HomeMy WebLinkAboutCity Council-Worksession Minutes-8/24/2016  City of Colleyville                                                                                                  Page 1   City of Colleyville City Council  Worksession Agenda City Hall 100 Main Street Colleyville, Texas 76034 817.503.1000 www.colleyville.com Wednesday, August 24, 2016 5:00 p.m. Executive Conference Room Third Floor ­ City Hall 1. CALL TO ORDER  2. EXECUTIVE SESSION ­ In accordance with Texas Government  Code, Chapter 551, Subchapter D    Section 551.072 ­ Real Estate ­ Deliberate the purchase, exchange,  lease, or value of real property for City facilities RESUME WORKSESSION ­ 6:00 P.M. 3. PRESENTATION AND DISCUSSION     3a Presentation and discussion of the Glade Road Project 4. ADJOURNMENT  I hereby certify this agenda was posted on City Hall bulletin boards Friday,  August 19, 2016, by 5:00 p.m. Amy Shelley, TRMC City Secretary A quorum of any Colleyville board, commission, or committee may be  present at this meeting.  Any matter on this agenda may, at the discretion of the governing body, be  opened for public comment and discussion. If you plan to attend this public meeting and have a disability that requires  special accommodations, please advise the City Secretary at least 48 hours in  advance at 817.503.1133, and reasonable accommodations will be made to assist  you.  City of Colleyville Page 1 City of Colleyville City Council Worksession Minutes City Hall 100 Main Street Colleyville, Texas 76034 817. 503.1000 www.colleyville.com Wednesday, August 24, 2016 5:00 p.m. Executive Conference Room Third Floor – City Hall Mayor Richard Newton called the Colleyville City Council Worksession to order on August 24, 2016, at 5:00 p.m. ROLL CALL: Mayor Richard Newton, Mayor Pro Tem Chris Putnam, and Councilmembers Tammy Nakamura, Bobby Lindamood, Jody Short, Nancy Coplen and Mike Taylor City Manager Jennifer Fadden, Deputy City Manager Chris Fuller, Assistant City Manager/Director of Public Safety Mike Holder, Fire Chief Brian Riley, Assistant Police Chief Robert Hinton, Chief Financial Officer Brian Hogan, Human Resources Director Rachel Huitt, Public Works Director Jeremy Hutt, City Engineer Cheryl Taylor, Principal Planner Shane Pace, Recreation and Library Director Mary Rodne, Colleyville Center Manager Leslie Hill, Finance Manager Karen Hines, Parks Manager Heather Dowell, SH26 Coordinator James Hubbard, Strategic Services Manager Adrienne Lothery, Information Systems Manager Chris Pena, and City Secretary Amy Shelley. Mayor Newton recessed the Worksession at 5:01 p.m. to enter into Executive Session. 2. EXECUTIVE SESSION - In accordance with Texas Government Code, Chapter 551, Subchapter D Section 551.072 - Real Estate - Deliberate the purchase, exchange, lease, or value of real property for City facilities Mayor Newton explained the Executive Session had been called in accordance with the Texas Government Code, Chapter 551, Subchapter D, Section 551.072, Real Estate and explained there would be no decisions made or action taken during this time. The worksession was reconvened at 6:09 p.m. 3. PRESENTATION AND DISCUSSION 3a Presentation and discussion of the Glade Road Project Public Works Director Jeremy Hutt presented this item and answered questions or the City Council. Chad Gartner, Transystems also presented and briefed the City Council. City Council Minutes August 24, 2016 City of Colleyville Page 2 Mayor Pro Tem Putnam asked if the City Council really needs to discuss Phase 1, or can we accelerate through the presentation. Councilmembers Coplen and Taylor agreed. Councilmember Short asked Mayor Newton if he has requested items be removed from Phase 1. Mayor Newton replied no, not yet. Councilmember Nakamura asked staff about the cost of Phase 1. Director Hutt replied $4.1 million. Mayor Newton asked Mr. Gartner if there is a department of public safety guideline or rule relative to site distance. Mr. Gartner replied the roadway site distance is dictated by Ashwood Design or better known in engineering as the “green book.” Mayor Newton asked Mr. Gartner about the median on Glade Road at Shadowood. Mr. Gartner replied it is a striped median, not raised. Mayor Newton asked Mr. Gartner why it is there. Mr. Gartner replied