HomeMy WebLinkAboutCity Council-Agenda Packets-1/24/2017 City of Colleyville Page 1
City of Colleyville
City Council
Worksession Agenda
City Hall
100 Main Street
Colleyville, Texas 76034
817.503.1000
www.colleyville.com
Tuesday, January 24, 2017
6:00 p.m.
Executive Conference Room
Third Floor City Hall
1.CALL TO ORDER
2.PRESENTATION AND DISCUSSION
2a Presentation and discussion of the Glade Road Project
3.ADJOURNMENT
I hereby certify this agenda was posted on City Hall bulletin boards Friday,
January 20, 2017, by 5:00 p.m.
Amy Shelley, TRMC
City Secretary
A quorum of any Colleyville board, commission, or committee may be
present at this meeting.
Any matter on this agenda may, at the discretion of the governing body, be
opened for public comment and discussion.
If you plan to attend this public meeting and have a disability that requires
special accommodations, please advise the City Secretary at least 48 hours in
advance at 817.503.1133, and reasonable accommodations will be made to assist
you.
City of Colleyville Page 1
City of Colleyville
Colleyville City Council
Worksession
Agenda Briefing
City Hall
100 Main Street
Colleyville, Texas 76034
www.colleyville.com
Agenda Number 2a Agenda Date 01/24/2017
Type Presentation and Discussion
Department Public Works
Title
Presentation and discussion of the Glade Road Project
Explanation
Staff presented an update on the Glade Road Project during the August 24, 2016 City
Council worksession. During the discussion at the worksession, City Council identified
questions and requests for additional information which required further analysis by
the design consultant. The August 24, 2016 City Council worksession presentation is
attached for reference and was a comprehensive review that covered several topics
including:
Project History
Review of Traffic Counts
Phase 1 overview of the current plans:
o Bransford Road Intersection
o Bedford Road Intersection
o Riverwalk Drive intersection
o Bluebonnet Drive intersection
o Overview of the proposed retaining walls
o Proposed traffic control plan
o Complete plans overview
Phase 2 overview
Phase 3 overview
Phase 4 overview
Project Schedules
Interim Maintenance
This presentation and discussion, which will be led by City staff and the design
consultant will focus on the follow up items discussed during the August 24, 2016 City
Council worksession. City Council identified questions and had requests for additional
information about various options for Phase 2 of Glade Road which required further
analysis including:
Base Option - Curb and gutters with Turn lanes, trail on the north side and
sidewalk on the south
City of Colleyville Page 2
City Council Worksession Agenda Briefing 2a
Option 1 - Ribbon curb with roadside ditches, sidewalk/trail on the south side,
sidewalk on the north side from Montclair to Pool Road, and no turn lanes
Option 2 - Ribbon curbs with roadside ditches and inlets, sidewalk/trail on the
south side, sidewalk on the north from Montclair to Pool Road, and no turn lanes
Option 3 - Ribbon curbs with roadside ditches and inlets, sidewalk/trail on the
south side, sidewalk on the north from Montclair to Pool Road, and turn lanes
It should be noted that the Base Option includes an asphalt street section with
concrete curbs. This option would be considered a complete reconstruction of the
roadway. Options 1, 2, and 3, include the reconstruction of the existing roadway
similar to a Full Depth Reclamation Project but with the addition of a concrete ribbon
curb as well as various other features depending on the option selected. Option 1, 2 or
3 would result in a new asphalt roadway (including surface and subgrade) with
concrete ribbon curbs.
Attachments
1.January 24, 2017 Presentation
2.August 24, 2016 Presentation
3.Opinion of Probable Cost
4.Typical Cross Sections
5.Base Option Exhibit
6.Option 1 - Exhibit
7.Option 2 - Exhibit
8.Option 3 - Exhibit
Glade Road
Project Update
January 24, 2017
City Council Worksession
Scope of Worksession
•Phasing Overview
•Current CIP Project Schedules
•Interim Maintenance
•Information Requested
•Phase 2 – Base Option
•Phase 2 – Base Option 1
•Phase 2 – Base Option 2
•Phase 2 – Base Option 3
•City Council Direction
Objective Statement – To provide the City Council with an update on the
status of the Glade Road Project with a focus on addressing questions and
requests for additional information presented during the August 24, 2016
worksession
Phase 1
Bransford Road
to Manning Drive
N
Phases of Glade Road Corridor
Phase 4
Western City
Limits to Bransford
Road
Phase 2
Manning Drive to
Pool Road
Phase 3
Pool Road to
Heritage Avenue
Current Project Schedules
Currently Underway
•Design of Glade Road Phase 2 (Manning Drive to Pool Road)
•Design of Glade Road Phase 3 (Pool Road to Heritage Avenue)
•Design of Glade Road Phase 4 (Western City Limits to Bransford Road)
Funding Currently Allocated
•Construction of Glade Road Phase 1 (Bransford Road to Manning Drive)
•ROW Acquisition for Glade Road Phase 2 (Manning Drive to Pool Road)
•ROW Acquisition for Glade Road Phase 3 (Pool Road to Heritage Avenue)
In the Current 5-Year CIP in FY 2018
•Construction of Glade Road Phase 2 (Manning Drive to Pool Road)
In the Current 5-Year CIP in FY 2019
•Construction of Glade Road Phase 3 (Pool Road to Heritage Avenue)
Not included in the current 5 year CIP
•ROW Acquisition for Glade Road Phase 4 (Western City Limits to Bransford
Road)
•Construction of Glade Road Phase 4 (Western City Limits to Bransford
Road)
Funding
•Project budget:
$142,000
•Funding source
•Capital Projects
Fund
Funding
•Project budget:
$198,000
•Funding source
•Capital Projects
Fund
Project Information
•In order to address the pavement condition and ride quality of the sections of Glade Road that
are not slated for reconstruction in the near future, a maintenance project was included in the
current year of the Capital Improvement Program. The work will include a level-up course in
order to address any rutting, and a 2” asphalt overlay which will address the surface condition of
the roadway and improve ride quality. This will be a short term solution that will provide a
better driving surface until such time the complete reconstruction can be performed . Staff is
working with the asphalt contractor to finalize the schedule and with City Council
concurrence staff will work to get this work completed as soon as possible.
Interim Maintenance
Information Requested
During the August 24, 2016 City Council worksession, staff presented an
update on the Glade Road Project and during the discussion at the
worksession, City Council identified questions and had requests for
additional information about various options for Phase 2 of Glade Road
which required further analysis including:
•Base Option - Curb and gutters with turn lanes, trail on the north side and sidewalk
on the south
•Option 1 - Ribbon curb with roadside ditches , sidewalk/trail on the south side,
sidewalk on the north side from Montclair to Pool Road, and no turn lanes
•Option 2 - Ribbon curbs with roadside ditches and inlets, sidewalk/trail on the south
side, sidewalk on the north from Montclair to Pool Road, and no turn lanes
•Option 3 - Ribbon curbs with roadside ditches and inlets, sidewalk/trail on the south
side, sidewalk on the north from Montclair to Pool Road, and turn lanes
Phase 2 - Base Option
Phase 2 - Option 1
Phase 2 - Option 2
Phase 2 - Option 3
City Council Direction
Staff is seeking City Council direction on the
following:
•Concurrence with the execution of the interim maintenance of
Glade Road from the Western City Limits to Bransford Road and
Stafford Drive to Jim Mitchell Trail
•Clarification of the City Council’s preference for the design
elements of Glade Road Phase 2
Questions and
Discussion
Glade Road
Project Update
August 24, 2016
Worksession
Scope of Worksession
•Project History
•Review of Traffic Counts
•Phase 1 overview:
–Bransford Road intersection
–Bedford Road intersection
–Riverwalk Drive intersection
–Bluebonnet Drive intersection
–Overview of the proposed retaining walls
–Proposed traffic control plan
–Complete overview
•Phase 2 overview
•Phase 3 overview
•Phase 4 overview
•Project Schedules
•Interim Maintenance
Objective Statement –To provide the City Council with an update on the
status of the Glade Road Project and provide an opportunity to discuss each
phase of the corridor
October 5, 2011
Pre Council presentation on the Glade Road and Bluebonnet Road
intersection
Project History
150’ east of eastbound stop sign
Project History
July 2, 2012 –Preliminary engineering study authorized for Glade Road from Heritage
Avenue to SH26 (Colleyville Boulevard)
November 20, 2012 –Results of preliminary engineering study presented to City Council
February 19, 2013 –Engineering services agreement approved for concept design from
Heritage Avenue to west city limits
May 7, 2013 –Preview of the public meeting presentation delivered to City Council during a
Pre Council session
May 23, 2013 –Initial public input meeting
November 5, 2013 –Council updated on the status of the project and feedback received at
initial Public Input Meeting
November 18, 2013 –Second Public Input Meeting (Concept Designs Presented)
March 3, 2014 –Recommended design presented to City Council
Project History
April 16, 2014 –Council Worksession to review recommended design
June 17, 2014 –Pre Council discussion to review recommended design
June 30, 2014 –Council Worksession to discuss the project. Council provided direction to
proceed with the final design of the section between Bransford Road and Manning Drive
July 15, 2014 –Approval of a final design contract for the section between Bransford Road
and Manning Drive
August 6, 2014 –Council Worksession to review the Glade Road Corridor
October 3, 2014 –Acquisition of 1209 Glade Road (right-of-way necessary for the
roundabout at the Riverwalk Intersection)
October 6, 2014 –Petition to limit scope of the Glade Road Project submitted to the City of
Colleyville
Project History
October 21, 2014 –Pre Council discussion and project design placed on hold
June 2, 2015 –Pre Council discussion and project was released to proceed with the design
July 28, 2015 –Pre Council discussion and Phase 1 Update
October 20, 2015 –Pre Council discussion and Phase 1 60% Update and CIP phasing
discussion
December 15, 2015 –Pre Council discussion on Phase 1, specifically on the roundabout at
Bransford Road and Glade Road
April 19, 2016 -Pre Council discussion on Phase 1, specifically on 90% exhibit and the tree
conservation and mitigation efforts
May 3, 2016 -Approval of the right-of-way acquisition services contract
Traffic Counts
2012 2013 2014 2015 2016
Glade Road (Western City Limits to SH26)9,274 9,177 9,480 9,618 9,490
Glade Road (SH26 to Bluebonnet Drive)14,250 13,433 13,557 13,085 12,322
Glade Road (Bluebonnet Drive to Pool Road)11,183 12,147 11,144 11,293 10,895
Glade Road (Pool Road to Eastern City Limits)14,478 14,501 13,796 13,625 13,610
7,500
8,500
9,500
10,500
11,500
12,500
13,500
14,500
15,500
2012 2013 2014 2015 2016
Glade Road Traffic Volumes
Glade Road (Western City Limits to SH26)Glade Road (SH26 to Bluebonnet Drive)
Glade Road (Bluebonnet Drive to Pool Road)Glade Road (Pool Road to Eastern City Limits)
Phase 1
Bransford Road
to Manning Drive
N
Phases of Glade Road Corridor
Phase 1 (Bransford Road Intersection)
Phase 1 (Bedford Road Intersection)
Phase 1 (Riverwalk Roundabout)
Phase 1 (Bluebonnet Drive Intersection)
Phase 1 (Retaining Walls)
Maximum Height
about 4.5’
Maximum Height
about 4’
Maximum Height
about 20”
= Proposed
Retaining Wall
Phase 1 (Possible Traffic Control Plan)
Stage 0
Phase 1 (Possible Traffic Control Plan)
Stage 1
Phase 1 (Possible Traffic Control Plan)
Stage 2
Phase 1 (Possible Traffic Control Plan)
Stage 3
Phase 1 (Possible Traffic Control Plan)
Stage 4
Phase 1 (Possible Traffic Control Plan)
Stage 5
Phase 1
The design consultant will walk through
the design of Glade Road Phase 1
Phase 1 (Bransford Road to Manning Drive)
Final design cost $664,365
Estimated construction cost $4,124,615
Estimated right-of-way parcels 9
Estimated sidewalk easements 13
Estimated temporary construction easements 19
Estimated number of affected parcels 32
Estimated construction duration 13 Months
Bransford Road to Manning Drive
Scope Includes –New through lane at Bransford Road, a
roundabout at Riverwalk Drive, realignment of Bedford Road,
lowering of Glade Road at Bluebonnet to remove the stop signs
and a 10’ trail on the north side and 5’ sidewalk on the south side.
N
Phase 2 (Manning Drive to Pool Road)
Phase 2
Manning Drive to
Pool Road
Phase 2 (Manning Drive to Pool Road)
Glade Road from Manning Drive to
Pool Road, key components
include:
•Engineered drainage system
designed to accommodate a 100
year storm using concrete curbs
and gutters
•A center turn lane between
Behrens Road and Chelsea Drive
•Two lane section for the majority
of the section between Chelsea
Drive and Camelot Drive to
reduce right-of-way impacts
•Eastbound dedicated left turn
lane for Camelot Drive
•Center turnlane for the section
between Camelot Drive to
Montclair Drive
•Two lane section from Montclair
Drive to Jim Mitchell Trail West
•Westbound dedicated left turn
lane for Jim Mitchell Trail West
•Center turn lane between Jim
Mitchell Trail East and
Summerbrook Drive
•Eastbound dedicated left turn
lane for the Senior Center
•5’ sidewalk on the south side
•10’ trail on the north side
•Street lighting at intersections
Phase 2 (Design Parameters)
Design parameters to include the following:
•Roadway Section
•Two lane roadway with left turn lanes at:
•Continuous from Behrens Road to Chelsea Drive, Camelot Drive to Montclair Drive, Jim
Mitchell Trail East to Summerbrook Drive.
