAL TRAFFIC AND AIR AUALITY?
The Commuter Rail Alternative is anticipated
to have beneficial impacts to the regional
transportation system by helping to reduce regional
ENVIRONMENTAL DATA*28
Table ES-5: Summary of Comm uter Rail Alternative Environmenta l Impacts
• •. •. •
Utilities Aerial and Minimai .relocations anticipated. To be determined in
Underground Utility final design with`and
Lines in`conformdnce with
requirements of Nye
appropriate owning/
operating utility company and
,,,
ju'r-sdiction. ;
Envrron~me~l
`~~ w income r~~ ~''.
~7. % of p
opul"af on s are w~ 'i ~
o ~ e u`r
Justice ~
1 ino :itX Po ~ u ations ~
w ~
rri `e~o~f's t~ s~, resin rng in ~irn ~rov
,~
~, -'_$~ ~
,t ~
~
:r ronal~access: o ~' o a:ro :groin-s-
;~~ ~i
3
~ 4'
fit;
~ i }~
~..: ~ ou d'e `Pe 'erne dispro rt':ona e
k
.~
~f. ~
fi`x` *: ~ ~
~ ..
.~,~ ig , er.a er ~ - - ~ e~ts~re a ~;ve~t ~~ ~ = e
p. opu Ca,,S~g rou , s _
Construction Construction Minimal impacts to environmental Applying water to disturbed
Impacts resources. Resources typically impacted soil, reyegetating'disturbed
include air quality; .noise and vibration, areas, covering and
utilities, water resources and traffic. maintaining trucks.
Air Quality Impacts would occur From fugitive dust {mplement dust control
From earthmovrng, ground disturbance, measures:
etc.~and emissions froni'constructron
equipment.
Noise and Vibration Generation of noise From construction Avoid nighttime construction
equipment Minimal vibration impacts in'resrdentral areas, use of
expected #rom pile driving. mufflers or enclosed engines,.
and constrict temporary
noise ba~~iers.
Utility Disruptions ` Short term impacts to area utilities due to Plan and schedule
line disruptions, relocations and general construction activities to
improvements. niinrmize~utility service-
interruptions and provide
nofifrcations"of disruptions.
Water Resources Temporary removal of vegetation, Implement of Stormwater,~
increased stormwater runoff, aril Pollution Prevention Pldn ;- . '
increased 'sedimentation: and adhere to appropriato
permitting prog`rarims."
Traffic Disruptions Traffic and circulation impacts, due to
: _.
_ Coordinate with appropriate ;
.
roadway cbsures. traffic control division's"to
maintain reasonable and safe
;,
traffic bperatrons at affected
crossings.
Develop temporary
,,
traffic control pldn, schedule
equipment movement during
non- k periods, etc.
27* ENVIRONMENTAL DATA
i
~:
HAT TYPES OF
ENVIRONMENTAL
DATA WERE COLLECTED
& ANALYZED IN THE
CORRIDOR?
Qualified professionals in their field have identified
the existing natural and built environmental
conditions in the Study Area. For purposes of .
this environmental evaluation, the Southwest-
to-Northeast Corridor study area generally
encompasses ahalf--mile on either side of the
alignment unless otherwise noted, and extends from
Sycamore School Road in southwest Tarrant County
to the north end of DFW Airport. The environmental
resources and issues identified include: Land Use
and Zoning; Economic Considerations; Acquisitions
and Displacements; Social Characteristics and
Community Facilities; Historic and Archeological
Resources; Parkland; Public Safety and Security;
Visual and Aesthetic Resources; Air Quality;
Noise and Vibration; Biological and Natural
Resources; Water Resources and Water Quality;
Mineral Resources, Geology, and Soils; Hazardous
Materials; Utilities; and Transportation. Detailed
information regarding the affected environment in
the project Study Area is provided in Chapter 3 of
the DEIS.
In terms of air quality, the proposed Southwest-to-
Northeast Rail Corridor is consistent with Mobility
2030, the Dallas-Fort Worth Area Metropolitan
Transportation Plan (MTP), and the 2006-2008
Transportation Improvement Program (TIP), both of
which were found to conform by FHWA and FTA on
June 12, 2007.
WHAT ARE THE ANTICIPATED ENVIRONMENTAL
IMPACTS OF THE PROJECT?
Potential adverse and beneficial environmental
impacts associated with the Commuter Rail
Alternative are summarized in Table ES-5 on the
following pages. (Note: environmental impacts of
the two design options are similar in nature to that
of the Commuter Rail Alternative and are not listed
here.) Specific mitigation measures in response
to anticipated impacts are also identified. Chapter
4 of the DEIS provides a detailed comparison of
the No-Build, Baseline/TSM and Commuter Rail
Alternative (and design option) impacts.
