HomeMy WebLinkAboutPlanning and Zoning Commission-Minutes-5/23/2005
cc.~
Texas
PLANNING AND ZONING COMMISSION
MEETING MINUTES - May 23, 2005
CALL TO ORDER
Chairman Byerly called the meeting to order at 7:00 p.m.
ROLL CALL
Present: Commissioners
Edwards, John Blassinga
Byerly were present.
Dudziak, Luann
nis Duffy and Jeff
Absent: Thomas D
Robert
INVOCATION
PLEDGE OF ALLEGIANCE
APPROVAL OF MINUTES
Commissioner Edwards
corrections on page 2
third paragraph nee
for clarity. Commissio
The motion w
Aye: Dudz.
Nay: No
tes of ay 9,2005 meeting with
1, change "raise" to "raze", page 3,
t full paragraph needs to be reworded
CITIZE
None
MS NOT ON THE AGENDA
REGULARAG
1. Case P-O liminary plat for Braemar Addition on 15.662 acres out of
the B.B.B. an .R. Survey, Abstract 211 and the AT. Young Survey,
Abstract 1756 located at 5000-5201 Fry Lane
Chris Fuller presented the case and briefed the Commissioners.
Commissioner Edwards questioned staff in regards to Fry Lane being brought up to
City standards, will it be brought up to standards? Barry LeBaron replied correct and
briefed the Commissioners about the history of Fry Lane, the street was a 30-foot
access easement, however the property owner's did not have control over all of the
50 feet of right-of-way. Therefore, they went to City Council and asked for a waiver
of the perimeter street improvements. City Council approved the waiver, provided
Planning & Zoning Commission
Minutes - May 23, 2005
Page 1 of 5
the owner's a.) Put two inches of asphalt down b.) Widen the street to the Fire
Department's requirements and c.) Maintain it. During the platting process, City
Council had the statement added to the plat regarding Fry Lane being a private
street, not a public street. These property owners are going to extend the water
utilities and put in a fire hydrant.
Commissioner Dudziak stated the waiver for street improvements only covers thru
lots 7, not lot 8. Barry LeBaron replied Fry Lane has alread been asphalted all the
way down including lot 8.
Commissioner Duffy stated having lots of questions for
Steve Stallard, 5100 Fry Lane, the applicant and
Lane, the applicant as well, presented their re sand bn
about the project and intentions.
Commissioner Duffy questioned the appli
utility services? Mr. Stallard replied the
Jackie Fluitt, GSWW, the engineer, brie
services that will be provided to e lots.
Commissioner Duffy question
Rockrimmon? Mr. Fluitt used
going to be established. Commi
would be completed? luitt stat
Commissioner D
southeast corn
to the northea
fire plugs in?
can an .f a fi
plicants.
ge, 5001 & 5004 Fry
the Commissioners
houses and
are going to stub out from
where the utility lines are
Mr. Fluitt when the line
pleted now.
fire plug will be? Mr. Fluitt stated in the
ffy stated that from the southeast corner
ch. Are there any plans to put any more
f constructing a home on that lot, they
eet the fire code requirements.
ned Mr. Fluitt on the submission there will be an 8 in.
.de of lot 7 and a 15-foot easement, however, there is
t, are we assuming the other 7 % feet belongs to
he no end? Mr. Fluitt replied being under the impression
d to 15 foot on lot 7.
Commissl stioned staff about the road, in the future when this is built
out, the city onsible for putting in a road. What is the guarantee that Fry
Lane will not city's responsibility for updating? Barry LeBaron replied an
amended plat wo d have to be filed to take the language off the plat for the city to
accept the responsibility to take over the street and a developer's agreement would
have to be filed between the property owners. Barry LeBaron stated these property
owner's have brought the road up to speed by what the City Council approved in the
resolution.
Commissioner Duffy stated being concerned with the future of the street being the
tax payer's responsibility. Commissioner Edwards stated the city does not have to
accept the street regardless of the condition of the road.
Planning & Zoning Commission
Minutes - May 23, 2005
Page 2 of 5
Commissioner Duffy stated having concerns with the utility and drainage layout
being submitted to the city. Mr. Fluitt stated those plans have been submitted to the
city and they have been reviewed. City Engineer, Robert Woods confirmed the
plans had been submitted.
