HomeMy WebLinkAboutCity Council-Agenda Packets-Worksession-8/25/2016 City of Colleyville Page 1
City of Colleyville
City Council
Worksession Agenda
City Hall
100 Main Street
Colleyville, Texas 76034
817.503.1000
www.colleyville.com
Wednesday, August 24, 2016
5:00 p.m.
Executive Conference Room
Third Floor City Hall
1. CALL TO ORDER
2. EXECUTIVE SESSION In accordance with Texas Government
Code, Chapter 551, Subchapter D
Section 551.072 Real Estate Deliberate the purchase, exchange,
lease, or value of real property for City facilities
RESUME WORKSESSION 6:00 P.M.
3. PRESENTATION AND DISCUSSION
3a Presentation and discussion of the Glade Road Project
4. ADJOURNMENT
I hereby certify this agenda was posted on City Hall bulletin boards Friday,
August 19, 2016, by 5:00 p.m.
Amy Shelley, TRMC
City Secretary
A quorum of any Colleyville board, commission, or committee may be
present at this meeting.
Any matter on this agenda may, at the discretion of the governing body, be
opened for public comment and discussion.
If you plan to attend this public meeting and have a disability that requires
special accommodations, please advise the City Secretary at least 48 hours in
advance at 817.503.1133, and reasonable accommodations will be made to assist
you.
City of Colleyville Page 1
City of Colleyville
Colleyville City Council
Worksession
Agenda Briefing
City Hall
100 Main Street
Colleyville, Texas 76034
www.colleyville.com
Agenda Number 3a Agenda Date 08/24/2016
Type Presentation and Discussion
Department Public Works
Title
Presentation and discussion of the Glade Road Project
Strategy Map Connection
B4- Cultivate a culture of transparency and consistent communication
Explanation
Staff will present an update on the status of the Glade Road Project. The presentation
will cover the current status of all phases of the corridor project and provide an
opportunity to discuss each phase of the corridor. The presentation will include:
Project History
Review of Traffic Counts
Phase 1 overview of the current plans:
Bransford Road Intersection
Bedford Road Intersection
Riverwalk Drive intersection
Bluebonnet Drive intersection
Overview of the proposed retaining walls
Proposed traffic control plan
Complete plans overview
Phase 2 overview
Phase 3 overview
Phase 4 overview
Project Schedules
Interim Maintenance
The last update presented on the Glade Road Phase 1 Project was presented to the City
Council during the April 19, 2016, Pre Council Meeting and the presentation is attached
for reference. That presentation covered several topics regarding the Glade Road Phase
1 Project. During that presentation, and previous discussions, the City Council provided
clear direction to the design consultant to identify ways to continue to minimize the
impacts of the project on the adjacent property owners. City staff and the design
consultant have continued to evaluate the design and the associated impacts on a parcel
by parcel basis. The design consultant has made revisions to the design of Phase 1 to
City of Colleyville Page 2
City Council Worksession Agenda Briefing 3a
lessen the respective impacts. The table below summarizes some of the adjustments
that have been made to the plans as a result of this continued effort.
60% Design 90%
Design
Updated
90%
Estimated right-of-way parcels
(Total Square Footage)
14
(29,000)
11
(19,800)
9
(18,750)
Estimated Sidewalk Easements
(Total Square Footage)
18
(14,900)
11
(10,000)
13
(13,940)
Estimated Drainage Easements
(Total Square Footage)
1
(575)
0
(0)
0
(0)
Estimated Temporary Construction
Easements
(Total Square Footage)
48
(47,900)
29
(26,200)
19
(22,030)
Total Estimated Transactions 81 51 41
Total Affected Parcels 48 33 32
The presentation will include updates on Phases 2, 3, and 4. While the design process
has been initiated, it has not been completed therefore all of the details of these phases
are not currently available but there is sufficient information available to discuss the
future project phases and the impacts of the proposed improvements. The table below
summarizes the acquisitions that are currently estimated to be necessary for the
proposed improvements that are currently included in the scope of the future project
phases.
Phase 2 Phase 3 Phase 4
Estimated right-of-way parcels
(Total Square Footage)
6
(29,515)
1
(13,090)
2
(7,935)
Estimated Sidewalk Easements
(Total Square Footage)
3
(3,080)
5
(12,500)
2
(1,640)
Estimated Temporary Construction
Easements
(Total Square Footage)
27
(17,590)
9
(9,750)
25
(34,605)
Total Estimated Transactions 36 15 29
Total Affected Parcels 30 13 26
The design engineer will be prepared to discuss the impacts of adjusting the scopes of
Phase 2, 3, and 4 to include ribbon curb and the reduction or removal of the pedestrian
elements. These possible scope changes would have an effect on the cost of
construction, the duration of construction, the need of additional rights-of-way, and the
timing of which funding would be available for the project. For a general comparison of
the cost differences associated with various maintenance techniques and reconstruction,
the comparison chart that was presented during the July 25, 2016 Capital
Improvements Program Worksession is attached for reference.
City of Colleyville Page 3
City Council Worksession Agenda Briefing 3a
Attachments
1.August 24, 2016 Glade Road Presentation
2.April 19, 2016 Presentation
3.Glade Road Phase 1 Exhibit
4.Glade Road Phase 2 Exhibit
5.Glade Road Phase 3 Exhibit
6.Glade Road Phase 4 Exhibit
7.Street Cost Comparison Chart - July 25, 2016
Glade Road
Project Update
August 24, 2016
Worksession
Scope of Worksession
•Project History
•Review of Traffic Counts
•Phase 1 overview:
–Bransford Road intersection
–Bedford Road intersection
–Riverwalk Drive intersection
–Bluebonnet Drive intersection
–Overview of the proposed retaining walls
–Proposed traffic control plan
–Complete overview
•Phase 2 overview
•Phase 3 overview
•Phase 4 overview
•Project Schedules
•Interim Maintenance
Objective Statement –To provide the City Council with an update on the
status of the Glade Road Project and provide an opportunity to discuss each
phase of the corridor
October 5, 2011
Pre Council presentation on the Glade Road and Bluebonnet Road
intersection
Project History
150’ east of eastbound stop sign
Project History
July 2, 2012 –Preliminary engineering study authorized for Glade Road from Heritage
Avenue to SH26 (Colleyville Boulevard)
November 20, 2012 –Results of preliminary engineering study presented to City Council
February 19, 2013 –Engineering services agreement approved for concept design from
Heritage Avenue to west city limits
May 7, 2013 –Preview of the public meeting presentation delivered to City Council during a
Pre Council session
May 23, 2013 –Initial public input meeting
November 5, 2013 –Council updated on the status of the project and feedback received at
initial Public Input Meeting
November 18, 2013 –Second Public Input Meeting (Concept Designs Presented)
March 3, 2014 –Recommended design presented to City Council
Project History
April 16, 2014 –Council Worksession to review recommended design
June 17, 2014 –Pre Council discussion to review recommended design
June 30, 2014 –Council Worksession to discuss the project. Council provided direction to
proceed with the final design of the section between Bransford Road and Manning Drive
July 15, 2014 –Approval of a final design contract for the section between Bransford Road
and Manning Drive
August 6, 2014 –Council Worksession to review the Glade Road Corridor
October 3, 2014 –Acquisition of 1209 Glade Road (right-of-way necessary for the
roundabout at the Riverwalk Intersection)
October 6, 2014 –Petition to limit scope of the Glade Road Project submitted to the City of
Colleyville
Project History
October 21, 2014 –Pre Council discussion and project design placed on hold
June 2, 2015 –Pre Council discussion and project was released to proceed with the design
July 28, 2015 –Pre Council discussion and Phase 1 Update
October 20, 2015 –Pre Council discussion and Phase 1 60% Update and CIP phasing
discussion
December 15, 2015 –Pre Council discussion on Phase 1, specifically on the roundabout at
Bransford Road and Glade Road
April 19, 2016 -Pre Council discussion on Phase 1, specifically on 90% exhibit and the tree
conservation and mitigation efforts
May 3, 2016 -Approval of the right-of-way acquisition services contract
Traffic Counts
2012 2013 2014 2015 2016
Glade Road (Western City Limits to SH26)9,274 9,177 9,480 9,618 9,490
Glade Road (SH26 to Bluebonnet Drive)14,250 13,433 13,557 13,085 12,322
Glade Road (Bluebonnet Drive to Pool Road)11,183 12,147 11,144 11,293 10,895
Glade Road (Pool Road to Eastern City Limits)14,478 14,501 13,796 13,625 13,610
7,500
8,500
9,500
10,500
11,500
12,500
13,500
14,500
15,500
2012 2013 2014 2015 2016
Glade Road Traffic Volumes
Glade Road (Western City Limits to SH26)Glade Road (SH26 to Bluebonnet Drive)
Glade Road (Bluebonnet Drive to Pool Road)Glade Road (Pool Road to Eastern City Limits)
Phase 1
Bransford Road
to Manning Drive
N
Phases of Glade Road Corridor
Phase 1 (Bransford Road Intersection)
Phase 1 (Bedford Road Intersection)
Phase 1 (Riverwalk Roundabout)
Phase 1 (Bluebonnet Drive Intersection)
Phase 1 (Retaining Walls)
Maximum Height
about 4.5’
Maximum Height
about 4’
Maximum Height
about 20”
= Proposed
Retaining Wall
Phase 1 (Possible Traffic Control Plan)
Stage 0
Phase 1 (Possible Traffic Control Plan)
Stage 1
Phase 1 (Possible Traffic Control Plan)
Stage 2
Phase 1 (Possible Traffic Control Plan)
Stage 3
Phase 1 (Possible Traffic Control Plan)
Stage 4
Phase 1 (Possible Traffic Control Plan)
Stage 5
Phase 1
The design consultant will walk through
the design of Glade Road Phase 1
Phase 1 (Bransford Road to Manning Drive)
Final design cost $664,365
Estimated construction cost $4,124,615
Estimated right-of-way parcels 9
Estimated sidewalk easements 13
Estimated temporary construction easements 19
Estimated number of affected parcels 32
Estimated construction duration 13 Months
Bransford Road to Manning Drive
Scope Includes –New through lane at Bransford Road, a
roundabout at Riverwalk Drive, realignment of Bedford Road,
lowering of Glade Road at Bluebonnet to remove the stop signs
and a 10’ trail on the north side and 5’ sidewalk on the south side.