•Glade Road westbound left turn lanes; Jim Mitchell Trail West and East Cranbrook Drive
•Glade Road eastbound left turn lanes; Camelot Drive, Senior Center
•Pedestrian Improvements
•10 foot trail on the north side of the roadway
•If needed -reduce trail width, minimum of 6 foot, to limit the various
impacts (right-of-ways, trees, etc.)
•Consider constructing the trail adjacent to the back of curb to reduce the
possible various impacts (right-of-ways, trees, etc.)
•5 foot sidewalk on the south side of the roadway
•Lighting
•Street lighting will be included at the intersections
•Storm Drainage
•Curb and gutter storm drainage
•Utilize existing curb and gutter on south side of Glade Road (approximately
18%), where feasible
Phase 2 (Design Update)
•The design consultant will walk through
the design of Glade Road Phase 2
Phase 2 (Manning Drive to Pool Road)
Final design cost $576,224
Estimated construction cost $5,484,000*
Estimated right-of-way parcels 6
Estimated sidewalk easements 3
Estimated temporary construction easements 27
Estimated number of affected parcels 30
Estimated construction duration 16 Months
Manning Drive to Pool Road
Scope Includes -All new pavement with left turn lanes where
warranted and standard curb and gutters. A 10’ trail on the north
side and 5’ sidewalk on the south side.
*Based on preliminary design
N
Phase 3 (Pool Road to Heritage Avenue)
Phase 3
Pool Road to
Heritage Avenue
Phase 3 (Pool Road to Heritage Avenue)
Glade Road from Pool Road to
Heritage Avenue, key
components include:
•Addition of a westbound lane from Heritage Avenue
to Roberts Road
•Add a southbound right turn lane on Roberts Road
•5’ sidewalk on the south side
•10’ trail on the north side
•Street lighting at intersections
•Standard curb and gutter
Phase 3 (Design Parameters)
Design parameters to include the following:
•Roadway Section
•From Pool Road to Strathmore Terrace will be two lanes with raised, curbed medians and
left turn lanes
•From Roberts Road to Heritage Avenue, westbound lane to be added
•Intersection of Glade Road and Prestwick Drive/Roberts Road to be adjusted to increase
sight distances
•Left turn lanes at:
•Glade Road westbound; Green Oaks Drive and Melrose Park Drive
•Glade Road eastbound; Overhill Drive and Strathmore Terrace
•A southbound right turn lane to be added to Roberts Road
•Pedestrian Improvements
•10 foot trail on the north side of the roadway
•If needed -reduce trail width, minimum of 6 foot, to limit the various impacts
(right-of-ways, trees, etc.)
•5 foot sidewalk on the south side of the roadway
•Lighting
•Street lighting will be included at the intersections
•Storm Drainage
•Curb and gutter storm drainage
•Utilize existing curb and gutter on south side of Glade Road (approximately 90%), where
feasible
Phase 3 (Design Update)
•The design consultant will walk through
the design of Glade Road Phase 3
Pool Road to Heritage Avenue
Scope Includes -All new pavement with left turn lanes where
warranted and standard curb and gutters. A right turn lane on
Roberts Road and an additional westbound lane from Heritage
Avenue to Roberts Road. A 10’ trail on the north side and 5’ sidewalk
on the south side.
Phase 3 (Pool Road to Heritage Avenue)
*Based on preliminary design
Final design cost $431,778
Estimated construction cost $3,530,250*
Estimated right-of-way parcels 1
Estimated sidewalk easements 5
Estimated temporary construction easements 9
Estimated number of affected parcels 13
Estimated construction duration 14 Months
N
Phase 4 (Western City Limits to Bransford Road)
Phase 4
Western City
Limits to Bransford
Road
Phase 4 (Western City Limits to Bransford Road)
Glade Road from the western
city limits to Bransford Road,
key components include:
•Engineered drainage system
designed to accommodate a
100 year storm using concrete
curbs and gutters
•A center turn lane between
River Bend Drive and Bear
Creek Drive
•Westbound dedicated left turn
lane for Clear Fork Drive
•Eastbound dedicated left turn
lane for Rockrimmon Court
•Westbound dedicated left turn
lane for Mill View Drive
•Westbound dedicated left turn
lane for Mill Creek Drive
•5’ sidewalk on the south and a
10’ trail on the north side
•Street lighting at intersections
•Standard curb and gutter
Phase 4 (Design Parameters)
Design parameters to include the following:
•Roadway Section
•From western city limits to Bransford Road will be a two-lane roadway with left
turn lanes at:
•Continuous from River Bend Drive to Bear Creek Drive
•Glade Road west bound; Clear Fork Drive, Mill View Drive, Mill Creek Drive
•Glade Road east bound; Rockrimmon Court
•Pedestrian Improvements
•10 foot trail on the north side of the roadway
•If needed -reduce trail width, minimum of 6 foot, to limit the various impacts
(right-of-ways, trees, etc.)
•5 foot sidewalk on the south side of the roadway
•Lighting
•Street lighting will be included at the intersections
•Storm Drainage
•Curb and Gutter storm drainage
•Culvert replacement or modification between Clear Fork Drive and
Rockrimmon Court
•Utilize existing infrastructure, where feasible
•Coordination with the City of Hurst
Phase 4 (Design Update)
•The design consultant will walk through
the design of Glade Road Phase 4
Western City Limits to Bransford
Road
Scope Includes -All new pavement with left turn lanes
where warranted and standard curb and gutters. A 10’ trail on
the north side and 5’ sidewalk on the south side.
Phase 4 (Western City Limits to Bransford Road)
*Based on preliminary design
Final design cost $425,475
Estimated construction cost $4,737,000*
Estimated right-of-way parcels 2
Estimated sidewalk easements 2
Estimated temporary construction easements 25
Estimated number of affected parcels 26
Estimated construction duration 13 Months
Project Schedules
FY 2016
•Construction of Glade Road Phase 1 (Bransford Road to Manning Drive)
•Design of Glade Road Phase 2 (Manning Drive to Pool Road)
•Design of Glade Road Phase 3 (Pool Road to Heritage Avenue)
•Design of Glade Road Phase 4 (Western City Limits to Bransford Road)
FY 2017
•ROW Acquisition for Glade Road Phase 2 (Manning Drive to Pool Road)
•ROW Acquisition for Glade Road Phase 3 (Pool Road to Heritage Avenue)
FY 2018
•Construction of Glade Road Phase 2 (Manning Drive to Pool Road)
FY 2019
•Construction of Glade Road Phase 3 (Pool Road to Heritage Avenue)
FY 2022
•ROW Acquisition for Glade Road Phase 4 (Western City Limits to Bransford
Road)
FY 2023
•Construction of Glade Road Phase 4 (Western City Limits to Bransford Road)
Interim Maintenance
•Current Pavement Condition
–A mill and overlay maintenance project
for the asphalt sections of Glade Road
Phase 2 and 4 has been included in the
proposed 2017 –2021 CIP which would
allow for the interim maintenance to take
place in FY2017
•Maintenance over the past 10
Years
–2004 M&O Bluebonnet to Summerbrook Drive
–2005 M&O Bedford Road to Bluebonnet Drive
–2006 Reconstruction from Strathmore Terrace
to Heritage Avenue
–2008 M&O Bluebonnet Drive to Montclair Drive
–2009 M&O SH26 to Bransford Road
–2010 M&O Riverwalk Drive to Bluebonnet Drive
and Bill Simmons Road to Patterson Lane
N
Current Pavement Conditions
Questions and
Discussion
ITEM NO.DESCRIPTION UNIT QUANTITY BID PRICE TOTAL
101 RIGHT‐OF‐WAY PREPARATION STA 54.00 1,000.00$ $54,000.00
102 REMOVING CONCRETE PAVEMENT (ROADWAY) SY 2882.22 6.00$ $17,293.33
103 REMOVING CONCRETE PAVEMENT (DRIVEWAY) SY 1768.44 8.50$ $15,031.78
104 REMOVING CONCRETE (SIDEWALK OR RAMP) SY 2044.44 7.00$ $14,311.11
105 REMOVING STAB BASE AND ASPH PAV (3"‐9") (ASPHALT ROADWAY) SY 16385.00 4.00$ $65,540.00
106 REMOVING CHAIN LINK FENCE LF 100.00 12.00$ $1,200.00
107 REMOVE STRUCTURE (INLET) EA 1.00 715.00$ $715.00
108 REMOVE STRUCTURE ( HEADWALL) EA 18.00 500.00$ $9,000.00
109 REMOVE STRUCTURE (PIPE) LF 1096.00 18.00$ $19,728.00
110 REMOVE STRUCTURE (DRIVEWAY CULVERT) EA 23.00 575.00$ $13,225.00
111 REMOVE/ RELOCATE MAILBOX (POST)EA 13.00 150.00$ $1,950.00
112 REMOVE/ RELOCATE MAILBOX (BRICK)EA 8.00 350.00$ $2,800.00
113 MOBILIZATION AND BONDS LS 1.00 365,000.00$ $365,000.00
200 ROADWAY EXCAVATION CY 21400.00 8.50$ $181,900.00
201 COMPACTED ROADWAY FILL AND EMBANKMENT CY 436.00 9.50$ $4,142.00
202 PORTLAND CEMENT TON 471.57 151.00$ $71,207.57
203 CEMENT STABILIZATION OF SUBGRADE 8" DEPTH SY 29473.33 2.50$ $73,683.33
204 TYPE B HMAC PG64‐22 TON 8980.00 70.00$ $628,600.00
205 TYPE D HMAC PG64‐22 TON 2570.00 88.25$ $226,802.50
206 8" CONCRETE STREET PAVING, CONTINUOUSLY REINFORCED SY 0.00 45.00$ $0.00
207 SIDEWALK RETAINING WALL (COLLEYVILLE) CY 50.00 1,100.00$ $55,000.00
208 PEDESTRIAN HANDRAIL, TxDOT TYPE "F" LF 30.00 133.00$ $3,990.00
209 CONCRETE CURB AND GUTTER, 6" BARRIER LF 12370.00 20.25$ $250,492.50
210 CONCRETE DRIVEWAY SY 2195.00 75.50$ $165,722.50
211 CONCRETE SIDEWALK TYPE B SY 2600.00 60.25$ $156,650.00
212 CONCRETE SIDEWALK TYPE C AND D SY 3556.00 64.00$ $227,584.00
213 ADA CURB RAMP EA 30.00 1,500.00$ $45,000.00
214 REFLECTIVE PAVEMENT MARKINGS TYPE II 4" WHITE SOLID LF 340.00 0.10$ $34.00
