HomeMy WebLinkAboutCity Council Resolutions (RESOLUTION R-15-3940)-12/15/2015 RESOLUTION R-15-3940 A RESOLUTION APPROVING AN ENGINEERING SERVICES AGREEMENT WITH TRANSYSTEMS, INC., FOR THE DESIGN OF THE IMPROVEMENTS TO GLADE ROAD, INCLUDING PHASES 2, 3, AND 4, IN AN AMOUNT NOT TO EXCEED $1,440,939, AND AUTHORIZE THE CITY MANAGER TO EXECUTE THE AGREEMENT WHEREAS, on February 19, 2013, the Colleyville City Council approved Resolution R-13-3597, authorizing the city manager to negotiate an Engineering Services Agreement with TranSystems, Inc., to develop a preliminary design for improvements to.Glade Road from Heritage Avenue to the western city limits; and WHEREAS, on July 15, 2014, the Colleyville City Council approved Resolution R-14-3766 approving an agreement with TranSystems, Inc. for the final design of Glade Road Project, Phase 1, the section between Bransford Road and Manning Drive; and WHEREAS, the Colleyville City Council adopted Resolution R-15-3907 on September 15, 2015, which adopted the Five-Year Capital Improvement Program, which includes the design of Glade Road Phases 2, 3, and 4 in Fiscal Year 2016; and WHEREAS, the Colleyville City Council seeks to move forward with the design of Glade Road Phases 2, 3, and 4; and WHEREAS, the Colleyville City Council hereby determines the passage of this resolution is in the best interests of the health, safety, and welfare of the public; and WHEREAS, all legal prerequisites for the approval of this resolution have been met, including but not limited to the Open Meetings Act. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COLLEYVILLE, TEXAS: Sec. 1. THAT all matters stated above are found to be true and correct and are incorporated herein by reference as if copied in their entirety. Resolution R-15-3940 Page 2 of 2 Sec. 2. THAT the Colleyville City Council approves the Engineering Services Agreement with TranSystems, Inc., attached as Exhibit "A", for the design of the improvements to Glade Road, Phases 2, 3, and 4, in an amount not to exceed $1,440,939, and authorizes the city manager to execute the agreement. AND IT IS SO RESOLVED. APPROVED BY A VOTE OF (o AYES, I NAYS, AND D ABSTENTIONS ON THIS THE 15TH DAY OF DECEMBER 2015. - - ATTEST CITY OF COLLEYVILLE ��, �� sit talo i _=Arn elley, n C David Kelly City Secretary Mayor AGREEMENT BETWEEN THE CITY OF COLLEYVILLE,TEXAS and TRANSYSTEMS CORPORATION d/b/a TRANSYSTEMS CORPORATION CONSULTANTS FOR PROFESSIONAL SERVICES THIS AGREEMENT is made this day of , 2015, by and between the City of Colleyville,Texas, (hereafter referred to as"CITY"or"CLIENT")and TranSystems Corporation d/b/a TranSystems Corporation Consultants(hereafter referred to as"CONSULTANT"). Whereas CITY desires to have CONSULTANT perform certain services as follows: Perform Engineering Design Services for improvements to Glade Road Phases 2,3 and 4 as defined in Exhibit A. Whereas CITY desires to engage CONSULTANT to provided and perform certain professional services in connection with the Project and CONSULTANT desires to provide and perform said professional services, all on the terms and conditions set forth in this Agreement. NOW,THEREFORE, in consideration of the foregoing and their mutual covenants hereinafter set forth, CITY and CONSULTANT agree as follows: SECTION 1 BASIC SERVICES OF CONSULTANT Section 1.1 Basic Services. In connection with the Project,CONSULTANT shall provide for CLIENT the professional services and perform,furnish or obtain from others the work and services expressly described in, and referred to those set forth in Exhibit A, attached hereto and incorporated herein by reference(collectively the"Basic Services"). CONSULTANT shall provide the Basic Services for CLIENT in all phases of the Project to which this Agreement applies,all as more particularly set forth in Exhibit A. Section 1.2 CONSULTANT'S Duties. In addition to the general duties,obligations and responsibilities set forth elsewhere in this Agreement,the specific duties and responsibilities of CONSULTANT in performing the Basic Services under this Agreement are set forth in Exhibit A. In addition to the specific duties and responsibilities of CONSULTANT in performing the basic services under this Agreement as set forth in Exhibit A,the following specific provisions shall apply to CONSULTANT'S duties. SECTION 2 ADDITIONAL SERVICES OF CONSULTANT Section 2.1. Additional Services. In connection with the Project, CONSULTANT may be called on to perform, provide,furnish or obtain from others services or work which are not part of,or are in addition to,the Basic Services("Additional Services"). If authorized in writing by CITY and agreed to by CONSULTANT, CONSULTANT shall perform, provide,furnish or obtain from others the agreed upon Additional Services. CONSULTANT shall not be authorized to perform, provide,furnish or obtain any Additional Services without the prior written authorization of CITY. Except to the extent expressly provided otherwise in Exhibit A or as otherwise agreed to in writing by the parties hereto,compensation to CONSULTANT for Additional Services will be paid for by CITY as indicated in the written authorization,or if not indicated in the written authorization,then according to Section 5. Notwithstanding the foregoing,when required due to an emergency, in order to prevent additional costs from arising, CONSULTANT shall perform Additional Services in order to prevent additional costs or any harm to work already completed when needed only on an emergency basis. CITY shall be promptly informed of any such work as soon as possible, and such services shall only continue after CITY is informed and upon written authorization of CITY. Additional Services may be any service or work not included as part of the Basic Services and may include, but are not limited to, services or work in connection with environmental or funding assistance, investigations not specifically required herein,services resulting from changes in the scope, extent or character of the project providing renderings or computer models, services to develop alternate bids or sequencing of work, outside CONSULTANT services not specifically required herein, out-of-town travel, and preparing to serve or serving as a CONSULTANT or witness in any litigation, arbitration or other legal or administrative proceeding. "Basic Services" and "Additional Services" are sometimes collectively referred to herein as"Services". Section 2.2 Changes in the Services. Section 2.2.1 Agreed Upon Changes in the Services. It is the desire of the parties to keep changes in the Scope of Services at a minimum, but the parties recognize that such changes may become necessary and agree that CITY may initiate deletions, modifications or changes to the Services by advising CONSULTANT in writing of the change believed to be necessary. As soon thereafter as practicable, CONSULTANT shall prepare a cost estimate of the change and shall inform CITY of the adjustment in the compensation due CONSULTANT under Section 5 hereof("CONSULTANT'S Compensation")and/or the Completion Date set forth in Section 4 hereof, if any, applicable to such requested change. CLIENT shall then advise CONSULTANT in writing of its approval or disapproval of the change. If CITY approves the change, a written contract amendment shall be executed by both parties and CONSULTANT shall perform the Services as changed and the adjustment in CONSULTANT'S Compensation and/or the Completion Date set forth in the executed contract amendment shall become effective. CONSULTANT may initiate changes in the Services by advising CLIENT in writing that in its opinion a change is necessary. Changes can only be made in writing and must be signed by CITY. If a change is not approved, or if a written contract amendment is not executed, by both CITY and CONSULTANT, the change shall not become effective and CONSULTANT shall not be obligated to perform the change. Section 2.2.2 Constructive Changes and Other Additional Costs. In the event of (1) the CITY'S written addition to, modification or change of or deletion from the Services to be performed by CONSULTANT (other than additions, modifications, changes or deletions handled through the provisions of Section 2.1 or Section 2.2.1 above); (2) a request for or approval from CITY in writing, signed by CITY, of performance of Services in excess of CONSULTANT'S standard work day or work week or such shorter times as are provided by applicable collective bargaining agreements, or on a holiday customarily observed by CONSULTANT; (3) the discovery of any subsurface or other conditions, which differ materially from those shown in or reasonably inferable from the documents or other information on which this Agreement is based and/or those ordinarily encountered and generally recognized as inherent in the locality of the Project; (4) a modification of applicable law by which CONSULTANT is required to pay increased or additional taxes,government-regulated