23* ENVIRONMENTAL DATA
f..
i
cost effectively, than if all trains were required to
start from one end of a corridor or off line at Irving
Yard. For the Southwest-to-Northeast Rail Corridor
project, a layover facility is proposed near Dirks
Road at the southwest end of the corridor between
the mainline of the FWWR tracks and the future
Southwest Parkway alignment shown in the figure
below. In addition, a layover facility is proposed
for the north end of the project immediately north of
the proposed DFW Airport-North Station.
ALTERNATIVES CONSIDERED*22
WHAT ABOUT A LAYOVER FACILITY
FOR THE PROJECT?
Heavy maintenance for the proposed Commuter
Rail Alternative would be conducted at the existing
THE Irving Yard. The facility would provide
supporting infrastructure for train operations and
would be used to inspect, repair, maintain, clean,
and store commuter rail vehicles. A maintenance
facility also typically includes vehicle storage,
a maintenance shop(s), employee offices, locker
rooms, train operation reporting and dispatching
rooms, and parking, all of which are already housed
at the THE Irving Yard. Some modification may be
needed to accommodate the number of vehicles that
are proposed for the Southwest-to-Northeast Rail
Corridor, and this is included in the total capital cost
for the project; it is assumed that most maintenance
could be accomodated at this facility by adding
workers on additional shifts.
A layover facility is a much smaller facility that
usually is located on the opposite end or ends of the
corridor relative to the maintenance facility. In this
case, because the maintenance facility is located in
Irving, a layover facility could be located at either
the southwest or northeast end of the corridor,
though it is likely that, regardless of the location
of a layover facility, there will be storage tracks at
both ends of the corridor to store one or two trains.
A layover facility would be used for the mid-day
and overnight storage of trains and could be used
for light cleaning, daily train servicing, and minor
inspection and repair. Some trains would be stored
at the maintenance facility and some would be
stored at the layover facility to allow trains to begin
or end the service day from each end of the corridor.
This would allow equal service to be operated in
both directions much sooner each day, and more
21 * ALTERNATIVES CONSIDERED
F ,
f
z
~`. = All station concepts shown are preliminary concepts and subject to change based on additional planning and design analysis and public review and comment.
~i
ALTERNATIVES CONSIDERED*20
~~
~_.
All station concepts shown are preliminary concepts and subject to change based on additional planning and design analysis and public review and comment.
ALTERNATIVES CONSIDERED* 18
~._..
All station concepts shown are preliminary concepts and subject to change based on additional planning and design analysis and public review and comment.
ALTERNATIVES CONSIDERED* 16
All station concepts shown are preliminary conceph and subject to change based on additional planning and design analysis and public review and comment.
15* ALTERNATIVES CONSIDERED
~_ _' All station concepts shown are preliminary concepts and subject to change based on additional planning and design analysis and public review and comment.
ALTERNATIVES CONSIDERED* 14
its publication, with the likelihood that the impacts described in this document will be less substantial on
opening day than those forecast for 2030.
WHERE Wlll THE COMMUTER RAIL STATIONS BE LOCATED?
The project team worked with The T, local jurisdiction representatives, residents, local businesses and
property owners in the corridor to ensure that proposed stations fit comfortably into the surroundings and
that both the ridership associated with stations and adjacent areas benefit from increased access. Table ES-
4 describes the general location and other characteristics of the proposed stations for the Commuter Rail
Alternative, and station concepts are shown on the following pages. Note these descriptions are based on
station characteristics forecast for full system build-out in 2030. These station characteristics are also
conceptual and subject to change based on additional analysis.
Table ES-4: Commuter Roil Station Characteristics (2030)
•
•
Sv amore, =ham ~,~Road :~' ~ ~~' ~ "Bus Bps 604;
-20/Granbury 4 Bus Bays 450
~aY-..~ _
T U/BAY ~``~~`~'~ .~~ ', ~ 3~~Bus`~ ~~ ~~~` ~ 350'
Medical Center Omstreet Bus Drop-Off 400
~
Ty~ Terminal (~M~ti,~ng ~ ~~ ~ r ^~{ry3;j~~
fir- ~,..anwBP'- ~C sm~Y.4 _
Exlstmg-Bus Facl' the ~~35
~:.
ITC (Exlsfing) Existing Bus Faalihes
.. Non.
e ,.
,
N~~orthSid&~e~Comm~
ut
eRa
l Alte~rna~ve'Op ~A ~
~S Bus
B
s _
.
