Loading...
HomeMy WebLinkAboutPlanning and Zoning Commission-Agenda Packets-1/20/2005 city or @ Texas AGENDA PLANNING AND ZONING COMMISSION Executive Conference Room 3rd Floor of City Hall - 100 Main Street Thursday, January 20, 2005 WORKSESSION 6:30 P.M. There will be a work session for the Planning and Zoning Commission The purpose of the work session is for the Planning and Zoning Commission to review and discuss the following: 1. Master Thoroughfare Amendment 2. PUD Regulations Amy Shelley, Planning and Zoning Assistant Posted: Thursday, January 13, 2005, 4:30 p.rn. .$ Texas PLANNING & ZONING COMMISSION WORKSHOP AGENDA BRIEFING Agenda Date: Subject: January 20, 2005 Thoroughfare Plan Amendment You will recall that one of the recommendations contained in the recently approved 2004 Master Plan involved an amendment to the Master Thoroughfare Plan to change the general alignment of the future four-lane north-south collector street that parallels Precinct Line Road between McDonwell School Road and L. D. Lockett Road. With the reduction in the width of the future commercial area along Precinct Line Road, the relocation of the north-south collector street will provide an excellent circulation route in support of the Precinct Line Road commercial area and also serve as a physical separator between the future commercial and residential areas. As properties are platted, they would be required to dedicate their portion of the right-of-way and construction the applicable part of the roadway. There is also some concern regarding the need for a four-lane roadway for this particular route. A two-lane facility constructed with a 60 foot right-of-way should satisfy traffic circulation needs in this area and provide sufficient right-of-way width to accommodate the trail route through this area. The current trail route shown on the 1999 Colleyville Pathways Plan is located immediately adjacent to Precinct Line Road. One of the goals being considered in the update to the trails plan is to relocate the trail route away from the busy traffic along Precinct Line Road. Attached is an exhibit showing the general location of the future north-south collector street as shown on the currently adopted Master Thoroughfare Plan. Also attached, are exhibits showing alternate routes for the future roadway. Staff will discuss these alternate routes and identify potential issues associated with each route at the workshop. Upon agreement by the Commission at the workshop, staff proposes to notify all affected property owners and schedule a public hearing before the Commission for the second regular meeting in February 2005. The following are the two issues to consider at the February 2005 public hearing: 1. Changing the location of the future north-south collector roadway or allow it to remain as shown on the current Master Thoroughfare Plan. 2. Change the designation of the roadway from a four-lane collector street to a two- lane collector street. Location of future four-lane collector street as shown on current Master Thoroughfare Plan H II I I J != '1=1 '1../';:~-:::'~L i 'i.-L_~:::4= ~ ~'--j 'v'F' L~rr r I i Ii 31"~ - -.--1..----r ')1 I b-. II ":: I I -{ ~RE 8-:::1 = -. '="m .~. h-l \ 'c: T ~ "1/ ,HH 1=-:"= ::{Trf', " ~,cj~.II' i ' . 1 f,\.r-.........../!.:...r-+-'..-..........t--........ -..- =r; : ,;iT,~:~~ ,~ ,1m i.,..81~~li I "~~~'~i]~3 ~ I I I.~ : II. II.'lDID~ \ '. '-1i-~Jt _ / -II L " I I /~~ . ~-;/:j[:... 1!'--1 f- ;f 1. I :1''-' I ~ r/\ X{'7I .. i i ~_ '; I :1 I j' MUS , 'T~J~~. !I i I I '\ ._ I ; ',. ... ~~d ~'f l;. ,I .' I I ~~~_"t{E~ I:,. I) /~)'f TJ:tl 'I~' 1_.,- = I f-Y I-- ~>.J-~I-- ~T' r'~ls- ~.. , , I t-.I-.J!li--fG --~,- ru 1-. J~ ~~5' r! '11' be.! ifl- Ijr~~~ ~~= '- ' ' ~ ~ i-~:1 I~\ :~ 'ff"~,,'-< .I~ Ii .@ ! J lt~ ~ -~ 'rJj~ inT'!" '~TT- I w=Jlrm'l i [I 1// \. !.f ij ~8: 'c:.o~' :,~ ".' JI I )~~; ! f-"F: - -=a' ;, )//#~ "-I 'I r-}: 'ty\j, k" . i ,Y/~'!;f - ,...- ; 10 ::!-( I I il ILl I /-.._Jii)~-. f-j- f-- p=--:--":::'" __~u CLL_ ,,-_::::1t.....' ~l// r- "olum ',,~~)f. _Ji "~ ~!l "7<::--' '- m~.J.J 8t-f-M- '-j I-I~W 'I' I !t'"=i 1 '1 'i Location of future collector street Alternative "A" i~1 -=-r.. II I , ! dll I II ! I: ~E I , ! , II! ' r+ " .1 ' . ~: '~I t3,-~L j v AX' ; ocr' v /,~, ~ '- ,,,,,.) ''<./\ .:=: ~ ,I ~. ~i;' lDl ~ -- f-- I .' r- .JJ, J)i _, I r--'j. I ,J LII >-<; iLL ~/i I/- -''1-. Ie-- -~ ... rl 1-' " ! '-, ~.LL " . --l-' ,- r-J ti ' P-v fT, . m,", ~r--1'"; j t\--r::: ; I i II, 1\ -'~~':-- \L.,.....'R...!::=~i~. ~!.., J I I I Tll ~~ ~ ~ I I!' ~Jd",~.(~'0, 'I ~ ~ ! i ! L i! t- I ! I I 'jfi 1-/ I ,c:!-' I iU I J ; u ~l~t"- ,:1 ' r-' ,[t-__-,--t1r I I' 1/ -~~~~'>'II: I ' .~ ~ . . ~ rt. J',,! \-" ...L. W-'--'I'---'-i I r- I I .-~~~;&t\ ~~+GST1E: i.R ' III I 1:-:,., ~ /-1::;Ul \~, bJ~l i f- l.... i I"~ j.\ /1''11.1 ~,,_ ... I i I ICy-; -::-'-= = ; 'l I I t 1,- -,"'" p ~ CUST tlA ~ - ; t I 1 1l f- _IV . M -- i- .j II ,:r; - ! ~ t-'s;j ,,-"00,: 0 0 L r- -,- L- c-'-1 ;r I "~I ~I-, 1-'_ N~ ~ ! ~~~~f-1~r-' ~ ~ICR~_- r _I --1-- [ ~/b\\::::-l H r-' ~ I~ ~ =1 ~~T-- ~ !- , --11E \ ~ 'ri-_ l;-t- ,_II . <'. ~ !I~ - ~ HI!l- to "';1""-', ~ "~ ! [ ~__rl~r- g--~L '\fr- ' ~ P4J rn ~ ! ];-dlL..G ~""~~ ~'="~ I !_F I / - * 1JJ~- I-~r U fTcmS;>~ · / 'I ~J- v'/ e-- '\ i ='tfl _1' b ~, !:, -;~"/~ - · ,) -.- ".l' I 'r~- '. J --" H '---'~~ " , - : //" (' i1 ,. _~I r:;-n; C~'i~~i I : :-'j~-- ---< 3.. J/:ll."" ~r~--r- r- =-- / LL ---1 I // -- r- --'-, / ,,_.11:: / r-- --'---- / ~r ~,,~J~/,i~ :1+1'L;; '- ",Ii'~J^,-_t dJRlwi I I ~ pr;=]::n~~ f-- Location of future collector stre Alternative "8" et _m -, ,- n~1== f.=I,-~8H (~rL-'-L~~-LLL" l=f1 -- v"'; j 'll ., '- i ' >- ' ~ 'T' 1\ 'IL UfltJ:jIL '--- 1-+ -CIjk. .Eb / ",I '{ /~ " II \ I- j'iJl, I ,':= tFRE ; _-'1" r-- ~- _I L . . , --4- ,- '--<-- \ L-< ...~ ,-- \'~ r+- -T T: c: J,LL , , I ' ~ e- /!if ~ T.:j:..:j ::i >-- I , \\ ',d:~t:r~ r~', II :;3~-, HI ~ I - I u .... j'- H j.... ,..E ' I 1 cc1 II i- l .' ",' J, 01 <if 11 1". .. -;J:'" 'I.Jm IT. -I,m,- ~1r-I. '. " .'. . "'?fS{'. Jl . ,L I j f.-- , ill lJ I I ~ I,i" hWf j.--H!J T '~= f- I,-__I-L I , I I"" '~;n,(~;-'t~~(~: . I r-r- == ~.. 'j( :-T.-:T r- lU& '~'. kti,,-L. .,. rH'. i r - I~ -] i 'I' I I ~I l-Y~ \\ ~'k; i: [~ ~ ...1:' 'I. I . i I .' 0 r: tJ.. \~~ r6tr I~GST f--1- q I I \' I.' iT-jIr v,rl =1~ I~~u. I, I I -,\ H,-~;';"~Jm1--h-, -=]= '(' !./- ~ --fO'lmm~' '~'-"i ; ST s' I---- I .... ~ L /' 1 00 I-m__ . ""1 m 1l I- ::::ya:;,--~~ ----r--" l --, ,-----i! I I- = -L.-' ?"---.-,~, . l: oA,[ 1 f--- ;;; _ ~ <1'''\ , ' ~ "I"1f-- ~ ~~. --I~~ml~~~~-\~~~~ r-iJ -.!..-.~ '. L-=:=!j ___mm-1~- .1 l/ I../: "r .;.- F=;---i 1/ C'iH I u:: I - -1 ~ V,,<HC ~~ ~. L.,._.~_~.o-::c::J _1----1 / )/"-/J ~ · 1~;/--f=L --1---. ~ r~, G f:r~ , ,I': ,JR~ vI i'ITI EL1~/! _~ nUR;I~Tl :~ f-- -H ......l-I. I ' II I ,Li,-L) -'r--' 1--1 .,- H. .~ Texas PLANNING & ZONING COMMISSION WORKSHOP AGENDA BlUEHNG Agenda Date: Subject: January 20, 2005 Review PUD Regulations Planned Unit Development (PUD) zoning became increasingly popular during the early 1960's in response to many perceived problems associated with traditional zoning and subdivision practices around the country. Developers often complained to municipalities that under traditional straight zoning, only the best lands could be developed, leaving many parcels undeveloped due to higher development costs and causing a hop-scotched pattern of neighborhoods with no interconnectivity. Most early subdivision developments had taken place on flat sites, which were cleared of all trees to make construction economical. Developers argued that they should be able to cluster development to achieve a higher density on the best parts of a tract and utilize the un-developable parts for open space. This approach, it was argued, was more sensitive to environmental issues, yet produced the same overall net development density as a traditionally zoned tract. Benefits to the developer included lower overall development costs by concentrating infrastructure investments and enhancing residential developments with greenbelt amenities. Benefits to the community were more open space areas and a pleasing rural atmosphere. However, municipalities were not quick to accept PUD zoning during the sixties due to the language contained in most state's enabling legislation, which required uniformity of regulations within zoning districts. PUD's regulations tend to be variable and generally do not comply with the uniformity requirement. It was not until model PUD ordinances had been published in the mid-1960's by several nationally recognized housing and development associations that PUD zoning became an accepted zoning practice around the country. The goals and objectives of PUD zoning generally focus on four issues: (1) flexibility in development standards, (2) encouragement of innovative housing types and choices, (3) provision of increased amenities; and (4) the role of negotiation and improved public regulation of development. The Colleyville Plan, recently adopted by the City Council, contains several goals and objectives related to open space and PUD regulations. These goals and objectives include: · Promote greenbelts and buffer areas in front of subdivisions adjacent to major thoroughfares · Plan for all neighborhoods to have access to sidewalks and hike and bike trails · Limit the amount of open space that can be utilized for detention ponds to 50% of the open space area in a residential planned unit development · Require amenities in residential planned unit development open space areas such as benches, sidewalks, play areas to enhance the quality of the open space · Ensure that open space areas function as quality areas for the neighborhood · Establish a minimum size for open space · Require tree planting or enhanced landscaping for PUD buffer areas along streets The current PUD regulations were adopted in 1977 as part of the overall zoning regulations, and have changed little since that time. The regulations are quite lengthy, contain many confusing and unnecessary sections and include minimum lot sizes for single-family residential developments. Development patterns in Colleyville have changed significantly since 1977, and the current regulations may not be achieving the type of development desired by the Planning and Zoning Commission and City Council and certain provisions in the regulations have been the source of considerable debate among Commissioners and City Council members. Staff believes the regulations could be revised to achieve the goals stated in The Colleyville Plan, and written in less. confusing, more specific language. Attached is a copy of the Colleyville PUD regulations, which have been modified to address many of the issues discussed over the past several years during public hearings on PUD rezoning requests. Also attached are copies of the current Colleyville PUD regulations and those PUD regulations from several other communities for your review and information. Modified Colleyville PUD regulations ~APf Section 3-410 PUD Planned Unit Developments A. Purpose - The purpose of a Planned Unit Development (PUD) is to permit flexibility and encourage a more creative, efficient and aesthetically desirable design and placement of buildings, open spaces, circulation patterns and to best utilize special site features such as topography, size and shape. This district may also be used to accommodate planned associations of uses developed as integral land use units, including mixed uses, which may be planned, developed and operated either by a single owner or a combination of owners. This district is designed to encourage flexible and creative planning to ensure the compatibility of land uses, to allow for the adjustment of changing demand to meet the current needs of the community, and to provide for a development that is superior to what could be accomplished in other zoning districts by meeting one or more of the following objectives: 1. Provide for an innovative design of lots or buildings; increased open space areas for recreational or leisure use; berms, greenbelts, trees, shrubs or other landscaping features; parking areas, street design or access; or other development plans, amenities or features that would be of special benefit to the property owner or community; 2. Protects or preserves topographical features, such as trees, creeks, ponds, floodplains, slopes or hills. B. Classification of Planned Unit Developments - Planned Unit Developments shall be authorized by one of the following classifications, and shall be designated on the Official Zoning Map in the following manner using the letter abbreviations of such districts. 1. PUD-R Planned Unit Development - Residential. A residential PUD may be designed to accommodate the following development: a. Dwelling units grouped into clusters, allowing an appreciable amount of land for open space. b. Projects with higher densities than conventional single family projects of the same acreage. c. Preservation or enhancement of areas exhibiting environmentally significant natural features. 2. PUD-C Planned Unit Development - Commercial. A commercial PUD may be designed to accommodate the following development: a. Commercial, offices, professional services, retail and institutional uses and facilities or combinations thereof developed in accordance with an overall development plan. b. Single purpose commercial or industrial projects that involve innovative land utilization. C. General Requirements - The lot area requirements, setback requirements, and other design or development regulations shall be established separately for each Planned Unit Development. The amending ordinance adopting a Planned Unit Development may establish these requirements specifically in the ordinance or by reference to another zoning district. The Planning & Zoning Commission and City Council may alter such requirements when, in their opinion, the proposed development's density and land use arrangements shown on the concept plan would result in a more innovative siting of buildings and facilities which would improve the usefulness of yard areas and their relationship to traffic circulation, admittance of light and air to buildings, fire protection and usable open space. H, Land Use ReQulations - A Planned Unit Development may allow any combination of land uses that are permitted by the Land Development Code. A Planned Unit Development may also be approved for specific uses or a class of generic uses, such as single family residential, office, retail, commercial or educational facilities. The list of permitted uses for every Planned Unit Development shall be described in the approving ordinance, which shall be established by one of the following criteria: 1. The permitted uses shall be those listed in Section III, Table of Permitted Uses, for the base zoning district applied to the Planned Unit Development. Additional uses may be permitted and specific uses may be prohibited. 2. The permitted uses may be listed without reference to a specific base zoning district. 3. The City Council may approve residential development in a non-residential PUD and non- residential development in a residential PUD, provide said ancillary development does not exceed ten percent (10%) of the total gross acreage of the PUD development. D. Lot Size - The minimum lot size in a PUD-R district shall be 13,000 square feet, with an average lot size of 16,000 square feet. Furthermore, the lot frontage may be adjusted to be consistent with adjacent properties on the same street but shall not be less than 100 feet. E. Densitv - The maximum residential density permitted in any PUD-R district, or in a PUD-C district where residential uses are proposed, shall not exceed 1.8 dwelling units per gross acre. This calculation shall exclude all proposed non-residential acreage from the gross acreage. F. Modification of Lot Size and Densitv - Modification of the minimum lot size or maximum residential density may be allowed by the City Council when all of the following circumstances are met: 1. The proposed modifications substantially meet the intent of the Master Plan and the Land Development Code. 2. The proposed modification provides for better project design. 