transportation costs, insurance or other amounts which are not required as of the date of this Agreement; (5) modification to or delay in furnishing design criteria or other information supplied by any person or entity,other than CONSULTANT,if CONSULTANT'S performance of the Services under this Agreement depends upon such criteria or information; and/or (6) any other increase in CONSULTANT'S costs, or the time required for completion of the Services due to"Force Majeure Event"as set forth in Section 4 hereof, or any other cause beyond CONSULTANT'S control,then the CONSULTANT'S Compensation and/or the Completion Date, if any, shall be equitably adjusted and CONSULTANT shall be paid, and CONSULTANT'S Compensation shall be adjusted by, an amount equal to the additional costs to CONSULTANT, as agreed upon by the CITY, resulting there from. SECTION 3 CLIENT'S RESPONSIBILITIES CITY shall perform the following unless agreed otherwise:: Section 3.1 City Representative. Designate a person to act as CITY'S representative with respect to the Services to be rendered under this Agreement. Such person shall have complete authority to transmit instructions, receive information,interpret,and define CITY'S policies and decisions with respect to CONSULTANT'S Services for the Project. Section 3.2 Project Information. Provide all criteria, all available information pertinent to the Project, and full information as to CITY'S requirements for the Project. Section 3.3 Notices. Give notice to CONSULTANT whenever CITY observes or otherwise becomes aware of any development that affects the scope or timing of CONSULTANT'S Services, or any defect or non-conformance in the Services by CONSULTANT (or its independent professional associates or CONSULTANTS) or in the work of any contractor or other party performing or providing work or services in connection with the Project. CITY shall have no duty to inform CONSULTANT of problems in CONSULTANT'S services or other work for which the CITY is entitled to rely upon CONSULTANT'S expertise. Section 3.4 Additional Services. When CITY deems it necessary or appropriate for Additional Services to be performed in connection with any phase of the Project, CITY shall furnish or direct CONSULTANT to provide, Additional Services as stipulated in Section 2 of this Agreement or other services as required. Section 3.5 Other Duties. Perform any other duties, obligations or responsibilities of the CITY set forth in this Agreement, such as the obligation to make the payments or perform any responsibilities and duties agreed to by the CITY and which are specifically identified on Exhibit B,if any. Section 3.6 Construction Management. If the CLIENT elects to employ a construction manager, the CLIENT will promptly notify CONSULTANT. SECTION 4 PERIODS OF SERVICE,COMPLETION DATE, FORCE MAJEURE Section 4.1 Period of Service. The provisions of this Section 4 and the various rates of compensation for CONSULTANT'S Services provided for elsewhere in this Agreement have been agreed to in anticipation of the orderly and continuous progress of the Project. CONSULTANT'S obligation to render Basic Services hereunder will extend during the period required for the Project including any Additional Services, extra or changed work and required extensions thereto. Section 4.2 Completion Date. It is estimated that the Basic Services will be completed on or about September 2016(the"Completion Date"). Section 4.3 Notice of Delay. If CONSULTANT becomes aware of delays due to time allowances for review and approval being exceeded, delay by the Contractor, the CITY, or any other cause beyond the control of CONSULTANT, which will result in the schedule for performance of CONSULTANT'S services not being met, CONSULTANT shall promptly notify the CITY. If the CITY becomes aware of any delays or other causes that will affect CONSULTANT'S schedule, the CITY shall promptly notify CONSULTANT. In either event, CONSULTANT'S schedule for performance of its services may be adjusted as agreed to in writing by CITY and CONSULTANT. Section 4.4 Force Majeure. For purposes hereof, a"Force Majeure Event"shall mean the occurrence of a failure or delay due to circumstances beyond CONSULTANT'S control including, acts of God, acts of a public enemy,fires,floods, earthquakes,wars, civil disturbances, sabotage, accidents, insurrection, blockages, embargoes, severe storms, explosions, catastrophes, epidemics, unavailable utilities and power, water, or other causes completely beyond CONSULTANT'S control. SECTION 5 CONSULTANT'S COMPENSATION Section 5.1 Compensation for Services and Expenses of CONSULTANT in connection with Basic Services Section 5.1.1 For Basic Services. As compensation for the performance of the Basic Services rendered by CONSULTANT under Section 1, CITY shall pay CONSULTANT a lump sum fee of $1,440,939.00. CONSULTANT shall submit monthly invoices for Basic Services. The statements will be based on CONSULTANT'S estimate of the portion of the total services actually completed at the time of billing. CITY shall review statements and shall make payments within 30 days of receipt of the statements. Section 5.2 Compensation for Services and Expenses of CONSULTANT in connection with Additional Services Section 5.2.1 For Additional Services. As compensation for the performance of the Additional Services rendered by CONSULTANT under Section 2, CLIENT shall pay CONSULTANT, in accordance with the provisions of Section 5.4,on basis of CONSULTANT'S Schedule of Rates and Expenses attached to this Agreement as Schedule 1, which shall remain in effect during the course of this Agreement. . "Reimbursable expenses" as agreed to by CITY and CONSULTANT shall be paid at cost. Section 5.3 Payments after Termination by City. In the event of termination by CITY under paragraph 7.1 upon the completion of any phase of the Basic Services, payments due CONSULTANT for all Services rendered and expenses incurred through such phase shall constitute total payment for such Basic Services. In the event of such termination by CLIENT during any phase of the Basic Services, CONSULTANT will be paid for Services rendered and expenses incurred during that phase through the date of termination on the basis of CONSULTANT'S Schedule of Rates and Expenses Section 5.4 Payments after Termination by CONSULTANT. In the event of termination by CONSULTANT under paragraph 7.1, CONSULTANT will be paid for Services rendered and expenses incurred, as agreed and approved by CITY, during that phase through the date of termination on a pro rata basis as set out in this Agreement. Section 5.5 Records. Records of CONSULTANTS salary costs pertinent to CONSULTANT'S compensation under this Agreement will be kept in accordance with generally accepted accounting practices. If CITY desires to have copies of such records,copies will be made available to CITY upon CITY'S request. SECTION 6 OPINIONS OF COST AND SCHEDULE Section 6.1 Opinions of Cost and Schedule. Since CONSULTANT has no control over the cost of labor, materials, equipment or services furnished by others, or over the resources provided by others to meet construction or other Project schedules, or over the methods of others in determining prices, or over competitive bidding or market conditions, CONSULTANT'S opinions of probable costs (including probable Total Project Costs and Construction Cost) and of Project schedules shall be made on the basis of CONSULTANT'S experience and qualifications and represent CONSULTANT'S best judgment as an experienced and qualified professional engineer, familiar with the construction industry; but CONSULTANT cannot and does not guarantee that proposals, bids or actual Project costs(including Total Project Costs or Construction Costs)will not vary from opinions of probable cost prepared by CONSULTANT or that actual schedules will not vary from the projected schedules prepared by CONSULTANT. SECTION 7 GENERAL CONSIDERATIONS • Section 7.1 Termination. The obligation to provide further services under this Agreement may be terminated by either party upon thirty(30) days written notice to the other party in the event of substantial failure by the other party to perform in accordance with the terms hereof through no fault of the terminating party. Section 7.2 Delivery of Electronic Files. In the event that CITY requests any electronic deliverables under this agreement, CONSULTANT and CLIENT shall execute a separate CADD agreement. Electronic files furnished by either party shall be subject to an acceptance period of sixty (60) days during which the receiving party agrees to perform appropriate acceptance tests. The party furnishing the electronic file shall correct any discrepancies or errors detected and reported within the acceptance period. After the acceptance period, the electronic files shall be deemed to be accepted and neither party shall have any obligation to correct errors or maintain electronic files. The CITY is aware that differences may