52ro
_
^
, ,
ay
North Side Commuter Rdil Alternative Option~B 6^Bus Bays 425 ~ •
Bea h,~~Strt ~~ Y 4 Bus Bas ~ ~32'S
Haltom City-US 377 4 Bus Bay's 550;
-,
,
orth Ric and
N
H'ills'Ir
ono se ~Y ` ~'
'~ ~~ .
_
_
~
_
_ ,
^ •
North Richland Hills-Smithfield Bus Loading Area =_ ,.. ; 70Q ~_ ~•°
aln~ " `'t'` ~,°~`tr~~r~
Coley
1~~• ohn'M „8~ B
us Ba
s b
~,
,
rte, ,
y
_ e~. _.-
Grapevme=lvlain`Street 3 Bus Bays `: U5. '
..~.
DFW~"1~o~~1,~,,~ ,~ ~
~'^' _4.. ~fi~`g 3~usa ,s ,
-
_
DFW Ai ort-Terminal A/B N/AY4J
~ None
•• ~ •• •
,, _ w
7th'~Street e `~ ,: *~" ~`~
Bu
~ rm
;~
F
,~~.°~
North Main Street Option A
3 Bus Bays ' '~ „ _,. -
350 ~ ~ ' ;` ,
N rth~arn Street Option B ,r ' 2 Bus Bay's ~ fi ~
:' X50 ~
-a
~. ~
Nosh Side Western B ss 5 Bus B s 525
•• •
North Si e Choctaw
'd
~3 Bus"Bays ~""'' ~"`~~"~
500
--
Beach Street Choctaw
3 $us Bays
550
SOURCE: URS CORPORATION, 2008.
13*ALTERNATIVES CONSIDERED
~'
t
~'
HOW MUCH WILL IT COST TO OPERATE AND
MAINTAIN EACH OF THE ALTERNATIVES?
Operating and maintenance (O&M) costs for all
bus components have been developed using the
operating cost information for The T's existing
fixed route service in year 2008 dollars. O&M costs
for Commuter Rail components were developed
using data from other systems around the country,
including the Trinity Railway Express (TRE)
service operated jointly by the T and DART. O&M
costs shown are for the fu112030 buildout; opening
day costs are expected to be lower. Table ES-3
summarizes annual O&M costs for the alternatives.
All costs are listed in 2008 dollars and are
preliminary in nature based on the level of design
as of the publication of this DEIS and are subject
to change as design and analysis proceed in
the future.
Table ES-3: 2030 Annual Operating and
Maintenance Cost Comparison (in $ millions)
Commuter Rail rystem
^ lindldng stot'ansl
90 ^ F«dar bus ~~
581.3 $81.1 $80.8
~-= ao
_. _ 70
} 60
so
e 40
30
so
io
°
`m
, ~~
~
~°
o
~
. ~~ 0~C m o
\C 0~C ~
o
J 0~
~
~
~y
~ ~ F
~
~ V~
yy
~~~Qo
C O
~~.
~ ..`~
3
,o oc
OQ
.~
~y
ALL COSTS IN 2008 DOLLARS.
SOURCE: URS CORPORATION; CONNETICS TRANSPORTATION GROUP,
INC., 2008.
HOW Wlll THE SYSTEM BE FUNDED
AND IMPLEMENTED?
The Commuter Rail Alternative proposed in this
document will be funded through a combination
of funding sources, including existing sales taxes
collected by The T and the City of Grapevine,
grant funds or other proceeds from NCTCOG and
Tarrant County, federal "New. Starts" funding,
and other local funding sources. This DEIS is
focused on evaluating the environmental issues
associated with the full build-out of the Southwest-
to-Northeast Commuter Rail corridor that extends
from Sycamore School Road in southwest Fort
Worth through downtown Fort Worth, to the north
entrance of the DFW Airport as envisioned for the
year 2030. That horizon year is used because it is
the current horizon year for the projects included
in the NCTCOG Long Range Transportation Plan.
NCTCOG demographic and travel forecasting
information is used as inputs into the evaluation
process for this project. However, The T is
targeting an opening day for the Southwest-to-
Northeast Commuter Rail by 2013. Therefore, the
Southwest-to-Northeast Commuter Rail project
that initially is opened by 2013 may vary in its
complexity, operating plan, costs, and facility
ROW requirements compared with the ultimate
2030 build-out plan evaluated in this DEIS. The
exact segmentation, phasing, and staging of this
system depends on funding availability and other
factors still to be examined and determined. The
evaluation conducted in this DEIS represents the
"maximum" case for the Southwest-to-Northeast
Commuter Rail project, as it is known at the time of
ALTERNATIVES CONSIDERED* 1Z
WHAT ARE THE PROPOSED OPERATING
HOURS AND FREAUENCIES OF THE
COMMUTER RAIL ALTERNATIVE?