Commissioner Duffy questioned staff about the language being different, the front
set back, has it been moved back to 20 feet from the right-of- way line, and is that a
40 foot set back? Barry LeBaron replied that refers to the ci wanting the developer
to dedicate an additional 20 feet beyond the 30 foot that. rt of the easement in
order to have a full 50 foot of right-of-way for that locati
Commissioner Duffy stated having concerns with t
wide pavement, and Fry Lane to be maintained
owner's or property owner's association. Co ioner Duf
covenant to hold harmless the city for all a ts or incidents
that road, or is that statement just a wor outh type issue?
nothing is being drafted right now, but i omething t will be in t
the property owners, plan on having an ag e t
Commissioner Duffy questione the applican
restrictions, would those condi rk prior to
Mr. Stallard replied absolutely. edge s
held the property owner's respon d.
the road being a great i rovemen
Commissioner Du
however, he st
the maintaini
d resolution, a 24-foot
nse of the property
stioned is there a
maintenance of
allard replied
orks. We,
e plat is approved with those
building permits being issued?
the financial institution has
IIdredge went on to state
was placed.
dredge road being an improvement;
not have to be burdened by the cost for
case P-05-013 with the conditions a)
ess agreement waiving city responsibility
Fry Lane rig t-of-way, b) the property owner's establish
c) the HOA must maintain and improve Fry Lane prior
ay as a public street and d) the easement along the
be increased to 15-feet. Commissioner Edwards
The motl
Aye: Dudzl
Nay: None
by the following vote:
, Blassingame, Duffy and Byerly
2. Case P-05-021- Preliminary plat for Alianne Estates Addition on 14 acres out
of the T. White Survey, Abstract 1692 located at 512 and 600 Shelton Drive
Chris Fuller presented the case and briefed the Commissioners.
Commissioner Duffy questioned staff about the perimeter street cost for improving
Shelton Drive; does that include easement and escrow for a sidewalk at some time
in the future? Barry LeBaron replied correct. Commissioner Duffy questioned staff
for clarity, that if this plat is approved, with the understanding that they pay all
Planning & Zoning Commission
Minutes - May 23, 2005
Page 3 of 5
perimeter costs, the sidewalk will be included at some time in the future? Barry
LeBaron replied correct.
Commissioner Dudziak questioned staff if the escrow funds go back into the general
fund after a certain period of time? Barry LeBaron replied the funds stay as part of
the perimeter street funds. Commissioner Dudziak questioned staff if the funds
could be pulled back into the general fund? Barry LeBaron stated not knowing if
there is a time limit. Commissioner Edwards stated there b .ng a time limit of about
10 years.
Commissioner Dudziak stated thinking there was so
Commissioner Duffy if he is comfortable with waitin
Commissioner Duffy replied being comfortable
Jeff Vanderpool, 605 Shelton Drive, the app.
have to build the sidewalk at this time.
e limit and questioned
?
re will be a eowner's
be a HOA, but not a gated
nderpool if the HOA would be
r clarity what the minimal
erpool stated not wanting
g of their home; we want
t what does the applicant mean about
this is straight zoning and we would not
e homes.
001 that any design covenants, he puts in,
eded covenants, not what the city will restrict. Mr.
hat the city requires, only having concerns with the
Commissioner Duffy stated the sidewalk is just part
questioned Mr. Vanderpool which way the homes on
r. Vanderpool stated those homes will face Shelton Drive.
Commissione uestioned staff with regards to escrowing the perimeter street
improvements, t mechanics do we have to put in the motion to cover the
improvements. Barry LeBaron replied the only motion would be to include approving
this development with the required perimeter street improvements for all the public
improvements, that way it will be clear that you are not approving the waiver of the
sidewalk.
Commissioner Duffy made motion to approve case P-05-021, subject to the
condition that the developer dedicates sidewalk easement and escrow estimating
cost of 5-foot sidewalk along Shelton with the perimeter improvements.
Commissioner Dudziak seconded.
Planning & Zoning Commission
Minutes - May 23, 2005
Page 4 of 5
The motion was approved by the following vote:
Aye: Dudziak, Edwards, Blassingame, Duffy and Byerly
Nay: None
Barry LeBaron stated not having the applicant put in a sidewalk before the engineering
is done for a bar ditch street. It is better to defer the building of the sidewalk until it is
better for the improvements of the street.
Respectfully Submitted,
in the future where all
STAFF REPORTS
Barry LeBaron stated the workshop will be scheduled
Commissioners will be able to attend.
COMMISSIONER COMMENTS
ADJOURNMENT
The Commission adjourned the meeting at 7:
Amy Shelley
Planning and Zoni
Approved on: Ju
Planning & Zoning Commission
Minutes - May 23, 2005
Page 5 of 5