215 REFLECTIVE PAVEMENT MARKINGS TYPE II 18" WHITE SOLID LF 190.00 2.00$ $380.00
216 REFLECTIVE PAVEMENT MARKINGS TYPE II 24" WHITE SOLID LF 1210.00 2.50$ $3,025.00
217 REFLECTIVE PAVEMENT MARKINGS TYPE II WHITE ARROW EA 20.00 44.00$ $880.00
218 REFLECTIVE PAVEMENT MARKINGS TYPE II 4" YELLOW BROKEN LF 560.00 0.15$ $84.00
219 REFLECTIVE PAVEMENT MARKINGS TYPE II 4" YELLOW SOLID LF 16430.00 0.10$ $1,643.00
220 PAVEMENT SEALER 4"LF 17330.00 0.15$ $2,599.50
221 PAVEMENT SEALER 18"LF 190.00 0.35$ $66.50
222 PAVEMENT SEALER 24"LF 1210.00 1.85$ $2,238.50
223 PAVEMENT SEALER (ARROW)EA 20.00 25.00$ $500.00
224 PAVEMENT SURFACE PREP FOR 4" PAVEMENT MARKINGS LF 15077.00 0.05$ $753.85
225 PAVEMENT SURFACE PREP FOR 18" PAVEMENT MARKINGS LF 190.00 0.05$ $9.50
226 PAVEMENT SURFACE PREP FOR 24" PAVEMENT MARKINGS LF 1210.00 1.15$ $1,391.50
227 PAVEMENT SURFACE PREP FOR ARROW EA 20.00 13.25$ $265.00
228 INSTALL NEW TRAFFIC SIGN EA 5.00 500.00$ $2,500.00
229 INSTALL EXISTING TRAFFIC SIGN ON NEW POST EA 25.00 300.00$ $7,500.00
230 TRENCH EXCAVATION PROTECTION LF 6134.00 2.75$ $16,868.50
231 PRECAST CONCRETE BOX CULVERT (4 FT X 2 FT)LF 2000.00 210.00$ $420,000.00
232 PRECAST CONCRETE BOX CULVERT (8 FT X 4 FT)LF 14.00 495.00$ $6,930.00
233 24" CLASS III RCP LF 3220.00 70.75$ $227,815.00
234 30" CLASS III RCP LF 900.00 87.50$ $78,750.00
235 STORM SEWER MANHOLE, TYPE 1 JUNCTION BOX EA 18.00 5,200.00$ $93,600.00
236 10' CURB INLET, TYPE 1 EA 47.00 3,700.00$ $173,900.00
237 10' OPEN BACK CURB INLET EA 6.00 4,500.00$ $27,000.00
238 WINGWALL (PW‐1) (HW=4 FT) EA 1.00 10,000.00$ $10,000.00
300 TRENCH EXCAVATION PROTECTION LF 2150.00 3.75$ $8,062.50
301 8" WATER PIPE (PVC)LF 2150.00 50.00$ $107,500.00
302 8" RESILIENT SEATED GATE VALVE EA 15.00 1,200.00$ $18,000.00
303 8" CUT IN GATE VALVE EA 3.00 1,500.00$ $4,500.00
304 FIRE HYDRANT ASSEMBLY EA 8.00 2,500.00$ $20,000.00
305 REMOVE EXISTING WATER LINE LF 2150.00 5.00$ $10,750.00
306 REMOVE EXISTING WATER VALVE EA 15.00 500.00$ $7,500.00
307 REMOVE FIRE HYDRANT ASSEMBLY EA 8.00 500.00$ $4,000.00
308 ADJUST WATER VALVE EA 25.00 250.00$ $6,250.00
309 ADJUST SANITARY SEWER MANHOLE EA 14.00 2,000.00$ $28,000.00
310 ADJUST SANITARY SEWER CLEAN OUT EA 4.00 750.00$ $3,000.00
311 RELOCATE WATER METER EA 7.00 250.00$ $1,750.00
312 ADJUST WATER METER EA 20.00 250.00$ $5,000.00
400 STORM WATER POLLUTION PREVENTION PLAN LS 1.00 50,000.00$ $50,000.00
REMOVALS $214,794.22
TRAFFIC CONTROL $365,000.00
ROADWAY $2,104,644.76
UTILITIES $224,312.50
DRAINAGE $1,054,863.50
SWPPP $50,000.00
SUBTOTAL $4,013,614.98
401 CONTINGENCY (15%)$602,042.25
TOTAL $4,615,657.23
City of Colleyville
Opinion of Probable Cost ‐ Alternatives Comparison
Glade Road Phase II ‐ Base Option
Curb & Gutter with Turn Lanes, Trail on North & Sidewalk on South
Prepared by: TranSystems Corporation Consultants
Date: December 22, 2016
ITEM NO.DESCRIPTION UNIT QUANTITY BID PRICE TOTAL
101 RIGHT‐OF‐WAY PREPARATION STA 54.00 1,000.00$ $54,000.00
102 REMOVING CONCRETE PAVEMENT (ROADWAY)SY 470 6.00$ $2,820.00
103 REMOVING CONCRETE PAVEMENT (DRIVEWAY) SY 2500 8.50$ $21,250.00
104 REMOVING CONCRETE (RETAINING WALLS) SY 44.00 34.50$ $1,518.00
105 REMOVING CONCRETE (SIDEWALK OR RAMP) SY 2103.00 7.00$ $14,721.00
106 REMOVE CONCRETE (PAVERS) SY 11.00 10.00$ $110.00
107 REMOVING STAB BASE AND ASPH PAV (0"‐4") (ASPHALT DRIVEWAYS) SY 201.00 3.00$ $603.00
108 REMOVING WOOD FENCE LF 500.00 15.00$ $7,500.00
109 REMOVING ROD IRON FENCE LF 30.00 15.00$ $450.00
110 REMOVING CHAIN LINK FENCE LF 230.00 12.00$ $2,760.00
111 REMOVING BRICK FENCE LF 520.00 40.00$ $20,800.00
112 REMOVE AND RELOCATE GATE EA 3.00 1,200.00$ $3,600.00
113 REMOVE STRUCTURE ( HEADWALL) EA 18.00 500.00$ $9,000.00
114 REMOVE STRUCTURE ( WINGWALL) EA 1.00 1,200.00$ $1,200.00
115 REMOVE STRUCTURE (PIPE) LF 1096.00 18.00$ $19,728.00
116 REMOVE STRUCTURE (DRIVEWAY CULVERT)EA 23.00 575.00$ $13,225.00
117 REMOVE CONC/ROCK RIPRAP SY 40 10.00$ $400.00
118 REMOVE/ RELOCATE MAILBOX (POST)EA 13.00 150.00$ $1,950.00
119 REMOVE/ RELOCATE MAILBOX (BRICK)EA 8.00 350.00$ $2,800.00
120 TRAFFIC CONTROL, MOBILIZATION, BONDS LS 1.00 260,000.00$ $260,000.00
200 ROADWAY EXCAVATION CY 10927.00 8.50$ $92,879.50
201 COMPACTED ROADWAY FILL AND EMBANKMENT CY 942.00 9.50$ $8,949.00
202 ASPHALT ROADWAY RECLAMATION SY 14373.00 38.00$ $546,174.00
203 PORTLAND CEMENT TON 88.00 151.00$ $13,288.00
204 CEMENT STABILIZATION OF SUBGRADE 8" DEPTH SY 5458.00 2.50$ $13,645.00
205 TYPE B HMAC PG64‐22 TON 799.00 70.00$ $55,930.00
206 TYPE D HMAC PG64‐22 TON 123.00 88.25$ $10,854.75
207 8" CONCRETE STREET PAVING, CONTINUOUSLY REINFORCED SY 448.00 45.00$ $20,160.00
208 SIDEWALK RETAINING WALL (COLLEYVILLE) CY 12.00 1,100.00$ $13,200.00
209 PEDESTRIAN HANDRAIL, TxDOT TYPE "F" LF 29.00 133.00$ $3,857.00
210 CONCRETE CURB AND GUTTER, RIBBON CURB LF 9510.00 20.25$ $192,577.50
211 CONCRETE DRIVEWAY SY 2655.00 75.50$ $200,452.50
212 CONCRETE SIDEWALK TYPE B SY 4873.00 60.25$ $293,598.25
213 ADA CURB RAMP EA 20.00 1,500.00$ $30,000.00
214 REFLECTIVE PAVEMENT MARKINGS TYPE II 24" WHITE SOLID LF 1928.00 2.50$ $4,820.00
215 REFLECTIVE PAVEMENT MARKINGS TYPE II 4" YELLOW SOLID LF 9050.00 0.10$ $905.00
216 PAVEMENT SEALER 4"LF 17847.00 0.15$ $2,677.05
217 PAVEMENT SEALER 18"LF 415.00 0.35$ $145.25
218 PAVEMENT SEALER 24"LF 2904.00 1.85$ $5,372.40
219 PAVEMENT SURFACE PREP FOR 4" PAVEMENT MARKINGS LF 15077.00 0.05$ $753.85
220 PAVEMENT SURFACE PREP FOR 24" PAVEMENT MARKINGS LF 2904.00 1.15$ $3,339.60
221 INSTALL NEW TRAFFIC SIGN EA 5.00 500.00$ $2,500.00
222 INSTALL EXISTING TRAFFIC SIGN ON NEW POST EA 25.00 300.00$ $7,500.00
223 TRENCH EXCAVATION PROTECTION LF 4344.00 2.75$ $11,946.00
224 PRECAST CONCRETE BOX CULVERT (4 FT X 2 FT)LF 2000.00 210.00$ $420,000.00
225 PRECAST CONCRETE BOX CULVERT (8 FT X 4 FT)LF 14.00 495.00$ $6,930.00
226 18" CLASS III RCP LF 1040.00 58.00$ $60,320.00
227 24" CLASS III RCP LF 2330.00 70.75$ $164,847.50
228 STORM SEWER MANHOLE, TYPE 1 JUNCTION BOX EA 10.00 5,200.00$ $52,000.00
229 10' CURB INLET, TYPE 1 EA 3.00 3,700.00$ $11,100.00
230 WINGWALL (PW‐1) (HW=4 FT) EA 1.00 10,000.00$ $10,000.00
231 SAFETY END TREATMENT (TYPE II)(18" RCP)(4:1)C EA 61.00 500.00$ $30,500.00
232 SAFETY END TREATMENT (TYPE II)(24" RCP)(4:1)P EA 44.00 500.00$ $22,000.00
233 GRATE INLET, TYPE 1 EA 2.00 5,000.00$ $10,000.00
300 FIRE HYDRANT ASSEMBLY EA 4.00 2,500.00$ $10,000.00
301 REMOVE FIRE HYDRANT ASSEMBLY EA 4.00 500.00$ $2,000.00
302 ADJUST WATER VALVE EA 18.00 250.00$ $4,500.00
303 ADJUST SANITARY SEWER MANHOLE EA 14.00 2,000.00$ $28,000.00
304 ADJUST SANITARY SEWER CLEAN OUT EA 2.00 750.00$ $1,500.00
305 RELOCATE WATER METER EA 23.00 250.00$ $5,750.00
306 ADJUST WATER METER EA 8.00 250.00$ $2,000.00
400 STORM WATER POLLUTION PREVENTION PLAN LS 1.00 50,000.00$ $50,000.00
REMOVALS $178,435.00
TRAFFIC CONTROL $260,000.00
ROADWAY $1,513,578.65
UTILITIES $53,750.00
DRAINAGE $799,643.50
SWPPP $50,000.00
SUBTOTAL $2,855,407.15
401 CONTINGENCY (15%)$428,311.07
TOTAL $3,283,718.22
City of Colleyville
Opinion of Probable Cost ‐ Alternatives Comparison
Glade Road Phase II ‐ Option 1
Ribbon Curb with Roadside Ditches, Sidewalk/Trail on South, Sidewalk on North from Montclair to Pool, No Turn Lanes
Prepared by: TranSystems Corporation Consultants
Date: December 22, 2016
ITEM NO.DESCRIPTION UNIT QUANTITY BID PRICE TOTAL
101 RIGHT‐OF‐WAY PREPARATION STA 54 1,000.00$ $54,000.00
102 REMOVING CONCRETE PAVEMENT (ROADWAY) SY 470 6.00$ $2,820.00
103 REMOVING CONCRETE PAVEMENT (DRIVEWAY) SY 1515 8.50$ $12,877.50
104 REMOVING CONCRETE (RETAINING WALLS) SY 10 34.50$ $345.00
105 REMOVING CONCRETE (SIDEWALK OR RAMP) SY 1421 7.00$ $9,947.00
106 REMOVE CONCRETE (PAVERS) SY 11 10.00$ $110.00
107 REMOVING STAB BASE AND ASPH PAV (0"‐4") (ASPHALT DRIVEWAYS) SY 201 3.00$ $603.00
108 REMOVING WOOD FENCE LF 253 15.00$ $3,795.00
109 REMOVING ROD IRON LF 48 15.00$ $720.00
110 REMOVING CHAIN LINK FENCE LF 227 12.00$ $2,724.00
111 REMOVING BRICK FENCE LF 42 40.00$ $1,680.00
112 REMOVE STRUCTURE ( HEADWALL) EA 18 500.00$ $9,000.00
113 REMOVE STRUCTURE (WINGWALL) EA 1 1,200.00$ $1,200.00
114 REMOVE STRUCTURE (PIPE) LF 1096 18.00$ $19,728.00
115 REMOVE STRUCTURE (DRIVEWAY CULVERT) EA 23 575.00$ $13,225.00
116 REMOVE CONC/ROCK RIPRAP SY 40 10.00$ $400.00
117 REMOVE/ RELOCATE MAILBOX (POST)EA 13 150.00$ $1,950.00
118 REMOVE/ RELOCATE MAILBOX (BRICK)EA 8 350.00$ $2,800.00
119 TRAFFIC CONTROL, MOBILIZATION, BONDS LS 1 265,000.00$ $265,000.00
200 ROADWAY EXCAVATION CY 7550 8.50$ $64,175.00
201 COMPACTED ROADWAY FILL AND EMBANKMENT CY 1190 9.50$ $11,305.00
202 ASPHALT ROADWAY RECLAMATION SY 14373 38.00$ $546,174.00
203 PORTLAND CEMENT TON 88 151.00$ $13,288.00
204 CEMENT STABILIZATION OF SUBGRADE 8" DEPTH SY 5458 2.50$ $13,645.00
205 TYPE B HMAC PG64‐22 TON 799 70.00$ $55,930.00
206 TYPE D HMAC PG64‐22 TON 123 88.25$ $10,854.75
207 8" CONCRETE STREET PAVING, CONTINUOUSLY REINFORCED SY 448 45.00$ $20,160.00
208 PEDESTRIAN HANDRAIL, TxDOT TYPE "F" LF 29 133.00$ $3,857.00
209 CONCRETE CURB AND GUTTER, RIBBON CURB LF 9510 20.25$ $192,577.50
210 CONCRETE DRIVEWAY SY 1952 75.50$ $147,376.00