N
Phase 2 (Manning Drive to Pool Road)
Phase 2
Manning Drive to
Pool Road
Phase 2 (Manning Drive to Pool Road)
Glade Road from Manning Drive to
Pool Road, key components
include:
•Engineered drainage system
designed to accommodate a 100
year storm using concrete curbs
and gutters
•A center turn lane between
Behrens Road and Chelsea Drive
•Two lane section for the majority
of the section between Chelsea
Drive and Camelot Drive to
reduce right-of-way impacts
•Eastbound dedicated left turn
lane for Camelot Drive
•Center turnlane for the section
between Camelot Drive to
Montclair Drive
•Two lane section from Montclair
Drive to Jim Mitchell Trail West
•Westbound dedicated left turn
lane for Jim Mitchell Trail West
•Center turn lane between Jim
Mitchell Trail East and
Summerbrook Drive
•Eastbound dedicated left turn
lane for the Senior Center
•5’ sidewalk on the south side
•10’ trail on the north side
•Street lighting at intersections
Phase 2 (Design Parameters)
Design parameters to include the following:
•Roadway Section
•Two lane roadway with left turn lanes at:
•Continuous from Behrens Road to Chelsea Drive, Camelot Drive to Montclair Drive, Jim
Mitchell Trail East to Summerbrook Drive.
•Glade Road westbound left turn lanes; Jim Mitchell Trail West and East Cranbrook Drive
•Glade Road eastbound left turn lanes; Camelot Drive, Senior Center
•Pedestrian Improvements
•10 foot trail on the north side of the roadway
•If needed -reduce trail width, minimum of 6 foot, to limit the various
impacts (right-of-ways, trees, etc.)
•Consider constructing the trail adjacent to the back of curb to reduce the
possible various impacts (right-of-ways, trees, etc.)
•5 foot sidewalk on the south side of the roadway
•Lighting
•Street lighting will be included at the intersections
•Storm Drainage
•Curb and gutter storm drainage
•Utilize existing curb and gutter on south side of Glade Road (approximately
18%), where feasible
Phase 2 (Design Update)
•The design consultant will walk through
the design of Glade Road Phase 2
Phase 2 (Manning Drive to Pool Road)
Final design cost $576,224
Estimated construction cost $5,484,000*
Estimated right-of-way parcels 6
Estimated sidewalk easements 3
Estimated temporary construction easements 27
Estimated number of affected parcels 30
Estimated construction duration 16 Months
Manning Drive to Pool Road
Scope Includes -All new pavement with left turn lanes where
warranted and standard curb and gutters. A 10’ trail on the north
side and 5’ sidewalk on the south side.
*Based on preliminary design
N
Phase 3 (Pool Road to Heritage Avenue)
Phase 3
Pool Road to
Heritage Avenue
Phase 3 (Pool Road to Heritage Avenue)
Glade Road from Pool Road to
Heritage Avenue, key
components include:
•Addition of a westbound lane from Heritage Avenue
to Roberts Road
•Add a southbound right turn lane on Roberts Road
•5’ sidewalk on the south side
•10’ trail on the north side
•Street lighting at intersections
•Standard curb and gutter
Phase 3 (Design Parameters)
Design parameters to include the following:
•Roadway Section
•From Pool Road to Strathmore Terrace will be two lanes with raised, curbed medians and
left turn lanes
•From Roberts Road to Heritage Avenue, westbound lane to be added
•Intersection of Glade Road and Prestwick Drive/Roberts Road to be adjusted to increase
sight distances
•Left turn lanes at:
•Glade Road westbound; Green Oaks Drive and Melrose Park Drive
•Glade Road eastbound; Overhill Drive and Strathmore Terrace
•A southbound right turn lane to be added to Roberts Road
•Pedestrian Improvements
•10 foot trail on the north side of the roadway
•If needed -reduce trail width, minimum of 6 foot, to limit the various impacts
(right-of-ways, trees, etc.)
•5 foot sidewalk on the south side of the roadway
•Lighting
•Street lighting will be included at the intersections
•Storm Drainage
•Curb and gutter storm drainage
•Utilize existing curb and gutter on south side of Glade Road (approximately 90%), where
feasible
Phase 3 (Design Update)
•The design consultant will walk through
the design of Glade Road Phase 3
Pool Road to Heritage Avenue
Scope Includes -All new pavement with left turn lanes where
warranted and standard curb and gutters. A right turn lane on
Roberts Road and an additional westbound lane from Heritage
Avenue to Roberts Road. A 10’ trail on the north side and 5’ sidewalk
on the south side.
Phase 3 (Pool Road to Heritage Avenue)
*Based on preliminary design
Final design cost $431,778
Estimated construction cost $3,530,250*
Estimated right-of-way parcels 1
Estimated sidewalk easements 5
Estimated temporary construction easements 9
Estimated number of affected parcels 13
Estimated construction duration 14 Months
N
Phase 4 (Western City Limits to Bransford Road)
Phase 4
Western City
Limits to Bransford
Road
Phase 4 (Western City Limits to Bransford Road)
Glade Road from the western
city limits to Bransford Road,
key components include:
•Engineered drainage system
designed to accommodate a
100 year storm using concrete
curbs and gutters
•A center turn lane between
River Bend Drive and Bear
Creek Drive
•Westbound dedicated left turn
lane for Clear Fork Drive
•Eastbound dedicated left turn
lane for Rockrimmon Court
•Westbound dedicated left turn
lane for Mill View Drive
•Westbound dedicated left turn
lane for Mill Creek Drive
•5’ sidewalk on the south and a
10’ trail on the north side
•Street lighting at intersections
•Standard curb and gutter
Phase 4 (Design Parameters)
Design parameters to include the following:
•Roadway Section
•From western city limits to Bransford Road will be a two-lane roadway with left
turn lanes at:
•Continuous from River Bend Drive to Bear Creek Drive
•Glade Road west bound; Clear Fork Drive, Mill View Drive, Mill Creek Drive
•Glade Road east bound; Rockrimmon Court
•Pedestrian Improvements
•10 foot trail on the north side of the roadway
•If needed -reduce trail width, minimum of 6 foot, to limit the various impacts
(right-of-ways, trees, etc.)
•5 foot sidewalk on the south side of the roadway
•Lighting
•Street lighting will be included at the intersections
•Storm Drainage
•Curb and Gutter storm drainage
•Culvert replacement or modification between Clear Fork Drive and
Rockrimmon Court
•Utilize existing infrastructure, where feasible
•Coordination with the City of Hurst
Phase 4 (Design Update)
•The design consultant will walk through
the design of Glade Road Phase 4
Western City Limits to Bransford
Road
Scope Includes -All new pavement with left turn lanes
where warranted and standard curb and gutters. A 10’ trail on
the north side and 5’ sidewalk on the south side.