3. The development will facilitate the adequate provision of transportation, water, sanitary sewer, drainage and open space in proportion with the type of development. I. Open Space Requirements - For all residential uses within a Planned Unit Development, common open space land shall be reserved primarily for the leisure and recreational use of the occupants of the residential uses. The common open space shall comprise not less than twenty percent (20%) of the gross residential project area. The required amount of open space may be reduced by the Planning and Zoning Commission and City Council when a lesser amount of such open space would be more appropriate to the density of development or size of families or households proposed in the project, or where the availability and nature of adjacent public open space is such that a lesser amount of common open space would adequately protect the health, safety and welfare and promote the orderly development of the residential uses. 1. Definition of Common Open Space. For the purpose of this section, common open space is defined as follows: a. Common Open Space may include: i. Land area of the development accessible to and permanently reserved for the common use and enjoyment of the occupants of the project for leisure and recreational purposes ii. Golf courses, parks, and other open greenbelt areas adjacent to the project, whether publicly or privately owned, which are readily accessible iii. Public school sites, excluding the area devoted to the buildings. iv. Low-impact passive uses include conservation of open land in its natural state (for example, woodland, fallow 'field, or managed meadow), neighborhood squares, common areas, picnic areas, community gardens, walking trails, bikeways, other kinds of pathways, and similar low-impact passive recreational uses. v. Active recreation uses including recreational playing fields, playgrounds, tennis courts, neighborhood pools, and clubhouse structures. vi. Other spaces as approved by the City Council b. Common Open Space shall not include: i. Land areas reserved for the exclusive use and benefit of an individual owner or tenant. ii. Public or private street right-of-way, parkways, alleys, driveways, parking or loading areas iii. Religious institutions or private school sites. iv. Street medians or islands less than seven thousand five hundred (7,500) square feet in area. 2. Guarantee of Common Open Space. Common open space provided in a PUD-R district shall be guaranteed by a restrictive covenant describing the open space and its uses, maintenance and improvement running with the land for the benefit of the occupants of the PUD-R development. The applicant for a PUD-R may submit a draft copy of the proposed covenants which will ensure the guarantees and, in particular, will provide for restricting the use of common spaces for the designated purposes. The plat shall contain a note stating that the common open space shall be maintained by the home owners association. In order to guarantee the preservation and maintenance of the common open space, one of the following methods shall be required: a. The common open space may be conveyed to the City or other public agency which will agree to maintain the common open space and any buildings, structures or other improvements. b. The common open space may be conveyed to a homeowner's association or property owner's association. The declaration of covenants and restrictions that govern the association shall include, but not be limited to, the following: i. The establishment of the association shall be made before any lot in the development is sold or any building occupied. ii. Membership must be mandatory for each building or property owner and any successive owner. iii. The common open space restrictions shall be permanent. iv. The association shall be totally responsible for liability, insurance, property taxes, and the maintenance of the common open space and any improvements. v. The association must have the power to compel contributions from residents of the development to cover their proportionate shares of the costs associated with the maintenance and upkeep of the common open space areas. 3. Open Space Design Requirements. a. The developer shall submit a description or plan of amenities to be included in the open space areas. The amenities may include sidewalks and trails, benches, pavilions, and play areas. b. The amount of common open space used for storm water detention or retention purposes shall be limited to fifty percent (50%) of the area of the common open space. [50% as recommended by The Colleyville Plan; other resources suggest 25%] c. If the open space area contains a pond that has a regular water level, the pond shall include at least one (1) aeration device, such as a fountain, waterfall or underwater device. [required to reduce algae growth, stagnation, reduce mosquito problems, protect public health] d. Open space areas adjacent to street rights-of-way shall be a minimum depth of twenty-five (25) feet. The open space area shall be landscaped to include the retention or planting of one (1) three (3) inch caliper tree per each fifty (50) feet of street frontage. J. ScreeninQ and landscapinQ - Requirements and standards for screening and landscaping shall be established separately for each Planned Unit Development. Areas within any PUD district not used for buildings, roadways, drives, parking areas and other similar features shall be landscaped with grass, shrubs, trees and other appropriate vegetative cover, and such shall be maintained in an aesthetic healthy growing condition. K. Approval Process a. Application Procedure - An application for a Planned Unit Development shall be made in the same manner that an application for zoning change is made. The application shall be processed according to the procedures specified in Chapter One of this land Development Code. b. Special Submittal and Exhibit Requirements - All applications for a Planned Unit Development shall include a Concept Plan. The Concept Plan shall contain appropriate information to describe the general land use configuration, proposed densities, proposed amenities and proposed regulations. The following items shall be shown on the Concept Plan: i. Proposed layout, size and dimensions of all residential and non-residential lots ii. Proposed land uses iii. Height of all non-residential structures iv. Elevation drawings of all non-residential structures v. landscaping lighting, fencing and screening or common areas. vi. General locations of existing tree clusters vii. location and detail of perimeter fencing viii. Design of ingress and egress with description of any special pavement treatments ix. Calculations and location of off-street parking and loading facilities, if applicable x. location and type of all signs, including lighting and heights, for parking lots and common areas. xi. location and description of subdivision signs and landscaping at entrance areas xii. Street names on all proposed streets c. Optional Preliminary Plat Submittal- An application for a Planned Unit Development may include the submittal of a Preliminary Plat. The review and consideration of the Preliminary Plat may run concurrently with the proposed zoning change. The Preliminary Plat shall meet all the submittal requirements specified in Chapter 8 of this Land Development Code. d. Conditions Related to Approval - In establishing a Planned Unit Development, each application shall be evaluated by the Planning and Zoning Commission and City Council as to its probable effect on the adjacent property and the community. The Planned Unit Development may be approved or denied as the findings indicate appropriate. The Planning and Zoning Commission shall review the following conditions associated with the proposed Planned Unit Development: i. ii. iii. iv. v. vi. hts xi. xii. xiii. xiv. xv. xvi. lots The Planning and Zoning Commission may recommend safeguards or conditions of approval to reduce the effect on adjacent or surrounding properties. The City Council may require such development standards and safeguards as recommended by the Planning and Zoning Commission. Upon approval of a Planned Unit Development, the applicant shall proceed with platting the property. Approval of a Preliminary Plat shall be required prior to submittal of a Final Plat. e. Amending the Planned Unit Development - Changes to any Planned Unit Development or to its approved Concept Plan shall be processed in the same manner as the original request. Notwithstanding the above, the administrator of this Code may approve minor modifications in an approved Concept Plan, provided the modifications: i. Do not alter the basic physical relationship of the property to adjacent property; ii. Do not change the permitted land uses; iii. Do not increase the maximum density, floor area, height; or, iv. Do not reduce the minimum yards or setbacks. f. Effect of this Section on Existing Planned Unit Developments - Previously approved PUD amending ordinances to the City's preceding zoning ordinance and Land Development Code, including accompanying plans and supporting documents, shall remain in full force and effect with respect to this Chapter and shall not be made to comply with the provisions of this Chapter. Current Colleyville PUD regulations Section 3.23 PUD - R; C; I (Planned Unit Development Districts) 3.23.A PUD-R; PUD-C; AND PUD-I PLANNED UNIT DEVELOPMENT DISTRICTS (R-RESIDENTIAL; C- COMMERCIAL; AND I-INDUSTRIAL The regulations set forth in this Section, or as set forth elsewhere in this Chapter when referred to in this Section, are the regulations of the PUD-R; C; or I; Planned Unit Development Districts. 3.23.B PURPOSE AND INTENT The purpose and intent of this district is to accommodate planned associations of land uses developed as integral land use units such as: industrial parks; office parks; commercial or service centers; shopping centers; residential development of multiple or mixed housing types (Le., conventional single family detached dwellings, duplexes, multifamily apartments, attached townhouses, condominium multifamily dwellings, cluster homes, "0 - lot line" homes, and patio and atrium homes); and other appropriate and compatible combinations of land uses which may be planned, developed and operated as integral land use units, either by a single owner or combination of owners. This district is designed to encourage the most appropriate uses of land, permit flexibility to encourage a more creative, efficient, environmentally pleasing and aesthetic design regarding the spatial arrangement of buildings and land uses, open spaces, circulation and transportation patterns, and considerations of special site and topographic features. Development controls aimed at assuring the character, compatibility of mixed land uses, and harmonious and timely development of the project are maintained through the establishment of standards specified for various land uses, yards, site coverage by buildings, etc., which are determined by actual design and incorporated into the amending ordinance of the zoning regulations. Likewise, site plans, development schedules, draft restrictive deed covenants and draft property owner association covenants when applicable, are required to be submitted. The Official Zoning Map of the City only identifies those Planned Unit Developments (PUD's) that have been previously approved by the City Council. The map does not forecast the location or type of planned unit developments but assumes that every parcel of land within the community has the potential of being appropriately planned under the regulations set forth herein; therefore, relies on the owner to initiate a petition for zoning change. 3.23.C USE REGULATIONS Land, buildings or structures within any "Planned Unit Development District" may be used for any appropriate combination of principal uses, accessory uses, community facility uses, and special uses permitted in any agricultural, residential, commercial or industrial district within the City; however, the City Planning and Zoning Commission and City Council reserve the right to prohibit'and exclude certain uses within any planned district when, in their opinion, the inclusion of certain uses would or could cause or create an adverse impact within or to adjacent development, or be an otherwise inappropriate use within the development or detrimental to persons or property both within or adjacent thereto. For the purposes of these regulations planned unit development districts shall be confined to one of the following designated classifications, and shall be designated on the Official Zoning Map in the following manner using the letter abbreviations of such districts: "PUD-R" - (Planned Unit Development - Residential); "PUD-C" - (Planned Unit Development - Commercial); "PUD-I" - (Planned Unit Development - Industrial). 3.23.D PERMITTED USES 1. "PUD-R" Planned Unit Development: Residential (where the majority of land use is designated for residential purposes) a. Any single purpose or mixed type of residential dwellings, including, but not limited to: detached single family dwellings on conventional subdivision type lots; attached dwellings such as duplexes and townhouses; "cluster housing," patio homes, atrium homes, "0 - lot line" homes (with a maximum of one side wall of the dwelling in common with a side property line), multifamily apartments, flats and condominiums of similar housing types. b. Community Facility Uses, as approved by the City (and when intended to serve the residential development). c. Agricultural Uses, as approved by the City. d. Commercial Uses, when a part of a residential development and as allowed in conformance with the permitted uses and regulations of the "CN - Neighborhood Commercial District;" and limited in total area to not more than (10) acres. Where the number of dwelling units proposed in the "PUD-R" district indicates a need for a greater amount of commercial land acreage than herein allowed, and the applicant desires greater flexibility or more permissive commercial uses than those contained in the "CN" district regulations, the applicant shall substantiate and document the need for such additional acreage and/or uses via a market analysis or other similar method before such additional land acreage or uses are allowed and approved by the City. e. Special Exception Uses, as designated for the various residential and commercial zoning districts in the "ML - Light Manufacturing and Industrial District", may be allowed by the Commission and Council by right, within a "PUD-R" district, without review and approval by the Zoning Board of Adjustment, including any restrictions imposed thereon. The extent and locations thereof shall be shown on the site plan and contained in the supporting documents herein required. f. Accessory Uses, customarily incidental and secondary to any allowed principal uses allowed in the respective residential districts or commercial district, with respect to the type of residential or nonresidential uses proposed in the "PUD-R" district. 