HomeMy WebLinkAboutParks and Rec Advisory Board-Agenda Packets-9/12/2005
city Of
llC9
Texas
PARKS AND RECREATION ADVISORY BOARD
AGENDA
Monday, September 12, 2005
6:30 p.m.
For the meeting conducted at the Park Annex
located at 5109 Bransford Rd.
AGENDA
NUMBER AGENDA ITEM
1. Call to order
2. Approval of the August 1, 2005 Parks and Recreation Advisory Board
Minutes
3. Discussion of Eagle Scout Project
4. Discussion of Eagle Scout Project
5. Discussion and Consideration of Redirecting Voluntary Park Fund
Monies
6. Update of Parks and Recreation Projects
7. Discussion of former City Hall Property
8. Recreation, Athletics, Tennis and Seniors' Reports
9. Park Operations and Capital Improvement Status Reports
10. Citizen comments/presentations regarding items not on the agenda*
11. Adjournment
*(This time is allocated for citizens to informally address the Board on matters not on the agenda that require no formal action.
Each presentation will be limited to a maximum of five (5) minutes. Board members may not respond to citizens who speak
regarding matters not on the agenda.)
I certify that the above agenda was posted on the bulletin board at City Hall on September 9, 2005:
/, ^i---'--
<'{,~!.
city Of
n~ p~
PARKS AND RECREATION ADVISORY BOARD
MINUTES
Monday August 1,2005
6:30 p.m.
Bob Leininger called the meeting to order at 6:33 p.m. on Monday, August 1, 2005 at
the Parks and Recreation office.
ROLL CALL:
Jerry Birkes, Steve Dalri, Connie Hampton, Pat Horn, Bob
Leininger, Pete Riis, Vince Rosen, Nancy Coplen,
Councilperson Tom Hart and Councilperson Tony Licata
ABSENT:
Gil Turner
STAFF:
Monica Walsh, Director of Parks and Recreation, Chuck
Majors, Parks Superintendent, Craig Dishman, Recreation
Supervisor and Dixie Smith, Administrative Assistant
1. Call to Order
2. Approval of the July 11,2005 Parks and Recreation Advisory Board Minutes
Pat Horn moved to approve the July 11, 2005 Parks and Recreation Advisory Board
minutes. Pete Riis seconded the motion. The vote was unanimous.
3. Introduction of Chuck Majors, Parks Superintendent
Monica Walsh, Director of Parks and Recreation, introduced Chuck Majors, the new
Parks Superintendent. He joined the Parks and Recreation Department for the City of
Colleyville on June 30, 2005.
4. Discussion of Eagle Scout Project
Parks and Recreation Advisory Board Meeting
August 1, 2005
Page 2
Broderick Young of Troop 905 presented his project to place mileage markers on the
Kimzey Park Hike and Bike Trail. Pete Riis moved to approve the Eagle Scout project
as presented. Pat Horn seconded the motion. The vote was unanimous.
5. Discussion and Consideration of Redirecting Voluntary Park Fund Monies
Monica Walsh, Director of Parks and Recreation, gave an overview of the Voluntary
Park Fund expenditures as approved by City Council:
S ar er Park Trail Grant Local Match
Cotton belt Trail Phase III
Balance - GCISD Practice Area 1m rovements
Balance - Fencin for Caboose Dis la
Balance - Sneed Pro ert Master Plan Phase I
Balance - Sneed Pro ert Master Plan Phase II
ADA 1m rovements
Webb House Furnishin s
TOTAL
$19,123
$46,325
$17,977
$ 3,000
$ 2,360
$ 5,905
$ 9,000
$ 2,000
$105,690
Cotton belt Trail Phase III will be retained in the Voluntary Park Fund expenditures. The
Board discussed using the balance of the GCISD area improvements ($17,977) to
provide maintenance of GCISD sites used for baseball practice. Monica Walsh,
Director of Parks and Recreation, stated that Voluntary Park Fund monies cannot be
used for maintenance, but that she would check with the Finance Director. Fencing for
Caboose Display has a $0 balance; it was spent on lighting. The ADA Improvements
($9,000) will be retained in the Voluntary Park Fund expenditures for ramping at L.D.