exist between the electronic files delivered and the printed hard- copy construction documents. In the event of a conflict between the signed construction documents prepared by CONSULTANT and electronic files,the signed or sealed hard-copy construction documents shall govern. Section 7.3 Standard of Practice, Warranties. Services performed by the CONSULTANT under this Agreement will be conducted in a manner consistent with the level of care, diligence and skill ordinarily possessed and exercised by members of the profession currently practicing in the same locality under similar conditions Section 7.4 Limitation of Responsibility,Job Site Safety/Techniques. Neither the professional activities of CONSULTANT, nor the presence of CONSULTANT or its employees and sub-consultants at a construction/project site, shall relieve the General Contractor of its obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence, techniques or procedures necessary for performing, superintending and coordinating the Work in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. Section 7.5 Insurance. Section 7.5.1 CONSULTANT Insurance. CONSULTANT shall maintain throughout the duration of this Agreement insurance in the following amounts and will, upon request of the CITY furnish a copy of certification thereof: (a) Worker's Compensation and Employer's Liability Worker's Compensation Statutory Employer's Liability $500,000/$500,000/$500,000 (b) Comprehensive Automobile Liability $1,000,000 combined single limit Bodily Injury and Property Damage (c) Comprehensive General Liability $1,000,000- per occurrence $2,000,000- annual aggregate $2,000,000- product/completed operations per occurrence $1,000,000- personal injury/advertising liability (d) Umbrella/Excess Liability $1,000,000- per occurrence $1,000,000- annual aggregate (e) Professional Liability Insurance in an amount of $1,000,000 per claim and $2,000,000 annual aggregate. Section 7.6 Liability and Indemnification. Section 7.6.1 General. Having considered the potential liabilities that may exist during the performance of the Services,the benefits of the Project, and CONSULTANT'S Compensation for the performance of the Services, and in consideration of the promises contained in this Agreement, CITY and CONSULTANT agree to allocate and limit such liabilities in accordance with the provisions of this Section 7.7. Section 7.6.2 CONSULTANT Indemnification. CONSULTANT agrees, to the fullest extent permitted by law, to indemnify and hold the CLIENT harmless from any damage, liability or cost(including reasonable attorney's fees and costs of defense)to the extent caused by CONSULTANT'S negligent acts, errors or omissions in the performance of professional services under this Agreement and those of its sub-consultants or anyone for whom CONSULTANT is legally liable. Section 7.6.3 City Indemnification. The CITY is not obligated to indemnify CONSULTANT in any manner whatsoever. Section 7.6.4 Employee Claims. CONSULTANT shall indemnify CITY against any loss, damage,cost or expense arising out of claims by CONSULTANT'S employees. Section 7.6.5 Survival. The terms and conditions of this Section 7.7 shall survive the termination of this Agreement and/or the completion of the Services. Section 7.7 Use of Logo. CONSULTANT may only use CITY'S logo when express permission is granted, on a case by case basis. CITY will not grant any blanket or ongoing permission for use of CITY logo. SECTION 8 SPECIAL PROVISIONS,EXHIBITS AND SCHEDULES 1 Section 8.1 Special Provisions. This Agreement is subject to no special provisions. Section 8.2 Contract Documents. This Agreement consists of this contract document and the following Exhibits and Schedules,which are attached to and made a part of this Agreement: Exhibit A-Project Description and Basic Services Exhibit B-CITY's Duties, if any Schedule 1 -CONSULTANT'S Schedule of Rates and Expenses Section 8.3 Entire Agreement. This Agreement together with the Exhibits and Schedules identified above constitute the entire agreement between CITY and CONSULTANT and supersede all prior written or oral understandings. This Agreement and said Exhibits and Schedules may only be amended, supplemented, modified, or canceled by a duly executed written instrument. Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against either the CITY or CONSULTANT. CONSULTANT'S services under this Agreement are being performed solely for the CITY'S benefit, and no other party or entity shall have any claim against CONSULTANT because of this Agreement or the performance or nonperformance of services hereunder. The CITY and CONSULTANT agree to require a similar provision in all contracts with contractors, subcontractors, sub- consultants,vendors and other entities involved in this Project to carry out the intent of this provision. Section 8.4 Hazardous Materials. CONSULTANT shall report to CITY the presence and location of any hazardous material which it notices or which an engineer of similar skill and experience should have noticed. Section 8.5 Attorneys Fees. In the event that either party hereto employs an attorney to enforce any provision of this Agreement or to collect damages for default or breach of this Agreement, or pursue claims in litigation or arbitration, the prevailing party in any such action shall be entitled to recover from the other such attorneys'fees and costs of collection as the prevailing party may expend or incur with respect thereto. In the event that a settlement is reached between the parties before a final decision in any such litigation or arbitration, then neither party shall be entitled to recover its attorneys fees or costs from the other and neither party shall be responsible for the other party's attorney's fees or costs,unless otherwise agreed by the parties. Section 8.6 Disputes. In the event a dispute arises between CONSULTANT and CITY regarding the application or interpretation of any provision of this Agreement, or quality of Services by CONSULTANT, the aggrieved party shall promptly notify the other party to this Agreement of the dispute, but in no event more than 20 calendar days after such dispute arises. If the parties fail to resolve the dispute within 20 calendar days after receipt of such notice, each party shall, within five days thereafter, proceed to make application for non-binding mediation, and each party shall proceed to mediation pursuant to an agreed upon schedule with each party to bear its own costs and attorneys' fees (except as otherwise provided in Section 8,5 above) and the parties shall share equally in the cost of the mediator. In the event that the mediation is unsuccessful, the aggrieved party may elect to litigate its dispute with the other party. All disputes shall be governed by the laws of the State of Texas and the jurisdiction and venue for litigation between the parties shall be solely and exclusively in Tarrant County, Texas, or the nearest United States District Court. Section 8.7 Independent Contractor. CONSULTANT shall be an independent contractor with respect to the Services to be performed hereunder. Neither CONSULTANT, nor its independent professional associates, CONSULTANTS or subcontractors, nor the employees of any of the foregoing, shall be deemed to be the servants, employees or agents of CLIENT. Section 8.8 Assignment,Subcontractors.This Agreement shall not be assignable by either party without the prior written consent of the other party hereto. No assignment of this Agreement shall be valid until this Agreement shall have been assumed by the assignee. This Agreement shall be binding upon and shall inure to the benefit of the CONSULTANT'S and CITY's respective successors and assigns. Nothing in this Section 8.9 shall prevent or be deemed to prevent CONSULTANT from employing, contracting with or engaging independent professional associates, CONSULTANTS and other subcontractors to perform or assist in the performance of the Services. Section 8.9 Notices. All notices or communications pertaining to this Agreement shall be in writing and shall be sufficient when mailed or delivered to the address specified below: If to CLI ENT: Director of Public Works City of Colleyville 100 Main Street Colleyville,TX 76034 If to CONSULTANT: TranSystems Corporation d/b/a TranSystems Corporation Consultants Attn: Raul Pena III, PE, Senior Vice President 500 West 7th Street, Suite 1100 Fort Worth,TX 76102 • Nothing in this Section 8.10 shall be construed to restrict the transmission of routine communications between representatives of CLIENT and CONSULTANT. Section 8.10 Interpretation. (a) This Agreement shall be governed by and interpreted in accordance with the laws of Texas.. (b) Headings and titles of sections, paragraphs and other subparts of this Agreement are for convenience of reference only and shall not be considered in interpreting the text of this Agreement. Modifications or amendments to this Agreement must be in writing and executed by