PUBLIC NOTICE
CITY COUNCIL WORKSESSION
MARCH 8, 2005
G:OO P.M.
CITY HALL
100 MAIN STREET
EXECUTIVE CONFERENCE ROOM
THIRD FLOOR
1. Call to Order
2. Discussion of 2004-2005 Work Initiatives
3. Discussion of 2004-2005 Operating Budget
4. Discussion of Multi-Year Budget Forecast
5. Adjournment
I hereby certify the above agenda was posted on the bulletin boards at City Hall on Friday, March
4, 2005 at 5:00 p.m.
Cynthia Singleton, TRMC
City Secretary
100 MAIN STREET COLLEYVILLE, TEXAS 76034 (817) 503-1000
MEMORANDUM
Office of City Manager
TO:
FROM:
SUBJECT:
DATE:
Mayor and City Council
Bill Lindley
March 8, 2005 Worksession
March 4, 2005
In anticipation of beginning the development of the FY 2005 - 2006 budget, the
City Council has scheduled a preliminary worksession for March 8, 2005. The
purpose of the meeting is to provide an opportunity for the City Council to review
the 2004 - 2005 Work Initiatives and end of the year budget projections. Along
with this discussion will be a presentation of the five-year budget forecast. The
last focus of the discussion is to allow an opportunity for the City Council to
provide preliminary direction in developing the FY 2005 - 2006 budget.
The Work Initiatives review provides a synopsis of the various work items that
staff have been working towards, which were identified by the City Council earlier
this year. As you can see, while there are still work efforts underway, a lot of
work has been completed. I am pleased with the focus and hard work provided
by the Management TEAM in meeting the initiatives developed by the City
Council.
Included for discussion is a projection of the revenue and expenses for the
current fiscal year. It is important that you consider that the estimates are drawn
from only five months of actual data, which somewhat limits a full forecast for the
end of the year. However, I feel this is a good basis for discussion. It appears
that we will have a FY 2005 operating budget balance of $743,280 for the end of
the year. Understandably, this estimate is subject to modification.
We will provide a nine-month review later this summer as part of the 2006 budget
development. This later forecast will provide a somewhat better summary of
meeting the expense plan for this year. It certainly appears that we are well on
the way to staying within the confines of the approved expense plan.
I am pleased to present to you the draft Five-Year Financial Forecast for Fiscal
Years 2005 through 2010. The purpose of this forecast is to provide the City
Council with an opportunity to look into the future, identifying the challenges and
opportunities facing the City over the next five years.
The Five-Year Financial Forecast focuses on the General Fund, which is the
main component of the combined annual budget (except those required for debt
or specifically attributable to the enterprise funds). Revenues are generated by
property and other taxes, franchise fees, fines, licenses, and fees for services.
Operating expenditures provide support for most traditional tax-supported
municipal services such as Public Safety, Parks and Recreation, Libraries,
Administration, Community Development and Public Works operations. With the
identification of financial trends and issues, the City Council and management
can begin to proceed with developing goals, objectives and priorities for the
coming year, as well as the next five years.
Total assessed property value is projected at $2,661,414,000 in FY 2006. The
average value of a home in Colleyville for FY 2005 is estimated at $323,000,
while the current average residential building permit value is $525,000.
Compared to neighboring cities, Colleyville has a lower property tax rate, offers
greater homestead exemptions and has had no property tax rate increase in the
last nine years. The current ad valorem tax rate of $0.3474 per $100 of
assessed property valuation is maintained through 2007. An increase to $0.3554
is anticipated beginning with FY 2007, to incorporate the planned debt sale for
the fire station and outdoor warning sirens approved by the citizens during the
2005 Bond Election.
After weathering the last several years, the City of Colleyville is experiencing
growth from the recovery of the local economy. Sales Tax, the General Fund's
second largest revenue source, is projected to be $1,889,664 for FY 2004 -
2005. Currently, sales tax collections for the first five-months of the fiscal year
are up $93,631 as compared to last year's actuals.
Listed below are highlights from the financial forecast:
o Not included in the projections are program enhancements relating to
increases for mandates and increased service requests for the five-year period.