Phase 4 (Western City Limits to Bransford Road)
*Based on preliminary design
Final design cost $425,475
Estimated construction cost $4,737,000*
Estimated right-of-way parcels 2
Estimated sidewalk easements 2
Estimated temporary construction easements 25
Estimated number of affected parcels 26
Estimated construction duration 13 Months
Project Schedules
FY 2016
•Construction of Glade Road Phase 1 (Bransford Road to Manning Drive)
•Design of Glade Road Phase 2 (Manning Drive to Pool Road)
•Design of Glade Road Phase 3 (Pool Road to Heritage Avenue)
•Design of Glade Road Phase 4 (Western City Limits to Bransford Road)
FY 2017
•ROW Acquisition for Glade Road Phase 2 (Manning Drive to Pool Road)
•ROW Acquisition for Glade Road Phase 3 (Pool Road to Heritage Avenue)
FY 2018
•Construction of Glade Road Phase 2 (Manning Drive to Pool Road)
FY 2019
•Construction of Glade Road Phase 3 (Pool Road to Heritage Avenue)
FY 2022
•ROW Acquisition for Glade Road Phase 4 (Western City Limits to Bransford
Road)
FY 2023
•Construction of Glade Road Phase 4 (Western City Limits to Bransford Road)
Interim Maintenance
•Current Pavement Condition
–A mill and overlay maintenance project
for the asphalt sections of Glade Road
Phase 2 and 4 has been included in the
proposed 2017 –2021 CIP which would
allow for the interim maintenance to take
place in FY2017
•Maintenance over the past 10
Years
–2004 M&O Bluebonnet to Summerbrook Drive
–2005 M&O Bedford Road to Bluebonnet Drive
–2006 Reconstruction from Strathmore Terrace
to Heritage Avenue
–2008 M&O Bluebonnet Drive to Montclair Drive
–2009 M&O SH26 to Bransford Road
–2010 M&O Riverwalk Drive to Bluebonnet Drive
and Bill Simmons Road to Patterson Lane
N
Current Pavement Conditions
Questions and
Discussion
Glade Road
Phase 1 Update
Pre Council Meeting
April 19, 2016
April 19, 2016 Presentation
Outline of Presentation
Glade Road Phase 1 overview of the 90% design including:
–Estimated right-of-ways
–Estimated sidewalk easements
–Estimated drainage easements
–Estimated temporary construction easements
–Impacted trees along the project area
Update on the tree conservation and mitigation efforts
Update on construction contract strategies
Glade Road Phase 1 -Next Steps
April 19, 2016 Presentation
Phase 1
Bransford Road
to Manning Drive
N
Phases of Glade Road Corridor
Phase 4
Western City
Limits to Bransford
Road
Phase 2
Manning Drive to
Pool Road
Phase 3
Pool Road to
Heritage Avenue
April 19, 2016 Presentation
Phase 1
Bransford Road
to Manning Drive
N
Phases of Glade Road CorridorApril 19, 2016 Presentation
Phase 1 (Recent History)
October 20, 2015 Pre Council Meeting - 60% Plans were presented and
discussed
•City Council provided direction to find ways to minimize the various impacts of the project
•City staff and the design consultant have since evaluated the design and the associated impacts on a parcel by parcel
basis
•The roundabout at the intersection of Glade Road and Bransford Road was also a major discussion point
December 15, 2015 Pre Council Meeting
•Staff and the design consultant provided a follow-up presentation and discussion specifically on the Bransford Road
and Glade Road Intersection
•City Council provided clear direction to the design consultant to eliminate the roundabout from the scope of the Phase
1 for the following reasons:
•The less-than-ideal roundabout configuration
•Concerns associated with the rights-of-way needs
•The impacts to existing mature trees at the southwest corner
April 19, 2016 Presentation
Phase 1 (Summary Statistics)
60% Design 90% Design
Estimated right-of-way parcels
(Total Square Footage)
14
(29,000)
11
(19,800)
Estimated Sidewalk Easements
(Total Square Footage)
18
(14,900)
11
(10,000)
Estimated Drainage Easements
(Total Square Footage)
1
(575)
0
(0)
Estimated Temporary Construction Easements
(Total Square Footage)
48
(47,900)
29
(26,200)
Total Estimated Transactions 81 51
Affected Parcels 48 33
Comparison of Statistics from 60% to 90% design
April 19, 2016 Presentation
Phase 1 (Section 1A -60% Design)
Proposed R-O-W 2 Parcels Proposed drainage easements 0 Parcels
Proposed sidewalk easements 7 Parcels Temporary construction easements 7 Parcels
Total number of trees impacted 28
April 19, 2016 Presentation
Phase 1 (Section 1A –90% Design)
Proposed R-O-W 0 (2) Parcels Proposed drainage easements 0 (0) Parcels
Proposed sidewalk easements 8 (7)Parcels Temporary construction easements 4 (7) Parcels
Total number of trees impacted 24 (28)
April 19, 2016 Presentation
Phase 1 (Section 1B –60% Design)
Proposed R-O-W 0 Parcels Proposed drainage easements 0 Parcels
Proposed sidewalk easements 6 Parcels Temporary construction easements 6 Parcels
Total number of trees to be impacted 11
April 19, 2016 Presentation
Phase 1 (Section 1B –90% Design)
Proposed R-O-W 0 (0) Parcels Proposed drainage easements 0 (0) Parcels
Proposed sidewalk easements 3 (6)Parcels Temporary construction easements 5 (6) Parcels
Total number of trees impacted 0 (11)
April 19, 2016 Presentation
Phase 1 (Section 1C –60% Design)
Proposed R-O-W 2 Parcels Proposed drainage easements 0 Parcels
Proposed sidewalk easements 3 Parcels Temporary construction easements 6 Parcels
Total number of trees impacted 15
April 19, 2016 Presentation
Phase 1 (Section 1C –90% Design)
Proposed R-O-W 2 (2) Parcels Proposed drainage easements 0 (0) Parcels
Proposed sidewalk easements 0 (3)Parcels Temporary construction easements 5 (6) Parcels
Total number of trees impacted 6 (15)
April 19, 2016 Presentation
Phase 1 (Section 1D –60% Design)
Proposed R-O-W 7 Parcels Proposed drainage easements 0 Parcels
Proposed sidewalk easements 1 Parcels Temporary construction easements 15 Parcels
Total number of trees impacted 13
April 19, 2016 Presentation
Phase 1 (Section 1D -90% Design)
Proposed R-O-W 7 (7) Parcels Proposed drainage easements 0 (0) Parcels
Proposed sidewalk easements 0 (1)Parcels Temporary construction easements 6 (15) Parcels
Total number of trees impacted 10 (13)
April 19, 2016 Presentation
Phase 1 (Section 1E –60% Design)
Proposed R-O-W 3 Parcels Proposed drainage easements 1 Parcels
Proposed sidewalk easements 1 Parcels Temporary construction easements 14 Parcels
Total number of trees impacted 64
April 19, 2016 Presentation
Phase 1 (Section 1E –90% Design)
Proposed R-O-W 2 (3) Parcels Proposed drainage easements 0 (1) Parcels
Proposed sidewalk easements 0 (1)Parcels Temporary construction easements 9 (14) Parcels
Total number of trees impacted 57 (64)
April 19, 2016 Presentation
Phase 1 (Summary Statistics)
60% Design 90% Design
Estimated right-of-way parcels
(Total Square Footage)
14
(29,000)
11
(19,800)
Estimated Sidewalk Easements
(Total Square Footage)
18
(14,900)
11
(10,000)
Estimated Drainage Easements
(Total Square Footage)
1
(575)
0
(0)
Estimated Temporary Construction Easements
(Total Square Footage)
48
(47,900)
29
(26,200)
Total Estimated Transactions 81 51
Affected Parcels 48 33
Comparison of Statistics from 60% to 90% design
April 19, 2016 Presentation
Phase 1 (Summary Statistics)
Conceptual
Design 60% Design 90% Design
Design Costs $664,365 $664,365 $664,365
Estimated Rights-of-Way and Easement
Costs $925,000 $814,340*$480,820*
Estimated Construction Costs $3,755,000 $5,061,684 $4,467,631
Total $5,344,365 $6,540,389 $5,612,816
Comparison of Statistics
* August 2014, R-14-3772 -$449,000 spent to acquire 1209 Glade Road in its entirety. The value shown in the chart is the remaining parcels
estimated value
Notes: Costs have been adjusted for inflation and market conditions
Costs have been adjusted and refined as the engineering design progressed
Costs have been adjusted as needs for additional storm drainage, traffic control, and utility infrastructure have been identified
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Stages of Preservation
•Tree Inventory
•Identification of trees impacted by the project
•Alteration of design plans to lessen impact on trees
•Identifying trees that require protection measures
•Identification of trees requiring special protection measures
•Arboricultural practices to assist with tree health
•Tree replacement program for those impacted
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Protective Measure Process
•Identification of trees that impact our citizens directly
•Inspect trees and identify the trees with better survivability
•Implement additional protective measures during construction*
•Arboricultural practices that will improve conditions for impacted trees prior,
during, and after construction*
*If funding is allocated
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Additional Protective Measures*
•This adds an additional step to
protecting our trees.
•The temporary 6’ chain link fence is
installed around the tree, to
incorporate as much of the critical
root zone possible.
•This prevents damage to the roots
within the fenced area during
construction.
*If funding is allocated
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Additional Signage Multiple Languages
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Additional Protective Measure Options
•Heavy Mulching*
•Root Pruning*
•Protective Chain Link Fencing*
•Additional Signage*
•Aeration*
•Vertical Mulching*
•Organic Root Stimulators/Fertilizers*
*If funding is allocated
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Vertical Mulching Before Backfill
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Vertical Mulching Area Process Complete
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Aerating Typical Small Machine
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Aeration Pattern Airspace Created
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Airspade to Expose Roots Trenching to Expose Roots
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Large Root Pruner Proper Pruning Tools
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Pre-Construction Efforts
•Carefully install protective fencing
•Educate contractors on the importance of trees and proper protection
•Selective root pruning*
•Heavy mulching to reduce compaction during construction*
•Trim branches that will be impacted by construction equipment
•Educate citizens that will be impacted on the process and how to improve the
health of their trees before construction
*If funding is allocated
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
During Construction Efforts
•Monitor trees and construction activity
•Continue to inform contractor of tree importance
•Selective root pruning during excavation on specified trees*
•Trim branches in conflict with construction equipment
•Add heavy mulch to additional areas if necessary*
*If funding is allocated
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Post Construction Efforts (if necessary)
•Carefully remove protective fencing
•Thin/remove mulch*
•Aerate around the root zones*
•Vertical mulch around root zones*
•Organic fertilization*
•Educate citizens on what they can do to improve tree health
•Plant trees*
*If funding is allocated
April 19, 2016 Presentation
Phase 1 (Tree Conservation and Mitigation Efforts)
Tree Voucher Program*
•Offer tree vouchers for citizens impacted
•Establish the right tree, right place philosophy
•30 gallon trees will be planted on the property
•The tree will be the private property owner’s responsibility
•Educate citizens on proper tree maintenance
•This will re-establish the tree canopy along the corridor
*If funding is allocated
April 19, 2016 Presentation
Phase 1 (Construction Contract Strategies)
Best Value Contract
•Contract Experience
•Proposed Project Price
•Project Team Resume
•Schedule and Timelines
•Written description of the contractor’s strategies to keep the project on schedule
Incentives and Disincentives
Key Components
•Bluebonnet Drive and Glade Road Intersection (vertical adjustment)
•Riverwalk Drive and Glade Road Roundabout
April 19, 2016 Presentation
Phase 1 (Next Steps)
Right-of-way Acquisition
•A contract for professional services for the right-of-way acquisition will be presented for
City Council consideration on May 3rd
Utility Relocations
•Utility meetings are held monthly and the utility work will progress as the right-of-way is
acquired
•The City cannot control the schedules of the respective franchise utilities
Construction Bidding and Award
•Once right-of-way acquisition is complete and franchise utilities are clear the project can be
advertised for bid
•Construction is estimated to take approximately 13 months to complete once started
April 19, 2016 Presentation
Questions and
Discussion
April 19, 2016 Presentation
V
P
I
5
7
+
3
2
.