duly authorized representatives of each party. (c) Unless specifically stated to the contrary therein, indemnities against, releases from and limitations on liability expressed in this Agreement shall apply even in the event of the fault, negligence or strict liability of the party indemnified or released or whose liability is limited and shall extend to the officers, directors, employees, a e agents, licensors and related entities of such party. (d) In the event that any portion or all of this Agreement is held to be void or unenforceable, the parties agree to negotiate in good faith to reach an equitable agreement which shall effect the intent of the parties as set forth in this Agreement. IN WITNESS WHEREOF, the parties hereto have made and executed this Agreement as of the day of 2015. City of Colleyville,Texas TranSystems Corporation d/b/a TranSystems Corporation Consultants By: By: Jennifer Fadden Raul Pena, Ill,PE City Manager Senior Vice President ATTEST: By: Amy Shelley City Secretary • Approved as to form: By: Matthew C.G. Boyle City Attorney Exhibit A Scope of Services/Schedule Glade Road—Final Design December 10, 2015 PROJECT DESCRIPTION • Perform Phase 2 thru 4 final design services, right-of-way services, public engagement and public meeting for Glade Road. Phase 2 thru 4 limits are defined as, Phase 2— Manning Drive to Pool Road, Phase 3—Pool Road to Heritage Avenue and Phase 4—Western City Limits to Branford Road. The design will be based on "design parameters" accepted by the City Council and will generally include: Phase 2 - Manning Drive to Pool Road. • Roadway Section o From Manning Drive to Pool Road.will be two lanes (one in each direction) with left- turn lanes at the side streets listed below. o Roadway improvements will tie to the western leg of the Pool Road. roundabout. o The typical cross-section will include a 10-foot trail on the north side of Glade Road and a 5-foot sidewalk on the south side. • Left-turn lanes o Glade Road east and west bound (continuous) left-turn lanes; Behrens Road to Chelsea Drive, Camelot Drive to Montclair Drive and Mitchell Trail East to Summerbrook Drive o Glade Road west bound left-turn lanes;Jim Mitchell Trail West and East Cranbrook Drive o Glade Road eastbound left-turn lanes; Camelot Drive and for the Senior Center • Intersections o The existing Pool Road roundabout is to remain; no improvements are planned at this intersection. • Storm drainage o Storm drainage will consist of curb and gutter with enclosed storm drain,to reduce impacts to adjacent land owners. • Lighting o Street lighting will be included at the intersections Phase 3 - Pool Road to Heritage Avenue • Roadway Section o From Pool Road to Strathmore Terrace will be two lanes (one in each direction)with raised curbed medians and left-turn lanes. o Roadway improvements will tie to the eastern leg of the Pool Road. roundabout. o From Roberts Road to Heritage Avenue, the addition of a westbound lane,to extend the existing merge condition, will be evaluated and the benefit quantified and presented to the City for consideration and if deemed necessary will be included in the design. o The typical cross-section will include a I 0-foot trail on the north side of Glade Road and a 5-foot sidewalk on the south side. • Left-turn lanes o Glade Road west bound left-turn lanes; Green Oaks Drive and Melrose Park Drive. o Glade Road eastbound left-turn lanes; Overhill Drive and Strathmore Terrace. Page 1 of 8 • Intersections o The existing Pool Road roundabout is to remain; no improvements are planned at this intersection. o The evaluation of the improvements, right turn lane and median modifications, to the Roberts Road and Prestwick Drive Intersection will be performed and recommended improvements will be presented to the City and if deemed necessary will be incorporate into the final design. • Storm drainage o Storm drainage will consist of curb and gutter with enclosed storm drain, to reduce impacts to adjacent land owners. • Lighting o Street lighting will be included at the intersections Phase 4 -Western City Limits to Branford Road • Roadway Section o From the Western City Limits to Branford Road will be two lanes (one in each direction) with left-turn lanes at the side streets listed below. o Roadway improvements will tie to the western leg of the Branford Road. roundabout. o The typical cross-section will include a I 0-foot trail on the north side of Glade Road and a 5-foot sidewalk on the south side. • Left-turn lanes o Glade Road east and west bound (continuous) left-turn lanes; River Bend Drive to Bear Creek Drive. o Glade Road west bound left-turn lanes; Clear Fork Drive, Mill View Drive and Mill Creek Drive o Glade Road eastbound left-turn lanes; Rockrimmon Court. • Intersections o The existing Bransford Road roundabout, to be constructed with Phase I, is to remain; no improvements are planned at this intersection. • Storm drainage o Storm drainage will consist of curb and gutter with enclosed storm drain,to reduce impacts to adjacent land owners. o One (I) culvert will be extended or replaced • • Between Clear Fork Drive and Rockrimmon Court. • Lighting o Street lighting will be included at the intersections • Coordination o TranSystems will work with City staff to prepare exhibits and estimates for work in the project that will serve the City of Hurst. TranSystems will assist the City with coordination with the City of Hurst to determine if they will participate in the improvements. TASK DESCRIPTIONS 100. Project Management • Prepare monthly status report and invoice. • Maintain project schedule. Page2of8 • Design Team Meetings—Monthly progress meetings will be held with City staff and the TranSystems'team to review progress. These meetings will be held at City Hall. TranSystems will prepare the agenda and produce meeting minutes for each meeting. 8 meetings are assumed. • Perform QA/QC—independent review of plans and specification prior to each mile stone submittal. 200. Topographic Survey • Perform supplemental field surveys to determine location/elevation of key design features. o Culvert flowlines, adjacent lakes or ponds, and existing pavement at tie-in points (driveways and side streets), fences, sidewalks, and other visible improvements,tie visible utilities, tie obscured areas from aerial flight data. 300. Right-of-Way Survey • Research: Deed records, right-of way maps, plats and appraisal district tax records. • Prepare, mail and track right-of-entry(ROE) letters. • Locate additional property corners for proposed right-of-way acquisitions. • Set property corners for proposed right-of-way acquisitions. • Prepare deed sketch and boundary analysis for proposed right-of-way acquisitions. • Develop parcel maps and legal descriptions. • Perform QA/QC 400. General- Plans, Specifications and Estimates • Prepare title sheets. • Prepare project layout sheet showing overall project, project control and layout of plan and profile sheets. The following information shall be indicated for each control point identified (existing City Monument#8901, PK Nail, 5/8" Iron Rod); descriptive location, Northing, Easting and Elevation, in an identified coordinate system, and a referred bearing base and scale factor. Scale: I" =400' • Develop existing and proposed typical sections for Glade Road. and side streets. • Develop plan general notes for items not cover by the City's standard specifications. • Prepare quantity summary sheet to show overall project quantities by item and associated City standard specification or TxDOT standard specification. • , Prepare opinion of probable cost for milestone submittals and final packages • Assemble project manual and technical specifications. TxDOT standard specification will be used to supplement the City standard specifications. • Assemble City and TxDOT standard sheets applicable to project. 