The 2030 operating plan assumes that the operating
days and hours for the Commuter Rail Alternative
are seven days per week, 365 days per year, 17
hours per day. Table ES-1 shows the proposed 2030
operating schedule for both weekday and weekend/
holiday service.
HOW MUCH WOULD THE ALTERNATIVES COST?
Capital cost estimates reflect basic engineering and
understanding of the principal structural and system
elements of the Baseline/TSM and Commuter.
Rail Alternatives. Table ES-2 summarizes capital
costs of the alternatives. The costs shown for the
Commuter Rail Alternative are for full build-out
in 2030; initial start-up costs are expected to be
lower. All costs are listed in 2008 dollars and are
preliminary in nature based on the level of design
as of the publication of this DEIS and are subject
to change as design and analysis proceed in the
future.
Table ES-2: 2030 Capital Cost
Comparisons Table (in $ millions]
Commuter Roil system
600 ^ (inducting stations)
^ Park•and-ride:
^ Feeaer ~S S531.3 S520.3
5502.3
500
400
~ r
.~
300 ~, t `' •~.,~:~ ,
SOURCE: URS CORPORATION, 2008.
Service hours could be extended later into the
evening or early morning hours for special events.
The service level days, hours and headways maybe
different for the initial year of operations depending
upon ridership demand.
- -- S'l.~;l.~~l -
----
~ .r.
~ ~ - -- ----~ --_ r~--
Q T I I I i
a
:m
° ~ ~
~ ``m ~°im
~
°
° y
o`\oc
p 3
,A oc
o ~c
2
.~ ~
~c
~ ic
~
0 ~
Q
~
~ .~ pQ
~1
~ ~
O
~
O y
~J
~ y`~
~
~
~
,y
~
v
ALL COSTS IN 2008 DOLLARS.
SOURCE: URS CORPORATION; CONNETICS TRANSPORTATION GROUP,
INC., 2008.
1 1 * ALTERNATIVES CONSIDERED
Table ES-1: Commuter Rail Alternative
Service Levels
r-
i
DFW Airport-North Station, which will provide
across- latform transfer to the futwe DART
p
alignment proposed to extend eastward on the
° CottonBelt to Carrollton. From the DFWAirport-
North Station, the rail line would then cross over the
John W. Carpenter Freeway (SH-114/SH-121) on
an elevated structure and tie into the International
Parkway ROW south of the northern toll plaza and
terminate at the DFW Airport-Terminal A/B Station
At that point, across-platform connection would
be provided to the planned DART light rail line
~. ~ from Irving.
WHAT PASSENGER VEHICLES ARE PROPOSED
fOR THE COMMUTER RAIL ALTERNATIVE?
+ The Southwest-to-Northeast Rail Corridor will
operate on tracks that are shared with freight for
-`' nearly the entire route. There are three methods in
F which railroad corridors maybe shared between
({ passenger rail and freight rail operations.
* Passenger rail vehicles may share the same
track with freight trains by providing a time
separation (such as operating freight trains at
night or during off-peak hours).
* Passenger rail vehicles may share freight tracks
and operate in a coordinated schedule if they are
built to Federal Railroad Administration (FRA)
mandated structural requirements for rolling
stock, known as FRA-compliant vehicles. This
is the most likely scenario for the Southwest-to-
Northeast Rail Corridor project.
Diesel multiple unit (DMLJ) technology is the
likely vehicle choice for this alternative and is used
for modeling. purposes in this report; however, no
specific vehicle or manufacturer has been specified
at the time of the DEIS. Vehicle technologies
and manufacturers will continue to be evaluated
throughout the course of this project.
ALTERNATIVES CONSIDERED* 10
~k Passenger rail vehicles may use existing railroad
before entering DFW Airport property east of Texan corridors, but operate on tracks completely
Trail/SH-114 Business, where it would diverge from physically separated from freight tracks.
the existing Cotton Belt alignment and stop at the
WHAT IS THE RECOMMENDED ALIGNMENT
OF THE COMMUTER RAII ALTERNATIVE?
The Commuter Rail Alternative would generally be
an at-grade, single-tracked line. From the southwest,
the line would begin at the Sycamore School Road
Station in southwest Fort Worth. It would continue
northeast, sharing the existing freight track with
existing FWWR freight traffic, with track that would
be upgraded to the Medical District Station.