211 CONCRETE SIDEWALK TYPE B SY 3295 60.25$ $198,523.75
212 ADA CURB RAMP EA 26 1,500.00$ $39,000.00
213 REFLECTIVE PAVEMENT MARKINGS TYPE II 24" WHITE SOLID LF 900 3.50$ $3,150.00
214 REFLECTIVE PAVEMENT MARKINGS TYPE II 4" YELLOW SOLID LF 9500 0.50$ $4,750.00
215 PAVEMENT SEALER 4"LF 9500 0.20$ $1,900.00
216 PAVEMENT SEALER 24"LF 900 1.25$ $1,125.00
217 PAVEMENT SURFACE PREP FOR 4" PAVEMENT MARKINGS LF 9500 0.20$ $1,900.00
218 PAVEMENT SURFACE PREP FOR 24" PAVEMENT MARKINGS LF 900 1.25$ $1,125.00
219 INSTALL NEW TRAFFIC SIGN EA 5 500.00$ $2,500.00
220 INSTALL EXISTING TRAFFIC SIGN ON NEW POST EA 25 300.00$ $7,500.00
221 TRENCH EXCAVATION PROTECTION LF 6286 2.75$ $17,286.50
222 PRECAST CONCRETE BOX CULVERT (4 FT X 2 FT)LF 2000 210.00$ $420,000.00
223 PRECAST CONCRETE BOX CULVERT (8 FT X 4 FT)LF 8 495.00$ $3,960.00
224 24" CLASS III RCP LF 4278 70.75$ $302,668.50
225 STORM SEWER MANHOLE, TYPE 1 JUNCTION BOX EA 12 5,200.00$ $62,400.00
226 DROP INLET TYPE C (GRATE) EA 56 4,000.00$ $224,000.00
227 10' CURB INLET, TYPE 1 EA 3 3,700.00$ $11,100.00
228 WINGWALL (PW‐1) (HW=4 FT) EA 1 10,000.00$ $10,000.00
300 FIRE HYDRANT ASSEMBLY EA 3 2,500.00$ $7,500.00
301 REMOVE FIRE HYDRANT ASSEMBLY EA 3 500.00$ $1,500.00
302 ADJUST WATER VALVE EA 18 250.00$ $4,500.00
303 ADJUST SANITARY SEWER MANHOLE EA 14 2,000.00$ $28,000.00
304 ADJUST SANITARY SEWER CLEAN OUT EA 2 750.00$ $1,500.00
305 RELOCATE WATER METER EA 22 250.00$ $5,500.00
306 ADJUST WATER METER EA 7 250.00$ $1,750.00
400 STORM WATER POLLUTION PREVENTION PLAN LS 1 50,000.00$ $50,000.00
REMOVALS $137,924.50
TRAFFIC CONTROL $265,000.00
ROADWAY $1,340,816.00
UTILITIES $50,250.00
DRAINAGE $1,051,415.00
SWPPP $50,000.00
SUBTOTAL $2,895,405.50
401 CONTINGENCY (15%)$434,310.83
TOTAL $3,329,716.33
City of Colleyville
Opinion of Probable Cost ‐ Alternatives Comparison
Glade Road Phase II ‐ Option 2
Ribbon Curb with Roadside Ditches with Inlets, Sidewalk/Trail on South, Sidewalk on North from Montclair to Pool, No Turn Lanes
Prepared by: TranSystems Corporation Consultants
Date: December 22, 2016
ITEM NO.DESCRIPTION UNIT QUANTITY BID PRICE TOTAL
101 RIGHT‐OF‐WAY PREPARATION STA 54 1,000.00$ $54,000.00
102 REMOVING CONCRETE PAVEMENT (ROADWAY) SY 493 6.00$ $2,958.00
103 REMOVING CONCRETE PAVEMENT (DRIVEWAY) SY 1633 8.50$ $13,880.50
104 REMOVING CONCRETE (RETAINING WALLS) SY 10 34.50$ $345.00
105 REMOVING CONCRETE (SIDEWALK OR RAMP) SY 1930 7.00$ $13,510.00
106 REMOVE CONCRETE (PAVERS) SY 11 10.00$ $110.00
107 REMOVING STAB BASE AND ASPH PAV (0"‐4") (ASPHALT DRIVEWAYS) SY 206 3.00$ $618.00
108 REMOVING WOOD FENCE LF 399 15.00$ $5,985.00
109 REMOVING ROD IRON FENCE LF 48 15.00$ $720.00
110 REMOVING CHAIN LINK FENCE LF 227 12.00$ $2,724.00
111 REMOVING BRICK FENCE LF 42 40.00$ $1,680.00
112 REMOVE STRUCTURE ( HEADWALL) EA 18 500.00$ $9,000.00
113 REMOVE STRUCTURE (WINGWALL) EA 1 1,200.00$ $1,200.00
114 REMOVE STRUCTURE (PIPE) LF 1096 18.00$ $19,728.00
115 REMOVE STRUCTURE (DRIVEWAY CULVERT) EA 23 575.00$ $13,225.00
116 REMOVE CONC/ROCK RIPRAP SY 40 10.00$ $400.00
117 REMOVE/ RELOCATE MAILBOX (POST)EA 13 150.00$ $1,950.00
118 REMOVE/ RELOCATE MAILBOX (BRICK)EA 8 350.00$ $2,800.00
119 TRAFFIC CONTROL, MOBILIZATION, AND BONDS LS 1 285,000.00$ $285,000.00
200 ROADWAY EXCAVATION CY 9597 8.50$ $81,574.50
201 COMPACTED ROADWAY FILL AND EMBANKMENT CY 1344 9.50$ $12,768.00
202 ASPHALT ROADWAY FILL AND EMBANKMENT SY 14564 38.00$ $553,432.00
203 PORTLAND CEMENT TON 129 151.00$ $19,479.00
204 CEMENT STABILIZATION OF SUBGRADE 8" DEPTH SY 8016 2.50$ $20,040.00
205 TYPE B HMAC PG64‐22 TON 1834 70.00$ $128,380.00
206 TYPE D HMAC PG64‐22 TON 439 88.25$ $38,741.75
207 8" CONCRETE STREET PAVING, CONTINUOUSLY REINFORCED SY 429 45.00$ $19,305.00
208 PEDESTRIAN HANDRAIL, TxDOT TYPE "F" LF 29 133.00$ $3,857.00
209 SIDEWALK RETAINING WALL (COLLEYVILLE) CY 30 1,100.00$ $33,000.00
210 CONCRETE CURB AND GUTTER,RIBBON CURB LF 9640 20.25$ $195,210.00
211 CONCRETE DRIVEWAY SY 2025 75.50$ $152,887.50
212 CONCRETE SIDEWALK TYPE B SY 4000 60.25$ $241,000.00
213 ADA CURB RAMP EA 26 1,500.00$ $39,000.00
214 REFLECTIVE PAVEMENT MARKINGS TYPE II 8" WHITE SOLID LF 316 1.00$ $316.00
215 REFLECTIVE PAVEMENT MARKINGS TYPE II 24" WHITE SOLID LF 900 3.50$ $3,150.00
216 REFLECTIVE PAVEMENT MARKINGS TYPE II WHITE ARROW EA 16 100.00$ $1,600.00
217 REFLECTIVE PAVEMENT MARKINGS TYPE II 4" YELLOW BROKEN LF 1418 0.50$ $709.00
218 REFLECTIVE PAVEMENT MARKINGS TYPE II 4" YELLOW SOLID LF 13583 0.50$ $6,791.50
219 REFLECTIVE PAVEMENT MARKINGS TYPE II 8" YELLOW SOLID LF 627 1.00$ $627.00
220 PAVEMENT SEALER 4"LF 15001 0.20$ $3,000.20
221 PAVEMENT SEALER 8"LF 943 0.40$ $377.20
222 PAVEMENT SEALER 24"LF 900 1.25$ $1,125.00
223 PAVEMENT SEALER (ARROW)EA 16 10.00$ $160.00
224 PAVEMENT SURFACE PREP FOR 4" PAVEMENT MARKINGS LF 15001 0.20$ $3,000.20
225 PAVEMENT SURFACE PREP FOR 8" PAVEMENT MARKINGS LF 943 0.40$ $377.20
226 PAVEMENT SURFACE PREP FOR 24" PAVEMENT MARKINGS LF 900 1.25$ $1,125.00
227 PAVEMENT SURFACE PREP FOR ARROW EA 16 10.00$ $160.00
228 INSTALL NEW TRAFFIC SIGN EA 5 500.00$ $2,500.00
229 INSTALL EXISTING TRAFFIC SIGN ON NEW POST EA 25 300.00$ $7,500.00
230 TRENCH EXCAVATION PROTECTION LF 6425 2.75$ $17,668.75
231 PRECAST CONCRETE BOX CULVERT (4 FT X 2 FT)LF 1999 210.00$ $419,790.00
232 PRECAST CONCRETE BOX CULVERT (8 FT X 4 FT)LF 8 495.00$ $3,960.00
233 24" CLASS III RCP LF 4418 70.75$ $312,573.50
234 STORM SEWER MANHOLE, TYPE 1 JUNCTION BOX EA 13 5,200.00$ $67,600.00
235 DROP INLET TYPE C (GRATE) EA 55 3,500.00$ $192,500.00
236 10' CURB INLET, TYPE 1 EA 2 3,700.00$ $7,400.00
237 WINGWALL (PW‐1) (HW=4 FT) EA 1 10,000.00$ $10,000.00
300 FIRE HYDRANT ASSEMBLY EA 4 2,500.00$ $10,000.00
301 REMOVE FIRE HYDRANT ASSEMBLY EA 4 500.00$ $2,000.00
302 ADJUST WATER VALVE EA 15 250.00$ $3,750.00
303 ADJUST SANITARY SEWER MANHOLE EA 14 2,000.00$ $28,000.00
304 ADJUST SANITARY SEWER CLEAN OUT EA 2 750.00$ $1,500.00
305 RELOCATE WATER METER EA 22 250.00$ $5,500.00
306 ADJUST WATER METER EA 8 250.00$ $2,000.00
400 STORM WATER POLLUTION PREVENTION PLAN LS 1 50,000.00$ $50,000.00
REMOVALS $144,833.50
TRAFFIC CONTROL $285,000.00
ROADWAY $1,571,193.05
UTILITIES $52,750.00
DRAINAGE $1,031,492.25
SWPPP $50,000.00
SUBTOTAL $3,135,268.80
401 CONTINGENCY (15%)$470,290.32
TOTAL $3,605,559.12
City of Colleyville
Opinion of Probable Cost ‐ Alternatives Comparison
Glade Road Phase II ‐ Option 3
Ribbon Curb with Roadside Ditches with Inlets, Sidewalk/Trail on South, Sidewalk on North from Montclair to Pool, Turn Lanes Added
Prepared by: TranSystems Corporation Consultants
Date: December 22, 2016
COPYRIGHT 2000 - FIREHOUSE DESIGNS
TYPICAL SECTION
6' Trail
27' Roadway
5' Sidewalk
COPYRIGHT 2000 - FIREHOUSE DESIGNS
TYPICAL SECTION
TYPICAL SECTION
COPYRIGHT 2000 - FIREHOUSE DESIGNS
L
TYPICAL SECTION
Proposed C Glade Rd
8' Trail
Curb & Gutter
18" Ribbon Curb
18" Ribbon Curb
2'
12' Lane
12' Lane
1' Avg. Depth
8' Trail
27' Roadway
5' Sidewalk
12' Lane
12' Lane
2' Avg. Depth
18" Ribbon Curb
18" Ribbon Curb
Typical Driveway
18" Culvert
COPYRIGHT 2000 - FIREHOUSE DESIGNS
5' Sidewalk
18" Ribbon Curb
2'
6' Trail
18" Ribbon Curb
1' Avg. Depth
39' Roadway
12' Lane
12' Lane
Curb & Gutter
5' Sidewalk
28' Roadway
12' Lane
12' Lane
GLADE ROAD - BASE OPTION
GLADE ROAD - OPTION 1
GLADE ROAD - OPTION 2
GLADE ROAD - OPTION 3
LProposed C Glade Rd
LProposed C Glade Rd
LProposed C Glade Rd
12' Lane (Select locations)
Ditch - Width Varies
Ditch - Width Varies
Ditch - Width Varies
Ditch - Width Varies
Ditch - Width Varies
Ditch - Width Varies
Varies
Varies
Varies
Varies Varies
VariesVaries
Varies Varies
Inlet Inlet
Inlet Inlet
Inlet Inlet
TREE REMOVAL
LIMITS OF CONSTRUCTION
PROPOSED ROW
PROPOSED PERMANENT SIDEWALK ESMT.
PROPOSED CONSTRUCTION ESMT.
PROPOSED SIDEWALK/TRAIL
PROPOSED ROADWAY/DRIVEWAY
120+00
125+00
130+00 135+00 140+00
145+00
150+00 155+00 160+00
165+00
170+00
175+00
@ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
TEMPORARY PAVING
BEGIN PHASE I
RECONSTRUCTION
END PHASE I FULL
STA 121+00.00
TEMPORARY PAVING
END PHASE I
STA 123+17.00
@ ℄ GLADE
PROPOSED GROUND (PHASE I)
V
P
I
1
2
3
+
3
0
.
0
0
E
L
6
2
1
.
5
0
-1.49%-0.89%
V
P
I
1
2
5
+
0
0
.
0
0
E
L
6
1
9
.
9
8
-0.89%-1.41%
VC = 100.00'
K = 194 V
P
I
1
2
6
+
8
0
.
0
0
E
L
6
1
7
.
4
5
-1.41%-0.87%
VC = 100.00'
K = 186
V
P
I
1
2
8
+
0
0
.
0
0
E
L
6
1
6
.
4
0
-0.87%-1.15%
VC = 100.00'
K = 358
V
P
I
1
3
2
+
0
0
.
0
0
E
L
6
1
1
.
8
0
-1.15%
-2.62%
VC = 200.00'
K = 136
V
P
I
1
3
7
+
8
0
.
0
0
E
L
5
9
6
.
5
8
-2.62%-1.51%
VC = 100.00'
K = 90
V
P
I
1
4
2
+
8
5
.
0
0
E
L
5
8
8
.
9
5
-1.51%+4.11%
VC = 360.00'
K = 64
V
P
I
1
4
8
+
6
2
.
9
3
E
L
6
1
2
.
7
2
+4.11%+5.01%
VC = 100.00'
K = 112
V
P
I
1
5
3
+
3
5
.
0
0
E
L
6
3
6
.
3
5
+5.01%-1.70%
VC = 450.00'
K = 67 V
P
I
1
6
1
+
9
0
.
0
0
E
L
6
2
1
.
8
1
-1.70%-0.77%
VC = 100.00'
K = 107
V
P
I
1
6
4
+
3
5
.
0
0
E
L
6
1
9
.
9
3
-0.77%
-4
.
60%
VC = 170.00'
K = 44
V
P
I
1
6
9
+
2
5
.
0
0
E
L
5
9
7
.
3
7
-4
.
60%+2.86%
VC = 475.00'
K = 64
V
P
I
1
7
4
+
1
0
.
0
0
E
L
6
1
1
.
2
4
+2.86%-1.30%
VC = 180.00'
K = 43
E
L
6
2
0
.