0
0
E
L
6
0
6
.
5
4
-1.63%
-0.63%
V
P
I
6
1
+
1
0
.
0
0
E
L
6
0
4
.
1
6
-0.63%+1.60%
VC = 280.00'
K = 126
E
L
6
0
5
.
0
4
V
P
C
5
9
+
7
0
.
0
0
E
L
6
0
6
.
4
0
V
P
T
6
2
+
5
0
.
0
0
E
L
6
0
6
.
5
0
S
T
A
6
2
+
5
6
.
5
0
M
A
T
C
H
E
X
I S
T
I N
G
E
N
D
C
O
N
C
R
E
T
E
P
A
V
I N
G
E
L
6
0
9
.
1
8
S
T
A
5
5
+
7
0
.
1
6
T
I E
T
O
E
X
I S
T
I N
G
B
E
G
I N
T
E
M
P
O
R
A
R
Y
A
S
P
H
A
L
T
P
A
V
I N
G
@ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
Y
I
E
L
D
Y
I
E L D
Y I E L D
55+00 60+00
65+00 70+00
75+00
80
+00
85+00
90+00
95+00 100+00 105+00 110+00 115+00 120+00
125+00
T
W
IRF
W
IRF
T
W
W
W
I
VLT
VLT
T
VLTVLT
I
I
I
I
I
G
G W
T
VLT
T
I
T
G
I
T
G
VLT
SS
T
T
W
WW
W
W
W
SD
WW
WW
WW
SD
WW
W
WW
SS
WW
WW
W
SD
SD
SD
W
W
W
W
W
W
WW
SS
WW
WW
W
W
SS
W
W
W
W
SS
SD
WW
WW
WW
WW
IRFIRF
SS
SS
W
W
VLVVLV
WW
SS
CO
WW
SS
SD
W
W
W
W
W
W
W
WW
W W
W
W
W
W
WW
W
W
WW
WW
WW
SS
W W
W
SS
W
W
WW
WW
WW
WW
W
W
W
SS
SS
W
SS
W
W
SS
W
W
WW
WW
WW
WW
W
W
WW
SD
WWW
SS
SS
W
SS
W
W
W
W
W W
W
W
SS
W
WW
W
W
W
W
WW W
SS
SD
WW
W
W
G G
G
T
G
II
T
G
G
VLTT
T
T
VLT
I
II
I
I
I
I
G
I
I
I
G
II
IWI
T FO
I
I
II
T
G
T
I
T
T
I
I
I
G
I
I
T
W
T
T
GG
III
I
T
I
I
I
I
I
T
T
T
T
G
III
T
VLT
VLT
T
II
I
I
I
VLT
VLT T
I
I
I I
T
II
I
I
T
I
I
I
TT
TV
I
I
I
I
I
I
I
I
I
G
II
G
G
G
G
VLT
CO
T
T
T
T
W
W
G
G
T
T
G
T
SS
G
II
T
G
G
VLTT
T
T
VLT
I
II
I
I
IRF
IRF
IRF
IRF
IRF
IRF
IPF
IRF
SS
SD
VLT
TT
W
W W
SD
SD
T
I
W
W
I
T
TVLT
SS
T
T
II
T
II
T
II
I
I
T
I
W
W I I
W
SD
SS
T
VLT
T
I
I
W
I
I
SD
W W
II
I
I
I
SD
W
I
I
I
I
I I
I
I
I
G
G
I
I
I
I
I
II
W
SS
T
W W
II
II
T
TT
IRF IRF
15668 620.12BLD
15672 619.40BLD
"X" CUT FND
"X" CUT FND
IRF
IRF
IRFIRF
IRF
15669 619.54BLD15670 619.53BLD
15671 619.76BLD
xx
x
x
xxxxxxxxxxx
x
x x
x
x x
x
x
x
x
x
x
x xxxx x xxx xxxxxxx
x
xxx xx
xx xx xx
xx x x x xxxxxxxxxxxxx
xx
xxx
x
x x x
xxx
x
x
x x
x
x
x
xx
xx
xxx
x
x
x
x
-0.50%-1.00%
V
P
I
9
8
+
2
0
.
0
0
E
L
6
1
7
.
4
5
-1.00%-2.50%
VC = 120.00'
K = 80
V
P
I
1
1
3
+
0
0
.
4
6
E
L
6
4
8
.
6
4
+6.95%-3
.43%
VC = 460.00'
K = 44
V
P
I
1
1
9
+
0
9
.
9
8
E
L
6
2
7
.
7
3
-3
.43%
-1.48%
VC = 250.00'
K = 128
V
P
I
1
2
1
+
3
5
.
0
0
E
L
6
2
4
.
4
0
-1.48%-0.50%
VC = 70.00'
K = 71
E
L
6
1
8
.
0
5
V
P
C
9
7
+
6
0
.
0
0
E
L
6
1
5
.
9
5
V
P
T
9
8
+
8
0
.
0
0
E
L
6
4
0
.
7
5
V
P
T
1
1
5
+
3
0
.
4
6
E
L
6
3
2
.
6
6
V
P
C
1
1
0
+
7
0
.
4
6
E
L
6
3
2
.
0
2
V
P
C
1
1
7
+
8
4
.
9
8
E
L
6
2
5
.
8
8
V
P
T
1
2
0
+
3
4
.
9
8
E
L
6
2
4
.
9
2
V
P
C
1
2
1
+
0
0
.
0
0
E
L
6
2
4
.
2
3
V
P
T
1
2
1
+
7
0
.
0
0
@ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
EXISTING GROUND
E
L
6
2
3
.
4
9
S
T
A
1
2
3
+
1
7
.
0
0
T
I E
T
O
E
X
I S
T
I N
G
E
N
D
T
E
M
P
O
R
A
R
Y
A
S
P
H
A
L
T
P
A
V
I N
G
EL 624.92
STA 121+00.00
BEGIN TEMPORARY ASPHALT PAVING
END FULL RECONSTRUCTION
R
W
A
L
K
-
S
E
T
U
R
N
P
R
O
F
I L
E
S
S
E
E
R
W
A
L
K
-
N
E
T
U
R
N
&
G
L
A
D
E
E
L
=
6
2
7
.
7
6
R
W
A
L
K
-
S
E
T
U
R
N
S
T
A
6
+
0
7
.
8
8
R
W
A
L
K
-
N
E
T
U
R
N
S
T
A
1
+
0
0
.
0
0
=
G
L
A
D
E
S
T
A
1
1
0
+
0
0
.
0
0
=
B
E
G
I N
A
S
P
H
A
L
T
P
A
V
I N
G
R
W
A
L
K
-
S
W
T
U
R
N
P
R
O
F
I L
E
S
S
E
E
R
W
A
L
K
-
N
W
T
U
R
N
&
G
L
A
D
E
E
L
=
6
0
8
.
5
8
R
W
A
L
K
-
S
W
T
U
R
N
S
T
A
1
+
0
0
.
0
0
R
W
A
L
K
-
N
W
T
U
R
N
S
T
A
4
+
9
8
.
4
5
=
G
L
A
D
E
S
T
A
1
0
1
+
7
5
.
0
0
=
B
E
G
I N
C
O
N
C
R
E
T
E
P
A
V
I N
G
E
N
D
A
S
P
H
A
L
T
P
A
V
I N
G
E
L
6
1
9
.
2
8
S
T
A
9
6
+
2
5
.
0
0
T
I E
T
O
E
X
I S
T
I N
G
B
E
G
I N
F
U
L
L
R
E
C
O
N
S
T
R
U
C
T
I O
N
E
L
6
1
9
.
1
5
V
P
I
9
6
+
5
0
.
0
0
@ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
EXISTING GROUND
6
1
9
.
1
5
6
1
8
.
6
5
6
1
8
.
1
5
6
1
7
.
5
5
6
1
6
.
6
4
6
1
5
.
4
5
6
1
4
.
2
0
6
1
2
.
9
5
6
1
1
.
7
0
6
1
0
.
4
5
6
0
9
.
2
0
6
2
7
.
7
6
6
3
1
.
2
3
6
3
4
.
6
1
6
3
7
.
4
7
6
3
9
.
7
7
6
4
1
.
5
0
6
4
2
.
6
6
6
4
3
.
2
7
6
4
3
.
3
1
6
4
2
.
7
8
6
4
1
.
6
9
6
4
0
.
0
8
6
3
8
.
3
7
6
3
6
.
6
5
6
3
4
.
9
4
6
3
3
.
2
2
6
3
1
.
5
2
6
2
9
.
9
6
6
2
8
.
5
9
6
2
7
.
4
2
6
2
6
.
4
5
6
2
5
.
6
6
6
2
4
.
9
2
6
2
4
.
3
6
6
2
4
.
0
8
6
2
3
.
8
3
6
2
3
.
5
8
5
9
7
.
2
2
5
9
7
.
8
7
5
9
8
.
4
3
5
9
9
.
6
9
6
0
1
.
3
2
6
0
3
.
4
0
6
0
6
.
3
9
6
0
9
.
3
7
6
1
2
.
1
0
6
1
4
.
4
3
6
1
6
.
5
6
6
1
8
.
0
3
6
1
8
.
4
8
6
1
8
.
9
2
6
1
9
.
2
9
6
1
9
.
0
7
6
1
8
.
6
0
6
1
8
.
3
2
6
1
7
.
9
3
6
1
7
.
2
2
6
1
6
.
0
8
6
1
4
.