These types of items will be examined on an individual basis during the budget
development process in each succeeding year.
o For purposes of this forecast, only positions for Public Safety (excepting one
parks maintenance position) are included in the forecast. While consideration for
other departmental staffing is merited, they will be examined on their individual
merit during the future annual budget development process.
o The 2005 - 2010 budget forecasts allocate full funding for sustainable budget
enhancement initiatives including the:
. Computer Replacement Program
. Vehicle Replacement Program
. Street Maintenance Program
o Operating expenditures are projected to increase by 1.5% annually to adjust
for inflation.
o Ad valorem valuation is projected to increase 5% per year.
Achieving a AA+ Bond reflects Colleyville's strong financial operations, as well as
being one of the few cities in Texas whose debt received the second highest
possible bond rating. Rating agencies lauded everything from the quality of City
Council oversight, city management, population growth, depth of tax base, to the
ability to attract quality retail and residential developments.
My special thanks go to each of you for expending the time and attention this
early to shape the FY 2005 Budget. Without a doubt, special appreciation is
given to the Management TEAM and members of the Budget Team for their
cooperation and support as we prepared this financial forecast. I look forward to
discussing this information with you at the March 8, 2005, City Council meeting.
city Of
ilC9
Texas
2004 - 2005 Work Initiatives
Mid year Report
March 8, 2005
2004 - 2005 Work Initiatives
The six main themes from the June 2004 planning session include:
o Economic Development
o Roads and streets
o Capital Improvement Program
o Sustainable Operating Budget
o Employee Development - Employer of Choice
o Standards and Process - efficiency - use of technology
Goal One:
Make Colleyville more prosperous through economic development efforts
· Prepare an incentive policy supporting existing and attracting new businesses
· Develop a branding campaign for the city
· Develop a marketing and image program for the city
· Host an annual business appreciation event
· Prepare a study evaluating the development process to enhance customer service
efficiency
· Continue work efforts with "Project Colleyville" by focusing on:
Identifying potential retail prospects and opportunities
Preparing an incentive policy to encourage property redevelopment
· Prepare an economic development strategic plan
· Establish an economic development plan designed to attain the retail sales tax growth
defined in a five year Financial Plan. Highlight all factors that must be managed,
especially an analysis of commercial land requirements that can be used as guidelines
by the City Council for zoning decisions
· Master Plan for commercial areas in the City to include planning requirements that will
ensure consistency of development with adjacent tracts
· Define standards for developers pertaining to gated subdivisions, higher density
developments, and commercial developments
· Provide quantifiable updates on economic development activities
· Provide continued enforcement of sign code regulations along SH26
· Pursue increasing taxable sales tax base by 15%
Goal Two:
Enhance Colleyville's roads and streets
· Prepare a study to evaluate opportunities to enhance access to residential-commercial
development sites with focus on street maintenance or construction of new roads
(including cost-benefits and funding alternatives) as identified in the Thoroughfare Plan
· Prepare a study reviewing construction schedules for ways to expedite intersection
construction
· Continue funding efforts to meeting a sustainable budget by funding $500,000 for street
maintenance for the 2005 expense plan
· Recommend to the City Council for approval a Five Year Capital Improvement Plan for
roads that contain projects that can be done on and associated with funding
recommendations
· Ensure all roads when improved, meet the standards defined in the Land Development
Code
· Evaluate all road improvements and new roads to include sidewalks to be constructed
at the time and not escrowed for future construction
Goal Three:
Capital Improvement Plan
· Pursue purchasing land for a new Central Fire Station
· Pursue modifying the TIF to include Fire Station land
· Evaluate opportunities to purchase park land
· Recommend to the City Council for approval a Five Year Capital Improvement Plan for
water, sewer and drainage, which contains projects that can be done, timelines and
associate funding recommendations
· Pursue constructing the McPherson Park Trail to connect to trails through the new
subdivision and trail on McDonwell School Road
Goal Four:
Make Colleyville a model city
· Review the City Charter for possible modifications
· Establish a Sunset Committee evaluating the Land Development Code with a focus on
"do we need the rule, is it a good rule and how to communicate the rule"
· Continue work with
Updating to the City Master Plan; and
Finalizing the Capital Improvement Program and tentatively schedule an election
for February 2005.