2. "PUD-C" Planned Unit Development - Commercial (where the majority of land use is designated for commercial purposes) a. Shopping centers, commercial or service centers, office parks, major recreational and entertainment facilities, and other similar business and commercial centers or facilities when such uses are in conformance with the various commercial zoning district regulations of this Chapter. Residential uses similar to those set forth in the "RMF - Multifamily Residential District. " b. Community Facility Uses, as approved and allowed by the City. c. Special Exception Uses, as designated for the various commercial zoning districts in the "ML - Light Manufacturing and Industrial District" may be allowed by right by the Commission and Council within a "PUD-C" district without review and approval by the Zoning Board of Adjustment, including any restrictions imposed thereon. The extent and locations thereof shall be shown on the site plan and contained in the supporting documents herein required. d. Accessory Uses, customarily incidental and secondary to any allowed principal uses with respect to the type of uses proposed in the "PUD-C" district. 3. "PUD-I" Planned Unit Development - Industrial (where the majority of land use is designated for industrial purposes) a. Single or multi-purpose industrial parks of innovative land utilization allowing for an appreciable amount of land reserved for open space, generous building setbacks with landscaped front lawns, and joint usage (where feasible) of parking and storage areas. The principal uses which may be permitted therein shall be as allowed and in conformance with the regulations established for the various commercial and industrial zoning districts elsewhere described in this Chapter. b. Residential Uses, similar to those set forth in the "RMF - Multifamily Residential District." c. Community Facility Uses, as allowed and when a part of an industrial or industrial- commercial development, as approved by the City; except that public and semi-public schools, churches, temples, synagogues and other places of worship are discouraged in this district unless their locations are approved by the City Planning Commission and City Council due to an overriding need for such use in an industrial area. d. Special Exception Uses, as designated for the various industrial zoning districts in the "ML - Light Manufacturing and Industrial District," may be allowed by right by the Commission and Council within a "PUD-I" district without review and approval by the Zoning Board of Adjustment, including any restrictions imposed thereon. The extent and locations thereof shall be shown on the site plan and contained in the supporting documents herein required. e. Accessory Uses, customarily incidental and secondary to any allowed principal use, with respect to the type of uses proposed in the "PUD_I" district. 3.23.E PROHIBITED USES Uses not expressly permitted in the various zoning district regulations of this Chapter are expressly prohibited in any "PUD" district unless otherwise authorized and approved by the Planning and Zoning Commission and City Council in conformance with the approving ordinance. 3.23.F OPEN SPACE REQUIREMENTS In Residential Planned Unit Development districts containing residential uses, common open space (whether dedicated to public use or owned and maintained in common by all or part of the occupants of the PUD development through a property owner association) land shall be reserved primarily for the leisure and recreational use of the project's occupants, and readily accessible thereto. The quantity of common open space required shall comprise not less than twenty (20%) percent of the project area. Said open space may be varied downward by the City Planning and Zoning Commission and City Council when a lesser amount of such open space would be more appropriate to the density of development or size of families or households proposed in the project, plus the availability and nature of adjacent publiC open space. For the purpose of this Chapter, common open space is defined as follows: 1. Common Open Space includes: Land area of the development accessible to and permanently reserved for the common use and enjoyment of the occupants of the project for leisure and recreational purposes, for which said area is not covered by buildings, structures or parking except that recreational facilities and structures and their accessory uses and related parking may be located within said common open space as long as their total impervious surfaces (paving, roofs, etc.) do not constitute more than five (5) percent of the total common open space. 2. Common Open Space does not include: a. Land areas reserved for the exclusive use and benefit of an individual owner or tenant. b. Public or private streets, alleys, driveways, parking or loading areas, except as otherwise allowed in paragraph 1. above. c. Church or school sites. d. Other buildings, structures or facilities than those allowed in paragraph 1. above. e. Utility easements, and drainage easements less than one hundred (100') feet in width. 3.23.G MAXIMUM RESIDENTIAL DENSITY PERMITTED; AND DENSITY INCREASE BONUSES 1. The maximum residential density permitted in any "PUD-R, C and I" district, where residential uses are proposed, shall not exceed the maximum residential density limits as permitted by the existing zoning classification in which the PUD district is proposed; except as follows: Upon the receipt of a zoning petition requesting a higher density within a Planned Unit Development the Planning and Zoning Commission shall study and make a recommendation to the City Council setting forth a density for the project identified as 'gross residential density.' The City Council shall take this recommendation under advisement at its hearing to consider the petition. For the purpose of this regulation, "gross residential density" shall mean the sum total of all residential land use area(s) of the project, including one-half (1/2) of any abutting streets located within the boundary of the project. 2. Density Increase Bonuses. In an effort to increase the quality of a residential planned unit development through the adequate provision of open space, community facilities, recreation areas and other similar amenities and improvements, the Planning and Zoning Commission and City Council may approve residential density increases for the amenities listed below and in the amounts prescribed therefor. a. Open space reservation shall be considered for residential density increases according to the following provisions: i. Each additional one (1) percent (1 acre minimum) of common open space (greater than the requirement set forth in the "Open Space Requirements") up to a maximum of five (5) percent of the total project areas, if improved, permits a maximum increase of gross residential density of six (6) percent of the total number of units allowed on the remaining balance of the land (after the extra open space is deducted to be used for residential purposes). If said additional common open space is unimproved, as defined above, the increase in gross residential density is reduced to one-half (1/2) of six (6) or three (3) percent. ii. Land within a designated 1 DO-year flood plain area, conveyed by easement or dedicated to the City as permanent open space may receive additional density bonuses in the following amounts: a) Add four (4) percent to the percentages listed in paragraph (i) above for improved open space; and three (3) percent for unimproved open space where such land is dedicated to the City. b) Add two (2) percent to the percentages listed in paragraph (i) above for improved open space; and one (1) percent for unimproved open space where such land is conveyed by easement to the City. b. Dedication of public school or park sites may be considered cause for density increase when such sites are of sufficient size and properly located so as to provide a direct benefit to the community. Up to twenty (20) percent increase in density or floor area ratio, within the proposed development may be granted by the Planning and Zoning Commission and City Council where such site dedications conform in general location and size to the City's latest approved Comprehensive City Plan and School District's general requirements. All dedications, whether for school or park purposes, shall be made in favor of the City. c. In no case shall bonus increases exceed fifty (50) percent of the total of all additional bonus percentages added together for any purposes. All increases shall be taken on the same initial "gross residential density." 3.23.H GUARANTEE OF COMMON OPEN SPACE Common open space provided in any "PUD" district shall be guaranteed by a restrictive covenant describing the open space and its uses, maintenance and improvement running with the land for the benefit of the occupants, or public, of the PUD development. The applicant for a PUD may file with said PUD zoning application a draft copy of the proposed covenants which will produce the aforesaid land Develooment Code City of Collevville. Texas PUD zoning application a draft copy of the proposed covenants which will produce the aforesaid guarantees and, in particular, will provide for restricting the use of common spaces for the designated purposes, for general review and approval by the Planning and Zoning Commission. At the time a "final plat" of the development is filed with the City for approval, the final legal documents regarding the approved covenants relative to the open space, shall be submitted to the City for approval. In order to guarantee the preservation and maintenance of the common open space, one of the following methods shall be required by the City for City Council approval: 1. It may be conveyed to the City or other public agency which will agree to maintain the common open space and any permitted buildings, structures or other improvements placed thereon. 2. If the common open space is not conveyed to the City or other public agency, the covenants governing the use, improvements, and maintenance of the common open space may authorize the City or other public agency to enforce their provisions. 3. If deeded to a property owners association or trustees thereof, the declaration of covenants and restrictions which is to govern the association shall include, but not be limited to, the following: a. Membership must be mandatory for each building or property buyer and any successive buyer, affected by the common open space. b. The common open space restrictions must be permanent, and not just for a period of years. c. The association shall be totally responsible for liability, insurance, local taxes (if assessed), and the maintenance of the common open space and any improvements thereon. d. Affected property owners shall pay their pro rata share of all costs associated therewith; any assessment levied by the association can become a lien on the property. e. The association must be able to adjust the assessment rate to meet changing needs. 3.23.1 SCREENING AND LANDSCAPE REQUIREMENTS Requirements and standards for screening of certain residential and non-residential uses in any "PUD" district shall be required and in conformance with the provisions for "Fences, Free Standing Walls, and Screening Materials" of this Chapter. Areas within any "PUD" district not used for buildings, roadways. drives, parking areas and other similar features shall be landscaped with grass, shrubs, trees and other appropriate vegetative cover, and such shall be maintained in an aesthetic healthy growing condition. 3.23.J ACCESS AND CIRCULATION 1. Vehicular Access - Principal vehicular access points shall be designed to permit smooth traffic flow with minimum hazards to vehicular or pedestrian traffic. 2. Emergency Access - Lots or tracts in any "PUD" district which do not abut a public street or alley shall be provided with an "emergency access easement" dedicated to the City, of not less than twenty (20) feet in width. Such easement shall be paved with an all weather driving surface, and with such turning radii and turnarounds at the terminal ends so as to permit the free unobstructed movement of emergency or City equipment to gain access and egress to the lot or tract. No obstructions or parking shall be permitted within or allowed to interfere with the full use of such emergency access easement, and said easement shall be permanently marked or signed to identify its intended use. The words "Fire Lane" may be used to designate such easement. 3.23.K MINIMUM LOT SIZE REQUIREMENTS; MINIMUM YARD REQUIREMENTS; MAXIMUM BUILDING HEIGHT; AND MAXIMUM LOT COVERAGE The maximum height, lot width, lot depth, floor-area ratio and lot area, and the minimum off-street parking and loading requirements for uses proposed shall be established for each Planned Development District, and such standards and requirements shall comply with or be more restrictive than the standards established in the following districts for the specified type uses: .----.-----.--.--.-.-.....-....---....--...---.--........-.-.......----...-..-..---.....-.......-----.....----.................--...........--.............--.-.-.----....-..-.----.-----.----------.-- Chapter 3 - Land Use Page 3 - 37 land DeveloDment Code City of Collevvilfe. Texas Residential ,.,_,___ 1 R-MF____ ,__-9J:!!ge ------________1-.,____________ C-F:Q___ _ Commercial Services i C-C -- --- -~dustriaJor Manufacturin-------,,-'---'----- M-L '---------- The Planning & Zoning Commission and City Council may alter such requirements when in their opinion the proposed development density and land use arrangements shown on the site plan would result in a more innovative siting of buildings and facilities which would improve the usefulness of yard areas and their relationship to traffic circulation, admittance of light and air to buildings, fire protection and usable open space. The average lot size in PUD-R is 16,000 square feet, with a minimum lot size of 13,000 square feet. Furthermore, the lot frontage may be adjusted to be consistent with adjacent properties on the same street but shall not be less than 100 feet. 3.23.M OFF-STREET PARKING AND LOADING REQUIREMENTS Off -street parking and loading requirements pertaining to uses allowed in this district shall conform with the provisions for "Off-Street Parking Requirements," and "Off-Street Loading Requirements." 