500. Traffic Control Plans • The traffic control plan will typically consist of two major phases with minor steps in each phase. In each phase Glade road will be reduced to one-way traffic with a detour for traffic in the opposite direction. Glade Road will be closed and detoured during construction in the area of Bluebonnet Drive. • Develop supplemental traffic control drawings as needed for review and approval by the City Engineer. These drawing would include plan view layoutsand typical sections. • Detour plans will be developed for each construction phase and the Bluebonnet Drive closing for review and approval by the City Engineer. • Provide a-written summary of the distinct phases to take place during construction operations to include road and/or lane closures, limited access to adjacent properties, driveway phasing and limited access to pedestrian and bicycle traffic. Page 3 of 8 600. Roadway Plans • Alignment and control data sheets. The following information will be included on these sheets station and coordinate data for all horizontal alignment elements such as P.C.'s, P.T.'s, P.I.'s and curves. • Removal sheets will show the location, limits and quantity of items being removed. • Roadway plan and profile sheets will show proposed horizontal roadway alignments, existing and proposed ROW, existing sidewalk to remain and proposed sidewalks, driveways, proposed lane dimensions and lane arrows, city owned and franchise utilities, and existing roadway vertical alignments (profiles). Alignment and station data for all horizontal alignment P.C.'s, P.T.'s, P.I.'s; station and elevation data of all proposed vertical profile P.C.'s, P.T.'s, P.I.'s, low points, and high points; lengths of vertical curves, grades, K values, e, and vertical clearances where required. Scale: I"=40' • Roadway design cross section will be provided at 50 foot intervals and critical locations determined during design. Cross sections will include existing ground, proposed improvements, roadway centerline, existing and proposed right-of-way, offsets and elevations to key points on each section. • Driveway Details will consist of a cross section at each driveway showing proposed slopes, offsets and elevations. Width and curb return radii will be shown on the roadway plan and profile in table form. • Miscellaneous details consist of special details not covered by City or TxDOT standard details. 700. Retaining Wall • Retaining Wall Layouts will show plan and profile of each wall with elevations for top of wall, top of sidewalk and bottom of wall. • Retaining Wall Details. The face of retaining walls will have a stone faux finish either by concrete form liner or stone veneer. • No retaining wall will be higher than 6' • Design of retaining walls is not included. Retaining walls will be City or TxDOT standard details. 800. Hydrologic and Hydraulic Analysis • Drainage area map with supporting runoff computations in tabular format. • Design enclosed storm drain systems and drainage swales. Analysis of connecting downstream drainage systems. • Storm drain layout sheets showing location and size of all inlets, manholes, junction boxes, culverts and piping to include storm drain profiles showing existing and proposed flow lines, flows, lengths and slopes of pipe, top of ground profile over pipe and connections to existing or proposed storm sewer systems. • Storm drain computations. • Analysis and design of one (I) proposed culverts. Size proposed culverts and determine alignment, length and upstream/downstream channel limits. Culvert located in FEMA Zone AE • Coordination with Local Floodplain Administrator is limited to providing existing and proposed analysis of culverts and design plans. No formal submittals to FEMA including FEMA documentation, coordination, models or exhibits are included. 900. Water and Sanitary Sewer Relocations and Adjustments • Prepare plan and profiles for 11,000 linear feet (5,700 PH2, 2,800 PH3 and 2,500 PH4) of water line relocation. Page 4 of 8 i - • Prepare plans for minor utility adjustments. This includes water valves and meters, fire hydrants, sanitary sewer cleanouts and manholes. 1000. Traffic Items • Illumination o Assist the City in the selection of desired lighting fixtures. o Assist the City in determining location of pedestal services and coordinating electrical service with the local power company. o Prepare illumination plans including voltage drop calculations and cable and conduit summaries • Prepare pavement marking plans in accordance with the latest version of the Texas Manual on Uniform Traffic Control Devices. • Prepare signing plans in accordance with the latest version of the Texas Manual on Uniform Traffic Control.Devices. 1100. Erosion Control • Prepare erosion control plans. The plans will show location and type of erosion control devices, tables for recording device maintenance, area being disturbed, existing and proposed direction of flow. • Erosion control notes outlining type and schedule of routine maintenance. • Select and apply appropriate standards. 1200. Franchise Utility Coordination • Prepare plans identifying potential conflicts with franchise utilities. • Prepare for and attend monthly utility coordination meetings. Twelve (12) meetings are assumed. 1300. Public Meeting • Prepare for and attend one(I) pre-construction public meeting for Phase 2 • Prepare for and attend one(I) pre-construction public meeting for Phase 3 • Prepare exhibits for public meeting • Attend Council workshops (Up to 3 per phase) • Prepare project phase renderings (Up to 9) 1400. Bid Phase Services • Bid Phase Services is for Phases 2 and 3. Phase 4 Bid Phase Services will not be included in this contract. • Prepare addenda as necessary. • Prepare for and attend Pre-bid meeting.Attend bid opening. • Prepare bid tabulation.Assist the City in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • Prepare conformed construction documents (plans and contract manual). 1500. Construction Phase Services • Construction Phase Services is for Phases 2 and 3. Phase 4 Construction Phase Services will not be included in this contract. • Attend preconstruction conference. • As requested by the City, provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. Page 5 of 8 • Respond to contractor Requests for Information (RFI). • • Review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction • Review contractor pay requests. 1600. Geotechnical Investigation—Subconsultant • The detailed geotechnical investigation will supplement the preliminary investigation performed during the preliminary engineering phase. The geotechnical investigation will provide pavement design for both asphalt pavement and concrete pavement. Recommendations will be given for slope stability and excavation requirements in the area of Bluebonnet Drive 1700. Level A Subsurface Utility Engineering(SUE)-Subconsultant • Level A SUE- Expose and locate utilities at specific locations,tie horizontal and vertical location of utility to survey control, provide utility size and configuration. • Up to 12 test holes. 7 in paved areas and 5 outside of paved areas General • Work with City Staff to assess the impacts to trees by reviewing/utilizing the City provided tree inventory data. Assumptions • Plan sheets will be 22"x34"full size and 11"x17" half size. • Drawings will be prepared'in MicroStation format. • City of Colleyville standard contract documents and technical specifications will be used. • Retaining walls are City standard combination sidewalk-retaining walls. No special design. • Does not include analysis of detention ponds or the design of detention. • Storm drain design assumes the either City or TxDOT standard inlets will be used. • Does not include modeling or formal submittals to FEMA for studied tributaries Little Bear I and Little Bear 2. • Does not include preparation of the contractors SWPPP. • Franchise utility coordination will be limited to identifying potential conflicts and a monthly meeting with franchise utility companies. Design of franchise utility relocations is not included. • Includes bid phase services for one bid package for both Phase 2 and 3. Phase 4 will not include bid phase services. Subsequent bid packages will require supplemental agreement. • Does not include arborilogical services or the assessment of tree(s) condition.. • Does not include landscaping design or plans. • Does not include irrigation design or plans. Schedule Milestones o 30% Plans o Franchise utility conflict plans o 60% Plans o 90% Plans o Final Plans Page 6 of 8 Project Design Parameters • Phase 2 - Design Parameters o Roadway Section • Two-lane roadway with left-turn lanes at: • Continuous from Behrens Road to Chelsea Drive, Camelot Drive to Montclair Drive,Jim Mitchell Trail East to Summerbrook Drive. • Glade Road west bound left-turn lanes;Jim Mitchell Trail West and East Cranbrook Drive • Glade Road east bound left-turn lanes; Camelot Drive, Senior Center o Pedestrian Improvements • 10 foot trail on the north side of the roadway • If needed - reduce trail width, minimum of 6 foot,to limit the various impacts (right-of-ways, trees, etc.) • Consider constructing the trail adjacent to the back of curb to reduce the possible various impacts (right-of-ways, trees, etc.) • 5 foot sidewalk on the south side of the roadway o Lighting • Street lighting will be included at the intersections o Storm Drainage • Curb and gutter storm drainage • Utilize existing curb and gutter on south side of Glade Road where feasible • Phase 3 - Design Parameters o Roadway Section • From Pool Road to Strathmore Terrace will be two lanes with raised curbed medians and left-turn lanes • From Roberts Road to Heritage Avenue, westbound lane to be evaluated and designed if deemed necessary. • Intersection of Glade Road and Prestwick Drive/Roberts Road to be evaluated to increase sight distances and intersection improvements designed if deemed necessary. • Left-turn lanes at: • Glade Road west bound left-turn lanes; Green Oaks Drive and Melrose Park Drive • Glade Road east bound left-turn