closer to SH26 on Glade Road is slated to be a three lane roadway, so the median allows for the narrowing down into two lanes, through this intersection. Councilmember Lindamood asked Mr. Gartner if there will be a retaining wall at Bedford Road and Glade Road. Mr. Gartner replied no, and the slopes are no more than 4:1. Mayor Newton asked Mr. Gartner if this will improve the site distance. Mr. Gartner replied yes. Councilmember Short asked Mr. Gartner if moving the wall would provide more site distance. Mr. Gartner replied yes, but then there is a concern because of the parking lot. Councilmember Nakamura asked Mr. Gartner about the width of the sidewalk. Mr. Gartner replied they are five feet on the south side, and the width varies on the north side between six and ten feet. Mayor Newton asked Mr. Gartner where the wall will be located at Glade Road and Bluebonnet Drive. Mr. Gartner replied at the back of the sidewalk, parallel to Bluebonnet Drive, with another one on the south side at Stafford. Councilmember Lindamood asked Mr. Gartner if they will be doing a slope at Mr. Winsworth home. Mr. Gartner replied it will be a walkable surface, no higher than four feet. Councilmember Lindamood asked Mr. Gartner if there will be a guard rail. Mr. Gartner replied there will be fencing of some type on the wall. City Council Minutes August 24, 2016 City of Colleyville Page 3 Councilmember Lindamood asked Mr. Gartner why so much of the 10 foot trail is being pulled from the Preservation. Mr. Gartner replied there are some issues meeting ADA compliance, given the slope. Mayor Newton asked Mr. Gartner about the impact to the entrance into Shadowood. Mr. Gartner replied the fence will not be effected at all. Councilmember Lindamood asked Mr. Gartner why they will be redoing about 80 feet on Garry Lynne, given that it has just recently been redone. Mr. Gartner replied it could be that there is a need for a wider approach. Councilmember Lindamood asked Mr. Gartner where the water is being dumped from east on Glade Road towards Riverwalk Drive. Mr. Gartner replied there is a channel that runs into the boxed culvert at Glade Road and Riverwalk Drive. Mayor Newton asked Mr. Gartner about the outfall at the roundabout. Mr. Gartner replied there are some modifications to be extended further south, past the roundabout. Councilmember Lindamood asked Mr. Gartner if any hydraulic study/testing has been done with the outfall to the pond. Mr. Gartner replied no analysis on the pond has been done, other than what the outfalls do today. He added they have validated the results of some studies, and they are not exceeding what is being drained today. Mayor Newton asked Mr. Gartner about the new storm drain for the section beyond the roundabout at Glade Road and Riverwalk Drive. Mr. Gartner replied storm drain comes in from the east and west. Mayor Newton asked if this section currently has curbs. Mr. Gartner replied no. Councilmember Nakamura asked Mr. Gartner how many days will Bransford Road be closed. Mr. Gartner replied 20-25 days. Mayor Newton asked Mr. Gartner why the boxed culvert at Bransford Road and Glade Road has to be changed. Mr. Gartner replied they have to lower the box culvert to be able to widen the road for the turn lane. Mayor Newton asked Mr. Gartner why the roadway is being lowered in this section. Mr. Gartner replied the object is to get the curbs lower than the right-of-way so that the drainage is taken from the street. Mayor Newton asked Mr. Gartner what is driving the need for curb and gutter. Mr. Gartner replied this section will then match Phase 4. City Council Minutes August 24, 2016 City of Colleyville Page 4 Councilmember Lindamood asked Mr. Gartner if the west side of Glade Road could be worked on with the closing of Bransford Road. Mr. Gartner replied they are trying to keep the window of the closing on Glade Road as small as possible. He added it will be started on at the same time, but it will not be completed at the same time. Mayor Newton asked Mr. Gartner if there are any options to leave a lane open. Mr. Gartner replied that is a possibility, but it could involve temporary widening. Councilmember Taylor asked Mr. Gartner if this intersection is still targeted for the summertime. Mr. Gartner replied they