3.23.N SITE PLAN AND SUPPORTING DOCUMENTS REQUIRED Any application for a change in zoning district boundaries on the "Official Zoning Map" to establish any PUD-R,C, or I district shall be accompanied by a site plan and supporting documents therefore, in conformance with the provisions of Chapter 1 - General Provisions of this Land Development Code. 3.23.0 NATURE OF AMENDING ORDINANCE ApPROVING ANY "PUD" DISTRICT ZONING CHANGE In approving any request for a zoning change for a "PUD" district the City Council shall, upon recommendation of the Planning and Zoning Commission, incorporate in the amending ordinance reference to the approved site plan, supporting documents and other conditions or restrictions imposed on the project by the Commission, including those of the Council. The approval and adoption of the amending ordinance by the City Council shall result in the appropriate change to the "Official Zoning Map." However, the zoning change does not constitute recording of a "Final Plat" nor authorize the issuance of building permits and "certificates of occupancy," until such time as a "Final Plat" and supporting legal and construction documents have been prepared and submitted for City Council approval on all or part of the proposed development, in conformance with the platting requirements and procedures of this Land Development Code. 3.23.P REQUIREMENTS FOR "FINAL PLAT" SUBMISSION FOLLOWING ZONING CHANGE Within a maximum of six (6) consecutive months, following approval of the "PUD" district zoning change by the City Council, the applicant shall file with the City Planning and Zoning Commission a "Final Plat" and necessary supporting documents of all or a part of the PUD district site, in conformance with the Chapter 8 - Plat Review Procedures of this Land Development Code. At its discretion and for good cause, the Planning and Zoning Commission may extend for six (6) months the period of filing for the "Final Plat" upon written request by the applicant. Should the applicant fail to submit a "Final Plat" within the six (6) month period following City Council approval of the zoning change, or by the termination date of the filing extension granted by the Planning and Zoning Commission, the Commission may initiate proceedings under Chapter 1 - General Provisions of this Land Development Code regarding "Amendments, Frequency of Petition and Site Plan Requirements: Zoning and Special Use Permits," to amend the Official Zoning Map by removing all or part of the Planned Unit Development (PUD) from the Official Zoning Map and placing the area involved in another appropriate zoning district. The City Council may uphold the Commission's recommendation and proceed to advertise and hold a public hearing thereon, or may elect to continue the PUD district zoning classification in effect. ----.-.-.----~-~--._.--_...~-.--..-.---.-.----.---.-.-___.__.M.__________._...M..M.M._...___._..____.__.M.._..____.___.__.____.._.M..._..___.__.____ Chapter 3 - land Use Page 3 - 38 3.23.Q COMPLIANCE WITH DEVELOPMENT SCHEDULE An application for a Planned Unit Development District shall be accompanied by a development schedule indicating the appropriate date on which construction is expected to begin and the rate of anticipated development to completion. The development schedule, if adopted and approved by the City Council, shall become part of the development plan and shall be adhered to by the owner, developer and his successors in interest. The development schedule shall be reviewed annually by the Building Inspector, and he shall report to the Planning and Zoning Commission the actual development accomplished in the various Planned Development Districts as compared with the development schedule. The Planning and Zoning Commission may, if in its opinion the owner or owners of property are failing or have failed to meet the approved schedule, initiate proceedings under Chapter 1 - General Provisions of this Land Development Code regarding "Amendments, Frequency of Petition and Site Plan Requirements: Zoning and Special Use Permits," to amend the Official Zoning Map or the Planned Development District by removing all or part of the Planned Development District from the Official Zoning Map and placing the area involved in another appropriate zoning district. Upon the recommendation of the Planning and Zoning Commission and for good cause shown by the owner and developer, the City Council may also extend the development schedule or adopt such new development schedule as may be indicated by the facts and conditions of the case. 3.23.R EFFECT OF THIS SECTION AND RELATED SUBSECTIONS ON PREVIOUSLY ApPROVED "PUD" ZONING CHANGES Previously approved "PUD" amending ordinances to the City's preceding zoning ordinance, including accompanying site plans and supporting documents thereof, shall remain in full force and effect with respect to this Chapter and shall not be made to comply with the provisions of this Chapter. City of Carrollton CA~-rOt-J ART XIX (PD) PLANNED DEVELOPMENT DISTRICT ARTICLE XIX. (PD) PLANNED DEVELOPMENT DISTRICT PAGE 217 SECTION A. PURPOSE. 1. The (PD) Planned Development District is intended to provide for combining and mixing uses into integral land use units such as industrial parks; industrial, office and commercial centers; residential developments with multiple or mixed housing types; or any appropriate combination of uses which may be planned, developed or operated as integral land use units, whether by a single owner or a combination of owners. 2. After a public hearing has been convened and proper notice to all affected property owners has been made in accordance with Article XXXI ofthis ordinance, and after a recommendation by the Planning and Zoning Commission has been submitted, the City Council may authorize the creation of a (PD) Planned Development District on: a. Residential developments on tracts of five (5) acres or more; or b. Mixed use developments on tracts of five (5) acres or more; or c. Developments on tracts ofless than five (5) acres when a determination has been made by the Planning and Zoning Commission that the area to be rezoned cannot be rezoned to any other zoning district without creating the potential of adversely affecting adjacent properties. SECTION B. GENERAL PROVISIONS. I. PERMITTED USES: The uses to be permitted in any specific (PD) Planned Development District shall be enumerated in the ordinance which creates such district. Any proposed amendment to the uses permitted within a specific (PO) Planned Development District shall be submitted and processed in accordance with Section E of this Article. 2. PROCEDURE: a. The steps necessary to request creation of a (PO) Planned Development District shall be as follows: 1. Preapplication conference between the applicant and the City Manager or his or her designee for presentation and discussion of a preliminary drawing (Reference Section C below); CARROLL TON COMPREHENSIVE ZONING ORDINANCE ART. XIX (PD) PLANNED DEVELOPMENT DISTRICT PAGE 218 2. Submission of the formal application fonn for a change of zoning with all required material. b. Every (PD) Planned Development District approved under the provisions of this Article shall be considered an amendment to the Comprehensive Zoning Ordinance and applicable only to the property involved; c. In carrying out the development of a (PD) Planned Development District, the development conditions and the development schedule shall be complied with. Such conditions as are specified for the development of a (PD) Planned Development District shall not be construed as conditions precedent to the approval of the zoning amendment, but shall be construed as conditions precedent to the granting of a Certificate of Occupancy by the city of Carrollton. SECTION C. PREAPPLICATION REQUIREMENTS. 1. PREAPPLICATION CONFERENCE: An applicant for a (PD) Planned Development District shall schedule a preapplication conference with the City Manager or his or her designated representative prior to the formal submission of the application materials. At the preapplication conference, the applicant shall provide a preliminary drawing that includes, but is not limited to, the following: a. Delineation of site boundaries; and b. General site layout indicating relationship of proposed land uses, parking, and street layout(s); and c. Proposed residential development densities; and d. Approximate gross square footage of non-residential uses where applicable; and e. Projected building heights; and f. General topographic conditions; and g. Significant environmental features, including flood plains and water courses; and h. Delineation of approximate acreage for each land use specified. Based on the information provided by the applicant, the City Manager or his or her designee shall provide initial comments concerning the merits of the proposed development and provide any other information necessary to aid the applicant in the preparation of the formal application. CARROLL TON COMPREHENSIVE ZONING ORDINANCE ART. XIX (PD) PLANNED DEVELOPMENT DISTRICT 2. APPLICATION SUBMISSION: PAGE 219 Any person, group of persons, or corporation having a proprietary interest in any property may file an application for a (PD) Planned Development District. Such application shall be submitted and processed in accordance with Article XXXI of this ordinance. 3. FORMAL PUBLIC HEARING: The Planning and Zoning Commission shall hold an advertised public hearing in accordance with the procedures set forth in Article XXXI of this ordinance. The Planning and Zoning Commission shall make its recommendation to the City Council in accordance with the standard procedures for a change of zoning in the city of Carroll ton. The Planning and Zoning Commission may recommend, and the City Council may approve the request for a (PD) Planned Development District as submitted or make any modifications thereto as may be appropriate. In approving the ordinance establishing the (PD) Planned Development District, the City Council shall, after recommendation ofthe Planning and Zoning Commission, specify such height, floor area, density, site coverage, setback, landscaping, off-street parking and all other standards as are appropriate for the development which are considered necessary to protect the health, safety, and general welfare, and to create a reasonable transition to, and protection from, property adjacent to the (PD) Planned Development District. SECTION D. DEVELOPMENT SCHEDULE. 1. If the applicant desires, or the Planning and Zoning Commission or City Council requires, a development schedule shall be submitted indicating the approximate date on which construction is expected to begin and the rate of anticipated development to completion. The development schedule shall, if adopted and approved by the City Council, become part of the ordinance creating such (PD) Planned Development District, and shall be adhered to by the owner, developer, and successors in the interest; 2. The Planning and Zoning Commission or the City Council may, ifin their opinion the owner or owners of the property are failing or have failed to meet the approved schedule, initiate proceedings to amend the ordinance of the (PD) Planned Development District, or remove all or part of the (PD) Planned Development District from the Official Zoning Map and place the area involved in another appropriate zoning district. Such action shall occur in accordance with Article XXXI ofthis ordinance. Upon the recommendation of the Planning and Zoning Commission, and for good cause shown by the owner or developer, the City Council may extend the development schedule or adopt such new development schedule as may be indicated by the facts and conditions of the case. CARROLL TON COMPREHENSIVE ZONING ORDINANCE ART. XIX (PD) PLANNED DEVELOPMENT DISTRICT SECTION E. AMENDMENT TO (PD) PLANNED DEVELOPMENT DISTRICT. PAGE 220 Any major amendment, supplement, deletion or modification to the (PD) Planned Development District may be granted upon application by any person, group of persons or corporation having a proprietary interest therein. Any application for such amendment, supplement, deletion or modification shall contain the information specified in this Article and shall be processed in accordance with the procedures set forth in Section C ofthis Article and Article XXXI ofthis ordinance. The City Manager or Designee may authorize minor modifications that: a. Do not alter the basic relationship of the proposed development to adjacent property; and b. Do not alter the uses permitted; and c. Do not increase the maximum density, floor area, height, or site coverage; and d. Do not decrease the amount of off-street parking; and e. Do not reduce the minimum yards or setbacks. An applicant may appeal the decision of the City Manager or Designee to the Planning and Zoning Commission for review and decision as to whether a formal amendment to the (PD) Planned Development District shall be required. SECTION F. COORDINATION WITH SUBDIVISION ORDINANCE. 1. It is the intent of this section that subdivision review under the subdivision regulations of the city of Carrollton be carried out simultaneously with the review of a (PD) Planned Development District under the provisions of this ordinance. 2. Both this ordinance and Appendix A of the Carrollton Code of Ordinances, otherwise known as the Subdivision Ordinance, contain regulations which apply to such matters in the design of a (PD) Planned Development District such as streets, utilities, and open spaces. In any (PD) Planned Development District for which the provisions of the two ordinances are in conflict, the City Manager or Designee shall submit a recommendation to the Planning and Zoning Commission, which shall determine which standard shall prevail. SECTION G. ELIMINATION OF SITE PLAN REVIEW FOR NON-RESIDENTIAL USES. Effective February 17, 1998, the approval of a site plan by either the Planning and Zoning Commission or the City Council, prior to the issuance of a building permit, shall not be required in Planned Development Districts, approved prior to February 17, 1998, for non-residential uses. (Ord. No. 2314, 02/17/98) CARROLLTON COMPREHENSIVE ZONING ORDINANCE City of Desoto De.~bTO 'to OVERLAY AND SPECIAL DISTRICTS Overlay and Prefix Districts shall be used in conjunction with base zoning districts. In the use of the following overlay zoning classifications, the base district shall remain in effect if it is already in existence unless changed by zoning amendment. New base districts or changes in existing base districts may be requested at the same time overlay or prefix districts are requested. SECTION 34 PO - PLANNED DEVELOPMENT DISTRICT 34.1 GENERAL PURPOSE AND DESCRIPTION The City Council of the City of DeSoto, Texas, after public hearing and proper notice to all parties affected and after recommendation from the Planning and Zoning Commission may authorize the creation of a Planned Development District. The Planned Development District is a district which accommodates planned associations of uses developed as integral land use units such as industrial districts, offices, commercial or service centers, shopping centers, residential developments of multiple or mixed housing including attached single- family dwellings or any appropriate combination of uses which may be planned, developed or operated as integral land use units either by a single owner or a combination of owners. A PO District may be used to permit new or innovative concepts in land utilization not permitted by other zoning districts in this Ordinance. While greater flexibility is given to allow special conditions or restrictions which would not otherwise allow the development to occur, procedures are established herein to ensure against misuse of increased flexibility. 34.2 PERMITTED USES An application for a PO District shall specify the base distric~ the use or the combination of uses proposed. Uses which may be permitted In a PO are specified In the Use Charts (Section 36) and must be specified if not permitted in the base district. In the case of residential PO districts for single~ family or duplex categories, the proposed lot area shall be no smaller than the lot sizes allowed in the base zoning district (Section 34.9 is exempt) except for minor changes in a small percentage of the lots in order to provide improved design. In selecting a base zoning district, the uses allowed in the base district must be similar or compatible with those allowed in the PD. PO designations shall not be attached to SUP requirements. Specific Use Permits allowed in a base zoning district are allowed in a PO only if specifically identified at the time of PO approval. 