lanes; Overhill Drive and Strathmore Terrace • A southbound right-turn lane to be added to Roberts Road o Pedestrian Improvements • 10 foot trail on the north side of the roadway • If needed - reduce trail width, minimum of 6 foot, to limit the various impacts (right-of-ways,trees, etc.) • 5 foot sidewalk on the south side of the roadway o Lighting • Street lighting will be included at the intersections o Storm Drainage • Curb and gutter storm drainage • Utilize existing curb and gutter on south side of Glade Road where feasible Page 7 of 8 • Phase 4 - Design Parameters o Roadway Section • From western City limits to Bransford Road will be two-lane roadway with left-turn lanes at: • Continuous from River Bend Drive to Bear Creek Drive • Glade Road west bound left-turn lanes; Clear Fork Drive, Mill View Drive, Mill Creek Drive • Glade Road east bound left-turn lanes; Rockrimmon Court o Pedestrian Improvements • 10 foot trail on the north side of the roadway • If needed - reduce trail width, minimum of 6 foot,to limit the various impacts (right-of-ways, trees, etc.) • 5 foot sidewalk on the south side of the roadway o Lighting • Street lighting will be included at the intersections o Storm Drainage • Curb and Gutter storm drainage • Culvert replacement or modification between Clear Fork Drive and Rockrimmon Court • Utilize existing infrastructure,where feasible o Coordination with the City of Hurst Page 8 of 8 — -;5- Schedule 1 _.- Titan444060_ TranSystems Corporation Schedule of Hourly Rates for 2015 Fort Worth Office . Classification ` PLC code Rate Classification PLC code Rate Principal/Engineer V PR&E5 $260 Three-Person Survey Crew 3M $202 Engineer IV E4 $215 Two-Person Survey Crew 2M $140 Civil Engineer V EC5 $260 • Industry Specialist V IS5 $280 Civil Engineer IV EC4 $215 Industry Specialist IV 1S4 $228 Civil Engineer III EC3 $185 Industry Specialist III IS3 $78 Civil Engineer II EC2 $145 Industry Specialist II 1S2 $74 Civil Engineer I EC1 $105 Industry Specialist' IS1 $54 Architect IV AR4 $192 Inspector V 15 $291 Architect III AR3 $130 Inspector IV 14 $116 Planner IV P4 $243 Inspector III 13 $102 Planner III P3 $140 Inspector II 12 $81 Planner II P2 $100 Inspector I 11 $62 Planner I P1 $81 Administrator Manager IV A4 $225 , Scientist IV SC4 $183 Administrator III A3 $157 Scientist III SC3 $116 Administrator II A2 $85 Scientist II SC2 _ $91 Administrator I Al $65 Scientist I SC1 $79 Clerical III C3 $79 Technician V T5 $148 Clerical II C2 $69 Technician IV T4 $96 Clerical I Cl $54 Technician III T3 $105 Technician II T2 $78 Technician I T1 $65 Information Systems Admin 3 AI3 $140 Surveyor V S5 $156 Marketing Administrator 2 AM2 $78 Surveyor IV S4 $150 Marketing Administrator 3 AM3 $135 Surveyor III S3 $135 Surveyor II S2 $90 Surveyor I S1 . $60 • Sub-contracted labor,material testing equipment,printing and technical photography,and all other direct job costs to be paid at cost. • Overtime paid to employees will be 1.5 times the rate shown in schedule. • Vehicle mileage to be paid at the current IRS rate per mile. • The rates set forth on this initial Schedule of Rates shall be the rates provisions in effect from the date of this Agreement until December 31,2015. TranSystems will revise the Schedule of Rates annually and will submit the revised Schedule of Rates which shall automatically become effective with regard to this Agreement and the Services performed under this Agreement on January 1st of the next calendar year. Rtsched u le.FW2015-Glad e EXHIBIT A Glade Road Final Design Fee Task Summary-Phase 2-4 City of Colleyville,Texas 12/10/2015 DESIGN SERVICES COSTS 100-Project Management $ 84,204.00 200-Topographic Survey(RAN Corners,Boundary Map,Supplemental Survey) $ 53,120.00 400-General Plans Specifications and Estimates $ 55,219.00 500-Traffic Control Plans $ 111,770.00 600-Roadway Plans $ 227,402.00 700-Retaining Walls $ 55,050.00 800-Hydrologic and Hydraulic Analysis $ 203,674.00 900-Water, Sanitary Sewer Relocation and Adjustments $ 70,638.00 1000-Traffic Items $ 77,576.00 1100-Erosion Control $ 33,726.00 1200-Franchise Utility Coordination $ 35,672.00 1600-Geotechnical Investigation $ 13,500.00 1700-Level A Subsurface Utility Engineering(Sue) $ 78,000.00 Design Services Total $ 1,099,551.00 RIGHT OF WAY SERVICES COSTS 300-Right-Of-Way Survey(Parcel Maps, Easement Descriptions,R/W Acquisition) $ 90,760.00 • (Cost based on 34 Parcels-ROW or Easement) Right of Way Services Total $ 90,760.00 PUBLIC COORDINATION/AWARENESS 1300-Public Coordination(Council,City, Exhibits, Meetings,etc) 1301 Public Meeting(Pre-Con)(Phase 2-3 Only) $ 24,158.00 1302 Public Meeting Exhibits(Pre-Con)(Phase 2-3 Only) $ 13,544.00 1303 Council Workshop Exhibits $ 27,774.00 1304 Council Workshops $ 10,350.00 1305 Renderings $ 45,840.00 Public Involvement Services Total $ 121,666.00 BID/CONSTRUCTION PHASE SERVICES 1400-Bid Phase Services(Phase 2-3 Only) $ 18,300.00 1500-Construction Phase Services(Phase 2-3 Only) $ 34,940.00 Construction Phase Services Total $ 53,240.00 Services Total $ 1,365,217.00 Owner Contingency(5%) $ 68,260.00 Expenses Total $7,462.00 TOTAL COST: $ 1,440,939.00 EXHIBIT A Glade Road Final Design—Phase 2(Manning Dr.to Pool Rd) City of Colleyville,Texas 12/10/2015 BASE ESTIMATE 100-PROJECT MANAGEMENT $ 28,068.00 200-TOPOGRAPHIC SURVEY $ 10,800.00 300-RIGHT-OF-WAY SURVEY $ 75,000.00 400-GENERAL PLANS SPECIFICATIONS AND ESTIMATES $ 19,184.00 500-TRAFFIC CONTROL PLANS $ 43,298.00 600-ROADWAY PLANS $ 88,942.00 700-RETAINING WALLS $ 18,350.00 800-HYDROLOGIC AND HYDRUALIC ANALYSIS $ 74,998.00 900-WATER,SANITARY SEWER RELOCATION AND ADJUE $ 30,758.00 1000-TRAFFIC ITEMS $ 25,328.00 1100-EROSION CONTROL $ 11,894.00 1200-FRANCHISE UTILITY COORDINATION $ 15,960.00 1300-PUBLIC MEETING $ 47,054.00 1400-BID PHASE SERVICES $ 9,150.00 1500-CONSTRUCTION PHASE SERVICES $ 19,500.00 Subtotal-TranSystems: $ 518,284.00 Expenses: Subconsultants: Terracon = $ 4,500.00 The Rios Group = $ 26,000.00 Subtotal-Subconsultants: $30,500.00 Other Expenses: Mileage: Surveyors 0 miles @ $ 0.56 = $ - Others 0 miles @ $ 0.56 = $ - Maps/Deed/Plats = $ Property Corners/Stakes and Field Supplies = $ - Printing(reports and intermediate reviews) = $ - Printing/boards/handouts/etc.(Public Involvement) _ $ - Misc.Expenses(Delivery Services,Overnight Mail,etc.) = $ - Subtotal-Other Expenses: $0.00 Owner Contingency(5%) $27,440.00 TOTAL COST: $576,224.00 . EXHIBIT A Glade Road Final Design—Phase 2(Manning Dr.to Pool Rd) City of Colleyville,Texas ESTIMATE OF HOURS AND FEE ESTIMATE 12/10/2015 E5 E4 E3 E2 El T4 S4 S3 S2 Survey Admin Totals Crew $260.00 $215.00 $185.00 $145.00 $105.00 $96.00 $150.00 $135.00 $90.00 $140.00 $65.00 100-PROJECT MANAGEMENT 101 Managing Team and Sub-Consultants 60 $ 12,900.00 102 Invoicing and Status Reports 32 $ 2,080.00 103 Design Team Meetings(8) 8 8 8 8 $ 4,488.00 104 QNQC 40 $ 8,600.00 Total Hours for TranSystems(100 Series) 0 108 0 8 8 8 0 0 0 0 32 $ 28,068.00 200-TOPOGRAPHIC SURVEY • 201 Supplemental Survey 4 20 60 $ 10,800.00 Total Hours for TranSystems(200 Series) 0 0 0 0 0 0 4 0 20 60 0 $ 10,800.00 300-RIGHT-OF-WAY SURVEY 301 Appraisal Dishtcttax records research 8 $ 720.00 302 Research deed records 16 $ 1,440.00 303 Prepare/mail ROE letters and track ROE 8 $ 720.00 304 Property Corner Parcel Ties 80 $ 11,200.00 305 Set Property Comers 64 $ 8,960.00 306 Deed Sketch 64 - $ 5,760.00 307 Boundary Analysis 8 80 $ 12,000.00 • 308 Parcel Map Drafting 120 $ 10,800.00 309 Legal Descriptions • 16 120 $ 18,600.00 310 QNQC 32 $ 4,800.00 Total Hours for TranSystems(300 Series) 0 0 0 0 0 0 56 200 .216 144 0 $ 75,000.00 400-GENERAL PLANS SPECIFICATIONS AND ESTIMATES 401 The Sheet 1 1 1 2. $ 657.00 402 Project Layout(2) 1 1 2 8 $ 1,338.00 403 Typical Sections(6) 1 2 4 12 $ 2,077.00 404 General Notes 1 1 4 2 $ 972.00 405 Summary Sheets(4) 1 7 10 2 $ 2,472.00 401 Quantities 1 12 20 $ 4,055.00 407 Opinion of Probable Cost 1 2 8 $ 1,345.00 408 Project Manual and Technical Specifications 4 2 8 - $ 1,990.00 409 Miscellaneous Details 1 4 16 $ 2031.00 410 Standard Detail Sheets 1 4 12 $ 1,947.00 Total Hours for TranSystems(400 Series) 0 13 0 36 57 54 0 0 0 0 0 $ 19,184.00 500-TRAFFIC CONTROL PLANS 501 Typical Sections(4) 2 4 8 24 $ 4,154.00 502 Phase Narratives(2) 2 12 24 8 $ 5,458.00 503 Phase Layouts(12)(2 Phases) 12 40 80 120 $ 28,300.00 504 Detour Layouts(4) 2 12 16 16 $ 5,386.00 Total Hours forTranSystems(500 Series) 0 18 0 68 128 168 0 0 0 0 0 $ 43,298.00 600-ROADWAY PLANS 601 A0gnment and Control data(2) 2 16 16 $ 4,286.00 602 Removal sheets.(12) 2 16 16 60 $ 10,190.00 603 Plans and profile sheets.(15) 12 30 80 110 $ 25,890.00 604 Cross sections at 25-foot intervals.(30) 2 40 42 110 $ 21,200.00 605 Intersection Design(15) 4 24 32 56 $. 13076.00 606 Roundabout Layout $ - 607 Driveway Design 4 24 40 60 $ 14,300.00 Total Hours for TranSystems(600 Series) 0 26 0 150 210 412 0 0 0 0 0 $ 88,942.00 700-RETAINING WALLS . 