do not have set dates, but summer is desirable. Councilmember Taylor asked Mr. Gartner if they have considered a one-way or both ways during the morning and afternoon rush hour. Mr. Gartner replied that has not been considered, currently just one-way. Councilmember Taylor suggested doing that where it can be done. Councilmember Short asked Mr. Gartner if they are trying to eliminate the amount of left or right turns. Mr. Gartner replied yes. Mayor Newton asked staff about the timeframe for the road closure at Glade Road at Bluebonnet Drive. Director Hutt replied it is 60 days with a maximum incentive of 20 days. Councilmember Taylor asked staff if we are planning to have another meeting to discuss this project, or are we making recommendations this evening. Director Hutt replied staff will provide an update before going to bid. Councilmember Taylor asked Mr. Gartner if there has been consideration given to temporary stop signs at Hall-Johnson Road at Bluebonnet Drive to help the flow of traffic. Mr. Gartner replied he would not recommend stop signs, but they could encourage traffic to go to Pool Road. Councilmember Taylor asked if City Council will see the plans that will go out for bid, especially if the contractor thinks it can be done quicker, faster, or better. Director Hutt replied yes, any changes can be brought back. Councilmember Taylor suggested having a diagram of this project in the lobby of City Hall for everyone to see. Mayor Newton asked staff about the plans for landscaping and tree replacement. Director Hutt replied the areas disturbed with construction will be reestablished. He added we are going to include a voucher program which will have funding set aside to work with property owners for tree replacement along the corridor. City Council Minutes August 24, 2016 City of Colleyville Page 5 Mayor Newton asked staff if there are any plans for us to plant anything, or is it up to the property owner. Director Hutt replied correct, we would not be planting any trees because we would not be able to maintain them. Parks Manager Heather Dowell added this program will allow anyone who wants to replace trees on their property, and water and maintain them, to be provided with a voucher and then a contractor will plant the trees. Mayor Newton asked staff how the trees were planted along Hall-Johnson. Director Hutt replied the City installed trees with quite a bit of irrigation along the corridor in the right-of-way. Councilmember Taylor added the only exception was along Highland Meadows because they did not want the corridor, and then they liked the landscaped medians. Councilmember Nakamura asked Mr. Gartner if the construction cost includes the right-of-way. Mr. Gartner replied yes, the last time an estimate was done. Councilmember Nakamura asked Mr. Gartner what amount was put in for right-of- way. Mr. Gartner replied not knowing at this time. Councilmember Nakamura stated she would like to know the amount. Director Hutt stated the $4.1 million does not include the purchase of additional right-of-way acquisition, it did include right-of-way preparation. Mayor Newton stated about $5.3 million includes design and right-of-way. Mayor Newton asked Mr. Gartner why it takes 13 months. Mr. Gartner replied because of doing this in phases and maintaining traffic. He stated that is one reason why we have incentives put in place for the contractor. Director Hutt added having a timeline in place is advantageous for the bidding process. Mayor Newton asked staff what the timeline would be if everything went perfect. Director Hutt replied 171 calendar days with a total incentive package of $252,000. Councilmember Taylor asked staff about bad weather days. Director Hutt replied calendar contracts do not include bad weather. Mayor Newton asked staff if there is a penalty for going over the time. Director Hutt replied yes, and they are still working on those details. Councilmember Lindamood asked staff about flexibility with the calendar days and the incentive package. Director Hutt replied we are trying to incentivize the contractor to stay on project to do what they can, and we understand there will be days in which there could be a rain delay, and that is why the 13 month timeline is put in place. City Council Minutes