34.3 PLANNED DEVELOPMENT REQUIREMENTS A. Development requirements for each separate PO District shall be set forth in the amending Ordinance granting the PO District and shall include, but may not be limited to: uses, density, lot area, lot width, lot depth, yard depths and widths, building height, building elevations, coverage, floor area ratio, parking, access, screening, landscaping, accessory buildings, signs, lighting, project phasing or scheduling, management associations, and other requirements as the City Council and Planning and Zoning Commission may deem appropriate. B. In the PO District, uses shall conform to the standards and regulations of the base zoning district to which it is most similar and/or the District authorized in the PO Approval.. The base zoning district(s) shall be stated in the granting ordinance. All applications to the City shall list all requested deviations from the standard requirements set forth throughout this Ordinance (applications without this list will be considered Incomplete). The Planned Development District shall conform to all other sections of the ordinance unless specifically excluded in the granting ordinance. , City of DeSoto Zoning Ordinance - August, 1997 Amended August, 2002 Page 54 C. The Ordinance granting a PO District shall include a statement as to the purpose and intent of the PO granted therein. A specific list is required of modifications in each district or districts and general statement citing the reason for the PD request D. The minimum acreage for a planned development request shall be three (3) acres. 34.4 In establishing a Planned Development District in accordance with this section, the City Council shall approve and file as part of the amending Ordinance appropriate plans and standards for each Planned Development District. To facilitate understanding of the request during the review and public hearing process, the Planning and Zoning Commission and City Council shall require a Conceptual Plan of the proposed project. A Detailed Site Plan may be submitted in lieu of the Conceptual Plan. A. Conceptual Plan or Concept Plan - This plan shall be submitted by the applicant at the time of the PO request (for exceptions, see Section 34.5 [0]). The plan shall show the applicant's intent for the use of the land within the proposed Planned Development District in a graphic manner and as may be required, supported by written documentation of proposals and standards for development. The City may prepare application form(s) which further describe and explain the following requirements: 1. Residential Concept Plan - A Conceptual Plan for residential land use shall show general use, thoroughfares and preliminary lot arrangements. For residential development (such as multi-family) which does not propose individual platted lots, the conceptual plan shall set forth the size, type and location of buildings and building sites, access, density, building height, fire lanes, screening, parking areas, landscaped areas, project scheduling, and other pertinent development data. 2. Nonresidential Concept Plan - A Conceptual Plan for uses other than residential uses shall set forth the land use proposals in a manner to adequately illustrate the type and nature of the proposed development Data which may be submitted by the applicant, or required by the Planning and Zoning Commission or City Council, may include but is not limited to the types of use(s), topography and boundary of PO area, physical features of the site, existing streets, alleys and easements, location of future public facilities, building height and location, parking ratios, project scheduling and other information to adequately describe the proposed development and to provide data for approval which is to be used in drafting the final Detailed Site Plan. B. Oetailed Site Plan - This plan shall set forth the final plans for development of the Planned Development District and shall conform to the data presented and approved on the Conceptual Plan. Changes of detail on the Detailed Site Plan, which differ from the original Concept Plan, but do not alter the basic relationship of the proposed development to adjacent property, the uses permitted, or increase the density, building height or coverage of the site, the off-street parking ratio or reduce the yards provided at the boundary of the site, or does not significantly alter the landscape plans as indicated on the approved Conceptual Plan may be authorized by the Planning and Zoning Manager. If an agreement cannot be reached regarding whether a Detail Site Plan conforms to the original Concept Plan, the Planning and Zoning Commission shall review the request and render judgment as to the conformity. Approval of the Detailed Site Plan shall be the basis for issuance of a building permit, but does not release the applicant of the responsibility to submit plans to the Building Official for a building permit. For any residential district, Agricultural through 2F. a preliminary plat shall qualify as the Detailed Site Plan, except that the PO submittal shall contain the proposed unit sizes for each of the proposed residential uses. The Detailed Site Plan may be submitted for the total area of the PO or for any sections or part as approved on the Conceptual Plan. 1. The Detailed Site Plan shall Include: City of DeSoto Zoning Ordinance - August, 1997 Amended August, 2002 Page 55 a. A site inventory analysis including a scale drawing showing major existing vegetation, natural water courses, creeks or bodies of water and an analysis of planned changes In such natural features as a result of the development. This shall Include a delineation of any flood prone areas. b. A scale drawing showing any proposed public or private streets and alleys; building sites or lots; and areas reserved as parks, parkways. playgrounds, utility easements, school sites, street widening and street changes: the points of ingress and egress from existing streets; general location and description of existing and proposed utility services, including size of water and sewer mains; the location and width for all curb cuts and the land area of all abutting sites and the zoning classification thereof on an accurate survey of the tract with a topographical contour interval of not more than two feet (2'). c. A site plan for proposed building complexes showing the location of separate buildings and the minimum distance between buildings, and between building and property lines, street lines, and alley lines. Also to be Included on the site plan is a plan showing the arrangement and provision of off-street parking. d. A landscape plan showing turf areas, screening walls, ornamental planting, wooded areas and trees to be planted. e. An architectural plan (elevations, etc.) showing elevations and signage style to be used throughout the development in all districts except single-family and two-family may be required by the Planning and Zoning Commission or City Council if deemed appropriate. f. All Detailed Site Plans may have supplemental data describing standards, regulations or other data pertinent to the development of the Planned Development District as appropriate to adequately explain or understand the request and which is to be included in the text of the amending ordinance. 34.5 Approval Process and Procedure - The procedure for establishing a Planned Development District shall follow the procedure for zoning amendments as set forth in Section 10. This procedure is further expanded as follows for approval of Conceptual and Detailed Site Plans. A. The Planning and Zoning Commission and the City Council may approve the Conceptual Plan or Detailed Site Plan or any section of the plan. separately or jointly, In public hearings. One public hearing at the Planning and Zoning Commission and one at the City Council for the PD request is adequate when: 1. The applicant submits adequate data with the request for the Planned Development District to fulfill the requirement for a detailed site plan; or 2, Information on the Concept Plan and attached application is sufficient to determine the appropriate use of the land and the Development Plan will not deviate substantially from it B. If the above two conditions are not met, then another public hearing must be held by the Planning and Zoning Commission and City Council prior to approval of the detailed site plan. C. The Ordinance establishing the Planned Development District shall not be approved until the Conceptual and/or Detailed Site Plan is approved. 1. The Site Plan may be approved In sections. VVhen a Site Plan is approved in sections, then separate approvals by the Planning and Zoning Commission and City Council for the initial and subsequent sections will be required. 2. A Detailed Site Plan shall be submitted for approval within six (6) months from the approval of the Conceptual Plan for some portion of the Concept Plan. If a partial Site Plan is not submitted within six (6) months, the Concept Plan is subject to review by the Planning and Zoning Commission and City Council. If some portion of the entire City of DeSoto Zoning Ordinance - August, 1997 Amended August, 2002 Page 56 project is not started within two (2) years, the Planning and Zoning Commission and City Council may review the original Concept Plan to ensure its continued validity. If the City determines the concept is not valid, a new Concept Plan must be approved prior to issuing a building permit for any portion of the PO District. 3. Although a public hearing may not be required for the Site Plan, approval by the Planning and Zoning Commission and City Council is still required. D. A Planned Development may be submitted and approved without a conceptual or detail site plan if in the amending ordinance it is stipulated tha~ 1) conceptual and detailed site plans are still required, 2) a public hearing In accordance with Section 10 is required at the time the plans are submitted to the City, and 3) no development may occur until a detailed site plan is approved. 34.6 When a PO District is being considered, a written report from the Planning and Zoning Manager discussing the impact on planning. engineering, water utilities, electric, sanitation, building Inspection, tax, police, fire, and traffic, and written comments from the applicable public agencies (such as the school district and utility companies) shall be submitted to the Planning and Zoning Commission prior to the Commission making any recommendations to the City Council. In the event written comments are not forthcoming in a reasonable amount of time, the Commission may, at its discretion, make a recommendation to the City Council. 34.7 All Planned Development Districts approved in accordance with the provisions of this Ordinance in its original form, or by subsequent amendments thereto, shall be referenced on the Zoning District Map, and a list of such Planned Development Districts, together with the category of uses permitted therein, shall be maintained as part of this Ordinance. 34.8 Planned Development Ordinances Continued: Prior to adoption of this Ordinance, the City Council has established various Planned Development Districts, some of which are to be continued in full force and effect. The ordinances or parts of ordinances approved prior to this Ordinance specified in Appendix A-1 shall be carried forth in full force and effect and are the conditions, restrictions, regulations and requirements which apply to the respective Planned Development Districts shown on the Zoning Map at the date of adoption of this ordinance. Base districts which were established under preceding ordinances have been converted to new base districts under this ordinance. 34.9 Uses or Developments Allowed Only by PO: Because of the uniqueness of the following uses in DeSoto, they shall be permitted by PO designation only: A. Patio HomeslZero lot Line Homes 1. General Purpose and Description: Patio homes allow for development of detached "zero lot line" homes in a modified residential district which encourages greater use of the side yard areas. Clustered lot patterns with a common usable open space system can be incorporated as an Integral part of the development. 2. Height Regulations: a. Maximum Height - Two and one-half (2%) stories for the main structure: one (1) story for accessory buildings. 3. Area Regulations: a. Minimum Front Yard - Twenty-five feet (25') City of DeSoto Zoning Ordinance - August, 1997 Amended August, 2002 Page 57 b. Minimum Rear Yard - Twelve feet (12'); twenty feet (20') for structure accommodating required off-street parking If provided access from a dedicated or private alley 4. Side Yard Regulations: a. Side Yard Setback: Side setbacks are one and one-half foot (1 %') maximum on one side and a minimum of eight and one-half feet (8%') on the opposite side. The dwelling shall be no closer than ten feet (10') between the face of exterior walls of neighboring dwelling units. b. No roof overhang, gutter or extension from a wall will be allowed to extend over a property line. c. The closest exterior roof line to an adjacent property shall be storm guttered if the general slope of the roof falls toward the neighboring property. d. Each adjacent lot shall provide an access or use easement, a minimum of three feet (3'), adjacent to the "zero" (one-foot) side or there must be a three- foot (3') setbacJ< from the adjacent "zero" side to allow the property owner access for maintenance of his dwelling. e. The majority of one side of the structure shall be located within three feel (3') of one side lot line. The building wall which faces the "zero" side of the lot shall not have any doors, windows, ducts, grills, vents, or other openings. f. Minimum Side Yard Setback Adjacent to Street Right-of-Way: Fifteen feet (15') 5, Size of Lots: a. Minimum Lot Area - Five thousand (5,000) square feet; b. Minimum Lot Width - Fifty feet (50') c. Minimum Lot Depth - Ninety feet (90') 6. Maximum Lot Coverage - Fifty percent (50%) total, inCluding main and accessory buildings 7. Minimum Area of Dwelling Unit - Each unit shall have a minimum floor area of one thousand, five hundred (1,500) square feet. 8. Parking Regulations: a. Two (2) enclosed spaces on the same lot as the main structure (see Section 38, Off-Street Parking and Loading Requirements) City of DeSoto Zoning Ordinance - August. 