North of the Medical District Station, the alignment
would transition eastward onto the UP mainline on
the northernmost track to access the existing T&P
Terminal and Fort Worth ITC Station. The alignment
would continue north at Purina Junction on what
is known as the Duncan Subdivision to Tower 60
located just east of the Fort Worth Stockyards. At
Tower 60, the alignment would transition onto the
DART owned Cotton Belt alignment to the Beach
Two alignment options around the downtown
area are also being considered through the DEIS
process as design options or future connections.
The Western Bypass Design Option would continue
to use the FWWR alignment north of the Medical
District Station, serving the area west of downtown
on what is known as the Western Bypass alignment,
reconnecting with the main alignment at Tower
60 north of downtown in the stockyards area. The
Choctaw Design Option would transition onto the
UP Choctaw Subdivision north of Purina Junction
and reconnect with the main alignment east of the
Beach Street station at what is known as Choctaw
Crossing at the intersection of Old Denton Road and
Meacham Boulevard.
After the Beach Street Station, the rail line would
then travel through eastern Fort Worth, Haltom City,
North Richland Hills, Colleyville, and Grapevine
on the DART-owned Cotton Belt railroad alignment
9*ALTERNATIVES CONSIDERED
~~
F.
,r
i
north of downtown.. After serving apark-and-ride
at the Stockyards, buses would travel east on 28th
Street over I-35W, to Belknap/SH-183 to Grapevine
Highway/SH-26. Buses would travel along SH-26
serving park-and-rides in Haltom City (at Haltom
Road), North Richland Hills (at SH-26 and Rufe
Snow Drive and SH-26 and Walker Boulevard/
Cardinal Lane), and Colleyville (at John McCain)
before serving apark-and-ride in downtown
Grapevine, apark=and-ride at DFW Airport-North,
~~
and the DFW Airport-Terminal AB Stations.
.,
A network of local and feeder buses would provide
su ortive e is t th tr
pp s rv e o e cen al element of the
t~
$:
Baseline/TSM Alternative similar to the existing
bus network, with some route modifications and
additions to better serve the study area. This feeder
bus network would consist of the nineteen routes
as described under the No-Build Alternative with
some route modifications to serve park-and-rides.
Additionally, seventeen feeder routes would also be
introduced to provide connectivity to municipalities
in the outlying areas, specifically Haltom City,
North Richland Hills, Colleyville, and Grapevine.
\, A /HAT IS THE COMMUTER RAIL
V v ALTERNATIVE?
The Commuter Rail Alternative would operate on
portions of the FWWR, UP, and the DART owned
Cotton Belt railroad lines from southwest Fort
Worth at approximately Sycamore School Road,
through Downtown Fort Worth, and continuing
through Haltom City, North Richland Hills,
Colleyville, and Grapevine to the northern entrance
of DFW Airport. The entire alignment, as proposed,
is approximately 37 miles in length. Fifteen stations
are proposed on the alignment: Sycamore School
Road, I-20/Granbury Road, TCUBerry, Medical
District, T&P Terminal (existing), ITC (existing),
North Side, Beach Street, Haltom City-US 377,
North Richland Hills-Iron Horse, North Richland
Hills-Smithfield, Colleyville-John McCain,
Grapevine-Main Street, DFW Airport-North, and
DFW Airport-Terminal AB. The station planning
process-and station locations for this project are
described in detail further in this section.
ALTERNATIVES CONSIDERED * 8
conducted between 2005 and 2006 and approved to
carry forward into the EIS process by The T's Board
of Directors in November 2006.
WHAT IS THE NO-BUILD ALTERNATIVE?
The No-Build Alternative was developed to assess
the impacts and the benefits if nothing more
is done beyond what is currently provided or
programmed in the NCTCOG Regional Long Range
Transportation Plan. The No-Build Alternative
would also include existing and committed roadway
and transit projects in the study area and is a way to
compare the travel benefits for the Baseline/TSM
and the Southwest-to-Northeast Rail Corridor
Build Alternative.
The No-Build Alternative focuses on a combination
of existing rail and bus routes to provide service
between maj or activity centers, the largest of which
are downtown Fort Worth and DFW Airport. Under
the No-Build Alternative, travel from Downtown
Fort Worth to DFW Airport requires the use of the
THE Rail Line from either the T&P Terminal or the
ITC in Downtown to the CentrePort/DFW Airport
Station. At the CentrePort Station, travelers must
transfer to DFW Airport via the Remote South
Shuttle Bus. Shuttle buses depart the station every
15 minutes. At the Remote South lot, passengers
connect to buses serving either Terminals A and C,
Terminals B and E, or Terminal D.