4
3
V
P
C
1
2
4
+
5
0
.
0
0
E
L
6
1
9
.
2
8
V
P
T
1
2
5
+
5
0
.
0
0
E
L
6
1
6
.
8
4
V
P
C
1
2
7
+
5
0
.
0
0
E
L
6
1
5
.
8
2
V
P
T
1
2
8
+
5
0
.
0
0
E
L
6
1
7
.
0
1
V
P
T
1
2
7
+
3
0
.
0
0
E
L
6
1
8
.
1
5
V
P
C
1
2
6
+
3
0
.
0
0
E
L
6
1
2
.
9
5
V
P
C
1
3
1
+
0
0
.
0
0
E
L
6
0
9
.
1
8
V
P
T
1
3
3
+
0
0
.
0
0
E
L
5
9
5
.
8
2
V
P
T
1
3
8
+
3
0
.
0
0
E
L
5
9
7
.
8
9
V
P
C
1
3
7
+
3
0
.
0
0
E
L
5
9
1
.
6
7
V
P
C
1
4
1
+
0
5
.
0
0
E
L
5
9
6
.
3
5
V
P
T
1
4
4
+
6
5
.
0
0
E
L
6
1
0
.
6
6
V
P
C
1
4
8
+
1
2
.
9
3
E
L
6
1
5
.
2
2
V
P
T
1
4
9
+
1
2
.
9
3
E
L
6
2
5
.
0
9
V
P
C
1
5
1
+
1
0
.
0
0
E
L
6
3
2
.
5
2
V
P
T
1
5
5
+
6
0
.
0
0
E
L
6
2
2
.
6
6
V
P
C
1
6
1
+
4
0
.
0
0
E
L
6
2
1
.
4
2
V
P
T
1
6
2
+
4
0
.
0
0
E
L
6
2
0
.
5
8
V
P
C
1
6
3
+
5
0
.
0
0
E
L
6
1
6
.
0
2
V
P
T
1
6
5
+
2
0
.
0
0
E
L
6
0
8
.
3
0
V
P
C
1
6
6
+
8
7
.
5
0
E
L
6
0
4
.
1
6
V
P
T
1
7
1
+
6
2
.
5
0
E
L
6
0
8
.
6
7
V
P
C
1
7
3
+
2
0
.
0
0
E
L
6
1
0
.
0
7
V
P
T
1
7
5
+
0
0
.
0
0
E
L
6
2
4
.
9
2
S
T
A
1
2
1
+
0
0
M
A
T
C
H
E
X
I S
T
E
L
E
V
A
T
I
O
N
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
E
L
6
0
9
.
8
8
S
T
A
1
7
5
+
1
5
.
0
0
M
A
T
C
H
E
X
I S
T
E
L
E
V
A
T
I
O
N
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
xx
xxx
x xxxxxxx
x
x x x x x xxx x x
xxx
x x xxxxx
xx
x x
x
xx
xx
x x
x
x
x
x
x
x
6
2
3
.
9
1
6
2
3
.
1
5
6
2
2
.
4
2
6
2
1
.
6
4
6
2
1
.
0
0
6
2
0
.
5
4
6
2
0
.
0
9
6
1
9
.
5
9
6
1
9
.
0
8
6
1
8
.
6
0
6
1
8
.
1
4
6
1
7
.
6
3
6
1
7
.
0
7
6
1
6
.
4
8
6
1
5
.
9
3
6
1
5
.
4
1
6
1
4
.
8
4
6
1
4
.
2
3
6
1
3
.
0
7
6
1
1
.
7
8
6
1
0
.
5
8
6
0
9
.
6
1
6
0
8
.
4
9
6
0
7
.
2
7
6
0
6
.
0
3
6
0
4
.
7
5
6
0
3
.
1
4
6
0
1
.
5
2
6
0
0
.
1
7
5
9
8
.
8
5
5
9
7
.
5
7
5
9
6
.
4
4
5
9
5
.
4
2
5
9
4
.
5
2
5
9
3
.
5
1
5
9
2
.
5
7
5
9
1
.
7
9
5
9
1
.
1
2
5
9
1
.
0
8
5
9
1
.
3
2
5
9
2
.
0
1
5
9
3
.
1
5
5
9
4
.
7
3
5
9
6
.
8
8
5
9
8
.
7
9
6
0
0
.
7
8
6
0
3
.
0
6
6
0
5
.
1
6
6
0
7
.
5
0
6
0
9
.
8
6
6
1
2
.
1
2
6
1
4
.
2
7
6
1
6
.
5
9
6
1
9
.
0
7
6
2
1
.
5
6
6
2
4
.
1
0
6
2
6
.
6
5
6
2
8
.
7
7
6
3
0
.
7
7
6
3
2
.
3
9
6
3
3
.
8
8
6
3
4
.
6
1
6
3
4
.
6
6
6
3
4
.
4
6
6
3
4
.
2
5
6
3
3
.
8
2
6
3
3
.
2
8
6
3
2
.
7
0
6
3
2
.
1
8
6
3
1
.
4
4
6
3
0
.
6
9
6
2
9
.
6
6
6
2
8
.
5
5
6
2
7
.
5
7
6
2
6
.
6
6
6
2
5
.
8
7
6
2
5
.
0
9
6
2
4
.
1
3
6
2
3
.
2
9
6
2
2
.
8
4
6
2
2
.
3
9
6
2
1
.
5
1
6
2
0
.
3
0
6
1
8
.
8
4
6
1
6
.
6
9
6
1
4
.
3
6
6
1
1
.
9
3
6
0
9
.
6
0
6
0
7
.
5
4
6
0
5
.
7
4
6
0
4
.
1
3
6
0
2
.
7
4
6
0
1
.
7
3
6
0
1
.
2
2
6
0
1
.
1
0
6
0
1
.
6
6
6
0
2
.
5
8
6
0
3
.
7
8
6
0
5
.
2
0
6
0
6
.
7
1
6
0
8
.
2
3
6
0
9
.
4
6
6
1
0
.
3
3
6
1
0
.
3
7
6
1
0
.
0
6
6
2
1
.
9
5
6
2
1
.
3
2
6
2
0
.
8
7
6
2
0
.
4
3
6
1
9
.
9
2
6
1
9
.
2
8
6
1
8
.
5
7
6
1
7
.
8
8
6
1
7
.
3
0
6
1
6
.
8
4
6
1
6
.
3
7
6
1
5
.
8
2
6
1
5
.
2
5
6
1
4
.
6
7
6
1
4
.
1
0
6
1
3
.
5
2
6
1
2
.
9
5
6
1
2
.
2
8
6
1
1
.
4
3
6
1
0
.
4
0
6
0
9
.
1
8
6
0
7
.
8
6
6
0
6
.
5
5
6
0
5
.
2
4
6
0
3
.
9
3
6
0
2
.
6
1
6
0
1
.
3
0
5
9
9
.
9
9
5
9
8
.
6
8
5
9
7
.
3
8
5
9
6
.
3
2
5
9
5
.
5
2
5
9
4
.
7
6
5
9
4
.
0
1
5
9
3
.
2
5
5
9
2
.
5
0
5
9
1
.
7
4
5
9
1
.
1
5
5
9
0
.
9
4
5
9
1
.
1
2
5
9
1
.
6
9
5
9
2
.
6
6
5
9
4
.
0
1
5
9
5
.
7
5
5
9
7
.
7
9
5
9
9
.
8
5
6
0
1
.
9
1
6
0
3
.
9
6
6
0
6
.
0
2
6
0
8
.
0
8
6
1
0
.
1
3
6
1
2
.
2
5
6
1
4
.
5
8
6
1
7
.
0
8
6
1
9
.
5
8
6
2
2
.
0
8
6
2
4
.
5
9
6
2
6
.
9
7
6
2
8
.
9
9
6
3
0
.
6
3
6
3
1
.
9
1
6
3
2
.
8
1
6
3
3
.
3
4
6
3
3
.
4
9
6
3
3
.
2
8
6
3
2
.
6
9
6
3
1
.
8
4
6
3
0
.
9
9
6
3
0
.
1
4
6
2
9
.
2
9
6
2
8
.
4
4
6
2
7
.
5
9
6
2
6
.
7
4
6
2
5
.
8
9
6
2
5
.
0
4
6
2
4
.
1
9
6
2
3
.
3
4
6
2
2
.
4
9
6
2
1
.
8
1
6
2
1
.
3
5
6
2
0
.
9
6
6
2
0
.
5
8
6
1
9
.
9
2
6
1
8
.
6
9
6
1
6
.
8
9
6
1
4
.
6
4
6
1
2
.
3
3
6
1
0
.
0
3
6
0
7
.
7
4
6
0
5
.
7
3
6
0
4
.
1
2
6
0
2
.
9
0
6
0
2
.
0
7
6
0
1
.
6
3
6
0
1
.
5
9
6
0
1
.
9
4
6
0
2
.
6
8
6
0
3
.
8
2
6
0
5
.
2
3
6
0
6
.
6
6
6
0
8
.
0
9
6
0
9
.
4
2
6
1
0
.
2
2
6
1
0
.
4
3
6
1
0
.
0
7
R
O
A
D
B
E
H
R
E
N
S
R
O
S
E
S
T
R
E
E
T
D
R
I
V
E
W
C
R
A
N
B
R
O
O
K
GLA DE ROA D
D
R
I
V
E
E
C
R
A
N
B
R
O
O
K
GLADE ROAD
D
R
I
V
E
S
U
M
M
E
R
B
R
O
O
K
T
R
A
I
L
E
J
I
M
M
I
T
C
H
E
L
L
T
R
A
I
L
W
J
I
M
M
I
T
C
H
E
L
L
L
A
N
E
P
A
T
T
E
R
S
O
N
R
O
A
D
B
I
L
L
S
I
M
M
O
N
S
D
R
I
V
E
M
O
N
T
C
L
A
I
R
D
R
I
V
E
C
A
M
E
L
O
T
D
R
I
V
E
C
H
E
L
S
E
A
C
O
U
R
T
B
E
H
R
E
N
S
GLA DE ROA D
GLADE ROAD GLADE ROAD
595
600
605
610
615
620
625
630
635
640
645
650
590
595
600
605
610
615
620
625
630
635
640
645
650
121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00
585
50 1500100
SCALE FEET
HOR 1"=50'
PHASE 2
PHASE 1
6' TRAIL
6' TRAIL
6' TRAIL
8' TRAIL
10' TRAIL
10' TRAIL
6' TRAIL
8' TRAIL
P
O
O
L
R
D
x
MAX HEIGHT = 2'
PROPOSED RETAINING WALL
MAX HEIGHT = 2'
PROPOSED RETAINING WALL
BASE OPT
PHASE 2 - BASE OPT
BASE OPTION
LEGEND
x
EXISTING 10' TRAIL
EXISTING 5' SIDEWALK
EXISTING 5' SIDEWALK
BRICK FENCE
25 LF PROPOSED
T
R
A
I
L
B
E
L
D
O
N
5' SIDEWALK
5' SIDEWALK 5' SIDEWALK
5' SIDEWALK 5' SIDEWALK
5' SIDEWALK 5' SIDEWALK
5' SIDEWALK
TREE REMOVAL
LIMITS OF CONSTRUCTION
PROPOSED ROW
PROPOSED PERMANENT SIDEWALK ESMT.
PROPOSED CONSTRUCTION ESMT.
PROPOSED SIDEWALK/TRAIL
PROPOSED ROADWAY/DRIVEWAY
V
P
I
1
2
2
+
0
2
.
8
6
E
L
6
2
4
.
4
0
-0.58%-1.05%
VC = 100.00'
K = 213
V
P
I
1
3
1
+
5
2
.
0
3
E
L
6
1
4
.
4
4
-1.05%-2.35%
VC = 121.00'
K = 93
V
P
I
1
3
5
+
2
6
.
4
7
E
L
6
0
5
.
6
5
-2.35%
-3.20%
VC = 100.00'
K = 118
V
P
I
1
3
7
+
2
4
.
8
5
E
L
5
9
9
.
3
0
-3.20%
-2.07%
VC = 100.00'
K = 89
V
P
I
1
4
2
+
5
6
.
2
5
E
L
5
8
8
.
2
8
-2.07%+4.30%
VC = 400.00'
K = 63
V
P
I
1
4
7
+
3
4
.
7
2
E
L
6
0
8
.
8
5
+4.30%+4.77%
V
P
I
1
5
3
+
1
0
.
0
0
E
L
6
3
6
.
3
0
+4.77%-1.05%
VC = 340.00'
K = 58
V
P
I
1
5
7
+
2
8
.
9
2
E
L
6
3
1
.
9
0
-1.05%-1.86%
VC = 100.00'
K = 123
V
P
I
1
6
1
+
9
5
.
5
8
E
L
6
2
3
.
2
0
-1.86%-0.75%
VC = 121.00'
K = 109
V
P
I
1
6
3
+
8
5
.
5
8
E
L
6
2
1
.
7
7
-0.75%
-4
.
51%
VC = 220.00'
K = 59
V
P
I
1
6
9
+
3
4
.
1
5
E
L
5
9
7
.
0
3
-4
.
51%+3.04%
VC = 450.00'
K = 60
V
P
I
1
7
3
+
9
5
.
9
1
E
L
6
1
1
.
0
9
+3.04%-1.00%
VC = 150.00'
K = 37
TEMPORARY PAVING
END PHASE I
STA 123+17.00
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
PROPOSED GROUND @ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
PROPOSED GROUND
E
L
6
0
9
.
9
4
S
T
A
1
7
5
+
1
0
.