August 24, 2016 City of Colleyville Page 6 Councilmember Lindamood asked staff who will be the project manager for this project. Director Hutt replied he is serving as the project lead for the Glade Road corridor, but it will be part of the public works team. Councilmember Taylor asked staff if this is a big enough project to get a good contractor. Director Hutt replied yes. Mayor Newton asked staff about other options for Phase 2. Director Hutt asked Mr. Gartner to highlight different cost scenarios if some of the scope were to change. He stated the main scenario includes a full depth reclamation style project with ribbon curbs. Mr. Gartner added the savings, with the removal of the ten foot trail on the north side, is $350,000. Mayor Pro Tem Putnam asked Mr. Gartner if that includes the right-of-way costs. Mr. Gartner replied that is just the construction costs. Councilmember Coplen asked staff how the crosswalk, at the end of Phase 1, would be addressed if the north sidewalk is removed. Director Hutt replied if the trail is eliminated, one way would be to utilize the roundabouts rather than mid- block crossings. Councilmember Coplen asked staff where the trail would end for Phase 1. Director Hutt replied it could be terminated at Bluebonnet Drive. Councilmember Lindamood asked Mr. Gartner if engineered drainage would exist with a sidewalk. Mr. Gartner replied yes, because of curb and gutter, there would be engineered drainage. Councilmember Taylor asked Mr. Gartner if the north side of the roadway would drain from the home to the street. Mr. Gartner replied correct, the curbs would be six inches below grade to allow a slope for drainage. Councilmember Lindamood asked Mr. Gartner if he has cut and fill sheets for the north side of Phase 2. Mr. Gartner replied there are cross sections, but no cut and fill sheets. He added cut and fill sheets are not done for roadway projects. Mayor Pro Tem Putnam stated he supports full depth reclamation with a pedestrian element on the south side only, for Phase 2. Councilmember Coplen suggested having a wider sidewalk on the south side. Councilmember Coplen asked Mayor Pro Tem Putnam about turn lanes. Mayor Pro Tem Putnam replied being good with whatever can be done within the existing right-of-way. City Council Minutes August 24, 2016 City of Colleyville Page 7 Mayor Newton asked Mr. Gartner if no additional right-of-way is needed through Chelsea. Mr. Gartner replied correct. Mayor Newton asked Mr. Gartner what adjustments were made to accomplish that. Mr. Gartner replied by shifting the roadway north or south; reductions in trail width; and adjustments in curb slope relative to the sidewalk. Mayor Newton asked Mr. Gartner how much right-of-way was originally needed. Mr. Gartner replied he did not know, there have been several iterations. Councilmember Short asked Mr. Gartner how long this current design has been on the table. Mr. Gartner replied January of this year. Mayor Newton asked Mr. Gartner what would have to change with this plan with no curbs. Mr. Gartner replied there were issues fitting the ribbon curb within the existing right-of-way, in the beginning. Mayor Newton asked Mr. Gartner if dropping the sidewalk on the north side helped. Mr. Gartner replied yes. Councilmember Nakamura stated she wants to have the roadway completed at a sufficient cost, but not at $20 million. Mayor Pro Tem Putnam stated there were scenarios to complete this at half the cost. Mayor Newton asked staff when this project would be done, if the plan is executed as presented. Director Hutt replied Phase 2 is slated for FY2018; Phase 3 is slated for FY 2019; and Phase 4 is slated for FY 2020. Mayor Newton suggested having the sidewalk on the south side only, as wide as it can be, adding crosswalks, and putting in turn lanes where needed, and without drainage. Councilmember Short asked Mr. Gartner if the bar ditches would remain with any widening of the roadway. Mr. Gartner replied he could not answer if there would be more or less impacts with trees or right-of-way relative to the bar ditches. Mayor Pro Tem Putnam stated there is the subjective issue with how we want Glade Road to look; and there is the objective issue of how much it will cost and the timeline. He stated this version of