Goal Five:
Sustainable Budget
· Prepare a Five year General Fund Financial Plan that includes revenue requirements
and sources
Goal Six:
Continue to be "An Employer of Choice"
· Review the compensation and benefits program to retain and attract quality employees
· Identify opportunities to enhance and advance employee knowledge base through
training
· Evaluate equipment and use of technology to enhance employee performance
· Evaluate programs with a focus to reduce employee turnover
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts.
TASK: Prepare an incentive policy supporting existing and attracting new
businesses
I STATUS: Complete
UPDATE:
Staff reviewed area cities for a benchmarking of competitive incentive
agreements for comparison. A draft policy was prepared and presented to
the City Council for discussion in December. Following modifications by the
City Council, an incentive policy was adopted in January by the City
Council. Staff has had a series of discussions with a retail developer for
possible incentive enhancements for a significant retail anchor. As
provided in the incentive policy, any agreement must be approved by the
City Council.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Develop a branding campaign for the city.
I STATUS: In process
UPDA TE:
A branding process has been outlined in a memo and was presented to City
Council. Staff has contacted two consultants to develop a timeline and
budget. The cost to do a branding exercise ranges from $10,000 to
$25,000. With the City's limited resources, staff discussed that the City
Council consider a logo and tagline contest from Colleyville students or
citizens. Entries would be judged by a City Council appointed group. This
could be the most efficient way to build community consensus and the most
cost effective way to develop the City's image for the future. The City
Council directed staff to review structuring a citizen committee with
marketing expertise, to assist in developing the program. Staff is reviewing
"best practices" from other cities with similar citizen programs to model.
SCHEDULED ACTION:
Action
a. City Council Workshop
b. Develop branding strategy
Complete bv
02/01/05
04/01/05
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Develop a marketing and image program for the city.
I STATUS: In process
UPDATE:
The marketing and image program for the City will follow the branding
campaign.
SCHEDULED ACTION:
Action
a. Develop strategy
b. Announce contest in Communicator
c. Receive entries
d. Judge entries and announce winner
Complete by
04/01/05
05/15/05
05/06/05
06/30/05
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Host an annual business appreciation event.
I STATUS: In process
UPDATE:
An appreciation luncheon is scheduled for June 15, 2005 at the Colleyville
Center. Invitations and promotion with the area media is scheduled for late
May.
SCHEDULED ACTION:
Action
a. Plan luncheon
b. Print and send invitations
c. Luncheon
Complete by
02/05/05
05/15/05
06/15/05
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Prepare a study evaluating the development process to enhance
customer service efficiency.
I STATUS: In process
UPDATE:
Staff has developed a customer service survey instrument to gather
information on a regular basis from homebuilders and contractors who
obtain building permits through the Building Permit Office. The information
collected will be used to help improve efficiency and to modify internal
review procedures, which may improve the building permit review and
approval process.
Staff has completed the survey instrument on 01/14/05. Building Permit
staff began distribution of the customer survey questionnaires to all
homebuilders and to randomly selected other permit-holders on 02/07/05
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Continue work efforts with "Project Colleyville" by focusing on
identifying potential retail prospects and opportunities.
I STATUS: Ongoing I
UPDATE:
Staff recently returned from the International Council of Shopping Centers
regional show in San Antonio where several targeted retailers were
exhibiting. Staff is scheduled to attend the national ICSC conference in
May 2005.
The Buxton report is finished and the pursuit packages have been sent out
that will be used to market perspective retailers. Staff is working with the
developers of several redevelopment sites (Chevron Station, Pecan Village,
etc.) to assist with development opportunities. In addition, staff has met
with a retail developer to get perspectives on development opportunities
along the Precinct Line Road corridor.
SCHEDULED ACTION:
Action
a.
b.
c.
d.
e.
Receive and evaluate pursuit packages
Send packages to retailers
Follow up on packages
Set up appointments for ICSC
ICSC
Complete by
12/15/04
02/10/05
03/01/05
03/05/05
OS/20/05
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Prepare an economic development strategic plan.