The No-Build Alternative assumes the background
roadway, thoroughfare, and transit network included
in the financially constrained regional long-range
plan developed by NCTCOG (Mobility 2030: The
Metropolitan Transportation Plan for the Dallas-
Fort Worth Area). Those projects include the DCTA
Commuter Rail line between North Carrollton and
Denton, the DART Northwest/Southeast Corridor
light rail line to Frankford Road in North Carrollton,
and the East Cotton Belt Corridor from Plano to
DFW Airport through North Carrollton. These rail
lines are planned and would be constructed by the
year 2030.
WHAT IS THE BASELINE/TSM ALTERNATIVE?
The Baseline/Transportation Systems Management
(TSM} Alternative is designed primarily to provide
a relatively low-cost alternative to the Commuter
Rail Alternative. To fulfill the requirements of
the FTA New Starts criteria, aBaseline/TSM
Alternative was prepared to represent "the best that
can be done" without implementing a major capital
investment, such as rail transit, in the study corridor.
This alternative is often described as the "best bus"
alternative. It is included for financial and mobility
comparisons.
Express bus service is proposed to serve the major
activity centers within the corridor. This service
would begin in southwest Fort Worth at Sycamore
School Road and use Granbury Road, serving park-
and-rides at Sycamore School Road, I-20/Granbury,
and TCUBerry. As Granbury transitions into 8th
Avenue, buses would serve apark-and-ride at the '~
Medical Center before heading east on Pennsylvania
Avenue to Main Street. Buses would serve the T&P ~.
Terminal and ITC in downtown Fort Worth before
heading to the Historic Stockyards via the Jones/
Calhoun couplet downtown and North Main Street
7* ALTERNATIVES CONSIDERED
would affect schedule adherence for the bus route
single-occupant auto more than 90 minutes to make
that same trip in the year 2030. Currently, transit
access to DFW Airport from the Fort Worth CBD
involves a minimum of two transfers via the existing
commuter rail line and two buses. Travel time on
_.
this service is not convenient. For example, under
current THE and DFW Airport shuttle schedules, it
takes 72 minutes at best (and 84 minutes at worst
depending on transfers and schedule reliability)
for a passenger to travel from the T&P Terminal
to DFW Airport Terminal A using the THE/shuttle
system involving a bus transfer at the THE
CentrePort station and another transfer at the DFW
South Remote shuttle lot. Even if direct bus service
to DFW Airport were to be initiated from the CBD,
no advantage in travel time over the automobile
would be realized using the existing roadways.
The primary route for fixed-route bus service
would be SH-121 and SH-183, which are currently
experiencing LOS E and F, respectively, during peak
hours, and are projected to maintain that same level
of service in the future even with additional general
purpose and managed lanes. Traffic congestion
resulting in inconsistent or unreliable transit service
to DFW Airport and other activity centers in the
Study Area, including Hulen Mall, TCU, the Fort
Worth Medical District, downtown Fort Worth, the
Fort Worth Stockyards, and downtown Grapevine.
An NCTCOG-led study entitled Dallas-Fort
Worth International Airport Rail Planning and
Implementation Study was completed in 2003 with
the goal to provide a seamless, customer sensitive,
affordable, and achievable surface transportation
access plan for DFW Airport. The basis of this study
was to improve the access via public transportation
modes to the airport, which is recognized as the top
employer and a major activity center for mobility
and trip generation in Tarrant County. The resulting
recommendation for this effort included a commuter
rail alignment in what is now the Southwest-to-
Northeast Rail Corridor Study Area to provide
transit access to DFW Airport from Tarrant County.
This rail corridor is also in NCTCOG's most recent
long-range plan (the Metropolitan Transportation
Plan or MTP).
HAT ALTERNATIVES WERE
CONSIDERED IN THIS DEIS?
Three alternatives are being considered in this EIS:
a No-Build Alternative, aBaseline/Transportation
Systems Management (TSM) Alternative and a
Commuter Rail Alternative. There are also two
design options that are being considered, the
Western Bypass Design Option and the Choctaw
Design Option. These alternatives were derived
from The T's Southwest-to-Northeast Transportation
Corridor Study, which was an Alternatives Analysis
ALTERNATIVES CONSIDERED*6
service shows that, even with significant expansions
of the Study Area's freeway system, it will take a
and constructed, the mobility needs of the area
will not be met. It is clear that we cannot simply
pave our way out of congestion; as soon as we add
new capacity to the roadway system, it's quickly
absorbed by latent demand."
Continued employment growth within the
Corridor is attracting increasing levels of
intra-corridor journey-to-work trips. The entire
Corridor contains fast-growing and widespread
employment centers throughout the Study Area
resulting in many complex travel patterns.