0
0
M
A
T
C
H
E
X
I S
T
E
L
E
V
A
T
I O
N
E
N
D
C
O
N
S
T
R
U
C
T
I O
N
E
L
6
2
5
.
0
0
S
T
A
1
2
1
+
0
0
M
A
T
C
H
E
X
I S
T
E
L
E
V
A
T
I O
N
B
E
G
I N
C
O
N
S
T
R
U
C
T
I O
N
E
L
6
2
4
.
6
9
V
P
C
1
2
1
+
5
2
.
8
6
E
L
6
2
3
.
8
8
V
P
T
1
2
2
+
5
2
.
8
6
E
L
6
1
5
.
0
7
V
P
C
1
3
0
+
9
1
.
5
3
E
L
6
1
3
.
0
2
V
P
T
1
3
2
+
1
2
.
5
3
E
L
6
0
6
.
8
2
V
P
C
1
3
4
+
7
6
.
4
7
E
L
6
0
4
.
0
5
V
P
T
1
3
5
+
7
6
.
4
7
E
L
6
0
0
.
9
0
V
P
C
1
3
6
+
7
4
.
8
5
E
L
5
9
8
.
2
7
V
P
T
1
3
7
+
7
4
.
8
5
E
L
5
9
2
.
4
3
V
P
C
1
4
0
+
5
6
.
2
5
E
L
5
9
6
.
8
8
V
P
T
1
4
4
+
5
6
.
2
5
E
L
6
2
8
.
1
9
V
P
C
1
5
1
+
4
0
.
0
0
E
L
6
3
4
.
5
2
V
P
T
1
5
4
+
8
0
.
0
0
E
L
6
3
2
.
4
3
V
P
C
1
5
6
+
7
8
.
9
2
E
L
6
3
0
.
9
7
V
P
T
1
5
7
+
7
8
.
9
2
E
L
6
2
4
.
3
3
V
P
C
1
6
1
+
3
5
.
0
8
E
L
6
2
2
.
7
5
V
P
T
1
6
2
+
5
6
.
0
8
E
L
6
2
2
.
6
0
V
P
C
1
6
2
+
7
5
.
5
8
E
L
6
1
6
.
8
1
V
P
T
1
6
4
+
9
5
.
5
8
E
L
6
0
7
.
1
8
V
P
C
1
6
7
+
0
9
.
1
5
E
L
6
0
3
.
8
8
V
P
T
1
7
1
+
5
9
.
1
5
E
L
6
0
8
.
8
1
V
P
C
1
7
3
+
2
0
.
9
1
E
L
6
1
0
.
3
4
V
P
T
1
7
4
+
7
0
.
9
1
BEGIN PHASE I TEMPORARY PAVING
RECONSTRUCTION
STA 121+00.00 END PHASE I FULL
@ ℄ GLADE
(PHASE I)
PROPOSED GROUND
120+00
125+00
130+00 135+00 140+00 145+00 150+00 155+00 160+00 165+00
170+00
175+00
xxx
x xxx
x xx
xxxxxxx x
x
x
xxxxxxx
x xx x x
x
xxxxx xxx
x x x xx
xxxxxx
xxxx
xx xxx
x
xxxx
x xx
xx x xx xx xx xxxx xxxx xxxxx
xxx
xxx
xxxxxxxx
x x
xxx
x xx
x
x
x xxxx
x
x
xx
xx
x
x
x
x
xxxx
xx x
6
2
3
.
3
8
6
2
2
.
8
6
6
2
2
.
3
3
6
2
1
.
8
1
6
2
1
.
2
8
6
2
0
.
7
6
6
2
0
.
2
3
6
1
9
.
7
1
6
1
9
.
1
8
6
1
8
.
6
6
6
1
8
.
1
3
6
1
7
.
6
1
6
1
7
.
0
8
6
1
6
.
5
6
6
1
6
.
0
3
6
1
5
.
5
1
6
1
4
.
9
8
6
1
4
.
2
8
6
1
3
.
3
0
6
1
2
.
1
4
6
1
0
.
9
6
6
0
9
.
7
9
6
0
8
.
6
2
6
0
7
.
4
4
6
0
6
.
2
5
6
0
4
.
8
7
6
0
3
.
3
0
6
0
1
.
7
0
6
0
0
.
1
3
5
9
8
.
8
2
5
9
7
.
7
5
5
9
6
.
7
1
5
9
5
.
6
7
5
9
4
.
6
3
5
9
3
.
6
0
5
9
2
.
5
6
5
9
1
.
6
7
5
9
1
.
1
9
5
9
1
.
0
9
5
9
1
.
4
0
5
9
2
.
1
1
5
9
3
.
2
1
5
9
4
.
7
1
5
9
6
.
6
1
5
9
8
.
7
6
6
0
0
.
9
1
6
0
3
.
0
6
6
0
5
.
2
1
6
0
7
.
3
6
6
0
9
.
5
8
6
1
1
.
9
6
6
1
4
.
3
5
6
1
6
.
7
4
6
1
9
.
1
2
6
2
1
.
5
1
6
2
3
.
8
9
6
2
6
.
2
8
6
2
8
.
6
6
6
3
0
.
7
4
6
3
2
.
4
0
6
3
3
.
6
3
6
3
4
.
4
3
6
3
4
.
8
1
6
3
4
.
7
5
6
3
4
.
3
1
6
3
3
.
7
8
6
3
3
.
2
6
6
3
2
.
7
3
6
3
2
.
1
9
6
3
1
.
4
8
6
3
0
.
5
8
6
2
9
.
6
5
6
2
8
.
7
1
6
2
7
.
7
8
6
2
6
.
8
5
6
2
5
.
9
2
6
2
4
.
9
8
6
2
4
.
0
6
6
2
3
.
3
1
6
2
2
.
7
9
6
2
2
.
3
7
6
2
1
.
5
7
6
2
0
.
3
4
6
1
8
.
6
9
6
1
6
.
6
1
6
1
4
.
3
6
6
1
2
.
1
0
6
0
9
.
8
5
6
0
7
.
5
9
6
0
5
.
4
8
6
0
3
.
7
7
6
0
2
.
4
9
6
0
1
.
6
3
6
0
1
.
1
9
6
0
1
.
1
6
6
0
1
.
5
6
6
0
2
.
3
7
6
0
3
.
6
1
6
0
5
.
1
3
6
0
6
.
6
5
6
0
8
.
1
7
6
0
9
.
5
8
6
1
0
.
3
7
6
1
0
.
4
9
6
1
0
.
0
5
6
2
3
.
9
1
6
2
3
.
1
5
6
2
2
.
4
2
6
2
1
.
6
4
6
2
1
.
0
0
6
2
0
.
5
4
6
2
0
.
0
9
6
1
9
.
5
9
6
1
9
.
0
8
6
1
8
.
6
0
6
1
8
.
1
4
6
1
7
.
6
3
6
1
7
.
0
7
6
1
6
.
4
8
6
1
5
.
9
3
6
1
5
.
4
1
6
1
4
.
8
4
6
1
4
.
2
3
6
1
3
.
0
7
6
1
1
.
7
8
6
1
0
.
5
8
6
0
9
.
6
1
6
0
8
.
4
9
6
0
7
.
2
7
6
0
6
.
0
3
6
0
4
.
7
5
6
0
3
.
1
4
6
0
1
.
5
2
6
0
0
.
1
7
5
9
8
.
8
5
5
9
7
.
5
7
5
9
6
.
4
4
5
9
5
.
4
2
5
9
4
.
5
2
5
9
3
.
5
1
5
9
2
.
5
7
5
9
1
.
7
9
5
9
1
.
1
2
5
9
1
.
0
8
5
9
1
.
3
2
5
9
2
.
0
1
5
9
3
.
1
5
5
9
4
.
7
3
5
9
6
.
8
8
5
9
8
.
7
9
6
0
0
.
7
8
6
0
3
.
0
6
6
0
5
.
1
6
6
0
7
.
5
0
6
0
9
.
8
6
6
1
2
.
1
2
6
1
4
.
2
7
6
1
6
.
5
9
6
1
9
.
0
7
6
2
1
.
5
6
6
2
4
.
1
0
6
2
6
.
6
5
6
2
8
.
7
7
6
3
0
.
7
7
6
3
2
.
3
9
6
3
3
.
8
8
6
3
4
.
6
1
6
3
4
.
6
6
6
3
4
.
4
6
6
3
4
.
2
5
6
3
3
.
8
2
6
3
3
.
2
8
6
3
2
.
7
0
6
3
2
.
1
8
6
3
1
.
4
4
6
3
0
.
6
9
6
2
9
.
6
6
6
2
8
.
5
5
6
2
7
.
5
7
6
2
6
.
6
6
6
2
5
.
8
7
6
2
5
.
0
9
6
2
4
.
1
3
6
2
3
.
2
9
6
2
2
.
8
4
6
2
2
.
3
9
6
2
1
.
5
1
6
2
0
.
3
0
6
1
8
.
8
4
6
1
6
.
6
9
6
1
4
.
3
6
6
1
1
.
9
3
6
0
9
.
6
0
6
0
7
.
5
4
6
0
5
.
7
4
6
0
4
.
1
3
6
0
2
.
7
4
6
0
1
.
7
3
6
0
1
.
2
2
6
0
1
.
1
0
6
0
1
.
6
6
6
0
2
.
5
8
6
0
3
.
7
8
6
0
5
.
2
0
6
0
6
.
7
1
6
0
8
.
2
3
6
0
9
.
4
6
6
1
0
.
3
3
6
1
0
.
3
7
6
1
0
.
0
6
R
O
S
E
S
T
R
E
E
T
D
R
I
V
E
W
C
R
A
N
B
R
O
O
K
GLA DE ROA D
D
R
I V
E
E
C
R
A
N
B
R
O
O
K
GLADE ROAD
D
R
I
V
E
S
U
M
M
E
R
B
R
O
O
K
T
R
A
I
L
E
J
I
M
M
I
T
C
H
E
L
L
T
R
A
I
L
W
J
I
M
M
I
T
C
H
E
L
L
D
R
I
V
E
M
O
N
T
C
L
A
I
R
D
R
I
V
E
C
A
M
E
L
O
T
D
R
I
V
E
C
H
E
L
S
E
A
GLA DE ROA D
GLADE ROAD
GLADE ROAD
595
600
605
610
615
620
625
630
635
640
645
650
590
595
600
605
610
615
620
625
630
635
640
645
650
121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00
585
50 1500100
SCALE FEET
HOR 1"=50'
PHASE 2
PHASE 1
P
O
O
L
R
D
MAX HEIGHT = 2'
PROPOSED RETAINING WALL
EXISTING 5' SIDEWALK
OPT 1
5' SIDEWALK
5' SIDEWALK EXISTING 5' SIDEWALK
6' SIDEWALK
5' SIDEWALK
8' TRAIL
8' TRAIL
6' TRAIL
8' TRAIL
6' TRAIL 8' TRAIL
8' TRAIL8' TRAIL
6' SIDEWALK
5' SIDEWALK
6' SIDEWALK 5' SIDEWALK
5' SIDEWALK
8' TRAIL
EXISTING 10' TRAIL
PROPOSED CULVERT EXTENSION
T
R
A
I L
B
E
L
D
O
N
B
I
L
L
S
I
M
M
O
N
S
R
O
A
D
P
A
T
T
E
R
S
O
N
L
A
N
E
OPTION 1
PHASE 2 - OPTION 1
B
E
H
R
E
N
S
C
O
U
R
T
B
E
H
R
E
N
S
R
O
A
D
LEGEND
x
TO REMAIN
EXISTING CURB & GUTTER
TO REMAIN
EXISTING CURB & GUTTER
PROPOSED CURB & G UTT ER (240 LF)
PROPOSED CURB & G UT TER (650 LF)
BRICK FENCE
132 LF PROPOSED
WOOD FENCE
167 LF PROPOSED
BRICK FENCE
88 LF PROPOSED
BRICK FENCE
42 LF PROPOSED
BRICK FENCE
25 LF PROPOSED
FENCE AND RETAINING WALL
160 LF PROPOSED WOOD CHAINLINK FENCE
200 LF PROPOSED
BRICK FENCE
123 LF PROPOSED
WOOD FENCE
155 LF PROPOSED
IRON FENCE
15 LF PROPOSED
IRON FENCE
15 LF PROPOSED
GUTTER
CURB &
CURB
RIBBON
GUTTER
CURB &RIBBON
CURB
8' TRAIL
TREE REMOVAL
LIMITS OF CONSTRUCTION
PROPOSED ROW
PROPOSED PERMANENT SIDEWALK ESMT.
PROPOSED CONSTRUCTION ESMT.
PROPOSED SIDEWALK/TRAIL
PROPOSED ROADWAY/DRIVEWAY
V
P
I
1
2
2
+
0
2
.
8
6
E
L
6
2
4
.
4
0
-0.58%-1.05%
VC = 100.00'
K = 213
V
P
I
1
3
1
+
5
2
.
0
3
E
L
6
1
4
.
4
4
-1.05%-2.35%
VC = 121.00'
K = 93
V
P
I
1
3
5
+
2
6
.
4
7
E
L
6
0
5
.
6
5
-2.35%
-3
.20%
VC = 100.00'
K = 118
V
P
I
1
3
7
+
2
4
.
8
5
E
L
5
9
9
.
3
0
-3
.20%
-2.07%
VC = 100.00'
K = 89
V
P
I
1
4
2
+
5
6
.
2
5
E
L
5
8
8
.
2
8
-2.07%+4.30%
VC = 400.00'
K = 63
V
P
I
1
4
7
+
3
4
.
7
2
E
L
6
0
8
.
8
5
+4.30%+4.77%
V
P
I
1
5
3
+
1
0
.