I STATUS: In process
UPDA TE:
Staff has prepared a draft strategic plan of action and scheduled for City
Council discussion for the March 15 meeting. Staff is registered for a one
day course on strategic economic development planning through the Texas
Leadership Institute on March 29 for additional input.
SCHEDULED ACTION:
Action Complete by
a. Develop draft strategic plan 12/15/05
b. Attend seminar 03/29/05
c. Revise plan and present to Council 04/19/05
c. Revise plan with Council recommendations 04/20/05
d. Present plan to City Council for approval 05/17/05
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Establish an economic development plan designed to attain the retail
sales tax growth defined in a five year Financial Plan. Highlight all factors that
must be managed, especially an analysis of commercial land requirements that
can be used as guidelines by the City Council for zoning decisions.
I STATUS: In process
UPDA TE:
The retail growth anticipated by the finance department is 5% annually for
2005 - 2006 and 4% for 2007 - 2009 due to the reconstruction of SH26.
The current budget forecast anticipates a 17.5% increase in sales tax
receipts for the fiscal year.
SCHEDULED ACTION:
Action
a. Inventory all commercial land
b. Develop timeline for buildout
c. Develop plan
Complete by
12/15/04
02/15/05
04/01/05
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Master Plan for commercial areas in the City to include planning
requirements that will ensure consistency of development with adjacent tracts.
I STATUS: In process I
UPDATE:
The Planning and Zoning Commission has embarked on a series of
workshops, which include a discussion and review of the zoning regulations
contained in the Land Development Code. For example, in 1996, the
commercial zoning districts were divided into three district categories, CC1,
CC2 and CC3. A review of these districts is in order to see if the
regulations are producing compatible developments along State Highway
26.
SCHEDULED ACTION:
Action
a. Hold P & Z workshop
b. Recommend changes, if any
Complete by
03/01/05
05/01/05
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Define standards for developers pertaining to gated subdivisions, higher
density developments, and commercial developments.
I STATUS: Partially complete I
UPDATE:
The Planning and Zoning Commission is currently evaluating the PUD
regulations, particularly as they relate to open space requirements and
higher density residential developments. A review of the gated
development regulations has recently been completed and proposed
amendments to the PUD regulations are forthcoming to the City Council
later this year.
Staff submitted gated development revisions to the City Council on
02/01/05 during pre-council session. The revisions were also heard at the
02/15/05 and 03/02/05 City Council meetings and approved by Ordinance
0-05-1513. Staff has held Planning and Zoning workshops on 01/20/05
and 02/21/05 to review PUD regulations. A draft revision is currently being
prepared and will be discussed at Planning and Zoning Workshop
scheduled for week of March 7, 2005.
SCHEDULED ACTION:
Action
a. Submit gated development revisions
b. Review PUD regulations
c. Submit PUD amendments to City Council
Complete by
02/01/05
02/01/05
04/01/05
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Provide quantifiable updates on economic development activities.
I STATUS: Ongoing I
UPDA TE:
Generally the reports are provided on a monthly basis but in no case past
the quarterly reporting standard.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
I TASK: Review and update sign code.
I STATUS: In process
UPDATE:
Over the past year, since the adoption of a new sign code, staff has
received several comments and suggestions from business owners
regarding possible amendments and enhancements to the sign code, in
order to provide more effective commercial advertising and to better
coordinate commercial advertising with special events. Staff will be
bringing several recommendations to the City Council for consideration in
the summer of 2005.
SCHEDULED ACTION:
Action
a. Prepare sign code amendments
b. Submit to City Council
Complete by
04/01/05
06/01/05
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Provide continued enforcement of sign code regulations along SH26.
I STATUS: In process I
UPDA TE:
Staff has been assigned to regularly monitor possible sign violations along
the retail corridor. Offending sign owners have been advised of infractions
for compliance with violations being corrected.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL ONE
Make Colleyville more prosperous through economic development efforts
TASK: Pursue increasing taxable sales tax base by 15%.
I STATUS: Ongoing
UPDATE:
Sales tax receipts for the fiscal year are averaging 17.5% increase for year
to date comparisons. This level of increase is very competitive with
comparable cities in the area.