1997 Amended August, 2002 Page 58 Town of Flower Mound FLOWER. MooN.D DIVISION 21. PO PLANNED DEVELOPMENT DISTRICT* *Cross references: Businesses, ch. 18. Sec. 98-811. Purpose and intent. The PO planned development district is designed primarily to ensure a high quality of development. It is intended for application in all land use designations on the land use map of the comprehensive master plan, provided that the uses and development standards proposed are consistent with such land use designations. In addition to the use and area regulations of this division, development in the PO planned development district shall be in compliance with all other applicable provisions of this chapter. (Code 1989, ch. 12,9 3.26(a)) Sec. 98-812. Types of planned developments. The town council, after public hearing and proper notice to parties affected and after recommendation from the planning and zoning commission, may authorize the creation of the following types of planned development districts: (1) Shopping center on tracts of three acres or more. (2) Residential development on tracts of five acres or more. (3) Campus commercial or campus industrial parks or districts on tracts of ten acres or more. (4) Medical center and/or hospital. (5) Civic center and/or community center. (6) Office, motel or hotel center on tracts of one acre or more. (7) Mixed-use development on tracts of 30 acres or more. (8) Recreation center. (9) Research park or scientific research center. (10) A combination of any of the types of planned development districts listed above. (Code 1989, ch. 12, 93.26(b)) Sec. 98-813. Zoning exhibit requirement. In establishing a planned development district in accordance with this division, the town council shall require a zoning exhibit of the development. Such zoning exhibit shall be approved and filed as part of the ordinance establishing the district prior to the issuance of any building permit in a planned development district. Such required zoning exhibit and development standards shall, at a minimum, address applicable comprehensive master plan features and shall comply with the requirements enumerated in article IV of chapter 78 of this Code, comprehensive master plan, zoning map and text amendments. Additional requirements may include, but not be limited to, the following: ingress and egress to the property, private streets or drives, parking space, height of building, maximum lot coverage, yards and open spaces, screening walls or fences, landscaping, and other development and protective requirements, including maintenance, considered necessary to create a reasonable transition to and protection of the adjacent property. A single- family residence may be constructed on a platted lot of record located in a planned development district without approval of a site plan, other than as required for a normal building permit. (Code 1989, ch. 12,9 3.26(c)) Sec. 98-814. Development standards. Every planned development application shall set forth the standard zoning district that will establish the minimum use and area regulations for the entire planned development district, or for an identified portion. In addition, the minimum standards set forth in the nondistrict regulations of this chapter will apply to every planned development district. The development standards set forth for the planned development district may be more restrictive, but may not be less restrictive, than the minimum requirements of the specified district regulations or the other regulations of this chapter. However, notwithstanding the foregoing, the town council may approve less restrictive, and/or vary, development standards and minimum requirements for campus commercial and campus industrial planned development districts. (Code 1989, ch. 12,9 3.26(d)) Sec. 98-815. Approval and conditions. Every planned development district approved under the provisions of this chapter shall follow the procedure for and be considered an amendment to the zoning map. In approving the planned development district, the town council may impose conditions relative to the standard of development, and such conditions shall be complied with before a certificate of occupancy is issued for the use of the land or any structure that is part of the planned development district, and such conditions shall not be construed as conditions precedent to the approval of the zoning amendment, but shall be construed as conditions precedent to the granting of a certificate of occupancy. All planned development districts approved in accordance with the provisions of this chapter shall be referenced on the zoning map, and a list of such planned development districts, together with the category of uses permitted therein, shall be maintained in the office of the director of community development. (Code 1989, ch. 12,9 3.26(e)) Sec. 98-816. Status of prior approvals. (a) In the planned development districts heretofore approved with specific minimum development requirements that are more or less stringent than the minimum development requirements contained in this chapter, the minimum development requirements set forth in such planned development districts are ratified, confirmed and validated. (b) In planned development districts numbered 11, 12, 13 and 14, the minimum development requirements established in single-family level 2 for single-family detached dwellings shall apply to single-family detached dwellings developed in single-family level 3. (c) Obsolete zoning regulations. (1) Planned developments approved prior to the effective date of the ordinance from which this chapter is derived, and whose adopting ordinances reference regulations of the MF-1, W-2 or CC districts, shall continue to be subject to the regulations of those districts set forth in sections 98- 1202--98-1204, but no new planned developments referencing such district regulations shall be approved after the effective date of the ordinance from which this chapter is derived. (2) Planned developments approved prior to the effective date of the ordinance from which this chapter is derived and whose adopting ordinances reference regulations of obsolete districts, shall be subject to the regulations of section 98-1205, obsolete district regulations. (3) Single-family detached (medium density) dwelling units authorized as a permitted use in planned developments approved prior to the effective date of this ordinance from which this chapter is derived shall continue to be authorized in such areas according to the regulations of section 98-1206, single-family detached (medium density), but no new planned developments containing such uses shall be approved after the effective date of the ordinance from which this chapter is derived. (4) Planned developments approved prior to the effective date of the ordinance from which this chapter is derived, and whose adopting ordinances are silent on or do not specify development regulations for uses other than single-family detached (medium density dwellings) shall be subject to the regulations of section 98-1207, obsolete planned development regulations, for such uses. (Code 1989, ch. 12,9 3.26(f)) Sec. 98-817. Permitted uses. The following uses shall be permitted in the PD planned development district only at locations specifically authorized by the establishing ordinance or site plan approving the planned development district, subject to compliance with any applicable conditions and all other provisions of this chapter. Approval of such uses when not specifically authorized shall require amendment of the planned development ordinance or site plan, according to the procedures for zoning map amendments set forth in section article IV of chapter 78 of this Code, comprehensive master plan, zoning map and text amendments. Notwithstanding the foregoing, specific authorization shall not be required for customary accessory uses. Accessory dwelling, subject to section 98-983 Accessory use, general, subject to section 98-972 Accessory retail/service uses Amusement and recreation (indoors), subject to section 98-973 Antique shop Art gallery or handicraft sales Art supply store Assembly hall Auto parts and accessory sales (indoors) Auto repair garage Auto leasing or rental Bait and sporting goods sales Bakery or confectionery, wholesale Bakery or confectionery shop, retail Bank or savings and loan Boat storage and service Book or stationary store or newsstand Bottling works Building material sales or storage (indoors) Bus station or terminal Cabinet and upholstery shop Car sales, new or used Car wash, full-service Car wash, self-service Car wash, automatic Church or rectory Cleaning shop or laundry pickup station Cleaning, dyeing or laundry plant College or university Community center, public Convenience store Convent or monastery Country club, private, subject to 98-978 Crop agriculture Custom personal service Dancehall Day camp for children Day care home Drugstore or pharmacy Dwelling, single-family detached Dwelling, duplex Dwelling, single-family attached Dwelling, multifamily Exhibition area or fairgrounds Feed store Fire station Florist Food processing Fraternal club or lodge Garage sale, subject to section 98-982 Golf course, private Golf course, public Greenhouse, wholesale Hardware store Heliport Home occupation, subject to section 98-984 Hospital Hotel or motel Institution, drug or psychiatric treatment Keeping of livestock or poultry, subject to section 98-985 Laboratory, medical and dental Laundry, self-service Lithographic or print shop Local utility line Maintenance service Manufacturing, light Manufacturing, general Marina Model home Mortuary or funeral home Motor vehicle fuel service station Museum, library or art gallery, public Nursing or congregate care facility Off-street parking, accessory Office, general business and professional Office, medical or dental Office-showroom/warehouse Optical sales Park or playground, public Parking lot, trucks or trailers (transport) Parking lot or structure, commercial Personal improvement services Pet store, subject to section 98-988 Plant nursery or garden shop Private franchise utility (not listed) Private utility shop, yard or building Public building, shop or yard Railroad freight or passenger station Railroad track Railroad team track Recreation center Recreation center, public Repair services, limited Restaurant, fast food Restaurant, general Retail, general (indoors) Retail, single tenant (less than 25,000 square feet) Retail, single tenant (25,000 square feet but less than 50,000 square feet) Retail, single tenant (50,000 square feet but less than 75,000 square feet) Retail, single tenant (75,000 square feet but less than 100,000 square feet) School, elementary or secondary School, commercial trade School, business Secondhand store Sewage pump station Sewage treatment plant Stadium or playfield, public Supermarket Swimming pool, public Swimming pool, commercial Swimming pool, private, subject to section 98-996 Telephone equipment station Theater Tool rental (domestic equipment Travel bureau or consultant Vehicle and equipment sales or rental Veterinary hospital (inside pens), subject to section 98-998 Warehousing and wholesale, general Water well, storage or pump station Welding or machine shop (Code 1989, ch. 12,3 3.26(g); Ord. No. 14-00,39,2-17-2000; Ord. No. 08-01, 3 14.2-5-2001; Ord. No. 09-01, 35,2-5-2001; Ord. No. 49-01, 38,7-16-2001; Ord. No. 48-03, 38.8-18-2003) Sec. 98-818. Specific uses. The following uses shall be permitted in the PD planned development district only upon approval of a specific use permit by the town council in accordance with the procedures and standards of section 90-186, specific use permits; provided, however, that the specific use permit process shall not be required if such uses are shown on the approved site plan for the planned development district: Airport or landing field Caretaker or guard residence, subject to section 98-975 Cemetery or mausoleum Communication tower, commercial, subject to 98-977 Convenience store with beer/wine sales Convenience store with gasoline sales Day care center Electrical line/substation, high voltage, subject to section 98-979 Electrical energy generating plant Helistop Private club, subject to section 98-989 Recycling dropoff center, subject to section 98-990 Retail, single tenant (100,000 square feet or more) Stable, commercial boarding or rental, subject to section 98-995 Supermarket with beer/wine sales Transmission pipeline, subject to section 98-997 Temporary special event, subject to section 98-976 (Code 1989, ch. 12,3 3.26(h); Ord. No. 14-00,39,2-17-2000; Ord. No. 49-01, 3 8, 7-16-2001; Ord. No. 76-03, 321,11-3-2003) Sec. 98-819. Temporary uses. The following uses shall be permitted in the PD planned development district only upon approval of a temporary use permit in accordance with the procedures and standards of 78-87 of this Code, temporary use permits: AsphalUconcrete batch plant, temporary, subject to section 98-974 Carnival or circus, temporary, subject to 98-976 Field office, temporary Refreshment stand, subject to section 98-991 Sales, temporary or seasonal, subject to section 98-992 Sales trailer, temporary, subject to section 98-993 (Code 1989, ch. 12, 3 3.26(i)) Sec. 98-820. Maximum residential density. The overall net densities, exclusive of dedicated street rights-of-way, dedicated park land, dedicated open space, and designated floodplain areas, of planned development district residential areas within each comprehensive master plan land use designation shall not exceed the following: TABLE INSET: Comprehensive plan Maximum overall Land use designation Net density Rural density 0.5 units per acre Estate density 1.0 units per acre Low density 2.9 units per acre Medium density 4.4 units per acre High density 14.0 units per acre Nonresidential 14.0 units per acre (Code 1989, ch. 12, ~ 3.260)) Sec. 98-821. Perimeter screening. (a) Subdivision perimeter fences and walls constructed adjacent and parallel to the rights-of- way of arterial and collector streets shall consist of masonry, stone, wrought-iron or tubular steel, or a combination of such materials. Such fences and walls shall be a minimum of six feet in height and shall have masonry or stone columns measuring a minimum of 24 inches by 24 inches, with monolithic tops, placed a maximum of 40 feet on center. Vertical or horizontal spacing of members of wrought-iron or tubular steel fencing and their attachment to any column shall not allow passage of a four-inch sphere. Wrought-iron and tubular steel fencing shall further provide for approved plantings from section 82-277 of this Code, screening plant selection list, placed three feet on center adjacent to all wrought-iron and tubular steel fencing. Such perimeter fencing shall be located within a three-foot wide fence easement dedicated to the mandatory homeowners' association for perpetual maintenance by such association. Parallel privacy fences of wood or other construction shall not be allowed between the perimeter fencing and parallel foundation lines on adjacent or contiguous lots. Notwithstanding the foregoing, wrought-iron or tubular steel fencing of a minimum four feet in height may be allowed at the open end of cul-de- sacs and between parallel streets, provided the fencing complies with all of the requirements contained in this section other than height. (b) Fences and walls constructed adjacent and parallel to dedicated park, trail or open space areas shall consist of wrought-iron or tubular steel. Such fences and walls shall be a minimum of four feet in height and shall have masonry or stone columns measuring a minimum of 24 inches by 24 inches, with monolithic tops, placed a maximum of 40 feet on center. Vertical or horizontal spacing of members of wrought-iron or tubular steel fencing and their attachment to any column shall not allow passage of a four-inch sphere. Such wrought-iron or tubular steel fencing may further provide for approved plantings from section 82-277 of this Code, screening plant selection list, placed three feet on center adjacent to the fencing. Such fencing shall be located within a three-foot wide fence easement dedicated to the mandatory homeowners' association for perpetual maintenance by such association. Parallel privacy screening of masonry construction, not exceeding 50 percent of the lot width, shall be allowed between the wrought-iron or tubular steel fencing and parallel foundation lines on abutting lots. Approved plantings from section 82- 277, screening plant selection list, shall be placed three feet on center along the entire length of that side of the masonry screening facing the wrought-iron or tubular steel fencing. Such masonry screening shall be located a minimum distance of ten feet from the wrought-iron or tubular steel fencing. Fences of wood shall not be allowed between the perimeter fencing and parallel foundation lines on adjacent or contiguous lots. (Code 1989, ch. 12,9 3.26(k)) Sees. 98-822--98-840. Reserved. City of Mansfield Ma~FIEtl9 ~5100 ARTICLE 5. SPECIAL PURPOSE DISTRICT REGULATIONS. Section 5000. General Provisions. The special Purpose Article is designed as an inclusive Article that establishes sets of standards for uses or areas that deserve specific, independent considerations. None of the districts contained in this Article are cumulative. Section 5100. PD, Planned Development District Regulations. A. Purpose: This district is intended to accommodate unified design of residential, commercial, office, professional services, retail and institutional uses and facilities or combinations thereof in accordance with an approved comprehensive development plan. This district is designed to permit flexibility and encourage a more creative, efficient and aesthetically desirable design and placement of buildings, open spaces, circulation patterns and parking facilities in order to best utilize special site features of topography, size or shape. B. Permitted Uses: Uses permitted in a PD, Planned Development District, are set forth in Section 4400. C. Development Standards and Regulations: I. Height Regulations: The maximum height requirement for permissible uses in this district shall be established on the approved development plan with due regard to site and general area characteristics including land use, zoning, topography and setbacks, etc. 2. Density Regulations: The density requirement for development shall be established on the approved development plan taking into account the goals and objectives, planning principles, and guidelines in the adopted Master Land Use Plan. 3. Open Space Regulations: Provisions for public, private and common open space shall be evaluated with due regard to density, site coverage, and physical characteristics of the site. Common open space must be usable for recreational activities including but not limited to playgrounds, trails, or other passive or active play areas. No open space shall be proposed that is less than twenty (20') feet in width to accommodate a minimum section of trail surface, landscape buffer area and space for maintenance. Ownership and maintenance of these areas must be addressed with the plan proposal. 