701 Retaining Wall Layouts 4 8 24 40 $ 8,380.00 702 Retaining Wall Details 4 8 12 20 $ 5,200.00 703 Standards 2 8 12 20 6 4,770.00 Total Hours for TranSystems(700 Series) 0 10 0 24 48 80 0 0. 0 0 0 $ 18,350.00 800-HYDROLOGIC AND HYDRUALIC ANALYSIS • 801 Drainage Area Map(7) 4 12 32 24 $ 8,264.00 802 Runoff Computations 4 16 32 16 $ 8,076.00 803 Storm Drain Plan and Profiles(15-Trunk,10-Lateral)) 16 80 120 120 - $ 39,160.00 804 Strom Drain Computations 16 30 80 8 $ 16,958.00 805 Box Culvert Plan and Profiles $ - 806 Coordination with FEMA flood plain coordinator(1-Zone X) 4 16 $ 2,540.00 Total Hours for TranSystems(800 Series) 0 44 0 138 280 168 0 0 0 0 0 $ 74,998.00 900-WATER,SANITARY SEWER RELOCATION AND ADJUSTMENTS 901 Water line plans(5700 LF)(8) 12 24 60 80 $ 20,040.00 902 Miscellaneous Adjustments 2 16 32 48 10,718.00 Total Hours for TranSystems(900 Series) 0 14 0 40 92 128 0 0 0 0 0 $ 30,758.00 1000-TRAFFIC ITEMS 1001 Illuminatioh Plans(7) 2 8 24 40 $ 7,950.00 1002 Photometrics Layout 2 40 $ 6,230.00 1003 Pavement marking plans(7) 2 8 16 24 $ 5,574.00 1004 Signing plans(7) 2 8 16 24 I I $ 5,574.00 EXHIBIT A • ' Glade Road Final Design—Phase 2(Manning Dr.to Pool Rd) City of Calieyville,Texas ESTIMATE OF HOURS AND FEE ESTIMATE 12/10/2015 05 E4 E3 E2 El T4 S4 S3 S2 Survey Admin Totals Crew $260.00 $215.00 $185.00 $145.00 $105.00 $96.00 $150.00 $135.00 $90.00 $140.00 $65.00 Total Hours for TranSystems(1000 Series) 0 8 0 64 56 88 0 0 0 0 0 $ 25,328.00 1100-EROSION CONTROL 1101 Eiosion control plan sheets(7) 2 8 24 40 $ 7,950.00 1102 Erosion control details 2 4 6 24 $ 3,944.00 Total Hours for TranSystems(1100 Series) 0 4 0 12 30 64 0 0 0 0 0 $ 11,894.00 1200-FRANCHISE UTILITY COORDINATION 1201 Utility Coomidation Plans(15) 4 16 32 40 $ 10,380.00 1202 Meetings with franchise utilities(6) 12 12 12 $ 5,580.00 Total Hours for TranSystems(1200 Series) 0 16 0 28 44 40 0 0 0 0 0 $ 15,960.00 1300-PUBLIC MEETING 1301 Public Meeting Preparation and Attendance(Pre-Construction) 22 16 28 24 $ 12,294.00 1302 Public Meeting Exhibits(Pre-Construction) 4 6 16 32 $ 6,772.00 1303 Council Workshop Exhibits 6 32 48 $ 9,258.00 1304 Council Workshops(3) 12 6 $ 3,450.00 1305 Renderings(3) 4 20 120 $ 15,280.00 Total Hours for TranSystems(1300 Series) 0 48 0 50 76. 224 0 0 0 0 0 $ 47,054.00 1400-BID PHASE SERVICES 1401 Pre-Bid Meeting 22 $ 640.00 1402 Pepare Addenda 4 8 16 $ 3,236.00 1403 Bid Tabulation and Recommendation 2 4 $ 850.00 1404 Construction documents(conformed plans) 4 12 24 $ 4,424.00 Total Hours for TranSystems(1400 Series) 0 12 0 0 26 40 0 0 0 0 0 $ 9,150.00 1500-CONSTRUCTION PHASE SERVICES - 1501 Attend preconsbuction conference. 2 2 $ 640.00 1502 Post Award Design and RFI's 2 16 40 40 $ 10,790.00 1503 Review Shop Drawing and Submittals 4 24 $ 3,380.00 1504 Review Pay Requests(12 months) 2 12 24 $ 4,690.00 Total Hours for TranSystems(1500 Series) 0 10 0 28 90 40 0 0 0 0 0 $ 19,500.00 1600-GEOTECHNICAL INVESTIGATION 1601 Geotechnical Investigation and Pavement Design(Subconsultant) $ 4,500.00 Total Subconsultant Fee(1600 Series) $ 4,500.00 1700-LEVEL A SUBSURFACE UTILITY ENGINEERING(SUE) 1701 Level A SUE(Subconsuftant) $ 26,000.00 Total Subconsuttam Fee(1700 Series) $ 26,000.00 Total Hours for TranSystems Corporation(Base): 0 331 0 646 1145 1514 60 200 236 204 32 I$ 548,784.00 • 0.0% 7.6% 0.0% 14.8% 26.2% 34.7% 1.4% 4.6% 5.4% 4.7% 0.7% 0.5% Design Services $ 423,784.00 . Right-of-way Services $ 75,000.00 Construction Services $ 19,500.00 Subconsultants $ 30,500.00 $ 548,784.00 • •i • EXHIBIT A Glade Road Final Design—Phase 3(Pool Rd to Heritage Ave) City of Colleyville,Texas 12/10/2015 BASE ESTIMATE 100-PROJECT MANAGEMENT $ 28,068.00 200-TOPOGRAPHIC SURVEY $ 10,800.00 300-RIGHT-OF-WAY SURVEY $ 19,200.00 400-GENERAL PLANS SPECIFICATIONS AND ESTIMATES $ 18,090.00 500-TRAFFIC CONTROL PLANS $ 34,446.00 600-ROADWAY PLANS $_ 66,058.00 700-RETAINING WALLS $ 18,350.00 800-HYDROLOGIC AND HYDRUALIC ANALYSIS $ 46,738.00 900-WATER,SANITARY SEWER RELOCATION AND ADJU; $ 19,940.00 1000-TRAFFIC ITEMS $ 26,544.00 1100-EROSION CONTROL $ 9,938.00 1200-FRANCHISE UTILITY COORDINATION $ 11,332.00 1300-PUBLIC MEETING $ 46,624.00 1400-BID PHASE SERVICES $ 9,150.00 1500-CONSTRUCTION PHASE SERVICES $ 15,440.00 Subtotal-TranSystems: $380,718.00 Expenses: Subconsultants: Terracon = $ 4,500.00 The Rios Group = $ 26,000.00 Subtotal-Subconsultants: $30,500.00 Other Expenses: Mileage: Surveyors 0 miles @ $ 0.56 = $ - Others 0 miles @ $ 0,56 = . $ - Maps/Deed/Plats = $ - Property Corners/Stakes and Field Supplies = $ - Printing(reports and intermediate reviews) _ $ - Printing/boards/handouts/etc.(Public Involvement) _ $ - Misc. Expenses(Delivery Services, Overnight Mail,etc.) = $ - Subtotal-Other Expenses: $0.00 Owner Contingency(5%) $20,560.00 TOTAL COST: $431,778.00 EXHIBIT A Glade Road Final Design—Phase 3(Pool Rd to Heritage Ave) ' City of Colleyville,Texas ESTIMATE OF HOURS AND FEE ESTIMATE 12/10/2015 E5 E4 E3 E2 El T4 S4 S3 S2 Survey Admin Totals Crew $260.00 $215.00 $185.00 $145.00 $105.00 $96.00 $150.00 $135.00 $90.00 $140.00 $65.00 100-PROJECT MANAGEMENT 101 Managing Team and Sub-Consultants 60 $ 12,900.00 102 Invoicing and Status Reports(8) 32 $ 2,080.00 103 Design Team Meetings(8) 8 8 8 8 $ 4,488.00 104 QNQC 40 $ 8,600.00 Total Hours for TranSystems(100 Series) 0 108 0 8 8 8 . 0• 0 0 0 32 $ 28,068.00 200-TOPOGRAPHIC SURVEY _ - 201 Supplemental Survey 4 20 60 $ 10,800.00 Total Hours for TranSystems(200 Series) 0 0 0 0 0 0 4 0 20 60 0 $ 10,800.00 300-RIGHT-OF-WAY SURVEY 301 Appraisal District tax records research 4 $ 360.00 302 Research deed records • 4 $ 360.00 303 Prepare/mail ROE letters and track ROE _ 4 $ 360.00 304 Property Comer Parcel Ties 20 $ 2,800.00 305 Set Property Corners 16 $ 2240.00 ' 306 Deed Sketch 16 $ 1,440.00 307 Boundary Analysis 2 24 $ 3,540.00 308 Parcel Map Drafting 28 $ 2,520.00 309 Legal Descriptions 4 28 • $ 4,380.00 310 QA/QC - 8 S 1,200.00 Total Hours for TranSystems(300 Series) 0 0 0 0 0 0 14 52 56 36 0 $ 19,200.00 400-GENERAL PLANS SPECIFICATIONS AND ESTIMATES 401 Title Sheet 1 1 1 2 $ 657.00 402 Project Layout(3) 1 1 2 8 $ 1,338.00 403 Typical Sections(4) 1 1 2 8 $ 1,338.00 404 General Notes 1 1 4 2 • $ 972.00 405 Summary Sheets(4) 1 4 10 2 $ 2,037.00 406 Quantities 1 12 20 $ 4,055.00 407 Opinion of Probable Cost 1 2 6 $ 1,135.00 408 Project Manual and Technical Specifications 4 4 8 $ 2,280.00 409 Miscellaneous Details 1 4 16 $ 2,331.00 ' 410 Standard Detail Sheets 1 4 12 $ 1,947.00 Total Hours for TranSystems(400 Series) 0 13 . 0 34 53 50 0 0 0 0 0 $ 18,090.00 500-TRAFFIC CONTROL PLANS 501 Typical Sections(2) 1 . 2 4 16. - $ 2,461.00 502 Phase Narratives(1) 1 12 4 $ 2,339.00 503 Phase Layouts(10)(2 Phases) 12 32 80 90 • $ 24,260.00 504 Detour Layouts(4) 2 12 16 16 - $ 5,386.00 Total Hours for TranSystems(500 Series) 0 16 0 58 100 126 0 0 0 0 • 0 $ 34,446.00 600-ROADWAY PLANS • • 601 Alignment and Control data(2) 2 4 12 24 $ 4,574.00 • 602 Removal sheets.(9) 2 12 12 48 ' - $ 8,038.00 • 603 Plans and profile sheets(11) 12. 20 52 78 $ 18,428.00 604 Cross sections at 25-foot intervals.(22) 2 12 40 90 $ 15,010.00 605 Intersection Design(9) 4 12 12 4B $ 8,468.00 606 Roundabout Layout 607 Driveway Design 4 24 32 40 $ 11,540.00 Total Hours for TranSystems(600 Series) 0 26 0 84 160 328 0 0 0 0 0 $ 66,058.00 700-RETAINING WALLS 701 Retaining Wall Layouts 4 8 24 . 40 $ 8,380.00 702 Retaining Wall Details 4 8 12 20 $ 5,200.00 703 Standards 2 8 12 20 $ 4,770.00 Total Hours for TranSystems(700 Series) 0 10 -0 24 48 80 0 0 0 0 0 3 18,350.00 800-HYDROLOGIC AND HYDRUALIC ANALYSIS 801 Drainage Area Map(4) 4 8 24 16 $ 6,076.00 802 Runoff Computations 4 12 24 8 $ 5,888.00 803 Storm Drain Plan and Profiles(8-Trunk,6-Lateral)) 8 24 48 110 $ 20,800.00 804 Strom Drain Computations 8 18 40 4 $ 8,914.00 805 Box Culvert Plan and Profiles $ - 806Coordination with FEMA flood plain coordinator(1-Zone AE) 4 40 $ 5,060.00 Total Hours for TranSystems(800 Series) 0 28 0 62 176 138 0 0 0 0 0 S 46,738.00 900-WATER,SANITARY SEWER RELOCATION AND ADJUSTMENTS • 901 Water fine plans(2800 LF)(4) 10 16 24 40 $ 10,830.00 902 Miscellaneous Adjustments 2 16 24 40 $ 9,110.00 Total Hours for TranSystems(900 Series) 0 12 0 32 48 80 0 0 ' 0 0 0 $ 19,940.00 1000-TRAFFIC ITEMS 1001 Illumination Plans(8) 2 8 32 40 3 8,790.00 1002 Photometrics Layout 2 40 $ 6,230.00 1003 Pavement malting plans(6) 2 4 16 32 $ 5,76200 1004 Signing plans(6) 2 4 16 32 $ 5,76200 • EXHIBIT A Glade Road Final Design—Phase 3(Pool Rd to Heritage Ave) City of Colleyville,Texas ESTIMATE OF HOURS AND FEE ESTIMATE 12/10/2015 • E5 E4 E3 E2 El T4 S4 S3 S2 Survey Admin Totals Crew $260.00 $215.00 $185.00 $145.00 $105.00 $96.00 $150.00 $135.00 $90.00 $140.00 $65.00 Total Hours for TranSystems(1000 Series) 0 8 0 56 64 104 0 0 0 0 0 $ 26,544.00 1100-EROSION CONTROL 1101 Erosion control plan sheets(6) 2 8 20 32 $ . 