According to NCTCOG 2005 trip table data, intra-
corridor journey-to-work trips are strongly diverse
within the corridor. Although the Fort Worth Central
Business District (downtown) has the most dense
employment base of any within the Study Area,
most of the activity centers in the corridor are
projected to have comparable or greater numbers
of commuter/work trips. For example, the far east/
northeast area around DFW Airport has an almost
equal number of people (nearly 50,000) leaving the
area for jobs and coming into the area for jobs. The
Fort Worth cultural district and stockyards areas
have more people coming to the. district to work
than leaving the district for jobs. This situation
is further complicated by pass-through traffic
producing demanding constraints on the major
roadways in the corridor.
The corridor lies within anon-attainment
area. In 2004, the U.S. Environmental Protection
Agency (EPA) designated Tarrant County and eight
adjoining counties in North Central Texas in non-
attainment for the eight-hour ozone standard in
accordance with the National Ambient Air Quality
Standards (NAAQS). 'The T and NCTCOG have
committed to achieve attainment of the ozone
NAAQS as early as possible and contribute to
a better quality of life for all North Texans; this
project is one means to help achieve that goal.
Access to DFW Airport and major activity
centers beyond TheT's service area is limited
due to lack of transit service. Improving access
to major employers such as DFW Airport is an
important goal of the Region, as mobility and air
quality issues demand alternative modes of travel
to single occupant vehicles. Current transit access
to DFW Airport and other activity centers is limited
in scope due to access and travel time constraints. A
large portion of this project's Study Area lies outside
The T's service area, and residents in those areas
currently do not have access to transit. Additionally,
travel time is inconsistent and constrained for over-
the road transit modes due to congestion along the
major roadways between the. Fort Worth CBD and
DFW Airport. Current travel time on the freeway
system from one end of the corridor to another (a
distance of just under 40 miles) is nearly 90 minutes
during peak periods. Analysis of future levels of
5* WHY IS THE PROJECT NEEDED?
€,_ .
C
Sustained residential growth within the
Corridor boundaries has resulted in increasing
travel demands along major roadways. Due
to high levels of migration and natural growth,
population within the Southwest-to-Northeast Rail
Corridor is expected to grow 23 percent between
2005 and 2030, growing from 846,243 to 1,040,786.
Employment within the Study Area is projected to
grow at a faster pace at 32 percent between 2005
and 2030, increasing from 636,815 to 840,481.
The corridor is primarily within Tarrant County, a
fast-growing urban county of 1.5 million people
located in north central Texas. Fort Worth is the
fastest growing city of more than 500,000 per the
U.S. Census Bureau based on statistics from July
of 2006. The County's population is expected
to dramatically increase in the coming decades.
Between now and 2030, the County's population
is estimated to grow by more than 40 percent. In
addition, major activity centers within the study
corridor are forecast to see significant population
and employment growth between now and 2030.
Population growth is forecast to increase in all
areas, but to more than double near the proposed
Sycamore School Road Station and in the Medical
District, .and to increase by approximately 75
percent in Downtown Fort Worth and nearly 60
percent near the proposed Beach Street Station.
Employment growth is projected to increase
significantly at Sycamore School Road, to more
than double near the Beach Street and Colleyville
stations; and to grow more than 50 percent near the
Haltom City, North Richland Hills-Smithfield, and
DFW North stations.
Existing and committed roadway
improvements have not kept pace with traffic
volume increases on the'major roadways in
the Study Area, resulting in steadily increasing
congestion. Most major roadways within the
corridor are experiencing unacceptable levels
of service resulting in increased congestion and
reductions in air quality. Level of Service (LOS) is
a qualitative rating system for roadways based on
operating conditions, with (A) being the best and
(F) being the worst. State Highway (SH) 183 and
SH-26 are forecast to operate at LOS F in 2030, and
the majority of other major roadways are expected
to operate at LOS E. The Region's Mobility 2030
Plan calls for improvements to I-35W, I-30, I-20,
SH-26, SH-121, SH-183, and Loop 820 as well
as the completion of a new toll road project (SH-
121T -also known as Southwest Parkway). The
vast majority of roadways in 2030 are projected
to experience severe congestion even with all of
the proposed improvements in place. According
to a 2004 study commissioned by The T and the
City of Fort Worth: "Even if the planned roadway
improvements [in the Mobility 2025 Plan (which
has now been updated to the 2030 Plan)] are funded
WHY IS THE PROJECT NEEDED?*4
decisions will be documented in the FEIS, which
will also include responses to comments received
during circulation of the DEIS.
The T will likely be pursuing New Starts (Section
5309) funding for one or more components of this
project's ultimate Locally Preferred Alternative.