4. Off-Street Parking Regulations: The off-street parking requirements shall be established on the approved development plan and generally in accordance with Section 7200, hereof. The location, number of spaces and size of parking areas shall be evaluated with due regard to vegetation, topography, and other physical characteristics of the site. 5. Setback Regulations: The setback requirements shall be established on the approved development plan. 6. Masonry Construction Standards: The masonry construction standards shall be established on the approved development plan. 7. Landscaping and Screening Regulations: The landscaping and screening requirements shall be established on the approved development plan but shall not be less than the minimum 5100-1 S5100 requirements for development prescribed in Section 7300 of the Natural Resources Management Ordinance. 8. Tree Preservation and Mitigation: Preservation of trees shall be evaluated with due regard to aesthetics and other physical characteristics (e.g. topography, view corridors, utilities, access) of the site. This evaluation should be made prior to the design and layout of proposed improvements such that the environment suggests design. The requirements for tree preservation and mitigation shall be established through the policies and procedures prescribed in the Natural Resources Management Ordinance in cooperation with the Landscape Administrator. The City deems it necessary that a developer consult with the Landscape Administrator as early in the site search, acquisition and planning process as possible so asto minimize negative impacts on the development. D. Approval Procedures: I. A concept plan shall be required as a pre-requisite to any application for PD, Planned Development zoning. 2. The Planning & Zoning Commission and City Council will each hold a public hearing to review the proposed concept plan. The review of the concept plan does not grant any change in zoning. It merely allows the applicant to seek a conceptual review before spending the necessary resources to prepare a development plan. 3. After the concept plan review and a favorable indication from Planning & Zoning and Council, the applicant may submit a formal application for zoning change to a Planned Development District and for approval of a development plan. Such application shall be submitted in accordance with the provisions of Section 8600. The procedures for hearing said zoning change application and for approval of the development plan shall be the same as for an application for any other zoning change. 4. The applicant has the option to by-pass the concept plan review process if prepared to submit a development plan without any prior indication from the Planning & Zoning Commission and City Council regarding the development concept. 5. Prior to considering an application for a zoning change to a Planned Development District and development plan, the City Council shall request a recommendation from the Planning & Zoning Commission. 6. After receiving the Planning & Zoning Commission's recommendation, the City Council shall hold a public hearing to consider the application. 7. After the public hearing, City Council may approve the original application and development plan or modifY the development plan as deemed appropriate by the City Council. 8. The approved development plan and the associated development standards and regulations to be observed on the Planned Development District shall be specified and incorporated as part of the ordinance establishing the district. Every Planned Development District approved under the provisions of this Ordinance shall be considered an amendment to the Zoning Ordinance and Zoning Map. 5100-2 ~5l00 E. Concept Plan Application: An application for review and consideration of a Concept Plan shall consist of the following: 1. A complete signed application as provided by the Planning Department or on the City's website at www.mansfield-tx.gov 2. The appropriate fee in accordance with the current fee schedule adopted by City Council. 3. On a separate 8 W' X 11" exhibit, provide a metes and bounds description of the property included in the concept plan boundaries, including the total acreage, signed and sealed by a registered surveyor. 4. On a separate 8 W' X 11" exhibit, list the proposed specific land uses in detail and the approximate acreage data for each use. If land uses are general, refer to the nearest, least intensive zoning district that would accommodate the proposed use and any excluded uses. Example: All uses permitted in the "C-3, Commercial District, excluding outside storage or sales" . 5. An electronic copy of the plan in accordance with current established policy. 6. All large format drawings shall be folded to an approximate size of 8 W' X 11" with the title block showing. 7. Fifteen (15) copies of the plan in 24" X 36" or 22" X 34" format, drawn at an acceptable scale indicating all significant features of the proposed development to include: a. A vicinity map locating the property in relationship to existing major thoroughfares. b. Title block, preferably in lower right-hand comer, including the following: "Concept Plan, name of development, survey and abstract number or recorded plat information, city, county, state, date of preparation, acreage and number oflots". c. Acceptable scale: 1" = 20', 1" = 40', 1" = 1 00' or as approved. d. Type size is legible at full scale and when reduced. e. North arrow, graphic and written scale in close proximity. f. Name, address, phone and fax of owner/developer and the firm preparing the plan. g. A map showing the boundaries of the different land uses and the boundary dimensions. h. Adjacent or surrounding land uses, zoning, streets and other pertinent existing or proposed off-site improvements, sufficient to demonstrate the relationship and compatibility of the site to the surrounding properties, uses and facilities. I. The location, height, setbacks and minimum floor areas for all buildings and if non- residential, the floor area ratio. J. The number, location, and typical dimensions of the lots, the setbacks, the number of dwelling units, and number of units per acre (density). 5100-3 95100 k. The location, type, and size of all fences, berms, or screening features. 1. When deemed necessary,the Planning and Zoning Commission or City Council may ask for more information during the review of a Concept Plan. F. Development Plan Application: An application for zoning change to PD, Planned Development shall consist of the following: 1. A complete signed application as provided by the Planning Department or on the City's website at www.mansfield-tx.gov The appropriate fee in accordance with the current fee schedule adopted by City Council. 2. On a separate 8 Y:z" X 11" exhibit, provide a metes and bounds description of the property included in the zoning change request, including the total acreage, signed and sealed by a registered surveyor. 3. On a separate 24" X 26" or 22" X 34" sheet, drawn at the same scale as the plan, show the approximate topography of the plan area, all water courses that will remain in a natural state, 100-year floodway and a 100-year floodplain per FEMA and other hydraulic and hydrologic studies as necessary. Provide two (2) copies. 4. On a separate 24" X 36" or 22" X 34" sheet, drawn at the same scale as the plan, show proposed and existing water and sanitary sewer locations. Also include the locations and sizes of private water and sanitary sewer lines. Provide two (2) copies. 5. On a separate 8 Y:z" X 11" exhibit, list the specific land uses in detail and the acreage data for each use. If land uses are general, refer to the nearest, least intensive zoning district that would accommodate the proposed use and excluded uses. Example: All uses permitted in the "C-3, Commercial District, excluding outside storage or sales". 6. A separate exhibit and documents indicating the traffic volumes, turning movements, evaluation of ingress and egress existing and proposed, when required by the City Engineer. 7. An electronic copy of the plan in accordance with current established policy. 8. All large format drawings shall be folded to an approximate size of 8 Yz" X 11" with the title block showing. 9. Fifteen (15) copies of the plan at 24" X 36" drawn at an acceptable scale indicating all significant features of the proposed development to include: a. A vicinity map locating the property in relationship to existing major thoroughfares. b. Title block, preferably in lower right-hand comer, including the following: "Development Plan, name of development, survey and abstract number or recorded plat information, city, county, state, date of preparation, acreage and number oflots". c. Acceptable scale: 1" = 20', 1" = 40', 1" = 100' or as approved. d. Type size is legible at full scale and when reduced. 5100-4 S5100 e. North arrow, graphic and written scale in close proximity. f. Name, address, phone and fax of owner/developer and the firm preparing the plan. g. A map showing the boundaries of the different land uses and the boundary dimensions. h. Adjacent or surrounding land uses, zoning, streets, drainage facilities and other existing or proposed off-site improvements, sufficient to demonstrate the relationship and compatibility of the site to the surrounding properties, uses and facilities. 1. The location and size of all streets, alleys, parking lots and parking spaces, loading areas or other areas to be used for vehicular traffic and the proposed access and connection to existing or proposed streets adjacent to the plan area. Include a chart indicating the number of required parking spaces by use, the method of calculation and the number of proposed parking spaces. j. The types of surfacing, such as paving (e.g. concrete, brick, turf, etc.) to be used at the various locations. k. The location and size of all fire lanes with all curb radii adjacent to the fire lane labeled. The nearest fire hydrant dimensioned to the property comer and all proposed fire hydrants. 1. The location, height, setbacks and minimum floor areas for all buildings, and if non- residential, the floor area ratio. Include the following building details for non single- family developments: (l) Entrance and exits to the building. (2) Architectural renderings or elevations of proposed structures with all exterior materials for roofs, awnings, walls etc. labeled. (3) Calculations of the masonry content on each fayade and in total for each building. (Example: Area of front facade = h x I, percent masonry = 80%) (4) Distance between buildings and distance from building to property lines. m. The number, location, and dimensions of the lots; and the setbacks, number of dwelling units, and number of units per acre (density). A graphic showing a typical lot layout, with size and setbacks. n. The location of all on-site facilities for liquid waste or method of temporary storage pending disposal, including existing or proposed septic fields. o. The location, size and type of each outside facility for waste or trash disposal. If no facility is shown, provide a note indicating method of disposal and removal. p. A tree survey locating all protected trees by type, size and species in aprinted and electronic format, as required by the Landscape Administrator, and mitigation plan, if required by the city's Natural Resources Management Ordinance. (Refer to the Tree Preservation Application as found on the city's website.) 5100-5 g5IOO q. A landscape plan showing all landscape setbacks and buffers; parking lot landscaping; and any additional landscaping proposed. A chart indicating the size, length and width of the landscape areas, with the required number of plants and the proposed number of plants should be included on the plan. The landscape plan may be presented on a separate exhibit on the same sheet size and at the same scale as the site plan. r. The approximate location and size of greenbelt, open, common, or recreation areas, the proposed use of such areas, and whether they are to be used for public or private use. If private, indicate the proposed ownership. s. The approximate location and size of required Parkland Dedication areas, as required by the city's Parkland Dedication Ordinance for residential development. t. The location, type, and size of all fences, berms, or screening features. u. A plan, including elevations, showing location, size, height, orientation and design of all signs regulated by the city's sign ordinance. v. The location, size and type of all pedestrian areas, bike paths and sidewalks. w. The location, size, type and purpose of any outside storage or outside display and method of screening. Indicate the percentage of outside storage as compared to the building square footage. x. Phases of development should be shown and labeled. Provide a development schedule indicating the start and finish date of each phase, broken down by use and acreage. y. When deemed necessary,the Planning and Zoning Commission or City Council may ask for more information during the review of a Planned Development. Likewise, they may waive some of the information if the application is a simple request to deviate from the existing zoning category on the property . z. If applicable, show the following mandatory owners association notes: (1) A mandatory owners association will be responsible for the maintenance of the "insert list of private amenities and common areas here". (Example: screening fences, common areas, parks, amenity centers, landscaping) (2) The Owners Association and associated documents shall be filed in accordance with the City of Mansfield policies. These documents must be reviewed by the City Attorney prior to filing the final plat. The documents shall be filed with the final plat at Tarrant County when deemed necessary by the attorney. The documents shall be submitted in a timely manner to allow for a minimum of 60 days review. Failure to submit the documents or incomplete documents may result in delay of construction, acceptance of the subdivision or delay in approval of a building permit. The City does not accept the responsibility for any delays in construction, approval or acceptance of the subdivision caused by the failure to submit the association documents or the inaccuracy of the documents. 