6,762.00 1102 Erosion control details 2 4 6 16 $ 3,176.00 • - Total Hours for TranSystems(1100 Series) 0 4 0 12 26 48 0 0 0 0 0 $ 9,938.00 1200-FRANCHISE UTILITY COORDINATION 1201 Utility Coomidation Plans(11) 4 8 24 32 $ 7,612.00 1202 Meetings with franchise utilities(4) 8 8 8 $ 3,720.00 Total Hours for TranSystems(1200 Series) 0 12 0 16 32 32 0 0 0 0 0 $ 11,332.00 1300-PUBLIC MEETING 1301 Public Meeting Preparation and Attendance(Pre-Construction) 20 16 28 24 $ 11,864.00 1302 Public Meeting Exhibits(Pre-Construction) 4 8 16 32 $ 6,772.00 1303 Council Workshop Exhibits 6 32 48 $ 9,258.00 1304 Council Workshops(3) 12 6 $ 3,450.00 1305 Renderings(3) 4 20 120 $ 15,280.00 Total Hours for TranSystems(1300 Series) 0 46 0 50 76 224 0 0 0 0 0 $ 46,624.00 1400-BID PHASE SERVICES 1401 Pre-Bid Meeting 2 2 • $ 640.00 1402 PepareAddenda 4 8 16 $ 3,236.00 1403 Bid Tabulation and Recommendation 2 4 $ 850.00 1404 Construction documents(conformed plans) 4 12 24 • $ 4,424.00 • Total Hours forTranSystems(1400 Series) 0 12 0 0 26 40 0 0 0 0 0 $ 9,150.00 1500-CONSTRUCTION PHASE SERVICES 1501 Attend preconsbuction conference. 2 2 • $ 640.00 1502 Post Award Design and RFI's 2 40 40 _ $ 8,470.00 1503 Review Shop Drawing and Submittals 4 - 24 $ 3,380.00 • 1504 Review Pay Requests(12 months) 2 24 $ 2,950.00 . • Total Hours for TranSystems(1500 Series) 0 10 0 0 90 40 0 0 0 0 0 $ 15,440.00 1600-GEOTECHNICAL INVESTIGATION 1601 Geotechnical Investigation and Pavement Design(Subconsultant) $ 4,500.00 Total Subconsultant Fee(1600 Series) S 4,500.00 • 1700-LEVEL A SUBSURFACE UTILITY ENGINEERING(SUE) 1701 Level ASUE(Subconsultant) . $ 26,000.00 • Total Subconsuttant Fee(1700 Series) $ 26,000.00 Total Hours forTranSystems Corporation(Base): 0 305 0 436 907 1298 18 52 76 96 32 I$ 411,218.00 0.0% 9.5% 0.0% 13.5% 28.2% 40.3% 0.6% 1.6% 2.4% 3.0% 1.0% 0.5% Design Services $ 346,078.00 Right-of-way Services $ 19,200.00 Construction Services $ 15,440.00 Subconsultant $ 30,500.00 $ 411,218.00 EXHIBIT A Glade Road Final Design—Phase 4(Western City Limits to Bransford Rd) City of Colleyville,Texas 12/10/2015 BASE ESTIMATE 100-PROJECT MANAGEMENT $ 28,068.00 20.0-TOPOGRAPHIC SURVEY $ 10,800.00 300-RIGHT-OF-WAY SURVEY $ 17,280.00 400-GENERAL PLANS SPECIFICATIONS AND ESTIMATES $ 17,945.00 500-TRAFFIC CONTROL PLANS .$ 34,026.00 600-ROADWAY PLANS $ 72,402.00 700-RETAINING WALLS $ 18,350.00 800-HYDROLOGIC AND HYDRUALIC ANALYSIS $ 81,938.00 900-WATER,SANITARY SEWER RELOCATION AND ADJUf $ 19,940.00 1000-TRAFFIC ITEMS $ 25,704.00 1100-EROSION CONTROL $ 11,894.00 1200-FRANCHISE UTILITY COORDINATION $ 8,380.00 1300-PUBLIC MEETING $ 27,988.00 1400-BID PHASE SERVICES $ - 1500-CONSTRUCTION PHASE SERVICES $ - Subtotal-TranSystems: $374,715.00 Expenses: Subconsultants; Terracon = $ 4,500.00 The Rios Group = $ 26,000.00 Subtotal-Subconsultants: $30,500.00 Other Expenses: Mileage: Surveyors 0 miles @ $ 0.56 = $ - Others 0 miles @ $ 0.56 = $ - Maps/Deed/Plats = $ - Property Corners/Stakes and Field Supplies = $ - Printing(reports and intermediate reviews) _ $ - Printing/boards/handouts/etc.(Public Involvement) = $ - Misc.Expenses(Delivery Services,Overnight Mail,etc.) = $ - Subtotal-Other Expenses: $0.00 Owner Contingency(5%) $20,260.00 TOTAL COST: $425,475.00 EXHIBIT A Glade Road Final Design—Phase 4(Western City Limits to Bransford Rd) City of Colleyville,Texas ESTIMATE OF HOURS AND FEE ESTIMATE 12/10/2015 E5 E4 E3 E2 E1 T4 S4 S3 82 Survey Admin Crew Totals $260.00 $215.00 $185.00 $145.00 $105.00 $96.00 $150.00 $135.00 $90.00 $140.00 $65.00 100-PROJECT MANAGEMENT 101 Managing Team and Sub-Consultants 60 - _ $ 12,900.00 102 Invoicing and Status Reports(8) 32 $ 2080.00 103 Design Team Meetings(8) 8 8 8 8 $ 4,48840 104 QNQC 40 - $ 8,600.00 Total Hours for TranSystems(100 Series) 0 108 0 8 8 8 0 0 0 0 32 $ 28,068.00 200-TOPOGRAPHIC SURVEY . 201 Supplemental Survey 4 20 60 $ 10,800.00 Total Hours for TranSystems(200 Series) 0 0 0 0 0 0 4 0 20 60 .: 0 $ 10,800.00 300-RIGHT-OF-WAY SURVEY 301 Appraisal District tax records research 4 $ 360.00 302 Research deed records 4 $ 360.00 303 Prepare/mail ROE letters and track ROE 4 $ 360.00 304 Property Comer Parcel Ties 12 $ 1,680.00 305 Set Property Comers12 $ 1,680.00 306 Deed Sketch 8 ' $ 720.00 307 Boundary Analysis - 4 24 $ 3,840.00 308 Parcel Map Drafting 24 $ 2,160.00 309 Legal Descriptions 4 32 $ 4,920.00 310 QA/QC 8 $ 1,200.00 Total Hours for TranSystems(300 Series) 0 0 0 0 0 0 16 56 44 24 0 $ 17,280.00 400-GENERAL PLANS SPECIFICATIONS AND ESTIMATES 401 Title Sheet 1 1 1 2 $ 657.00 402 Project Layout(2) 1 1 2 8 $ 1,338.00 403 Typical Sections(4) 1 1 2 8 $ 1,338.00 404 General Notes 1 1 4 2 $ 972.00 405 Summary Sheets(4) 1 3 10 2 $ 1,892.00 406 Quantities 1 12 20 $ 4,055.00 407 Opinion of Probable Cost 1 2 6 $ 1,135.00 408 Project Manual and Technical Specifications 4 4 8 $ 2,280.00 409 Miscellaneous Details 1 4 16 $ 2,331.00 410 Standard Detail Sheets 1 4 12 $ 1,947.00 Total Hours for TranSystems(400 Series) 0 13 0 33 53 50 0 0 0 0 0 S 17,945.00 500-TRAFFIC CONTROL PLANS 501 Typical Sections(2) 1 2 4 16 $ 2,461.00 502 Phase Narratives(1) 1 12 - 4 $ 2,339.00 503 Phase Layouts(10)(2 Phases) 12 32 80 90 $ 24,260.00 504 Detour Layouts(4) 2 12 12 16 $ 4,966.00 Total Hours for TranSystems(500 Series) 0 16 0 58 96 126 0 0 0 0 • 0 $ 34,026.00 • 600-ROADWAY PLANS 601 Alignment and Control data(2) 2 4 12 24 $ 4,574.00 602 Removal sheets.(10) 2 16 16 48 $ 9,038.00 - 603 Plans and profile sheets.(13) 12 _ 32 60 90 $ 22,160.00 604 Cross sections at 25-foot intervals.(25) 2 16 48 100 $ 17,390.00 605 Intersection Design(8) 4 12 12 40 $ 7,700.00 606 Roundabout Layout - 607 Driveway Design 4 24 32 40 $ 11,540.00 Total Hours for TranSystems(600 Series) 0 26 0 104 180 342 0 0 0 0 0 $ 72,402.00 ' 700-RETAINING WALLS 701 Retaining Wall Layouts 4 8 24 40 $ 8,380.00 702 Retaining Wall Details 4 8 12 20 $ 5,200.00 703 Standards 2 8 12 20 - $ 4,770.00 Total Hours for TranSystems(700 Series) 0 10 0 24 48 80 0 0 - 0 0 0 $ 18,350.00 800-HYDROLOGIC AND HYDRUALIC ANALYSIS 801 Drainage Area Map(6) 4 12 32 20 $ 7,880.00 802 Runoff Computations 8 8 32 16 $ 7,776.00 803 Storm Drain Plan and Profiles(13-Trunk,8-Lateral) 6 80 88 100- $ 31,730.00 804 Strom Drain Computations 8 24 40 8 $ 10,168.00 805 Box Cu Nert Plan and Profiles(1)(Zone AE) 4 16 24 $ 5,484.00 006 Coordination with FEMA flood plain coordinator 4 40 80 40 $ 18,900.00 Total Hours for TranSystems(000 Series) 0 34 0 180 272 208 0 0 0 0 0 $ 81,938.00 900-WATER,SANITARY SEWER RELOCATION AND ADJUSTMENTS 901 Water line plans(25001.9(4) 10 16 24 40 $ 10,830.00 902 t4scellaneousAdjustments 2 16 24 40 _ $ 9,110.00 Total Hours for TranSystems(900 Series) 0 12 0 32 48 80 0 0 0 0 0 $ -19,940.00 1000-TRAFFIC ITEMS 1001 Illumination Plans(7) 2 8 24 40 $ 7,950.00 1002 Photomehics Layout 2 40 _ $ 6,230.00 1003 Pavement marking plans(7) 2 4 18 32 $ 5,762.00 1004 Signing plans(7) 2 4 16 32 $ 5,762.00 Total Hours far TranSystema(1000 Series) 0 8 0 56 56 104 0 0 0 0 0 $ 25,704.00 1100-EROSION CONTROL — • 1 IXHIBIF A Glade Road Final Design—Phase 4(Western City Limits to Bransford Rd) City of Colleyville,Texas ESTIMATE OF HOURS AND FEE ESTIMATE 12710/2015 E5 E4 E3 E2 El T4 S4 S3 S2 Survey Admin Totals I Crew $260.00 $215.00 $185.00 $145.00 $105.00 598.00 $150.00 $135.00 $90.00 $140.00 $65.00 1101 Erosion control plan sheets(7) 2 8 24 40 $ 7,950.00 1102 Erosion control details 2 4 6 24 $ 3,944.00 — Total Hours for TranSystems(1100 Series) 0 4 0 12 30 64 0 0 0 0 0 $ 11,894.00 1200-FRANCHISE UTILITY COORDINATION 1201 Utility Coomidaton Plans(13) 4 8 24 40 $ 8,380.00 1202 Meetings wi h franchise utilities(0) $ - Total Hours for TranSystems(1200 Series) 0 4 0 8 24 40 0 0 0 0 0 $ 8,380:00 1300-PUBLIC MEETING 1301 Public Meeting Preparation and Attendance(Pre-Construction) $ - 1302 Public Feting Exhibits(Pre-Construction) $ - 1303 Council Workshop Exhibits 6 32 46 S 9,258.00 1304 Council Workshops(3) 12 6 $ 3,45•00 1305 Renderings(3) _ 4 20 120 $ 15,280.00 Total Hours for TranSystems(1300 Series) 0 22 0 26 32 168 0 0 0 0 0 $ 27,988.00 1400-BID PHASE SERVICES 1401 Pre-Bid Feting . $ - 1402 PepareAddenda - $ - 1403 Bid Tabulation and Recommendation $ - 1404 Construction documents(conformed plans) $ - Total Hours for TranSystems(1400 Series) 0 0 0 0 0 0 0 0 0 0 0 $ - - 1500-CONSTRUCTION PHASE SERVICES 1501 Attend preconsbuctionconference. $ - 1502 Post Award Design and RFPs $ - 1503 Review Shop Drawing and Submittals $ - 1504 Review Pay Requests(12 months) $ - Total Hours for TranSystems(1500 Series) 0 0 0 0 0 0 0 0 0 0 0 $ - 1600-GEOTECHNICAL INVESTIGATION ' 1601 Geotechnlcal Investigation and Pavement Design(Subconsultant) $ 4,500.00 Total Subconsultant Fee(1600 Sexes) $ 4,500.00 1700-LEVEL A SUBSURFACE UTILITY ENGINEERING(SUE) 1701 Level ASUE(Subconsultant) $ 26,000.00 Total Subconsultant Fee(1700 Series) . . $ 26,000.00 Total Hours for TranSystems Corporation(Base): 0 257 0 541 847 1270 20 56 64 84 32 I$ 405,215.00 0.0% 8.1% 0.0% 17.1% 26.7% 40.1% 0.6% 1.8% 2.0% 2.6% 1.0% 0.5% Design Services $ 357,435.00 Right-of-way Services $ 17,280.00 Construction Services $ - Subconsultants $ 30,500.00 $ 405,215.00