SCHEDULED ACTION:
Action
a. Identify development potential of sites
b. Evaluate traffic flow
c. Develop conceptual plan
Complete by
03/15/05
04/01/05
05/01/05
2004 - 2005 Work Initiatives
GOAL TWO
Enhance Colleyville's roads and streets
TASK: Prepare a study to evaluate opportunities to enhance access to
residential-commercial development sites with focus on street maintenance or
construction of new roads (including cost-benefits and funding alternatives) as
identified in the Thoroughfare Plan.
I STATUS: On going I
UPDATE:
The City Council allocated $445,000 for street maintenance in the FY 2005
Budget. The City Council has awarded $315,000 for street overlay. In
partnership with Tarrant County and support provided by Commissioner
Whitely, the City has realized a value of approximately $600,000 in actual
street overlay improvements. Streets selected are main thoroughfares
which aid retail shopping. The City Council approved a three way
partnership for the improvement of the intersection at McDonwell School
Road at Precinct Line Road. The improvements will facilitate retail
development at the intersection and address anticipated traffic from the
opening of an elementary school this fall. As part of the overall work efforts
for McDonwell School Road, staff is developing an overlay plan for
McDonwell School Road, which would facilitate retail shopping. A proposal
is anticipated to be presented to the City Council in April for discussion.
The Planning and Zoning Commission is currently reviewing the
Thoroughfare Plan for possible modifications. As part of the discussion, the
Commission is reviewing the benefits and alignment for the proposed
parallel road along Precinct Line Road. A recommendation is anticipated to
be presented to the City Council in early summer on possible changes to
the Thoroughfare Plan.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL TWO
Enhance Colleyville's roads and streets
TASK: Prepare a study reviewing construction schedules for ways to expedite
intersection construction.
I STATUS: On going
UPDA TE:
McDonwell School Road & Precinct Line Road Intersection
· Met with consultants on a bi-weekly basis to discuss design
related issues.
· Set a "hard" deadline for bidding and construction of the
project.
· Provided the consultant information on a "1 day max" turn-
around.
· Reviewed the construction sequencing plans early on and
eliminated one phase of construction by modifying other
phases saving approximately thirty days of construction.
Glade & Heritage Intersection
· City staff is having monthly meetings with the consultant to
ensure the design timeline is met.
· Staff has expedited the property appraisals contract through
the City Council approval process.
· Staff has sent clear and accurate information to property owners
regarding the purchase of ROW.
· Staff has kept all residents and HOA groups up to date on the
design and construction process through neighborhood public
meetinqs.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL TWO
Enhance Colleyville's roads and streets
TASK: Continue funding efforts to meeting a sustainable budget by funding
$500,000 for street maintenance for the 2005 expense plan.
I STATUS: Complete I
UPDATE:
As part of the FY 2005 Budget, the City Council increased funding for street
maintenance to $445,000. In October, the City Council awarded $165,000
and in February the City Council awarded an additional $150,000. In
partnership with Tarrant County and support provided by Commissioner
Whitely, the City has realized a value of approximately $600,000 in actual
street overlay improvements. Streets selected are main thoroughfares
which aid retail shopping.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL TWO
Enhance Colleyville's roads and streets
TASK: Recommend to the City Council for approval a Five Year Capital
Improvement Plan for roads that contain projects that can be done on and
associated with funding recommendations.
I STATUS: In process I
UPDA TE:
The City Council finalized development of a CIP in the fall of 2005.
Subsequently a bond election was held in February for voter consideration
of various projects. Staff is finalizing cost and funding estimates for several
possible street improvements. A presentation is scheduled with the City
Council in May. As part of the 2005 - 2006 Budget, a summary of all
funded CIP projects will be included for consideration by the City Council.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL TWO
Enhance Colleyville's roads and streets
TASK: Ensure all roads when improved; meet the standards defined in the Land
Development Code.
I STATUS: On going I
UPDATE:
Excluding annual overlay of various streets, the Public Works Department
reviews construction plans for street construction for compliance with the
Land Development Code. Provision for sidewalks and specifications for
concrete streets are met.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL TWO
Enhance Colleyville's roads and streets
TASK: Evaluate all road improvements and new roads to include sidewalks to
be constructed at the time and not escrowed for future construction.