Lockett. Pat Horn moved to redirect the Sparger Park Trail Grant Local Match
($19,123), the balance of the Sneed Property Master Plan Phase I ($2,360), the
balance of the Sneed Property Master Plan Phase II ($5,905) and Webb House
furnishings ($2,000) into the Voluntary Park Fund. Vince Rosen seconded the motion.
The vote was unanimous. The Board requested that the GCISD Practice Area
Improvements ($17,977) be an agenda item for the September 12, 2005 meeting.
Parks and Recreation Advisory Board Meeting
August 1, 2005
Page 3
6. Prioritizing Parks and Recreation Projects
Monica Walsh, Director of Parks and Recreation, distributed a packet and gave an
overview of the Parks and Recreation projects that needed to be prioritized for Capital
Improvements Projects for 2005. The Board members ranked the projects (with 1 being
the highest priority and 16 being the lowest) as follows:
PRIORITY LIST
(t) - indicates a tie
McPherson Park - Phase I 1
Cottonbelt Trail - Phase III 2
Park Land Purchase 3
McPherson Park - Phase II 4
Pleasant Run Park - Phase II 5
Little Bear Creek Trail Extension 6
ADA Improvements 7
McPherson Park - Phase III 8 (t)
Senior Center 8 (t)
New Tennis Courts 9
Bransford Park - Phase II 10m
Parks Maintenance Facility 10 (t)
Lonqwood Trail 11
Recreation Center 12
McPherson Park - Phase IV 13
Uniform Park Siqnaqe 14
The rankings of Capital Improvement Projects by the Parks and Recreation Advisory
Board will be submitted to the CEDC Board and presented to City Council.
7. Recreation, Athletics, Tennis and Seniors' Reports
Craig Dishman, Recreation Supervisor, provided an overview of the current and
proposed recreation programs and activities available to citizens of Colleyville and
surrounding areas.
Parks and Recreation Advisory Board Meeting
August 1, 2005
Page 4
8. Park Operations and Capital Improvement Status Reports
Monica Walsh, Director of Parks and Recreation, presented a status report on current
projects.
9. Adjournment
Vince Rosen moved to adjourn at 8:57 p.m. Connie Hampton seconded the motion.
The vote was unanimous.
Respectfully submitted and approved:
r -, ,--"
~~L/~~ .\x~~)
Dixie S: Smith, Administrative Secretary
CITY OF COLLEYVILLE
PARKS AND RECREA TION
" ,
...~
colleyville parks and recreation
Meeting
9/12/05
Agenda #
3
. .
Department: Parks and Recreation
Subject: Discussion of Eagle Scout Project
Chris Bonner of Troop 28 will present his project to recover the trails at the Nature Center.
Recommendation:
Approval
ACTION TO BE TAKEN
~ Discussion Only
D Procedural Change
D Possible City Council Policy
Recommendation
D Information Only
Page :Lof 1
CITY OF COLLEYVILLE
PARKS AND RECREA TION
';'\))~":,
....... ,
~
colleyville parks and recreation
Meeting
9/12/2005
Agenda #
4
. .
Department: Parks and Recreation
Subject: Discussion of Eagle Scout Project
Chris Plorin of Troop 28 will present his project for improvements at Pleasant Run Soccer
Complex. His project includes painting some soccer goals, building shelves in the storage
buildings, provide lockers in the concession stand and attach a bulletin board to the side of
the concession stand.
Recommendation:
Approval
ACTION TO BE TAKEN
[gJ Discussion Only
D Procedural Change
D Possible City Council Policy
Recommendation
D Information Only
Page 1..0f 1
CITY OF COLLEYVILLE
PARKS AND RECREA TION
~
colleyville parks and recreation
Meeting
9/12/2005
Agenda #
5
. .
Department: Parks and Recreation
Subject: Discussion and Consideration of Redirecting Voluntary Park Fund Monies
Staff has prepared the following summary of the Voluntary Park Fund expenditures, as
approved by City Council for your review and consideration:
I Balance - GCISD Practice Area Improvements
$17,977 I
Recommendation:
Approval
ACTION TO BE TAKEN
D Discussion Only
D Procedural Change
[gJ Possible City Council Policy
Recommendation
D Information Only
Page 1..0f 1
CITY OF COLLEYVILLE
PARKS AND RECREA TION
colleyville parks and recreation
Meeting
9/12/2005
Agenda #
6
. .