0
0
E
L
6
3
6
.
3
0
+4.77%-1.05%
VC = 340.00'
K = 58
V
P
I
1
5
7
+
2
8
.
9
2
E
L
6
3
1
.
9
0
-1.05%-1.86%
VC = 100.00'
K = 123
V
P
I
1
6
1
+
9
5
.
5
8
E
L
6
2
3
.
2
0
-1.86%-0.75%
VC = 121.00'
K = 109
V
P
I
1
6
3
+
8
5
.
5
8
E
L
6
2
1
.
7
7
-0.75%
-4
.
51%
VC = 220.00'
K = 59
V
P
I
1
6
9
+
3
4
.
1
5
E
L
5
9
7
.
0
3
-4
.
51%+3.04%
VC = 450.00'
K = 60
V
P
I
1
7
3
+
9
5
.
9
1
E
L
6
1
1
.
0
9
+3.04%-1.00%
VC = 150.00'
K = 37
TEMPORARY PAVING
END PHASE I
STA 123+17.00
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
PROPOSED GROUND @ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
PROPOSED GROUND
E
L
6
0
9
.
9
4
S
T
A
1
7
5
+
1
0
.
0
0
M
A
T
C
H
E
X
I
S
T
E
L
E
V
A
T
I
O
N
E
N
D
C
O
N
S
T
R
U
C
T
I O
N
E
L
6
2
5
.
0
0
S
T
A
1
2
1
+
0
0
M
A
T
C
H
E
X
I
S
T
E
L
E
V
A
T
I
O
N
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I O
N
E
L
6
2
4
.
6
9
V
P
C
1
2
1
+
5
2
.
8
6
E
L
6
2
3
.
8
8
V
P
T
1
2
2
+
5
2
.
8
6
E
L
6
1
5
.
0
7
V
P
C
1
3
0
+
9
1
.
5
3
E
L
6
1
3
.
0
2
V
P
T
1
3
2
+
1
2
.
5
3
E
L
6
0
6
.
8
2
V
P
C
1
3
4
+
7
6
.
4
7
E
L
6
0
4
.
0
5
V
P
T
1
3
5
+
7
6
.
4
7
E
L
6
0
0
.
9
0
V
P
C
1
3
6
+
7
4
.
8
5
E
L
5
9
8
.
2
7
V
P
T
1
3
7
+
7
4
.
8
5
E
L
5
9
2
.
4
3
V
P
C
1
4
0
+
5
6
.
2
5
E
L
5
9
6
.
8
8
V
P
T
1
4
4
+
5
6
.
2
5
E
L
6
2
8
.
1
9
V
P
C
1
5
1
+
4
0
.
0
0
E
L
6
3
4
.
5
2
V
P
T
1
5
4
+
8
0
.
0
0
E
L
6
3
2
.
4
3
V
P
C
1
5
6
+
7
8
.
9
2
E
L
6
3
0
.
9
7
V
P
T
1
5
7
+
7
8
.
9
2
E
L
6
2
4
.
3
3
V
P
C
1
6
1
+
3
5
.
0
8
E
L
6
2
2
.
7
5
V
P
T
1
6
2
+
5
6
.
0
8
E
L
6
2
2
.
6
0
V
P
C
1
6
2
+
7
5
.
5
8
E
L
6
1
6
.
8
1
V
P
T
1
6
4
+
9
5
.
5
8
E
L
6
0
7
.
1
8
V
P
C
1
6
7
+
0
9
.
1
5
E
L
6
0
3
.
8
8
V
P
T
1
7
1
+
5
9
.
1
5
E
L
6
0
8
.
8
1
V
P
C
1
7
3
+
2
0
.
9
1
E
L
6
1
0
.
3
4
V
P
T
1
7
4
+
7
0
.
9
1
BEGIN PHASE I TEMPORARY PAVING
RECONSTRUCTION
STA 121+00.00 END PHASE I FULL
@ ℄ GLADE
(PHASE I)
PROPOSED GROUND
120+00
125+00
130+00 135+00 140+00 145+00 150+00 155+00 160+00 165+00
170+00
175+00
x
xxxxxx
x xxx
x
xx x
xx x x x x
x xx xxx xxxx xx x xx x xxxx x xxx x x x xxxx x x
xx
x
x
xxx
x
6
2
3
.
3
8
6
2
2
.
8
6
6
2
2
.
3
3
6
2
1
.
8
1
6
2
1
.
2
8
6
2
0
.
7
6
6
2
0
.
2
3
6
1
9
.
7
1
6
1
9
.
1
8
6
1
8
.
6
6
6
1
8
.
1
3
6
1
7
.
6
1
6
1
7
.
0
8
6
1
6
.
5
6
6
1
6
.
0
3
6
1
5
.
5
1
6
1
4
.
9
8
6
1
4
.
2
8
6
1
3
.
3
0
6
1
2
.
1
4
6
1
0
.
9
6
6
0
9
.
7
9
6
0
8
.
6
2
6
0
7
.
4
4
6
0
6
.
2
5
6
0
4
.
8
7
6
0
3
.
3
0
6
0
1
.
7
0
6
0
0
.
1
3
5
9
8
.
8
2
5
9
7
.
7
5
5
9
6
.
7
1
5
9
5
.
6
7
5
9
4
.
6
3
5
9
3
.
6
0
5
9
2
.
5
6
5
9
1
.
6
7
5
9
1
.
1
9
5
9
1
.
0
9
5
9
1
.
4
0
5
9
2
.
1
1
5
9
3
.
2
1
5
9
4
.
7
1
5
9
6
.
6
1
5
9
8
.
7
6
6
0
0
.
9
1
6
0
3
.
0
6
6
0
5
.
2
1
6
0
7
.
3
6
6
0
9
.
5
8
6
1
1
.
9
6
6
1
4
.
3
5
6
1
6
.
7
4
6
1
9
.
1
2
6
2
1
.
5
1
6
2
3
.
8
9
6
2
6
.
2
8
6
2
8
.
6
6
6
3
0
.
7
4
6
3
2
.
4
0
6
3
3
.
6
3
6
3
4
.
4
3
6
3
4
.
8
1
6
3
4
.
7
5
6
3
4
.
3
1
6
3
3
.
7
8
6
3
3
.
2
6
6
3
2
.
7
3
6
3
2
.
1
9
6
3
1
.
4
8
6
3
0
.
5
8
6
2
9
.
6
5
6
2
8
.
7
1
6
2
7
.
7
8
6
2
6
.
8
5
6
2
5
.
9
2
6
2
4
.
9
8
6
2
4
.
0
6
6
2
3
.
3
1
6
2
2
.
7
9
6
2
2
.
3
7
6
2
1
.
5
7
6
2
0
.
3
4
6
1
8
.
6
9
6
1
6
.
6
1
6
1
4
.
3
6
6
1
2
.
1
0
6
0
9
.
8
5
6
0
7
.
5
9
6
0
5
.
4
8
6
0
3
.
7
7
6
0
2
.
4
9
6
0
1
.
6
3
6
0
1
.
1
9
6
0
1
.
1
6
6
0
1
.
5
6
6
0
2
.
3
7
6
0
3
.
6
1
6
0
5
.
1
3
6
0
6
.
6
5
6
0
8
.
1
7
6
0
9
.
5
8
6
1
0
.
3
7
6
1
0
.
4
9
6
1
0
.
0
5
6
2
3
.
9
1
6
2
3
.
1
5
6
2
2
.
4
2
6
2
1
.
6
4
6
2
1
.
0
0
6
2
0
.
5
4
6
2
0
.
0
9
6
1
9
.
5
9
6
1
9
.
0
8
6
1
8
.
6
0
6
1
8
.
1
4
6
1
7
.
6
3
6
1
7
.
0
7
6
1
6
.
4
8
6
1
5
.
9
3
6
1
5
.
4
1
6
1
4
.
8
4
6
1
4
.
2
3
6
1
3
.
0
7
6
1
1
.
7
8
6
1
0
.
5
8
6
0
9
.
6
1
6
0
8
.
4
9
6
0
7
.
2
7
6
0
6
.
0
3
6
0
4
.
7
5
6
0
3
.
1
4
6
0
1
.
5
2
6
0
0
.
1
7
5
9
8
.
8
5
5
9
7
.
5
7
5
9
6
.
4
4
5
9
5
.
4
2
5
9
4
.
5
2
5
9
3
.
5
1
5
9
2
.
5
7
5
9
1
.
7
9
5
9
1
.
1
2
5
9
1
.
0
8
5
9
1
.
3
2
5
9
2
.
0
1
5
9
3
.
1
5
5
9
4
.
7
3
5
9
6
.
8
8
5
9
8
.
7
9
6
0
0
.
7
8
6
0
3
.
0
6
6
0
5
.
1
6
6
0
7
.
5
0
6
0
9
.
8
6
6
1
2
.
1
2
6
1
4
.
2
7
6
1
6
.
5
9
6
1
9
.
0
7
6
2
1
.
5
6
6
2
4
.
1
0
6
2
6
.
6
5
6
2
8
.
7
7
6
3
0
.
7
7
6
3
2
.
3
9
6
3
3
.
8
8
6
3
4
.
6
1
6
3
4
.
6
6
6
3
4
.
4
6
6
3
4
.
2
5
6
3
3
.
8
2
6
3
3
.
2
8
6
3
2
.
7
0
6
3
2
.
1
8
6
3
1
.
4
4
6
3
0
.
6
9
6
2
9
.
6
6
6
2
8
.
5
5
6
2
7
.
5
7
6
2
6
.
6
6
6
2
5
.
8
7
6
2
5
.
0
9
6
2
4
.
1
3
6
2
3
.
2
9
6
2
2
.
8
4
6
2
2
.
3
9
6
2
1
.
5
1
6
2
0
.
3
0
6
1
8
.
8
4
6
1
6
.
6
9
6
1
4
.
3
6
6
1
1
.
9
3
6
0
9
.
6
0
6
0
7
.
5
4
6
0
5
.
7
4
6
0
4
.
1
3
6
0
2
.
7
4
6
0
1
.
7
3
6
0
1
.
2
2
6
0
1
.
1
0
6
0
1
.
6
6
6
0
2
.
5
8
6
0
3
.
7
8
6
0
5
.
2
0
6
0
6
.
7
1
6
0
8
.
2
3
6
0
9
.
4
6
6
1
0
.
3
3
6
1
0
.
3
7
6
1
0
.
0
6
R
O
A
D
B
E
H
R
E
N
S
R
O
S
E
S
T
R
E
E
T
D
R
I
V
E
W
C
R
A
N
B
R
O
O
K
GLADE ROAD
D
R
I
V
E
E
C
R
A
N
B
R
O
O
K
GLADE ROAD
D
R
I
V
E
S
U
M
M
E
R
B
R
O
O
K
T
R
A
I
L
E
J
I
M
M
I
T
C
H
E
L
L
T
R
A
I
L
W
J
I
M
M
I
T
C
H
E
L
L
L
A
N
E
P
A
T
T
E
R
S
O
N
D
R
I
V
E
M
O
N
T
C
L
A
I
R
D
R
I
V
E
C
A
M
E
L
O
T
D
R
I
V
E
C
H
E
L
S
E
A
C
O
U
R
T
B
E
H
R
E
N
S
GLA DE ROA D
GLADE ROAD GLADE ROAD
595
600
605
610
615
620
625
630
635
640
645
650
590
595
600
605
610
615
620
625
630
635
640
645
650
121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00
585
50 1500100
SCALE FEET
HOR 1"=50'
PHASE 2
PHASE 1
P
O
O
L
R
D
PROPOSED CULVERT EXTENSION
6' SIDEWALK6' SIDEWALK
5' SIDEWALK
8' TRAIL8' TRAIL6' TRAIL8' TRAIL
6' SIDEWALK
8' TRAIL 6' TRAIL
OPTION 2
PHASE 2 - OPTION 2
OPT 2
5' SIDEWALK
EXISTING 5' SIDEWALK
EXISTING 5' SIDEWALK EXISTING 5' SIDEWALK
EXISTING 10' TRAIL EXISTING 10' TRAIL
LEGEND
x
PROPOSED CURB & G UTT ER (240 LF)
TO REMAIN
EXISTING CURB & GUTTER
TO REMAIN
EXISTING CURB & GUTTER
PROPOSED CURB & G UT TER (650 LF)
WOOD FENCE
130 LF PROPOSED
BRICK FENCE
25 LF PROPOSED
FENCE AND RETAINING WALL
92 LF PROPOSED WOOD
CHAINLINK FENCE
200 LF PROPOSED
8' TRAIL
8' TRAIL8' TRAIL
T
R
A
I
L
B
E
L
D
O
N
B
I
L
L
S
I
M
M
O
N
S
R
O
A
D
5' SIDEWALK
8' TRAIL
GUTTER
CURB &RIBBON
CURB
GUTTER
CURB &RIBBON
CURB
TREE REMOVAL
LIMITS OF CONSTRUCTION
PROPOSED ROW
PROPOSED PERMANENT SIDEWALK ESMT.
PROPOSED CONSTRUCTION ESMT.
PROPOSED SIDEWALK/TRAIL
PROPOSED ROADWAY/DRIVEWAY
V
P
I
1
2
2
+
0
2
.
8
6
E
L
6
2
4
.
4
0
-0.58%-1.05%
VC = 100.00'
K = 213
V
P
I
1
3
1
+
5
2
.
0
3
E
L
6
1
4
.
4
4
-1.05%-2.35%
VC = 121.00'
K = 93
V
P
I
1
3
5
+
2
6
.
4
7
E
L
6
0
5
.
6
5
-2.35%
-3
.20%
VC = 100.00'
K = 118
V
P
I
1
3
7
+
2
4
.
