HomeMy WebLinkAboutColleyville Sidewalks Committee-Minutes-4/8/20022001-2002 COLLEYVILLE SIQEWALK TASK FORGE
MINUTES OF MEETING - 4-08-02
April 8, 2002 -1:00 p.m. -East End Conference Room
PRESENT: Members: Gail Manion, Chair; Judy Atwood, Earline Kennedy, Nancy Jane
Langford, and Dulce Moore. Absent: Deena Dendy.
Staff: Tom Niederauer, Sr. Planner &Troy Gray, Engineering.
I. Call to Order:
The Task Force reviewed the minutes of the past three meetings -February 22"d
March 8t" and March 25t". After Judy Atwood requested clarification of Sec. II. para. 3,
the minutes were adopted and signed.
II. Reports from Staff and Task Force:
Glade Road survey from Bluebonnet to Bedford Road -
The Task Force discussed the issues regarding this segment of road /sidewalk
-how much r-o-w will be needed for the streets and/or the potential sidewalks?
The Task Force requested that prior to the next meeting Tom &Troy breakdown
the segments of this part of Glade and do an issues /cost analysis for each
piece and on both sides.
2. Glade Road west of Bransford -
As with the Glade survey project above, the Task Force requested that prior to
the next meeting Tom &Troy breakdown the components of this part of Glade
and do an issues /cost analysis for each piece. There is a culvert under the
existing walk at the Mill Creek and Haggard property line (far west end), so that
is not an expense to this project. Because of safety, the Task Force determined
that we should not pursue walks on the north side of Glade Road.
3. Collevville Blvd. -Pedestrian Crosswalks and StorJliahts -
Manion submitted a report regarding pedestrian crosswalk, sidewalk and traffic
signal light needs along Colleyville Blvd. (see attached). Several projects on
this list were discussed as potential priorities for this year. See priorities below.
III. Discussion and initial prioritization of potential projects for (this) fy 2002.
The Task Force determined the following preliminary priority projects:
- High Priorities:
Bogart at Pleasant Run -temporary sidewalk replacement.
Brown Trail to Mill Valley - connections needed on the north and south
side of Mill Valley adjacent to Braums and C'ville Animal Clinic.
Central Glade -side and segments to be determined from staff report.
Glade Road west -Bransford to Mill Valley -also from staff reports
Centerpark -connection on the south side of Centerpark adjacent to
(swtf min #4 - 4-08-02) page 1 of 2
2001-2002 COLLEYVILLE SIDEWALK TASK FORCE
MINUTES OF MEETING - 4-OH-O2
Landmark Bank.
III. Priorities -continued)
- Low Priorities:
• Martin Parkway ramps -potential for improving 14 intersections times 2
ramps each on both sides of the street. Use as filler projects starting at
Glade Rd. working south.
• Replacements & repairs in Citv Parks - L.D. Lockett, Sparger, Mill
Creek) -funds should come from the Park Dept. budget.
• Martin Parkwav /Cheek-Sparger to Woodland Hts. -one block sidewalk
on the west side to connect to Cheek-Sparger.
IV. Next Meeting and Adjournment:
* The next meeting will be on April 25th at 3:30 pm.
* Today's meeting adjourned at 2:45 pm.
Submitted by Tom Niederauer, Sidewalk Task Force staff:
Approved by: APPROVED 4-25-02
Gail Manion, Chair
(swtf min #4 - 4-08-02) page 1 of 2