9
2
6
1
3
.
7
8
6
1
2
.
6
3
6
1
1
.
3
7
6
0
9
.
9
6
6
0
8
.
6
9
6
0
7
.
7
9
6
0
7
.
1
1
6
0
6
.
6
3
6
0
6
.
5
6
6
0
6
.
8
7
6
0
7
.
5
0
6
0
8
.
2
3
6
0
9
.
5
7
6
1
1
.
1
5
6
1
2
.
8
0
6
1
4
.
8
6
6
1
7
.
1
9
6
1
9
.
6
9
6
2
2
.
3
7
6
2
4
.
8
6
6
2
7
.
9
3
6
3
1
.
4
1
6
3
5
.
0
2
6
3
8
.
6
9
6
4
2
.
0
3
6
4
5
.
5
0
6
4
7
.
2
2
6
4
7
.
1
1
6
4
6
.
0
1
6
4
4
.
4
4
6
4
2
.
7
6
6
4
1
.
0
2
6
3
9
.
4
0
6
3
8
.
0
0
6
3
6
.
6
1
6
3
4
.
9
8
6
3
3
.
2
4
6
3
1
.
5
3
6
3
0
.
2
4
6
2
9
.
1
1
6
2
8
.
2
1
6
2
7
.
1
9
6
2
6
.
2
2
6
2
5
.
4
2
6
2
4
.
9
6
6
2
4
.
5
2
6
2
3
.
8
2
6
2
2
.
9
3
6
2
2
.
2
5
6
2
1
.
3
9
6
2
0
.
8
6
6
2
0
.
5
4
6
0
6
.
4
2
6
0
6
.
1
1
6
0
5
.
7
9
6
0
5
.
4
8
6
0
5
.
1
6
6
0
4
.
8
8
6
0
4
.
7
9
6
0
4
.
8
9
6
0
5
.
1
9
6
0
5
.
7
0
6
0
6
.
4
0
6
0
7
.
6
8
6
0
7
.
2
0
6
0
6
.
9
4
6
0
6
.
6
2
6
0
6
.
3
4
6
0
5
.
9
9
6
0
5
.
6
1
6
0
5
.
5
5
6
0
5
.
7
1
6
0
5
.
6
2
6
0
6
.
4
4
6
0
7
.
3
4
6
0
8
.
4
3
6
0
9
.
3
4
6
1
0
.
2
5
6
1
1
.
3
0
6
1
2
.
3
9
6
1
3
.
4
6
6
1
4
.
5
3
6
1
5
.
3
6
6
1
5
.
7
8
6
1
6
.
1
5
6
1
6
.
0
9
6
1
5
.
6
3
6
1
4
.
9
0
6
1
4
.
3
4
6
1
3
.
9
2
6
1
3
.
6
5
6
1
3
.
4
8
6
1
3
.
7
1
6
1
3
.
9
6
6
1
4
.
4
0
6
1
5
.
0
0
6
1
5
.
8
4
6
1
6
.
8
3
6
1
8
.
0
7
6
1
9
.
0
3
6
1
9
.
9
1
6
2
0
.
5
4
6
2
0
.
6
2
6
2
0
.
2
9
6
1
9
.
4
0
6
1
8
.
3
0
6
1
7
.
5
1
6
1
6
.
9
3
6
1
7
.
1
0
6
1
6
.
9
9
6
1
5
.
8
7
6
1
4
.
1
4
6
1
1
.
8
0
6
0
8
.
9
2
6
0
6
.
0
9
6
0
3
.
3
5
6
0
0
.
9
8
5
9
9
.
2
2
5
9
8
.
2
6
5
9
7
.
5
9
605
610
615
620
625
630
635
640
645
650
655
660
600
605
610
615
620
625
630
635
640
645
650
655
660
55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 89+00 90+00 91+00 92+00 93+00 94+00 95+00 96+00 97+00 98+00 99+00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00
595
590
585
B
R
A
N
S
F
O
R
D
R
O
A
D
GLADE ROAD
GLADE ROAD
GLADE ROAD
GLADE ROAD GLADE ROAD
GLADE ROA D
S
H
A
D
O
W
O
O
D
T
R
A
I
L
S
H
A
D
O
W
O
O
D
R
O
A
D
SH 26
T
H
O
M
P
S
O
N
T
E
R
R
A
C
E
B
E
D
F
O
R
D
R
O
A
D
O
A
K
T
I
M
B
E
R
C
O
U
R
T
G
A
R
R
Y
L
Y
N
N
E
D
RI
V
E
C
A
R
M
E
L
D
R
I
V
E
B
L
U
E
B
O
N
N
E
T
R
O
A
D
S
T
A
F
F
O
R
D
D
R
I
V
E
M
A
N
N
I
N
G
D
R
I
V
E
R
O
S
E
S
T
R
E
E
T
R
I
V
E
R
W
A
L
K
D
R
I
V
E
B
E
H
R
E
N
S
R
O
A
D
50 1500100
SCALE FEET
HOR 1"=50'
PHASE 1 PHASE 2
PHASE 4 PHASE 1
SEE GRADING PLANS FOR ROUNDABOUT GRADING
PHASE 1 EXHIBIT
120+00
125+00
130+00 135+00 140+00
145+00
150+00 155+00 160+00
165+00
170+00
175+00
@ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
PROPOSED GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
@ ℄ GLADE
EXISTING GROUND
TEMPORARY PAVING
BEGIN PHASE I
RECONSTRUCTION
END PHASE I FULL
STA 121+00.00
TEMPORARY PAVING
END PHASE I
STA 123+17.00
@ ℄ GLADE
PROPOSED GROUND (PHASE I)
V
P
I
1
2
3
+
3
0
.
0
0
E
L
6
2
1
.
5
0
-1.49%-0.89%
V
P
I
1
2
5
+
0
0
.
0
0
E
L
6
1
9
.
9
8
-0.89%-1.41%
VC = 100.00'
K = 194 V
P
I
1
2
6
+
8
0
.
0
0
E
L
6
1
7
.
4
5
-1.41%-0.87%
VC = 100.00'
K = 186
V
P
I
1
2
8
+
0
0
.
0
0
E
L
6
1
6
.
4
0
-0.87%-1.15%
VC = 100.00'
K = 358
V
P
I
1
3
2
+
0
0
.
0
0
E
L
6
1
1
.
8
0
-1.15%
-2.62%
VC = 200.00'
K = 136
V
P
I
1
3
7
+
8
0
.
0
0
E
L
5
9
6
.
5
8
-2.62%-1.51%
VC = 100.00'
K = 90
V
P
I
1
4
2
+
8
5
.
0
0
E
L
5
8
8
.
9
5
-1.51%+4.11%
VC = 360.00'
K = 64
V
P
I
1
4
8
+
6
2
.
9
3
E
L
6
1
2
.
7
2
+4.11%+5.01%
VC = 100.00'
K = 112
V
P
I
1
5
3
+
3
5
.
0
0
E
L
6
3
6
.
3
5
+5.01%-1.70%
VC = 450.00'
K = 67 V
P
I
1
6
1
+
9
0
.
0
0
E
L
6
2
1
.
8
1
-1.70%-0.77%
VC = 100.00'
K = 107
V
P
I
1
6
4
+
3
5
.
0
0
E
L
6
1
9
.
9
3
-0.77%
-4
.
60%
VC = 170.00'
K = 44
V
P
I
1
6
9
+
2
5
.
0
0
E
L
5
9
7
.
3
7
-4
.
60%+2.86%
VC = 475.00'
K = 64
V
P
I
1
7
4
+
1
0
.
0
0
E
L
6
1
1
.
2
4
+2.86%-1.30%
VC = 180.00'
K = 43
E
L
6
2
0
.
4
3
V
P
C
1
2
4
+
5
0
.
0
0
E
L
6
1
9
.
2
8
V
P
T
1
2
5
+
5
0
.
0
0
E
L
6
1
6
.
8
4
V
P
C
1
2
7
+
5
0
.
0
0
E
L
6
1
5
.
8
2
V
P
T
1
2
8
+
5
0
.
0
0
E
L
6
1
7
.
0
1
V
P
T
1
2
7
+
3
0
.
0
0
E
L
6
1
8
.
1
5
V
P
C
1
2
6
+
3
0
.
0
0
E
L
6
1
2
.
9
5
V
P
C
1
3
1
+
0
0
.
0
0
E
L
6
0
9
.
1
8
V
P
T
1
3
3
+
0
0
.
0
0
E
L
5
9
5
.
8
2
V
P
T
1
3
8
+
3
0
.
0
0
E
L
5
9
7
.
8
9
V
P
C
1
3
7
+
3
0
.
0
0
E
L
5
9
1
.
6
7
V
P
C
1
4
1
+
0
5
.
0
0
E
L
5
9
6
.
3
5
V
P
T
1
4
4
+
6
5
.
0
0
E
L
6
1
0
.
6
6
V
P
C
1
4
8
+
1
2
.
9
3
E
L
6
1
5
.
2
2
V
P
T
1
4
9
+
1
2
.
9
3
E
L
6
2
5
.
0
9
V
P
C
1
5
1
+
1
0
.
0
0
E
L
6
3
2
.
5
2
V
P
T
1
5
5
+
6
0
.
0
0
E
L
6
2
2
.
6
6
V
P
C
1
6
1
+
4
0
.
0
0
E
L
6
2
1
.
4
2
V
P
T
1
6
2
+
4
0
.
0
0
E
L
6
2
0
.
5
8
V
P
C
1
6
3
+
5
0
.
0
0
E
L
6
1
6
.
0
2
V
P
T
1
6
5
+
2
0
.
0
0
E
L
6
0
8
.
3
0
V
P
C
1
6
6
+
8
7
.