8
5
E
L
5
9
9
.
3
0
-3
.20%
-2.07%
VC = 100.00'
K = 89
V
P
I
1
4
2
+
5
6
.
2
5
E
L
5
8
8
.
2
8
-2.07%+4.30%
VC = 400.00'
K = 63
V
P
I
1
4
7
+
3
4
.
7
2
E
L
6
0
8
.
8
5
+4.30%+4.77%
V
P
I
1
5
3
+
1
0
.
0
0
E
L
6
3
6
.
3
0
+4.77%-1.05%
VC = 340.00'
K = 58
V
P
I
1
5
7
+
2
8
.
9
2
E
L
6
3
1
.
9
0
-1.05%-1.86%
VC = 100.00'
K = 123
V
P
I
1
6
1
+
9
5
.
5
8
E
L
6
2
3
.
2
0
-1.86%-0.75%
VC = 121.00'
K = 109
V
P
I
1
6
3
+
8
5
.
5
8
E
L
6
2
1
.
7
7
-0.75%
-4
.
51%
VC = 220.00'
K = 59
V
P
I
1
6
9
+
3
4
.
1
5
E
L
5
9
7
.
0
3
-4
.
51%+3.04%
VC = 450.00'
K = 60
V
P
I
1
7
3
+
9
5
.
9
1
E
L
6
1
1
.
0
9
+3.04%-1.00%
VC = 150.00'
K = 37
TEMPORARY PAVING
END PHASE I
STA 123+17.00
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
PROPOSED GROUND @ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
PROPOSED GROUND
E
L
6
0
9
.
9
4
S
T
A
1
7
5
+
1
0
.
0
0
M
A
T
C
H
E
X
I
S
T
E
L
E
V
A
T
I
O
N
E
N
D
C
O
N
S
T
R
U
C
T
I O
N
E
L
6
2
5
.
0
0
S
T
A
1
2
1
+
0
0
M
A
T
C
H
E
X
I
S
T
E
L
E
V
A
T
I
O
N
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I O
N
E
L
6
2
4
.
6
9
V
P
C
1
2
1
+
5
2
.
8
6
E
L
6
2
3
.
8
8
V
P
T
1
2
2
+
5
2
.
8
6
E
L
6
1
5
.
0
7
V
P
C
1
3
0
+
9
1
.
5
3
E
L
6
1
3
.
0
2
V
P
T
1
3
2
+
1
2
.
5
3
E
L
6
0
6
.
8
2
V
P
C
1
3
4
+
7
6
.
4
7
E
L
6
0
4
.
0
5
V
P
T
1
3
5
+
7
6
.
4
7
E
L
6
0
0
.
9
0
V
P
C
1
3
6
+
7
4
.
8
5
E
L
5
9
8
.
2
7
V
P
T
1
3
7
+
7
4
.
8
5
E
L
5
9
2
.
4
3
V
P
C
1
4
0
+
5
6
.
2
5
E
L
5
9
6
.
8
8
V
P
T
1
4
4
+
5
6
.
2
5
E
L
6
2
8
.
1
9
V
P
C
1
5
1
+
4
0
.
0
0
E
L
6
3
4
.
5
2
V
P
T
1
5
4
+
8
0
.
0
0
E
L
6
3
2
.
4
3
V
P
C
1
5
6
+
7
8
.
9
2
E
L
6
3
0
.
9
7
V
P
T
1
5
7
+
7
8
.
9
2
E
L
6
2
4
.
3
3
V
P
C
1
6
1
+
3
5
.
0
8
E
L
6
2
2
.
7
5
V
P
T
1
6
2
+
5
6
.
0
8
E
L
6
2
2
.
6
0
V
P
C
1
6
2
+
7
5
.
5
8
E
L
6
1
6
.
8
1
V
P
T
1
6
4
+
9
5
.
5
8
E
L
6
0
7
.
1
8
V
P
C
1
6
7
+
0
9
.
1
5
E
L
6
0
3
.
8
8
V
P
T
1
7
1
+
5
9
.
1
5
E
L
6
0
8
.
8
1
V
P
C
1
7
3
+
2
0
.
9
1
E
L
6
1
0
.
3
4
V
P
T
1
7
4
+
7
0
.
9
1
BEGIN PHASE I TEMPORARY PAVING
RECONSTRUCTION
STA 121+00.00 END PHASE I FULL
@ ℄ GLADE
(PHASE I)
PROPOSED GROUND
120+00
125+00
130+00 135+00 140+00 145+00 150+00 155+00 160+00 165+00
170+00
175+00
x
xxxxxx
x xxx
x
xx x
xx x x x x
x xx xxx xxxx xx x xx x xxxx x xxx x
x x x x x xxxx x x
xx
xx xxx x x
x
x
x xxxxx x xxx
x x x x
x x x xx xxxxx
x
xxx
x
xx
x x
x
x
xxx
6
2
3
.
3
8
6
2
2
.
8
6
6
2
2
.
3
3
6
2
1
.
8
1
6
2
1
.
2
8
6
2
0
.
7
6
6
2
0
.
2
3
6
1
9
.
7
1
6
1
9
.
1
8
6
1
8
.
6
6
6
1
8
.
1
3
6
1
7
.
6
1
6
1
7
.
0
8
6
1
6
.
5
6
6
1
6
.
0
3
6
1
5
.
5
1
6
1
4
.
9
8
6
1
4
.
2
8
6
1
3
.
3
0
6
1
2
.
1
4
6
1
0
.
9
6
6
0
9
.
7
9
6
0
8
.
6
2
6
0
7
.
4
4
6
0
6
.
2
5
6
0
4
.
8
7
6
0
3
.
3
0
6
0
1
.
7
0
6
0
0
.
1
3
5
9
8
.
8
2
5
9
7
.
7
5
5
9
6
.
7
1
5
9
5
.
6
7
5
9
4
.
6
3
5
9
3
.
6
0
5
9
2
.
5
6
5
9
1
.
6
7
5
9
1
.
1
9
5
9
1
.
0
9
5
9
1
.
4
0
5
9
2
.
1
1
5
9
3
.
2
1
5
9
4
.
7
1
5
9
6
.
6
1
5
9
8
.
7
6
6
0
0
.
9
1
6
0
3
.
0
6
6
0
5
.
2
1
6
0
7
.
3
6
6
0
9
.
5
8
6
1
1
.
9
6
6
1
4
.
3
5
6
1
6
.
7
4
6
1
9
.
1
2
6
2
1
.
5
1
6
2
3
.
8
9
6
2
6
.
2
8
6
2
8
.
6
6
6
3
0
.
7
4
6
3
2
.
4
0
6
3
3
.
6
3
6
3
4
.
4
3
6
3
4
.
8
1
6
3
4
.
7
5
6
3
4
.
3
1
6
3
3
.
7
8
6
3
3
.
2
6
6
3
2
.
7
3
6
3
2
.
1
9
6
3
1
.
4
8
6
3
0
.
5
8
6
2
9
.
6
5
6
2
8
.
7
1
6
2
7
.
7
8
6
2
6
.
8
5
6
2
5
.
9
2
6
2
4
.
9
8
6
2
4
.
0
6
6
2
3
.
3
1
6
2
2
.
7
9
6
2
2
.
3
7
6
2
1
.
5
7
6
2
0
.
3
4
6
1
8
.
6
9
6
1
6
.
6
1
6
1
4
.
3
6
6
1
2
.
1
0
6
0
9
.
8
5
6
0
7
.
5
9
6
0
5
.
4
8
6
0
3
.
7
7
6
0
2
.
4
9
6
0
1
.
6
3
6
0
1
.
1
9
6
0
1
.
1
6
6
0
1
.
5
6
6
0
2
.
3
7
6
0
3
.
6
1
6
0
5
.
1
3
6
0
6
.
6
5
6
0
8
.
1
7
6
0
9
.
5
8
6
1
0
.
3
7
6
1
0
.
4
9
6
1
0
.
0
5
6
2
3
.
9
1
6
2
3
.
1
5
6
2
2
.
4
2
6
2
1
.
6
4
6
2
1
.
0
0
6
2
0
.
5
4
6
2
0
.
0
9
6
1
9
.
5
9
6
1
9
.
0
8
6
1
8
.
6
0
6
1
8
.
1
4
6
1
7
.
6
3
6
1
7
.
0
7
6
1
6
.
4
8
6
1
5
.
9
3
6
1
5
.
4
1
6
1
4
.
8
4
6
1
4
.
2
3
6
1
3
.
0
7
6
1
1
.
7
8
6
1
0
.
5
8
6
0
9
.
6
1
6
0
8
.
4
9
6
0
7
.
2
7
6
0
6
.
0
3
6
0
4
.
7
5
6
0
3
.
1
4
6
0
1
.
5
2
6
0
0
.
1
7
5
9
8
.
8
5
5
9
7
.
5
7
5
9
6
.
4
4
5
9
5
.
4
2
5
9
4
.
5
2
5
9
3
.
5
1
5
9
2
.
5
7
5
9
1
.
7
9
5
9
1
.
1
2
5
9
1
.
0
8
5
9
1
.
3
2
5
9
2
.
0
1
5
9
3
.
1
5
5
9
4
.
7
3
5
9
6
.
8
8
5
9
8
.
7
9
6
0
0
.
7
8
6
0
3
.
0
6
6
0
5
.
1
6
6
0
7
.
5
0
6
0
9
.
8
6
6
1
2
.
1
2
6
1
4
.
2
7
6
1
6
.
5
9
6
1
9
.
0
7
6
2
1
.
5
6
6
2
4
.
1
0
6
2
6
.
6
5
6
2
8
.
7
7
6
3
0
.
7
7
6
3
2
.
3
9
6
3
3
.
8
8
6
3
4
.
6
1
6
3
4
.
6
6
6
3
4
.
4
6
6
3
4
.
2
5
6
3
3
.
8
2
6
3
3
.
2
8
6
3
2
.
7
0
6
3
2
.
1
8
6
3
1
.
4
4
6
3
0
.
6
9
6
2
9
.
6
6
6
2
8
.
5
5
6
2
7
.
5
7
6
2
6
.
6
6
6
2
5
.
8
7
6
2
5
.
0
9
6
2
4
.
1
3
6
2
3
.
2
9
6
2
2
.
8
4
6
2
2
.
3
9
6
2
1
.
5
1
6
2
0
.
3
0
6
1
8
.
8
4
6
1
6
.
6
9
6
1
4
.
3
6
6
1
1
.
9
3
6
0
9
.
6
0
6
0
7
.
5
4
6
0
5
.
7
4
6
0
4
.
1
3
6
0
2
.
7
4
6
0
1
.
7
3
6
0
1
.
2
2
6
0
1
.
1
0
6
0
1
.
6
6
6
0
2
.
5
8
6
0
3
.
7
8
6
0
5
.
2
0
6
0
6
.
7
1
6
0
8
.
2
3
6
0
9
.
4
6
6
1
0
.
3
3
6
1
0
.
3
7
6
1
0
.
0
6
R
O
S
E
S
T
R
E
E
T
D
R
I
V
E
W
C
R
A
N
B
R
O
O
K
GLADE ROAD
D
R
I
V
E
E
C
R
A
N
B
R
O
O
K
GLADE ROAD
D
R
I
V
E
S
U
M
M
E
R
B
R
O
O
K
T
R
A
I
L
E
J
I
M
M
I
T
C
H
E
L
L
T
R
A
I
L
W
J
I
M
M
I
T
C
H
E
L
L
D
R
I
V
E
M
O
N
T
C
L
A
I
R
D
R
I
V
E
C
A
M
E
L
O
T
D
R
I
V
E
C
H
E
L
S
E
A
GLA DE ROA D
GLADE ROAD GLADE ROAD
595
600
605
610
615
620
625
630
635
640
645
650
590
595
600
605
610
615
620
625
630
635
640
645
650
121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00
585
50 1500100
SCALE FEET
HOR 1"=50'
PHASE 2
PHASE 1
P
O
O
L
R
D
6' SIDEWALK
5' SIDEWALK
5' SIDEWALK
6' SIDEWALK
5' SIDEWALK
5' SIDEWALK
5' SIDEWALK
8' TRAIL8' TRAIL
8' TRAIL
6' TRAIL8' TRAIL
8' TRAIL8' TRAIL
PROPOSED CULVERT EXTENSION
MAX HEIGHT = 2'
PROPOSED RETAINING WALL
PHASE 2 - OPTION 3
OPTION 3
T
R
A
I
L
B
E
L
D
O
N
OPT 3
MAX HEIGHT = 2'
PROPOSED RETAINING WALL
P
A
T
T
E
R
S
O
N
L
A
N
E
B
I
L
L
S
I
M
M
O
N
S
R
O
A
D
B
E
H
R
E
N
S
C
O
U
R
T
B
E
H
R
E
N
S
R
O
A
D
EXISTING 5' SIDEWALK
EXISTING 5' SIDEWALK EXISTING 5' SIDEWALK
EXISTING 10' TRAIL
TO REMAIN
EXISTING CURB & GUTTER
TO REMAIN
EXISTING CURB & GUTTER
PROPOSED CURB & G UT TER (650 LF)
PROPOSED CURB & G UT TER (240 LF)
LEGEND
x
WOOD FENCE
130 LF PROPOSED
FENCE AND RETAINING WALL
130 LF PROPOSED WOOD CHAINLINK FENCE
200 LF PROPOSED
WOOD FENCE
132 LF PROPOSED
BRICK FENCE
25 LF PROPOSED
8' TRAIL8' TRAIL
GUTTER
CURB &RIBBON
CURB
GUTTER
CURB &RIBBON
CURB