Department: Parks and Recreation
Subject: Update of Parks and Recreation Projects
On August 1, 2005 Park Board members established the following priorities for
recommendation to City Council
PRIORITY LIST
One being the most important
(t) - indicates a tie
McPherson Park - Phase I
Cotton belt Trail - Phase III
Park Land Purchase
McPherson Park - Phase II
Pleasant Run Park - Phase II
Little Bear Creek Trail Extension
ADA 1m rovements
McPherson Park - Phase III
Senior Center
New Tennis Courts
Bransford Park - Phase II
Parks Maintenance Facilit
Lon wood Trail
Recreation Center
McPherson Park - Phase IV
Uniform Park Si na e
1
2
3
4
5
6
7
8 t
8 t
9
10
10
11
12
13
14
ACTION TO BE TAKEN
[gJ Discussion Only
D Information Only
D Procedural Change
D Possible City Council Policy
Recommendation
Page 1..0f ~
Update of Parks and Recreation Projects
Page 2 of 3
The Colleyville Economic Development Corporation (CEDC) at their meeting August 23, 2005
adopted the combined Economic Development Capital Improvement Program (EDCIP) to be
forwarded to City Council for approval. On September 6, 2005 City Council approved it.
Projects:
The EDCIP plan proposes $638,000 in FY 2006 for Phase I of McPherson Park, which
includes a walking trail, picnic and playground areas, entry road, fishing pond, unstructured
play areas, recreation amenities and pavilion with a restroom. McPherson Park, Phase I, is
priority number 1 of the Parks and Recreation Advisory Board. The total cost of this project
is approximately $1.9 million with proposed funding allocations from CEDC ($638,000),
Parkland Dedication ($855,000) and Voluntary Park Funds ($500,000).
The EDCIP plan proposes $400,000 in FY2006 for the purchase of parkland. The purchase
of parkland is priority number 3 of the Parks and Recreation Advisory Board.
The EDCIP plan proposes $95,000 in FY2006 for ADA improvements to the Nature Center
and $125,000 in FY2007 for Sparger Park. The ADA improvements are priority number 7 of
the Parks and Recreation Advisory Board.
The EDCIP plan proposes $1,200,000 in FY 2006 for the Senior Center facility and $150,000
in FF&E and renovations. The Parks and Recreation Advisory Board ranked the Senior
Center as priority number 8 along with McPherson Park Phase III.
Additionally, the plan provides funding for the allocation of $80,000 in FY2006, $100,000 in
FY2007 $70,000 in 2008 and $100,000 in 2010 for trail construction. Also in FY 2006
$130,000 for City Park Road extension, $50,000 in Pleasant Run Practice Field Parking Lot
and $50,000 in Citywide Irrigation Monitoring System.
In addition to the parks and recreation related improvements FY2006-2010 EDCIP plan, this
plan also provides for the allocation of $400,000 for Marketing in FY2006-2010, with an
annual allocation of $80,000.
The EDCIP plan proposes $108,000 in FY2007 and $300,000 in FY2010 for Open Area
Development in conjunction with the Senior Center facility.
The construction of the Cottonbelt Trail, Phase III, from John McCain Road (north) to the
Grapevine city limits and the Little Bear Creek Trail Extension from the Nature Center to
Sparger Park are planned for future grant funding. The Little Bear Creek Trail Extension is
priority 6 of the Parks and Recreation Advisory Board.
The Cotton belt Trail Phase I is complete. The Cotton belt Trail Phase II in conjunction with the
City of Hurst is currently under design. Cottonbelt Trail Phase III will be the final phase of the
regional trail system located within the City of Colleyville. This phase of the project will be
constructed during the construction of the planned improvements for SH26. The design of
the trail will need to be completed prior to the construction of the highway, which is scheduled
for 2007.