full depth will be far more affordable. Councilmember Coplen asked staff if a ribbon curb helps the life of the roadway. Director Hutt replied it saves roadway edge failure on an asphalt road. Director Hutt recapped City Council’s direction for Phase 2: options include - 24 foot wide roadway without turn lanes, with a pedestrian element on the south side only, no trail or sidewalk on the north side, and coming up with layout and costs City Council Minutes August 24, 2016 City of Colleyville Page 8 for this option; adding the turn lanes and comparing that with the other option; and, evaluate locations for crosswalks to allow for access from the north to the south side of the roadway. Mayor Newton revised the recap with, option one includes two 12 foot lanes, with a potential layout of having a pedestrian element on the north side, as long as it is included in the current right-of-way, and full depth reclamation. He stated he wants the sidewalk to be considered, but if it cannot be done, then that is okay too. He stated option two includes adding turn lanes to option one. Mayor Newton asked Mr. Gartner if the expense of the engineered drainage comes back even if it is included in the bar ditches. Mr. Gartner replied yes, but it provides flexibility for placing inlets, and it may play a big part in what can fit in the right-of-way. Mayor Pro Tem Putnam asked Mr. Gartner if there is an easier way to understand the cost. Mr. Gartner replied the change in impacts is not simple. Councilmember Taylor asked Mr. Gartner if the plan would be to dig out the bar ditches and put in the drainage, and then recover the drainage, while keeping the bar ditch element. Mr. Gartner replied yes. City Manager Jennifer Fadden asked Mayor Newton what level of detail he would like for Mr. Gartner to provide. Mayor Newton replied some rough cost estimates. Mr. Gartner added he would have to bring this level of detail back in order to show costs and impacts. Mayor Pro Tem Putnam stated it seems the detail has been provided before. Mayor Newton recessed the worksession at 8:12 p.m. Mayor Newton reconvened the worksession at 8:20 p.m. Mayor Newton recapped the options: (1) two 12 foot lanes, full depth reclamation, with a possible pedestrian element on the north side; and, (2) same as option 1, but add turn lanes, understanding that could change based on sidewalk changes, while trying to avoid eliminating the whole thing. Mayor Newton asked Mr. Gartner about the cost estimate for ribbon curb. Mr. Gartner replied $300,000 range for Phase 2 Councilmember Coplen asked Mr. Gartner if drains under the ditches is being considered. Mr. Gartner replied based on the conversation to use our judgement, if that will improve the situation, a concrete pipe with a swale would be included. City Council Minutes August 24, 2016 City of Colleyville Page 9 Mayor Newton suggested Mr. Gartner provide a cost estimate for the options include the ditches with or without the drainage. Mr. Gartner stated keeping it simple would be to provide drainage underground. Councilmember Lindamood asked staff why double drainage on the roadway would be necessary. Director Hutt replied it is based on capacity relative to sizing. Councilmember Lindamood stated there are no flooding issues now. Director Hutt explained with added elements, such as turn lanes drainage will encroach into the existing drainage, which will require it to be built back or be rebuilt in a smaller size to accommodate the drainage. Councilmember Nakamura asked Mayor Newton if there is no determination on the cost of Phase 2. Mayor Newton replied correct, it will depend on the options. Councilmember Taylor asked Mr. Gartner if the agreement with Transystems will have to be amended. Mr. Gartner replied not at this time. Mayor Newton asked Mr. Gartner how many pieces of right-of-way is necessary for Phase 3. Mr. Gartner replied one. Director Hutt replied there are 13 parcels affected in Phase 3; however, one will be right-of-way. Mayor Newton asked Mr. Gartner about the road grade by Mr. McCormick’s property. Mr. Gartner replied it goes down some and one option to minimize the impact is to slope the road to the south to put the storm drain in the median. Councilmember Lindamood asked Mr. Gartner how Mr. McCormick