I STATUS: On going
UPDATE:
Construction Regan Park Road, McDonwell School Road and Glade Road
intersection improvements provide minimally for a five-foot sidewalk. In
several areas, a ten-foot hike and bike trail is provided for McDonwell
School Road and for the Glade Road intersection projects.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL THREE
Capital Improvement Plan
TASK: Pursue purchasing land for a new Central Fire Station.
I STATUS: In process
UPDATE:
It is anticipated that a property site for a fire station will be secured within
the next several months. In the interim, staff is proceeding with soliciting
proposals for an architect for initial planning. It is anticipated that the City
Council will select an architect by late spring.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL THREE
Capital Improvement Plan
TASK: Pursue modifying the TIF to include Fire Station land.
, STATUS: Ongoing
UPDATE:
Pending selection of property for a fire station, staff will initiate review and
modification of the TIF District as needed, in order to incorporate the
property for consideration by the TIF Board and City Council.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL THREE
Capital Improvement Plan
TASK: Evaluate opportunities to purchase park land.
/STATUS: Ongoing
UPDATE:
Over the last several months staff has reviewed all existing available land in
the City that is larger than 10 acres with associated identification of TAD
appraisals for the identified land parcels. This report is anticipated to be
complete by April 15 and will be presented to the Parks and Recreation
Advisory Board and City Council. Also, staff has discussed with one
developer the possible donation of land for a park with particular emphasis
in the donation of a historical structure. Along with these efforts, staff has
discussed with the City Council two sites for possible parkland acquisition
with no action to date.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL THREE
Capital Improvement Plan
TASK: Recommend to the City Council for approval a Five-Year Capital
Improvement Plan for water, sewer and drainage, which contains projects that
can be done, timelines and associate funding recommendations.
I STATUS: In process I
UPDATE:
Staff assembled various projects with funding sources for project selection
by the City Council. Several identified projects were submitted to the voters
for funding approval by the City Council in a recent bond election. A five
year CIP will be finalized for adoption as part of the FY 2005 - 2006 Budget.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL THREE
Capital Improvement Plan
TASK: Pursue constructing the McPherson Park Trail to connect to trails
through the new subdivision and trail on McDonwell School Road.
I STATUS: In Process I
UPDA TE:
Staff prepared an alignment and construction cost for review and
consideration by the Park Land Dedication Committee, Parks and
Recreation Advisory Board and City Council in January. As part of this
discussion was consideration of funding options for the project. The City
Council subsequently approved funding and a construction contract for the
trail. Construction is anticipated to be complete by early summer.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL FOUR
Make Colleyville a model city
TASK: Review the City Charter for possible modifications.
I STATUS: Complete I
UPDATE:
The City Council appointed a citizen advisory committee In October
charged with the responsibility to review and make recommendations for
possible modifications. In February, the Committee presented their findings
and the City Council held worksessions for further discussion. A special
election has been called for May 7, 2005 for the citizens to consider the
various proposed modifications.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL FOUR
Make Colleyville a model city
TASK: Establish a Sunset Committee evaluating the Land Development Code
with a focus on "do we need the rule, is it a good rule and how to communicate
the rule".
I STATUS: I
UPDA TE:
The Planning and Zoning Commission has embarked on a series of
workshops, which will include a discussion and review of the zoning
regulations contained in the Land Development Code. For example, in
1996, the commercial zoning districts were divided into three district
categories, CC 1, CC2 and CC3. A review of these districts is in order to
see if the regulations are producing compatible developments along State
Highway 26.
Chapter Three of the Land Development Code contains the bulk of the
development regulations, such as zoning, parking, fencing and land use
controls. This chapter of the Land Development Code needs a thorough
review and re-organization. Over the years, amendments have been made
that make it difficult to find a particular regulation. Some language should
be modified; other changes are simply the need to add proper section titles.
The review of this chapter will require numerous workshops of the Planning
and Zoning Commission prior to submittal of any changes to the City
Council. This task is identified as a recommended project in the 2004
Master Plan update.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL FOUR
Make Colleyville a model city
TASK: Continue work with updating to the City Master Plan.