New Starts is the Federal government's primary
program for providing financial support to locally
planned, implemented and operated fixed-guideway
transit capital investments. The New Starts
evaluation process is separate from the evaluation
required by NEPA, for which this DEIS is being
prepared. FTA is the sponsoring agency for this
project and is working in concert with the following
cooperating and participating agencies:
* Cooperating Agencies
Environmental Protection Agency (EPA), U.S.
Department of Housing and Urban Development
(HUD), Federal Railroad Administration (FRA),
U.S. Army Corp of Engineers (USAGE), Bureau
of Indian Affairs (BIA), Federal Emergency
Management Agency (FEMA), U.S. Fish and
Wildlife Service (USFWS), Federal Aviation
Administration (FAA), Federal Highway
Administration (FHWA)
~k Participating Agencies
Texas Historical Commission (THC), Dallas
Area Rapid Transit (DART), City of Fort Worth,
Texas Commission on Environmental Quality
(TCEQ), Denton County Transit Agency
(DCTA), City of Haltom City, Texas Parks and
Wildlife Department (TPWD), North Central
Texas Council of Governments (NCTCOG),
City of Hurst, TxDOT Multi-Modal Office,
Regional Transportation Council (RTC), City of
Grapevine, TxDOT -Fort Worth District, DFW
International Airport, City of North Richland
Hills, North Texas Tollway Authority (NTTA),
City of Colleyville, City of Southlake
The Executive Summary highlights the most
significant findings for the DEIS relative to each
chapter of the document:
~ Purpose and Need
# Alternatives Considered
* Affected Environment
~ Environmental Consequences
~ Transportation Impacts
* Public and Agency Involvement
\, A /HY IS THIS PROJECT NEEDED?
V V The purpose of this project is to:
* Improve mobility between and among activity
centers in the corridor;
* Provide multimodal solutions for mobility in
the corridor that help mitigate congestion and
improve air quality; and
* Provide a transportation solution that
interacts seamlessly and efficiently with other
transportation systems in the region.
The challenges within the Study Area include
congestion, growth, air quality, and transit access.
Those challenges {or needs) include:
3* WHY IS THE PROJECT NEEDED?
EXECUTIVE SUMMARY
The Federal Transit Administration
(FTA) and the Fort Worth Transportation
Azrthority (FWTA, also knotivn as The T),
in cooperation with the Federal Aviation
Administration (FAA), have initiated an
Environmental Impact Statement (EIS) and
Section 4(~ Evaluation for the Southwest-
to-Northeast Rail Corridor project.
The project consists of transportation
improvements along portions of the Foi°t
Worth and Western Railroad (FWWR),
Union Pack Railroad (UP), and the
Dallas Area Rapid Transit (DART)-owned
Cotton Belt railroad lines.f~om southwest
Fort Worth at approximately Sycamore
School Road, through Downtown Foi-t
Worth, and continuing through Haltom
City, North Richland Hills, Colleyville,
and Grapevine to the northern entrance of
Dallas-Fort Worth International Airport
(DFW Airport).
NTRODUCTION -
WHAT IS THE T?
The Fort Worth Transportation Authority, or
The T, operates the public transportation system
throughout the City of Fort Worth and in Richland
Hills and Blue Mound. This network is comprised
of local and express bus service, Mobility Impaired
Transportation Service (MITS) for residents who have
disabilities, and commuter rail operating between
downtown Fort Worth and Dallas.
r_,
II
HAT IS THIS PROJECT?
The primary purpose of this EIS is
to assist decision-makers and the public in
assessing potential impacts associated with the
implementation of the Southwest-to-Northeast
Rail Corridor project. The EIS documents
the "purpose and need" for the Southwest-to-
Northeast project and presents a discussion of the
alternatives considered for implementation. It
addresses, in detail, the potential social, economic,
environmental, and transportation related impacts
of each of the alternatives, and describes the
recommended mitigation measures to offset the
unavoidable impacts.
In accordance with federal regulations, full
consideration of environmental effects as disclosed
during the National Environmental Policy Act
(NEPA) process is required before the Southwest-
to-Northeast project can be advanced to final design,
right-of--way (ROW) acquisition, equipment and
facilities procurement, and system construction.
This Draft EIS (DEIS) will determine the
environmental effects, while a Final EIS (FEIS) and
Record of Decision (ROD) from the FTA will be
required for advancement to the subsequent stages
noted. This DEIS document will be made available
and circulated for review to interested parties,
including private citizens, community groups, the
business community, elected officials, and public
agencies in accordance with federal and state
requirements. After consideration of the comments
received during circulation of the DEIS and the
public hearing, the resolution of any outstanding
issues will be made by The T. The result of these
7 * INTRODUCTION