5
0
E
L
6
0
4
.
1
6
V
P
T
1
7
1
+
6
2
.
5
0
E
L
6
0
8
.
6
7
V
P
C
1
7
3
+
2
0
.
0
0
E
L
6
1
0
.
0
7
V
P
T
1
7
5
+
0
0
.
0
0
E
L
6
2
4
.
9
2
S
T
A
1
2
1
+
0
0
M
A
T
C
H
E
X
I S
T
E
L
E
V
A
T
I
O
N
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
E
L
6
0
9
.
8
8
S
T
A
1
7
5
+
1
5
.
0
0
M
A
T
C
H
E
X
I S
T
E
L
E
V
A
T
I
O
N
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
0.00
TREE432
xx
x
xxx
x
x
x
xxxxxx
x
x x x x x xxx x x
xxx
x x xxxxx
xx
x x
x
xx
xx
x x
x
x
x
x
6
2
3
.
9
1
6
2
3
.
1
5
6
2
2
.
4
2
6
2
1
.
6
4
6
2
1
.
0
0
6
2
0
.
5
4
6
2
0
.
0
9
6
1
9
.
5
9
6
1
9
.
0
8
6
1
8
.
6
0
6
1
8
.
1
4
6
1
7
.
6
3
6
1
7
.
0
7
6
1
6
.
4
8
6
1
5
.
9
3
6
1
5
.
4
1
6
1
4
.
8
4
6
1
4
.
2
3
6
1
3
.
0
7
6
1
1
.
7
8
6
1
0
.
5
8
6
0
9
.
6
1
6
0
8
.
4
9
6
0
7
.
2
7
6
0
6
.
0
3
6
0
4
.
7
5
6
0
3
.
1
4
6
0
1
.
5
2
6
0
0
.
1
7
5
9
8
.
8
5
5
9
7
.
5
7
5
9
6
.
4
4
5
9
5
.
4
2
5
9
4
.
5
2
5
9
3
.
5
1
5
9
2
.
5
7
5
9
1
.
7
9
5
9
1
.
1
2
5
9
1
.
0
8
5
9
1
.
3
2
5
9
2
.
0
1
5
9
3
.
1
5
5
9
4
.
7
3
5
9
6
.
8
8
5
9
8
.
7
9
6
0
0
.
7
8
6
0
3
.
0
6
6
0
5
.
1
6
6
0
7
.
5
0
6
0
9
.
8
6
6
1
2
.
1
2
6
1
4
.
2
7
6
1
6
.
5
9
6
1
9
.
0
7
6
2
1
.
5
6
6
2
4
.
1
0
6
2
6
.
6
5
6
2
8
.
7
7
6
3
0
.
7
7
6
3
2
.
3
9
6
3
3
.
8
8
6
3
4
.
6
1
6
3
4
.
6
6
6
3
4
.
4
6
6
3
4
.
2
5
6
3
3
.
8
2
6
3
3
.
2
8
6
3
2
.
7
0
6
3
2
.
1
8
6
3
1
.
4
4
6
3
0
.
6
9
6
2
9
.
6
6
6
2
8
.
5
5
6
2
7
.
5
7
6
2
6
.
6
6
6
2
5
.
8
7
6
2
5
.
0
9
6
2
4
.
1
3
6
2
3
.
2
9
6
2
2
.
8
4
6
2
2
.
3
9
6
2
1
.
5
1
6
2
0
.
3
0
6
1
8
.
8
4
6
1
6
.
6
9
6
1
4
.
3
6
6
1
1
.
9
3
6
0
9
.
6
0
6
0
7
.
5
4
6
0
5
.
7
4
6
0
4
.
1
3
6
0
2
.
7
4
6
0
1
.
7
3
6
0
1
.
2
2
6
0
1
.
1
0
6
0
1
.
6
6
6
0
2
.
5
8
6
0
3
.
7
8
6
0
5
.
2
0
6
0
6
.
7
1
6
0
8
.
2
3
6
0
9
.
4
6
6
1
0
.
3
3
6
1
0
.
3
7
6
1
0
.
0
6
6
2
1
.
9
5
6
2
1
.
3
2
6
2
0
.
8
7
6
2
0
.
4
3
6
1
9
.
9
2
6
1
9
.
2
8
6
1
8
.
5
7
6
1
7
.
8
8
6
1
7
.
3
0
6
1
6
.
8
4
6
1
6
.
3
7
6
1
5
.
8
2
6
1
5
.
2
5
6
1
4
.
6
7
6
1
4
.
1
0
6
1
3
.
5
2
6
1
2
.
9
5
6
1
2
.
2
8
6
1
1
.
4
3
6
1
0
.
4
0
6
0
9
.
1
8
6
0
7
.
8
6
6
0
6
.
5
5
6
0
5
.
2
4
6
0
3
.
9
3
6
0
2
.
6
1
6
0
1
.
3
0
5
9
9
.
9
9
5
9
8
.
6
8
5
9
7
.
3
8
5
9
6
.
3
2
5
9
5
.
5
2
5
9
4
.
7
6
5
9
4
.
0
1
5
9
3
.
2
5
5
9
2
.
5
0
5
9
1
.
7
4
5
9
1
.
1
5
5
9
0
.
9
4
5
9
1
.
1
2
5
9
1
.
6
9
5
9
2
.
6
6
5
9
4
.
0
1
5
9
5
.
7
5
5
9
7
.
7
9
5
9
9
.
8
5
6
0
1
.
9
1
6
0
3
.
9
6
6
0
6
.
0
2
6
0
8
.
0
8
6
1
0
.
1
3
6
1
2
.
2
5
6
1
4
.
5
8
6
1
7
.
0
8
6
1
9
.
5
8
6
2
2
.
0
8
6
2
4
.
5
9
6
2
6
.
9
7
6
2
8
.
9
9
6
3
0
.
6
3
6
3
1
.
9
1
6
3
2
.
8
1
6
3
3
.
3
4
6
3
3
.
4
9
6
3
3
.
2
8
6
3
2
.
6
9
6
3
1
.
8
4
6
3
0
.
9
9
6
3
0
.
1
4
6
2
9
.
2
9
6
2
8
.
4
4
6
2
7
.
5
9
6
2
6
.
7
4
6
2
5
.
8
9
6
2
5
.
0
4
6
2
4
.
1
9
6
2
3
.
3
4
6
2
2
.
4
9
6
2
1
.
8
1
6
2
1
.
3
5
6
2
0
.
9
6
6
2
0
.
5
8
6
1
9
.
9
2
6
1
8
.
6
9
6
1
6
.
8
9
6
1
4
.
6
4
6
1
2
.
3
3
6
1
0
.
0
3
6
0
7
.
7
4
6
0
5
.
7
3
6
0
4
.
1
2
6
0
2
.
9
0
6
0
2
.
0
7
6
0
1
.
6
3
6
0
1
.
5
9
6
0
1
.
9
4
6
0
2
.
6
8
6
0
3
.
8
2
6
0
5
.
2
3
6
0
6
.
6
6
6
0
8
.
0
9
6
0
9
.
4
2
6
1
0
.
2
2
6
1
0
.
4
3
6
1
0
.
0
7
R
O
A
D
B
E
H
R
E
N
S
R
O
S
E
S
T
R
E
E
T
D
R
I
V
E
W
C
R
A
N
B
R
O
O
K
GLA DE ROA D
D
R
I
V
E
E
C
R
A
N
B
R
O
O
K
B
E
L
D
O
N
T
R
A
I
L
GLADE ROAD
D
R
I
V
E
S
U
M
M
E
R
B
R
O
O
K
T
R
A
I
L
E
J
I
M
M
I
T
C
H
E
L
L
T
R
A
I
L
W
J
I
M
M
I
T
C
H
E
L
L
L
A
N
E
P
A
T
T
E
R
S
O
N
R
O
A
D
B
I
L
L
S
I
M
M
O
N
S
D
R
I
V
E
M
O
N
T
C
L
A
I
R
D
R
I
V
E
C
A
M
E
L
O
T
D
R
I
V
E
C
H
E
L
S
E
A
C
O
U
R
T
B
E
H
R
E
N
S
GLA DE ROA D
GLADE ROAD GLADE ROAD
595
600
605
610
615
620
625
630
635
640
645
650
590
595
600
605
610
615
620
625
630
635
640
645
650
121+00 122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00 145+00 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00
585
50 1500100
SCALE FEET
HOR 1"=50'
PHASE 2
PHASE 1
PHASE 2 EXHIBIT
EXISTING ROW EXISTING ROW
6
0
8
.
1
2
6
0
6
.
1
0
6
0
5
.
0
4
6
0
5
.
0
2
6
0
5
.
3
8
6
0
6
.
4
6
6
0
6
.
3
5
6
0
5
.
3
7
6
0
4
.
3
4
6
0
3
.
1
2
6
0
1
.
8
6
6
0
0
.
3
1
5
9
8
.
4
4
5
9
5
.
7
3
5
9
2
.
2
3
5
8
8
.
6
7
5
8
4
.
8
9
5
8
1
.
2
0
5
7
8
.
1
3
5
7
5
.
3
6
5
7
2
.
2
5
5
6
9
.
9
0
5
6
7
.
7
2
5
6
5
.
5
4
5
6
4
.
5
1
5
6
4
.
0
4
5
6
5
.
6
7
5
6
8
.
1
6
5
7
1
.
8
3
5
7
5
.
7
5
5
8
0
.
5
8
5
8
4
.
9
2
5
8
9
.
1
6
5
9
1
.
6
4
5
9
2
.
9
0
5
9
2
.
4
3
5
9
0
.
5
3
5
8
9
.
0
2
5
8
6
.
3
0
5
8
3
.
9
6
5
8
3
.
