PUBLIC NOTICE
SH26 ADVISORY COMMITTEE
MEETING AGENDA
September 25, 2002
COLLEYVILLE City Hall
Council Chambers
5400 Bransford Road
7:00 P.M.
I. Call to Order
Joe Allen, Chair
II. Approval of Minutes of June 26,2002
III. Update of SH26 Planned Improvements and Preliminary Schematic Design
Teague Nail and Perkins
IV. Update of Utility Relocations of SH26 Planned Improvements
Keith Fisher, Public Works Director
V. Overview of preliminary Landscape and Streetscape Concepts
Newman, Jackson and Bieberstein
VI. Questions and Answers
VII. Establish next meeting date
VIII. Adjournment
I certify that this public notice was posted on the bulletin board at City Hall on Friday,
September 20, 2002, at 4:30 p.m.
Cynthia Singleton, TRMC
City Secretary
STATE HIGHWAY 26 ADVISORY COMMITTEE
MEETING MINUTES
September 25, 2002
Colleyville City Hall Council Chambers
7:00 p.m.
I. Chair Joe Allen called the meeting to order. Also attending the meeting
were Dee McNosky, Jody Short, Curtis Young, Jimmy Archie, Mike Taylor,
Kipp Whitman, Joyce Hammill and Louis Miller. City Council liaisons
Richard Newton and Rich Hendler were also present. Staff present
included Public Works Director Keith Fisher and Senior Planner Tom
Niederauer.
Members absent were Butch Wallace and Larry Midtbo.
II. The minutes of the June 26,2002 meeting were approved as distributed.
III. Gary Teague of Teague Nail and Perkins provided an update of the SH26
planned improvements and preliminary schematic design. Several
modifications have been made to the schematic based on comments
received during May public meeting held by TxDOT, as well as additional
written comments submitted to TxDOT and Teague, Nail and Perkins. Mr.
Teague reported that the Cities of Hurst and Grapevine are working
closely with the City of Colleyville for continuity in the design and
improvements. Staff anticipates that by late October, TxDOT is expected
to have approved 30 percent of the schematic and final design would
proceed immediately. Areas in which some redesign has occurred based
on citizen input include the following:
(1) A left turn access at Cheek Sparger into the shopping center and
hooded left turn into Forman's;
(2) On the basis that the Texaco owner at Bransford desires to stay in
business, the City is taking the lead on three options including to
realign, leave as is or cul-de-sac the street and cut it off;
(3) Considerations of how to address long term access to undeveloped
properties and properties off of Acuff;
(4) Signalization at Church Street will help along with a full left turn into the
First Baptist Church;
~
(5) The section at Old Glade Road would be closed;
(6) Continued exploration of how to provide emergency access to Ross
Downs area; i.e., as a driveway for private property or public street,
with a turn-around for emergency vehicles;
(7) the realignment of John McCain is on the TXDOT letting schedule; and
(8) committee members continue to work on solutions for access to
Colleyville Elementary School.
IV. An update of utility relocations was given by Public Works Director Keith
Fisher. He said that a study of modeling the citywide water system would
be incorporated into the consultant's recommendations. On Aug. 28,
2002, representatives of Teague Nail and Perkins and the city met with all
utility providers to explore the feasibility of placing underground utilities
along SH26 from Little Bear Creek to Hall Johnson Road. The utility
providers are expected to identify associated cost with the underground
utility relocations by late October.
V. Mike Jones of Teague Nail and Perkins presented an overview of
preliminary landscape and streetscape concepts. Roadway enhancements
could include entry portals to the city, bridge railings, decorative facades,
use of different colored and textured pavers at intersections, and
ornamental lighting. The City will be responsible for maintenance of all
enhancements. TxDOT will not allow spray irrigation in medians from a
safety perspective except when grass and other plants are first planted
and is concerned about trees in the medians because of visibility issues.
Emphasis is on consistency for the roadway from Loop 820 to HS 114
through the Cities of Hurst, Colleyville and Grapevine. Mr. Jones reported
that the draft environmental impact assessment is complete and currently
being reviewed by TxDOT.
VI. The engineering team responded to committee questions. It was noted
that the Hurst and Grapevine sections of SH 26 construction are not
funded at this time; therefore, the City of Colleyville can set standards for
the roadway's overall attractiveness. Over the next three to four months, a
budget will be determined for the city's portion of the improvements and
on-going maintenance.
VII. The next meeting will be held on Wednesday, November 20, 2002, at 7:00
p.m. at the Colleyville Community Center.
VIII. The meeting was adjourned.