felt about the deceleration lane by his property. Mr. Gartner replied Mr. McCormick did not like it, but we are trying not to impact his gate, and he has looked at the modified design. Mayor Newton asked Mr. Gartner about the raised median at the McCormick property. Mr. Gartner replied they were trying to remain consistent with the same section east of this section. Mayor Newton asked Mr. Gartner if the median will be irrigated or landscaped. Mr. Gartner replied no, it will be a colored stamped concrete. Councilmember Lindamood asked Mr. Gartner if there is a turn lane for Ashmore. Mr. Gartner replied there will be a two-way left turn lane for Overhill Drive and Ashmore. Councilmember Coplen asked Mr. Gartner if the two turn lanes at Roberts Road and Prestwick Drive have been off-set because of the site distance. Mr. Gartner replied yes, although it is not shown on this plan. City Council Minutes August 24, 2016 City of Colleyville Page 10 Councilmember Coplen asked Mr. Gartner if the lane merge will extend all the way from Heritage Avenue to Roberts Road. Mr. Gartner replied yes, and at Roberts Road, it will then be a right turn only. Mayor Newton asked Mr. Gartner if putting the medians further east is for aesthetics. Mr. Gartner replied to match the existing section from Heritage Avenue to Pool Road. Mayor Newton asked Mr. Gartner if the width of the median is the same as the one that is landscaped to the east. Mr. Gartner replied yes. Mayor Newton asked staff why this median is not landscaped. Director Hutt replied if there is a vehicle that breaks down in this area, and emergency vehicles need to pass, there is nowhere to go. Mayor Newton stated it seems like an extra expense. Councilmember Taylor asked Mr. Gartner if these are curbed medians. Mr. Gartner replied they are three to four inch rollover curbs. Mayor Newton asked about the cost of Phase 3. Councilmember Nakamura replied $4 million. Mayor Newton asked staff about the timing for Phase 3. Director Hutt replied the right-of-way acquisition for Phase 3 is slated for FY 2017. City Manager Jennifer Fadden added if we proceed with the schedule, the design would need to be completed before the right-of-way acquisition. Councilmember Short asked Mr. Gartner if there are sight distance issues for both entrances into Mill Valley subdivision. Mr. Gartner replied the intersection at Mill View is worse because the wall hides the view of the roadway. Mayor Newton asked Mr. Gartner about the right-of-way for Phase 4. Mr. Gartner replied there are two parcels. Mayor Newton asked Mr. Gartner about the cost estimate for Phase 4. Mr. Gartner replied $4.7 million. Councilmember Lindamood asked staff if they have visited with the city of Hurst about Phase 4. Director Hutt replied yes, Hurst is are aware of the project, but they do not have these details or the cost. Mayor Newton asked Mr. Gartner if there is anything driving the necessity for curb and gutter. Mr. Gartner replied a good portion of Phase 4 is already curb and gutter. Mayor Newton suggested tabling the discussion on Phase 4 until clarity is provided for Phase 2. City Council Minutes August 24, 2016 City of Colleyville Page 11 Councilmember Short asked staff if there are parcels in Phase 4 for potential redevelopment. Director Hutt replied there may be a few that will require some platting. Councilmember Coplen asked staff if the construction for Phase 1 is slated for FY 2017. Director Hutt replied yes. Councilmember Coplen asked staff what they see as a start date. Director Hutt replied next summer, depending on the utility relocation and right-of-way acquisition. Councilmember Nakamura asked staff about the cost estimates for the interim maintenance. City Manager Jennifer Fadden replied $198,000 from Stafford Drive to Jim Mitchell Trail, and $142,000 from Bransford Road to the western City limits. Councilmember Lindamood expressed his appreciation to Public Works for the work being done on Glade Road to fix some issues. 4. ADJOURNMENT There being no further business before the City Council, Mayor Newton adjourned the worksession at _______ p.m. APPROVED BY A VOTE OF 6 AYES, 0 NAYS, AND 0 ABSTENTIONS ON THIS THE 20TH DAY OF SEPTEMBER 2016. Minutes taken and prepared by: Amy Shelley, TRMC City Secretary