5
6
5
8
2
.
0
3
5
8
2
.
2
8
5
8
3
.
9
8
5
8
4
.
0
4
5
8
4
.
6
3
5
8
5
.
5
8
5
8
6
.
8
1
5
8
6
.
8
9
5
8
7
.
3
4
5
8
6
.
0
4
5
8
4
.
8
2
5
8
3
.
9
1
5
8
2
.
5
4
5
8
1
.
7
9
5
8
0
.
5
4
6
0
6
.
3
2
6
0
5
.
3
4
6
0
5
.
4
9
6
0
5
.
8
6
6
0
6
.
2
2
6
0
6
.
5
3
6
0
5
.
7
4
6
0
4
.
5
6
6
0
3
.
2
4
6
0
1
.
8
9
6
0
0
.
5
5
5
9
8
.
3
0
5
9
5
.
9
9
5
9
2
.
5
8
5
8
8
.
8
8
5
8
5
.
2
2
5
8
1
.
4
7
5
7
8
.
1
8
5
7
5
.
3
0
5
7
2
.
4
3
5
7
0
.
1
6
5
6
8
.
2
2
5
6
6
.
3
5
5
6
4
.
9
6
5
6
4
.
8
1
5
6
6
.
1
9
5
6
8
.
8
2
5
7
2
.
4
3
5
7
6
.
6
4
5
8
1
.
0
7
5
8
4
.
9
4
5
8
8
.
7
8
5
9
1
.
3
3
5
9
2
.
3
4
6
0
7
.
3
5
6
0
6
.
3
0
6
0
5
.
2
2
6
0
5
.
3
9
6
0
5
.
7
8
6
0
6
.
1
6
6
0
6
.
5
1
6
0
5
.
7
0
6
0
4
.
5
0
6
0
3
.
2
0
6
0
1
.
8
6
6
0
0
.
4
6
5
9
8
.
2
9
5
9
6
.
0
0
5
9
2
.
5
6
5
8
8
.
8
7
5
8
5
.
2
0
5
8
1
.
4
3
5
6
7
.
9
4
5
6
6
.
2
7
5
6
4
.
8
5
5
6
4
.
5
5
5
6
6
.
0
9
5
6
8
.
8
0
5
7
2
.
4
0
5
7
6
.
6
2
5
8
1
.
0
6
6
0
7
.
5
3
6
0
6
.
4
6
6
0
5
.
3
5
6
0
5
.
5
1
6
0
5
.
8
9
6
0
6
.
2
7
6
0
6
.
6
2
6
0
5
.
8
1
6
0
4
.
6
1
6
0
3
.
3
0
6
0
1
.
9
7
6
0
0
.
5
7
5
9
8
.
3
9
5
9
6
.
1
1
5
9
2
.
6
7
5
8
8
.
9
8
5
8
5
.
3
0
5
8
1
.
5
4
5
6
4
.
9
5
5
6
4
.
6
5
5
6
6
.
2
0
5
6
8
.
9
0
5
7
2
.
5
1
5
7
6
.
7
2
5
8
1
.
1
6
5
6
8
.
0
4
5
6
6
.
3
7
V
P
I
3
0
1
+
2
8
.
9
6
E
L
6
0
7
.
2
3
-1.05%
6
0
7
.
4
9
V
P
I
3
0
1
+
7
0
.
8
7
E
L
6
0
6
.
5
3
-1.68%
-0.70%
V
P
I
3
0
2
+
2
0
.
8
8
E
L
6
0
6
.
1
8
V
P
I
3
0
2
+
9
0
.
0
7
E
L
6
0
5
.
0
8
-1.58%+0.37%
VC = 125.00'
K = 64
V
P
I
3
0
5
+
9
0
.
3
7
E
L
6
0
6
.
1
9
+0.37%+0.33%
V
P
I
3
0
7
+
1
6
.
1
9
E
L
6
0
6
.
6
1
+0.33%-0.96%
VC = 60.00'
K = 46
V
P
I
3
0
7
+
5
8
.
9
1
E
L
6
0
6
.
2
0
-1.12%
V
P
I
3
0
8
+
7
1
.
0
8
E
L
6
0
4
.
9
4
-1.12%-1.32%
V
P
I
3
0
9
+
9
4
.
3
8
E
L
6
0
3
.
3
1
-1.32%-1.35%
V
P
I
3
1
2
+
0
1
.
4
7
E
L
6
0
0
.
5
3
-1.35%-2.26%
V
P
I
3
1
4
+
3
0
.
9
3
E
L
5
9
5
.
3
3
-2.26%
-3
.98%
VC = 110.00'
K = 64
V
P
I
3
1
5
+
3
1
.
7
0
E
L
5
9
1
.
3
2
-3
.98%
-3
.58%V
P
I
3
1
6
+
5
8
.
1
3
E
L
5
8
6
.
8
0
-3
.58%
-3
.77%
V
P
I
3
1
7
+
9
3
.
5
0
E
L
5
8
1
.
6
9
-3
.77%
-3
.43%
V
P
I
3
1
8
+
7
4
.
8
9
E
L
5
7
8
.
9
0
-2.87%
V
P
I
3
2
1
+
3
5
.
3
7
E
L
5
7
1
.
4
1
-2.87%
-1.93%
V
P
I
3
2
3
+
8
5
.
5
6
E
L
5
6
6
.
5
7
-1.93%-1.51%
V
P
I
3
2
6
+
0
0
.
6
1
E
L
5
6
3
.
3
2
-1.51%+2.76%
VC = 280.00'
K = 66
V
P
I
3
2
8
+
3
9
.
5
4
E
L
5
6
9
.
9
1+2.76%+4.17%
VC = 100.00'
K = 71
V
P
I
3
2
9
+
3
4
.
4
1
E
L
5
7
3
.
8
6
+4.24%
V
P
I
3
2
9
+
9
9
.
7
0
E
L
5
7
6
.
6
3
+4.79%
V
P
I
3
3
0
+
2
9
.
7
1
E
L
5
7
8
.
0
7
+4.79%+4.47%
V
P
I
3
3
0
+
7
7
.
7
3
E
L
5
8
0
.
2
1
+3.87%
V
P
I
3
3
3
+
5
8
.
0
2
E
L
5
9
1
.
0
6
+3.87%+0.90%
VC = 150.00'
K = 51
5
9
2
.
7
6
V
P
C
3
0
2
+
2
7
.
5
7
E
L
6
0
6
.
0
7
V
P
T
3
0
3
+
5
2
.
5
7
E
L
6
0
5
.
3
1
V
P
C
3
0
6
+
8
6
.
1
9
E
L
6
0
6
.
5
1
V
P
T
3
0
7
+
4
6
.
1
9
E
L
6
0
6
.
3
2
V
P
C
3
1
3
+
7
5
.
9
3
E
L
5
9
6
.
5
8
V
P
T
3
1
4
+
8
5
.
9
3
E
L
5
9
3
.
1
4
V
P
C
3
2
4
+
6
0
.
6
1
E
L
5
6
5
.
4
4
V
P
T
3
2
7
+
4
0
.
6
1
E
L
5
6
7
.
1
8
V
P
C
3
2
7
+
8
9
.
5
4
E
L
5
6
8
.
5
3
V
P
T
3
2
8
+
8
9
.
5
4
E
L
5
7
1
.
9
9
V
P
C
3
3
2
+
8
3
.
0
2
E
L
5
8
8
.
1
6
V
P
T
3
3
4
+
3
3
.
0
2
E
L
5
9
1
.
7
3
x x
x xxxxxx
x x x
x
300+00 305+00 310+00 315+00 320+00
325+00 330+00
335+00 340+00 345+00 350+00 355+00
Glade Rd
Glade Rd Glade Rd
Glade Rd
J
a
c
k
s
o
n
R
d
P
o
o
l
R
d
G
r
e
e
n
O
a
k
s
D
r
O
v
e
r
h
i
l
l
D
r
M
e
l
r
o
s
e
P
a
r
k
D
r
S
p
r
i
n
g
C
t
M
a
r
t
i
n
P
k
w
y
℄ GLA ℄ GLA
EXISTING GROUND @ ℄ GLA
EXISTING GROUND @ ℄ GLA
PROPOSED GROUND @ ℄ GLA
PROPOSED GROUND @ ℄ GLA
EXIST RT-C&G EDGE PROJECTED 2.0% @ ℄ GLA
EXIST RT-C&G EDGE PROJECTED 2.5% @ ℄ GLAEXIST RT-C&G EDGE PROJECTED 2.5% @ ℄ GLA
EXIST RT-C&G EDGE PROJECTED 2.0% @ ℄ GLA
EXISTING GROUND @ ℄ GLA
PROPOSED GROUND @ ℄ GLA
EXISTING GROUND @ ℄ GLA
PROPOSED GROUND @ ℄ GLA
2.0% @ ℄ GLA
EXIST RT-C&G EDGE PROJECTED
2.0% @ ℄ GLA
EXIST RT-C&G EDGE PROJECTED
2.5% @ ℄ GLA
EXIST RT-C&G EDGE PROJECTED
2.5% @ ℄ GLA
EXIST RT-C&G EDGE PROJECTED
PROPOSED C&G RECONSTRUCTION
526.38'
EXIST C&G TO REMAIN
1145.99'
PROPOSED C&G RECONSTRUCTION
20.00'
EXIST C&G TO REMAIN
613.38'
PROPOSED C&G RECONSTRUCTION
374.65'
EXIST C&G TO REMAIN
324.74'
PROPOSED C&G RECONSTRUCTION
202.11'
PROPOSED RETAINING WALL
S
t
r
a
t
h
m
o
r
e
T
e
r
H
o
l
l
o
w
b
r
o
o
k
C
t
A
u
b
u
r
n
d
a
l
e
A
v
e
R
o
b
e
r
t
s
R
d
C
o
p
p
e
r
g
l
e
n
C
i
r
C
o
p
p
e
r
g
l
e
n
C
i
r
Glade Rd Glade Rd
50 1500100
SCALE FEET
HOR 1"=50'
EXISTING GROUND @ ℄ GLA
PROPOSED GROUND @ ℄ GLA
EXISTING GROUND @ ℄ GLA
540
550
560
570
580
590
600
610
620
630
640
301+00300+00 302+00 303+00 304+00 305+00 306+00 307+00 308+00 309+00 310+00 311+00 312+00 313+00 314+00 315+00 316+00 317+00 318+00 319+00 320+00 321+00 322+00 323+00 324+00 325+00 326+00 327+00 328+00 329+00 330+00 331+00 332+00 333+00 334+00 335+00 336+00 337+00 338+00 339+00 340+00 341+00 342+00 343+00 344+00 345+00 346+00 347+00 348+00 349+00 350+00 351+00 352+00 353+00 354+00 355+00 356+00
545
555
565
575
585
595
605
615
625
635
645
PROPOSED GROUND @ ℄ GLA
EXISTING GROUND @ ℄ GLAPHASE 3 EXHIBIT
V
P
I
1
3
+
0
2
.