I STATUS: In process
UPDATE:
There are several areas in the community that were identified during the
development of the 2004 Master Plan as having zoning designations that
conflicted with the actual development that existed on the ground. For
example, Fox Meadow Addition is zoned for Duplex development, but all of
the homes in the subdivision are single-family detached dwellings.
Bridlewood Addition, Lakewood Estates Addition and parts of Saddlebrook
Addition have similar conflicts between the designated zoning classification
and the actual development.
The Planning and Zoning Commission has scheduled a workshop to
discuss a strategy for correcting these potential zoning problems. The
Planning and Zoning Commission completed a preliminary review of the
zoning map at the February 21, 2005 workshop. Staff will be contacting the
homeowner associations to determine a strategy for revising the zoning
map for these properties.
SCHEDULED ACTION:
Action
a. P & Z review
b. Public hearings & adoptions
Complete by
03/01/05
05/01/05
2004 - 2005 Work Initiatives
GOAL FOUR
Make Colleyville a model city
TASK: Continue work with finalize the Capital Improvement Program and
tentatively schedule an election for February 2005.
I STATUS: Complete I
UPDATE:
The City Council selected various public improvements as part of the
development of the CIP. Projects included facilities, roads, sidewalks,
parks and landscaping. An election was called and held in February.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL FIVE
Sustainable Budget
TASK: Prepare a Five year General Fund Financial Plan that includes revenue
requirements and sources.
I STATUS: In process
UPDATE:
Staff will be presenting a preliminary five-year plan for City Council
discussion at a March 8 City Council worksession. A final document will be
incorporated for approval with the FY 2005 - 2006 Budget. The budget
forecast will include sustainable budget funding needs including: computer
replacement, vehicle replacement, street maintenance and building
maintenance.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL SIX
Continue to be "An Employer of Choice"
TASK: Review the compensation and benefits program to retain and attract
quality employees.
I STATUS: In process I
UPDATE:
As part of the 2005 - 2006 Budget development, staff is finalizing a report
to present for City Council discussion as part of the 2006 budget
worksessions.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL SIX
Continue to be "An Employer of Choice"
TASK: Identify opportunities to enhance and advance employee knowledge
base through training.
I STATUS: On going I
UPDATE:
Staff has initiated a "Succession Plan" to identify employees who are likely
to retire within the next five to ten years. Skill sets and working knowledge
will be reviewed for these positions to ensure that remaining employees
receive training opportunities for advancement. In addition to this planning
effort, department heads will be evaluating ongoing training opportunities to
ensure that funding is allocated for training needs for the development of
the Succession Plan.
SCHEDULED ACTION:
2004 - 2005 Work Initiatives
GOAL SIX
Continue to be "An Employer of Choice"
TASK: Evaluate equipment and use of technology to enhance employee
performance.
I STATUS: On going
UPDATE:
The Fire Department is reviewing a proposal for ambulance software billing
to allow better entry of medical information for billing purposes. In addition
to the software, the company manages ambulance billing for a city. This
feature will allow existing staff to better focus on other operational needs.
Preliminary review indicates the program will fund itself and potentially
increase ambulance revenues.
Engineering design software was acquired with the recent hiring of an
engineer with Public Works. It is anticipated that a substantial part of salary
costs will be absorbed by the employee being able to do small design
projects.
Staff is reviewing a web based software to manage and track customer
service requests. Several cities have implemented the program and report
very good comments from citizens. The program will allow for tracking of
requests for service and monitor completion within specified time frames.
This aspect will be of assistance in the City complying with new GASB
accounting standards for the annual budget to establish more quantifiable
performance standards.
Funding in the 2005 Budget provided for the acquisition of a breath
intoxilyzer which reduces the travel time to other cities for testing of
suspected violations. It is anticipated that the cost for the equipment will be
paid off by reduced out of service costs in two years. The purchase of
asphalt truck in this years budget has dramatically enhanced the quality and
turn around of Public Works staff completing street repairs.
2004 - 2005 Work Initiatives
GOAL SIX
Continue to be "An Employer of Choice"
TASK: Evaluate programs with a focus to reduce employee turnover.