Update of Parks and Recreation Projects
Page 3 of 3
The EDCIP plan proposes $300,000 in FY2010 for trail grant opportunities. The Parks and
Recreation Advisory Board ranked Cotton belt Trail Phase III priority number 2 and Little Bear
Trail Extension priority number 6.
The EDCIP plan proposes $500,000 in FY 2009 for Phase II of the McPherson Park, which
includes expanded parking; demolish brick house, park service center improvements,
pavilions at lower unstructured open space area, turf, landscaping and irrigation. McPherson
Park, Phase II, is priority number 4 of the Parks and Recreation Advisory Board.
With limited funds and multiple projects, the recommended five-year plan does not provide
sufficient resources for every project identified as a priority of the Parks and Recreation
Advisory Board or the City Council. It does provide funds for McPherson Park, Phase I and II,
ADA improvements to the Nature Center and Sparger Park, City Park Road Extension,
Pleasant Run Practice Field Parking Lot, Parkland Purchase, Senior Center, Citywide
Irrigation Monitoring System, Citywide Trail System and leaves open the possibility of
additional funds if the sales tax receipts exceed projections.
Other projects that will be proposed from the Voluntary Park Fund and Parkland Dedication
Fund over the next two years include Parks Administration Office Improvements, Ballfield
Renovations, Dugout Shade Cloth Replacement, MUSCO Control Link - City Park, L.D.
Lockett House Improvements, Cotton belt Trail Phase II and Log Barn Renovation.
COLLEYVlLE ECONOMIC DEVELOPMENT COPRORATION
ECONOMIC DEVELOPMENT CAPITAL IMPROVEMENT PROGRAM FY 2006. FY 2010
Exhibit A
PROJECTED
FISCAL YEAR 2005 2006 2007 2008 2009 2010
BEGINNING FUND BALANCE $949.709 SI.23O,394 $710.209 $869,533 $627.086 $501.883
~~iimm:::::mwm:m:mm:U1!:ii1::im:11u1:::111mmWm1:111
PROJECTED 1/2 CENT SALES TAX REVENUE S944.932 $963,831 $1,002,384 $1,042,479 $1.084,178 $1,127,545
INTEREST INCOME $15.435 $36,912 $21.306 $20,088 $18,813 $15,056
2005 BOND SALE PROCEEDS SO $2.000,000 SO $0 $0 SO
USE OF AVAlABLE CASH $0 $n7,357 $299,223 S302.453 1382,482 $247.204
rOT AL REVENUES $960,367 13.778,099 $1,322.912 $1,365.018 $1,465,473 $1,389.806
~~W#~~~@)!w::m:;::1~W:i::;m:!::::::1!W:1:!::Wm:::1U:W::!
OPERATING:
~INISTRATIVE $5.000 $5,000 $5.000 $5.000 $5.000 $5.000
2005 DEBT SERVICE & 1.4 TIMES COVERAGE so $900,099 $904,913 $910,018 $900.473 $904,806
1997 DEBT SERVICE & 1.4 TIMEs COVERAGE $665,606 so SO SO SO $0
2000 DEBT SERVICE & 1.4 TIMES COVERAGE $179,549 SO SO $0 SO $0
MARKETING $0 $80.000 $80,000 $80,000 $80,000 $80.000
::APrr AL:
ADA IMPROVEMENTS
NATURE CENTER PARK SO $95,000 SO $0 so SO
SPARGER PARK SO $0 $125,000 so $0 SO
COLLEYVLLE CENTER CHAIR REPlACEMENT $36.000 SO SO $0 SO $0
Me PHERSON PARK
Phase I 10 $238.000 SO $0 SO SO
Phase I (Bond Sale Proceeeds) SO $400.000 SO SO SO SO
Phase II $0 SO SO SO $500.000 SO
crrv PARK ROAD EXTENSION SO $130.000 $0 SO $0 SO
PlEASANT RUN PRACTICE FIELD PARKING LOT SO $50,000 SO $0 SO SO
PARK lAND PURCHASE (Bond Sale Procaedl) $0 $400,000 SO $0 $0 $0
SENIOR CENTER
FACILITY (Bond Sale Proceeds) SO $1,200,000 $0 $0 $0 $0
FF&E AND RENOVATIONS $35,000 $150,000 SO SO SO $0
OPEN AREA DEVELOPMENT SO SO $108.000 $0 $0 $300,000
CITYWIDE IRRIGATION MONITORING SYSTEM $0 $50,000 SO $0 SO SO