1
7
E
L
6
0
5
.
2
9
+0.90%
+0.70%
6
0
5
.
0
3
V
P
I
1
4
+
5
9
.
5
8
E
L
6
0
6
.
3
9+0.70%+1.30%
V
P
I
1
8
+
8
3
.
2
4
E
L
6
1
1
.
9
0
+1.30%-0.50%
VC = 300.00'
K = 167
V
P
I
2
4
+
4
5
.
6
3
E
L
6
0
9
.
0
8
-0.50%-2.80%
VC = 160.00'
K = 70
V
P
I
2
7
+
2
2
.
2
5
E
L
6
0
1
.
3
4
-2.80%+0.90%
VC = 250.00'
K = 68
V
P
I
3
2
+
0
4
.
1
8
E
L
6
0
5
.
6
8
+0.90%+0.50%
V
P
I
3
5
+
1
3
.
8
0
E
L
6
0
7
.
2
2+0.50%+3.70%
VC = 300.00'
K = 94
V
P
I
3
9
+
2
0
.
3
7
E
L
6
2
2
.
2
7
+3.70%+0.60%
VC = 200.00'
K = 65
V
P
I
4
4
+
7
8
.
5
3
E
L
6
2
5
.
6
2
+0.60%
-4
.00%
VC = 250.00'
K = 54
V
P
I
4
8
+
5
1
.
0
5
E
L
6
1
0
.
7
2
-4
.00%+0.70%
VC = 320.00'
K = 68
V
P
I
5
2
+
7
3
.
3
2
E
L
6
1
3
.
6
7
+0.70%-1.70%
VC = 150.00'
K = 62
V
P
I
5
5
+
5
9
.
4
1
E
L
6
0
8
.
8
1
-1.70%-0.70%
VC = 100.00'
K = 100
V
P
C
1
7
+
3
3
.
2
4
E
L
6
0
9
.
9
5
V
P
T
2
0
+
3
3
.
2
4
E
L
6
1
1
.
1
5
V
P
C
2
3
+
6
5
.
6
3
E
L
6
0
9
.
4
8
V
P
T
2
5
+
2
5
.
6
3
E
L
6
0
6
.
8
4
V
P
C
2
5
+
9
7
.
2
5
E
L
6
0
4
.
8
4
V
P
T
2
8
+
4
7
.
2
5
E
L
6
0
2
.
4
6
V
P
C
3
3
+
6
3
.
8
0
E
L
6
0
6
.
4
7
V
P
T
3
6
+
6
3
.
8
0
E
L
6
1
2
.
7
7
V
P
C
3
8
+
2
0
.
3
7
E
L
6
1
8
.
5
7
V
P
T
4
0
+
2
0
.
3
7
E
L
6
2
2
.
8
7
V
P
C
4
3
+
5
3
.
5
3
E
L
6
2
4
.
8
7
V
P
T
4
6
+
0
3
.
5
3
E
L
6
2
0
.
6
2
V
P
C
4
6
+
9
1
.
0
5
E
L
6
1
7
.
1
2
V
P
T
5
0
+
1
1
.
0
5
E
L
6
1
1
.
8
4
V
P
C
5
1
+
9
8
.
3
2
E
L
6
1
3
.
1
5
V
P
T
5
3
+
4
8
.
3
2
E
L
6
1
2
.
4
0 V
P
C
5
5
+
0
9
.
4
1
E
L
6
0
9
.
6
6
V
P
T
5
6
+
0
9
.
4
1
E
L
6
0
8
.
4
6
15' ROW DEDICATION
OPEN SPACE & PEDESTRIA N ESMT
OPEN SPACE & PEDESTRIA N ESMT
x
x
xxxxxx
xx
x x
xx
x
xx
x
x
x
xxxxxxx
x
6
0
5
.
3
3
6
0
6
.
1
5
6
0
6
.
9
9
6
0
8
.
4
2
6
0
9
.
7
1
6
1
0
.
7
2
6
1
1
.
4
8
6
1
1
.
6
1
6
1
0
.
7
4
6
1
0
.
3
9
6
0
9
.
8
1
6
0
9
.
4
7
6
0
7
.
5
7
6
0
4
.
7
4
6
0
2
.
8
4
6
0
2
.
4
7
6
0
3
.
0
2
6
0
3
.
8
9
6
0
4
.
9
3
6
0
5
.
6
9
6
0
6
.
2
3
6
0
6
.
8
4
6
0
8
.
2
4
6
1
0
.
8
3
6
1
4
.
0
6
6
1
7
.
9
9
6
2
1
.
4
7
6
2
2
.
8
4
6
2
3
.
7
7
6
2
4
.
3
8
6
2
5
.
1
7
6
2
4
.
7
9
6
2
4
.
1
0
6
2
1
.
5
3
6
1
6
.
8
1
6
1
3
.
3
9
6
1
1
.
7
9
6
1
1
.
8
3
6
1
2
.
5
5
6
1
3
.
4
1
6
1
3
.
4
3
6
1
1
.
6
7
6
0
9
.
8
4
6
0
8
.
7
9
6
0
8
.
2
0
13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00
6
0
5
.
2
7
6
0
5
.
9
7
6
0
6
.
9
1
6
0
8
.
2
1
6
0
9
.
5
1
6
1
0
.
6
8
6
1
1
.
2
8
6
1
1
.
2
8
6
1
0
.
8
1
6
1
0
.
3
1
6
0
9
.
8
1
6
0
9
.
2
3
6
0
7
.
5
1
6
0
4
.
7
6
6
0
2
.
7
4
6
0
2
.
2
0
6
0
2
.
9
4
6
0
3
.
8
4
6
0
4
.
7
4
6
0
5
.
6
4
6
0
6
.
1
6
6
0
6
.
7
3
6
0
8
.
1
5
6
1
0
.
6
3
6
1
4
.
1
1
6
1
7
.
8
1
6
2
1
.
0
2
6
2
2
.
7
1
6
2
3
.
3
5
6
2
3
.
9
5
6
2
4
.
5
5
6
2
4
.
9
5
6
2
3
.
7
7
6
2
0
.
7
6
6
1
6
.
7
6
6
1
3
.
6
3
6
1
1
.
9
6
6
1
1
.
7
7
6
1
2
.
4
6
6
1
3
.
1
6
6
1
3
.
0
3
6
1
1
.
5
2
6
0
9
.
8
2
6
0
8
.
5
3
6
0
7
.
8
2
10+00 15+00 20+00
25+00
30+00
35+00
40+00
45+00 50+00 55+00
50 1500100
SCALE FEET
1"=50'
EXISTING GROUND @ ℄ GLA
EXISTING GROUND @ ℄ GLA
PROPOSED GROUND @ ℄ GLA
PROPOSED GROUND @ ℄ GLA
EXISTING GROUND @ ℄ GLA EXISTING GROUND @ ℄ GLA
G
L
A
D
E
C
R
E
E
K
D
R
GLA DE RD
B
E
A
R
C
R
E
E
K
D
R
R
O
C
K
R
I
M
M
O
N
C
T
GLA DE RD
GLA DE RD
PROPOSED GROUND @ ℄ GLA PROPOSED GROUND @ ℄ GLA
590
595
600
605
610
615
620
625
630
635
640
645
650
M
I
L
L
C
R
E
E
K
D
R
B
E
N
D
D
R
R
I
V
E
R
F
O
R
K
D
R
C
L
E
A
R M
I
L
L
V
I
E
W
D
R
F
R
Y
L
N
GLADE RD
PHASE 4 EXHIBIT
Reconstruction & Maintenance
Reconstruction
(31' wide)
Full Depth Reclamation
(24' wide)
4" Mill and Overlay
(24' wide)
2" Mill and Overlay
(24' wide)
New pavement surface
Stabilized base/subgrade --
Engineered road geometry
(vertical and horizontal curves)---
Intersection Improvements where needed ---
Turns lanes added where needed ---
Lane width per standards ---
Engineered drainage
(curbs, gutters, and underground storm pipes)---
Pedestrian elements
Estimated useful life
(if properly maintained, in years)50 Years 20 -30 Years 12 -15 Years +/-5 Years
Estimated initial construction cost per mile
(today's dollars)$3,637,000 $704,000 $422,000 $239,000
Total cost over 50-year life
(includes maintenance and a 5% annual inflation rate)$4,736,000 $3,691,000 $6,482,000 $9,510,000
All cost estimates as of July 2014