I STATUS: On going
UPDA TE:
The Human Resource Department is projecting that employee turnover for
the current fiscal year will be approximately 10%. In conjunction with the
Succession Plan initiative, focus is being provided for ways that enhanced
training to possibly avoid employees being otherwise released from the
City. Staff is surveying cities where employees indicate leaving for higher
compensation to determine any possible clustering of competition cities and
market base for compensation. Related to this initiative, an employee
committee is reviewing all facets of the City compensation and benefits
program to our market cities.
An employee driven health awareness campaign was initiated this year.
The program offers support and information for varied health concerns. A
unique aspect of the program is its web based format allowing individual
customization of information. In March, a wellness challenge was "kicked
off' among various departmental employee groups, which has gained
considerable excitement.
SCHEDULED ACTION:
FY05 BUDGET PROJECTIONS - FEBRUARY 2005
GENERAL FUND SUMMARY
CMO 623,091 221,374 610,155 12,936
Building Inspection 301,988 104,221 279,389 22,596
Economic Development 152,835 59,174 151,346 1,491
CSO** 308,531 114,989 302,232 6,300
Finance 470,257 184,789 466,207 4,051
Legal 70,000 30,255 99,748 (29,7 48)
Library 475,470 164,728 467,956 7,512
Engineering 461,279 146,367 445,229 16,050
Community Development 282,684 103,139 271,030 11,654
Fire 3,017,388 1,211,835 3,062,623 (45,236)
Police 3,135,076 1,272,728 3,165,226 (30,149)
Parks Maintenance 1,313,213 433,645 1,262,770 50,443
Streets and Drainage 1,786,026 620,330 1,747,055 38,970
Recreation 287,648 92,465 286,495 1,151
Communications 145,222 80,053 144,949 274
Colleyville Center 345,334 110,643 324,699 20,635
Municipal Court 237,688 74,380 229,900 7,789
Fleet Maintenance 181,246 68,926 179,411 1,836
Compensation Adjustment 256,158 0 256,158 0
Building Services 232,680 56,100 198,830 33,850
Information Services 165,518 56,136 143,861 21,655
Capital Equip Reserve 45,740 0 45,740 0
Amended Budget $ 14,295,071
Projected Expenditures 14,141,010
Expenditures Variance $ 154,061
Adopted Revenues $ 13,920,458
Projected Revenues 14,509,677
Revenues Variance $ 589,219
Projected Operating Budget Balance $ 743,280
PROJECTION-MBA FEB05
3/4/2005 3:55 PM
GENERAL FUND REVENUE/EXPENDITURE SUMMARY
FIVE YEAR FINANCIAL PLAN FY 2006 - FY 2010
04-Mar-05
FY 2005
FY 2006
FY 2007
FY 2008
FY 2009
FY 2010
REVENUES
AD VALOREM TAXES
7,403,928
7,444,754
7,781,628
8,061,683
8,574,976
9,386,949
ALL OTHER REVENUES
6,891,637
6,553,498
6,525,380
6,671,158
6,875,918
7,087,078
TOTAL REVENUES
14,295,565
13,998,252
14,307,008
14,732,841
15,450,895
16,474,027
EXPENDITURES
GENERAL FUND EXP
14,295,071
13,997,462
14,251,648
14,466,853
14,689,146
14,912,908
ENHANCED BUDGET:
STREET MAINTENANCE 0 0 0 0 200,000 750,000
NEW PERSONNEL 0 0 45,000 264,356 302,574 307,112
COMPENSATION 0 0 0 0 250,000 500,000
VARIANCE 494 789 10,361 1,632 9,175 4,006
LESS USE OF FUND BALANCE 719,744 0 0 0 0 0
ENDING FUND BALANCE 6,048,342 6,049,131 6,059,492 6,061,123 6,070,298 6,074,305
. ASSUMPTIONS OF MODEL
ANNUAL EXPENDITURE INCREASE: 1.5%
TAX BASE GROWTH: 5%
PROJECTED VALUE (IN $100'S) 25,346,801 26,614,141 27,944,848 29,342,091 30,809,195 32,349,655
ADDITIONAL PERSONNEL: FY 2007 - POLICE OFFICER; FY 2008 - POLICE OFFICER AND 3 FIREFIGHTERS; FY 2009 - PARKS MAINTENANCE WORKER