CITYWIDE TRAIL SYSTEM
GRANT MATCH SO SO $0 $300.000 $0 $0
TRAIL CONSTRUCTION SO $80,000 $100,000 $70,000 $0 $100.000
'OTAL EXPENDITURES $921.155 S3.na,099 $1.322,913 $1,365,018 $1,485,473 $1,389,606
XCESS REVENUES OVER EXPENDITURES 139.213 SO SO $0 SO $0
.00 BACK.4 TIMES BOND COVERAGE RATIO 5241.473 $257.171 $258,547 $260.005 5257,278 1258.516
NDING FUND BALANCE $1 ,230.394 $710.209 $669,533 S627.086 $501,883 $513.195
SSUMPTIONS: FY 2006: 1/2 OF crrv SALES TAX BUDGET PROJECTION I FY 2007 - 2010: 4% GROWTH DUE TO COLLEYVILLE BL VD.CONSTRUCTION
CITY OF COLLEYVILLE
PARKS AND RECREA TION
....iii..'.......i......:i......;..iii...:/i. , _
~
colleyville parks and recreation
Meeting
9/12/2005
Agenda #
7
. .
Department: Parks and Recreation
Subject: Former City Hall Property
The Parks and Recreation Advisory Board Chairperson requested that this item be placed
on the agenda.
Recommendation:
Approval
D Information Only
D Procedural Change
D Possible City Council Policy
Recommendation
ACTION TO BE TAKEN
[gJ Discussion Only
Page 1..0f 1
CITY OF COLLEYVILLE
PARKS AND RECREA TION
colleyville parks and recreation
Meeting
9/12/2005
Agenda #
8
. .
Department: Parks and Recreation
Subject: Recreation, Athletics, Tennis and Seniors Report
I. Recreation
A. During the months of June, July and August approximately 275 participants
were involved in recreation classes
II. Athletics
A. During the months of June, July and August approximately 485 participants
were involved in athletic programs.
III. Tennis
A. For the fall session approximately 55 junior tennis players are involved in group
tennis lessons.
IV. Senior Adults
A. Metroport Meals on wheels luncheons and activity programs continue on the first
and third Friday of each month at the Colleyville Center. In August they had
167 participants enjoy the luncheons.
ACTION TO BE TAKEN
D Discussion Only
[] Procedural Change
D Possible City Council Policy
Recommendation
[gJ Information Only
Page 1..0f 2.
Recreation. Athletic, Tennis and Seniors' Report
Page 2 of 2
July Recreation Classes and Participants Revenue
Proarams
Adult Enrichment 2 0 $0
Youth Development 1 10 $250
Tennis 6 16 $2,050
Athletic ProQrams 0 0 $0
Senior Adults 0 102 $0
Special Events 0 0 $0
Reservations 34 0 $290
Volunteers 0 0 $0
Totals 128 $2,590
CITY OF COLLEYVILLE
PARKS AND RECREA TION
~
colleyville parks and recreation
Meeting
9/12/2005
Agenda #
9
. .
Department: Parks and Recreation
Subject: Park Operations and Capital Improvement Status Reports
COTTONBEL T TRAIL. PHASE II
Project Description:
Consultant
Contractor:
Design of Cotton belt Trail Phase II
Halff Associates, Inc.
N/A
Status: Under design
Substantial Completion: Spring 2006
CITY COUNCIL ACTION
In August, City Council approved the Colleyville Girls Softball Association (CGSA) waiver
to practice on City Parks' softball fields. They also approved the ground maintenance
mowing and horticulture contracts for next year. The Colleyville Soccer Association
(CSA) proposed a $10,000 donation for shade structures on two fields that was also
approved by City Council.
OTHER INFORMATION
The Log Barn will be temporarily located.
ACTION TO BE TAKEN
[gJ Discussion Only
D Procedural Change
D Possible City Council Policy
Recommendation
D Information Only
Page 1..0f 1