HomeMy WebLinkAboutColleyville Sidewalks Committee-Minutes-12/15/20002000-2001 COLLEYVILLE SIDEWALK TASK FORCE
_ - -- --
MINUTES OF MEETING -NOVEMBER 10, 2000 - 9:00 am
East Wing Conference Room -Colleyville Public Services Building
(swtf-min-11.10.00) Page 1 Of 2
PRESENT: Gail Manion, Chair, Deena Dendy, and Nancy Jane Langford.
ABSENT: Judy Atwood and Rick Staples.
STAFF: Tom Niederauer, Sr. Planner, Keith Fisher, Staff Engineer, Troy Gray, Engineering
R-O-W Technician and Monica Walsh, Park Director
I. Review of minutes of previous meeting:
• Being the first Task Force meeting of this fiscal year, there were no minutes to
review.
II. Miscellaneous Staff Reports:
• The staff reported on several projects that were /are carried over from last year:
The Task Force asked if Pleasant Run Road had been surveyed all the way to
the Village project just north of Colleyville Boulevard? Fisher said that the last
survey went from the soccer fields on the north to Bogart on the south.
Gray said he will go back to Mr. Behrens regarding purchase of right-of-way
along Glade Road to see if there has been a change of heart. He also stated
that he hasn't given up pursuing a route through the Pecan Park Estates
neighborhood to connect Colleyville Elementary and Middle schools with
Ponderosa. He also mentioned the right-of-way issue with the property owner
on the southeast corner of Glade and Bluebonnet.
Manion asked about Bluebonnet Drive and the potential for projects along that
street. Fisher said that the City will not build walks along the north side of the
new street from Hall-Johnson to the Justice Center because commercial
development will eventually provide the walks here. Niederauer agreed to do a
map of the central part of Colleyville because of all of the projects in the area.
The map would be prepared for the next meeting.
• Upon questions from the Task Force about the Spring Garden project on Cheek-
Sparger, Niederauer said that he would find out the status of plans in that area
• Fisher stated that the Hall-Johnson street construction is proceeding and that
they have designed 4' and 5' wide walks at a minimum of 2' from the curb.
III. Glade walks from Bluebonnet to Bedford Road:
Manion mentioned that she had talked to Mr. Hickson at the southwest corner of
Glade and Bluebonnet and that they are willing to permit a sidewalk across the
front of their property. Staff noted that a walk would be required when these
properties are built or rebuilt.
Sidewalk Task Force pg. 2 of 2
Minu#es 1-26-01
IV. Cottonbelt Trail:
Walsh stated that the City has submitted the Cottonbelt Trail plans for review by
the State (TxDOT). This will be a "T-21" Grant to build the link from John
McCain Road south and west to Bettinger Road at L. D. Lockett Road. The "T-
21" is the (Federal) "Transportation Enhancement Act for the 21St Century".
Fisher mentioned that the trail will be kept on the north side (of the R.R. Tracks)
since the owner of the Tracks -Dallas Area Rapid Transit -will not permit gates
for pedestrian crossings.
Walsh noted that the City will start early in 2001 and probably be complete by
the end of the year. At present there is no money to bridge Big Bear Creek at
the north end of the Trail. Fisher stated that Engineering will do a bridge
extension.
• The next priority for a grant is to construct a trail from the Nature Center on the
west along Little Bear Creek to Sparger Park on the east.
• Walks for the Webb House property are also being considered.
V. Task Force Discussion:
Manion requested copies of the Cottonbelt Plan.
Fisher emphasized the need to meet early, make decisions and get the needed
engineering completed early in the (fiscal) year. This will permit time for
bidding, construction and any follow-up needed before the end of the (fiscal)
year.
VIII. Adjournment:
The next meeting was scheduled for December 15th at 9:00 am. The meeting was
adjourned.
Submitted by: Tom Niederauer, Sidewalk Task Force staff.
Approved by: (DRAFT -- not reviewed by Task Force)
Gail Manion, Chair, Sidewalk Task Force
2000-2001 COLLEYVILLE SIDEWALK TASK FORCE
MINUTES OF MEETING -DECEMBER 15, 2000 / 9:00 am
East Wing Conference Room - Colleyville City Hall
(swtf-min-12.1s.oo) Page 1 Of 1
PRESENT: Gail Manion, Chair, Judy Atwood and Deena Dendy.
ABSENT: Nancy Jane Langford, Rick Staples.
STAFF: Keith Fisher, Staff Engineer
Minutes of Sidewalk Task Force Meeting
I. Issues Discussed:
• Sidewalk from Bluebonnet Drive to the new Riverwalk Drive
• Highway 26 sidewalks -need clarification from TNP / TxDOT on the sidewalk
issue. Who will pay and the location of each. Sidewalks around schools.
• City will make one more effort to contact Charlie Behrens.
• Marion Bone property -potential sidewalk?
• Thompson Terrace & Glade Road /Village park Drive -use escrow money to
build sidewalks on both sides of road. TxDOT will not pay for sidewalks on
this project.
• City to check for the amount of sidewalk money escrowed from Mirabella and
other developments in the area.
• Hickson Prop. -Glade Rd. (817) 685-7980 -Troy to contact for potential
walk.
II. Schedule for:
• Riverwalk Drive
• Thompson Terrace & Glade Road /Village park Drive
• Hall Johnson Road
III. Cost Estimate:
• Pleasant Run Road from the Village to the Pleasant Run Soccer Fields
IV. Next Meeting:
• January 26th 9:00 am East Wing Conference Room
V. Adjournment:
• The meeting was adjourned at 11:00 am.
Submitted by: Keith Fisher for Tom Niederauer, Sidewalk Task Force staff.
Approved by: Approved at meeting of 1-26-01
Gail Manion, Chair
(see next page for Keith's notes)
Minutes of Sidewalk Task Force Meeting -Keith Fisher's Notes
December 15, 2000
9:00 am
East Wing Conference Room
Attendees:
Gail Manion
Dena Dendy
Judy Atwood
Keith Fisher, City of Colleyville
Issues Discussed:
• Sidewalk from Bluebonnet Drive to the new Riverwalk Drive
• Highway 26 sidewalks -need clarification from TNP / TxDOT on the sidewalk issue.
Who will pay and the location of each. Sidewalks around schools.
• City will make one more effort to contact Charlie Behrens.
• Bone property -potential sidewalk?
• Thompson Terrace & Glade Road /Village park Drive -use escrow money to build
sidewalks on both sides of road. TxDOT will not pay for sidewalks on this project.
City to check for the amount of sidewalk money escrowed from Mirabella and other
developments in the area.
Schedule fora
• Riverwalk Drive
• Thompson Terrace & Glade Road /Village park Drive
• Hall Johnson Road
Cost Estimate:
• Pleasant Run Road from the Village to the Pleasant Run Soccer Fields
Hixson's Property
Glade Road
817-685-7980
Contact for potential sidewalk -Troy
Next Meeting: January 26`h 9:00 am East Wing Conference Room