11. A statement that clearly indicates that the proposed development will be in complete accordance with the provisions of the approved Planned Development District and that all 51 00-6 ~5100 Development Plans recorded hereunder shall be binding upon the applicant thereof, his successors and assigns, and shall limit and control all building permits. G. Revision of Development Plan: Proposed revisions or modification to an approved development plan shall be noted and shown on a mylar of the approved plan. Upon the submission of such proposed revision, copies of the proposed revised plan shall be submitted to the City Council for its review and determination as to whether the proposed revision constitutes such a significant change in land use or structures that a public hearing should be called regarding said revision. If, in the City Council's determination, said revised plan does not constitute a significant change, no public hearing shall be called and the revision shall be deemed approved. If such revision is determined by the City Council to be a significant change, a public hearing shall be scheduled regarding such revision, proper notice given, and thereafter be considered by the City Council for approval or denial; provided, however, the City Council in its sole discretion may direct any development plan revision to the Planning and Zoning Commission for its review and recommendation and, in such event, said revision shall follow the procedures set out in Section 8600 herein regarding amendments to the Zoning Ordinance. No proposed revision shall be effective until it is approved by the City Council. H. Platting Required Prior to Development: 1. Prior to issuance of any building permits, the development plan shall reflect all stipulations as approved by the City Council and the property shall be final platted in accordance with the subdivision ordinance and platting policies of the City. 2. When a development plan has been approved, final plats may be submitted in phases as shown on the approved plan. In no case, however, shall the density of all approved final plats exceed the maximum approved project density. I. Maintenance of Common Open Space: When common open space, common recreational areas or private utilities and private streets are approved as a part of a development plan, the applicant for the approval of the applicable Planned Development District shall also submit a scheme, subject to the approval of the City Attorney and City Council, for assuring continued retention and perpetual maintenance of said items for as long as the developmerit exists. The associated documents must be reviewed by the City Attorney prior to filing the final plat. The documents shall be filed with the final plat at Tarrant County when deemed necessary by the attorney. The documents shall be submitted in a timely manner to allow for a minimum of 60 days review. Failure to submit the documents or incomplete documents may result in delay of construction, acceptance of the subdivision or delay in approval of a building permit. The City does not accept the responsibility for any delays in construction, approval or acceptance of the subdivision caused by the failure to submit the association documents or the inaccuracy of the documents. J. Enforcement of Development Schedule: If the developer or property owner fails to adhere to the development schedule shown in the approved development plan, the City has the option to initiate an amendment of the Planned Development District or development plan as deemed necessary by the City Council. The procedures for amending the Planned Development District or development plan shall be the same as for a new zoning change application. 5100- 7 City of Rockwall ~w~LJ- General Article X. Planned Development ARTICLE:x. PLANNED DEVELOPMENT REGULATIONS SECI'ION IPLANNED DEVELOPMENT. GENERAL 1.1 PURPOSE The purpose of this Article is to provide for the creation of planned development zoning districts ("PD Districts"). PD Districts are intended to provide for the development of land as an integral unit for single or mixed use in accordance with a PD Concept Plan that may include uses, regulations and other requirements that vary from the City's Zoning Ordinance or from other ordinances, rules or regulations of the City. PD Districts are intended to implement the goals and objectives of the City's Comprehensive Plan, but may be accompanied by specific amendments to provisions of the Comprehensive Plan, the Parks and Open Space Plan or the Thoroughfare Plan. PD Districts are also intended to encourage flexible and creative planning, to ensure the compatibility of land uses, and to allow for the adjustment of changing demands to meet the current needs of the community by meeting one or more of the following purposes: · to provide for a superior design of lots or buildings; · to provide for increased recreation and/or open space opportunities for public use; · to provide amenities or features that would be of special benefit to the property users or community; · to protect or preserve natural amenities and environmental assets such as trees, creeks, ponds, floodplains, slopes or hills and view corridors; · to protect or preserve existing historical buildings, structures, features or places; or · to provide an appropriate balance between the intensity of development and the ability to provide adequate supporting public facilities and services. 1.2 NATURE OF PD DISTRICTS AND MINIMUM STANDARDS Each PO District is intended to be a free-standing zoning district in which land uses and intensities of land use may be tailored to fit the physical features of the site and to achieve compatibility with existing and planned adjacent uses. In order to ensure that a PO District implements the policies of the Comprehensive Plan, and to further ensure that the PO District is in accordance with a comprehensive plan of zoning regulation, it is necessary to establish minimum standards for residential and non-residential uses proposed for the PO District that must be incorporated within an ordinance adopted by the Council (the "PO Ordinance"). A. Land Use 1. Uses. Unless otherwise provided by the PD Ordinance, only those uses authorized by the City's Zoning Ordinance are permitted in PD Districts. 2. Location. The location of all authorized uses shall be consistent with the PD Concept Plan and PO Site Plan. June 7. 2004 City of Rockwall ZONING ORDINANCE Page 1 General Article X. Planned Development B. Open Space Standards 1. Public and Private Open Space. Unless otherwise provided by the PO Ordinance, a minimum of twenty percent (20%) of the gross land area within the entire PO District shall be devoted to open space, consistent with the open space requirements of the City's Parks and Open Space Plan. Open space for PO Districts may be satisfied by either public or by a combination of public and private open space. Open space requirements specified in this subsection are in addition to requirements for site landscaping and buffering. Public open space shall be dedicated to the City. 2. Preservation of Natural Features. Unless otherwise provided by the PO Ordinance or PO Concept Plan: a) Floodplain areas shall be preserved and maintained as open space; and b) Significant stands of native trees and shrubs shall be preserved and protected from destruction or alteration. 3. Open Space Allocation. Open space requirements shall be satisfied for each phase of a multi-phased residential development. If open space is not to be provided proportionally among phases of development, the applicant must execute a reservation of open space in a form that will assure the City that such open space will be provided. The City may require that all open space within the district must be provided prior to completion of development within the district. C. Other Minimum Development Standards 1. Dimensional and Area Standards. Unless otherwise provided by the PO Ordinance, dimensional and area standards for uses shall be the most restrictive standards authorized by the City's Zoning Ordinance for the same or similar uses. 1.3 PD PLANS REQUIRED There are three types of plans that may be required as part of the development process within a PO District. Each successive plan may modify the previous plan provided that it does not substantially change the general intent of the original PO district. Each successive plan becomes part of the Zoning Ordinance governing the property and replaces the previously approved plan. A. PD Concept Plan. The PO Concept Plan is mandatory and is intended to be used as the first step in the PO development process. It establishes the most general guidelines for the PO District by identifying the land uses and intensities, thoroughfare locations, and open space boundaries (including public trail systems). It may include images of intended style and type of development. The Concept Plan illustrates the integration of these elements into a master plan for the whole PO District. The PO Concept Plan establishes the development standards for the PO district. B. PD Development Plan. A PO Development Plan is optional and is intended to be used where appropriate as the second step of the PO development process. It may be required by the PO ordinance, or it may be submitted voluntarily by the property owner. A PO Development Plan constitutes an amendment to the approved PO Concept Plan and PD Ordinance and may be used where the developer requests, or the Council requires, certain standards for the PO District '- Page 2 City of Rockwall ZONING ORDINANCE June 7, 2004 General Article X. Planned Development to be specified after initial establishment of the PO District. A PO Development Plan includes more detailed information as to the specific development standards and land uses, including their boundaries. The purposes of a PO Development Plan are to allow flexibility in the development process by deferring specification of all development standards at the time of PO District creation and to enable developers to satisfy conditions imposed on creation of the District prior to submittal of a PO Site Plan. C. PD Site Plan. A PO Site Plan is mandatory and is the final step of the PO development process. The purposes of a PD Site Plan are to assure that the development of individual building lots, parcels, or tracts within the PO District are consistent with the approved Concept Plan and Development Plan, if any, and to assure that the standards applicable within the PO District are met for each such lot, parcel or tract. A PD Site Plan shall continue to be valid for a period of three years after it is approved by the Commission; however, such period may be extended by the Council upon recommendation of the Planning Commission. 1. The Site Plan shall be accompanied by building elevations and landscape and master sign plans, which shall be reviewed by the Architectural Review Board for consistency with the overall objectives of the district. The Board's recommendation shall be forwarded to the Planning & Zoning Commission for consideration in their recommendation to City Council. 2. A PO Site Plan shall terminate at the end of a two-year period (or more with an extension approved by the City Council) unless, within such period, a preliminary plat has been filed with the City for all of the land covered by the PO Site Plan. In which case, the Site Plan will remain valid as long as there is an approved plat for the property. If a PO Site Plan terminates, development of the land covered by the terminated plan cannot occur until a new PO Site Plan has been approved for the land as provided by this Article. 1.4 PD COMPLIANCE WITH ApPROVED PLANS Except as otherwise provided by the subdivision provisions of the City's Zoning Ordinance, no development shall begin and no building permit shall be issued for any land within a PO District until a PO Site Plan that is consistent with the PD Concept Plan and applicable PO Development Plan has been approved. Each PD District shall be developed, used, and maintained in compliance with the approved PO Site Plans for the district. Compliance with the PO Ordinance shall be construed as a condition precedent to granting of Certificates of Occupancy. June 7, 2004 City of Rockwall ZONING ORDINANCE Page 3 Procedures Article X. Planned Development SEcrION 2 PLANNED DEVELOPMENT PROCEDURES 2.1 ESTABUSHMENT OF A PD DISTRICT A. Zoning Amendment. An application for the establishment of a PD District shall be made to the Commission. The application shall: 1. Be accompanied by a PO Concept Plan; 2. Be accompanied by a list of proposed PD District development standards; 3. Identify the City's then-current zoning district which shall apply to the extent not otherwise provided by the PD Concept Plan or by the proposed PO District development standards; 4. Be accompanied by a Concept Plan informational statement, and traffic impact analysis unless waived by the Council. Except to the extent provided by the PO Concept Plan and the PD Ordinance, development within the PO District shall be governed by all of the ordinances, rules, and regulations of the City in effect at the time of such development (including the standards of the City's zoning district so identified in the application). In the event of any conflict between (i) the PO Concept Plan and the PO Ordinance and (ii) the then-current ordinances, rules, and regulations of the City, the terms, provisions, and intent of the PO Concept Plan and PD Ordinance shall control. In addition, prior to action by the Commission on the establishment of the PD District, the applicant shall submit a traffic impact analysis. B. PD Concept Plan. A PO Concept Plan (or, at the applicant's option, a PO Development Plan) shall be processed simultaneously with the zoning amendment application, and if the zoning amendment application is approved, the PO Concept Plan (or PO Development Plan) shall be incorporated as part of the PD Ordinance. The graphic depictions contained on a PO Concept Plan shall be considered as regulatory standards. Each PO Concept Plan shall be prepared on one or more standard sheets of sizes of 30" x 42" or 24" x 36" and at an engineering scale of 1"=100' or larger. If multiple sheets are required, an overall plan shall be submitted as well (which may be to any scale). Unless waived by the Council on recommendation of the Zoning Administrator, each PD Concept Plan shall graphically depict the following: 1. A diagram or drawing of the boundaries of the proposed PO District; 2. Proposed and existing land uses by category (including, if applicable, proposed and existing land uses by category for any sub-areas to be developed within the PO District); 3. Proposed density by type of residential uses, including the maximum numbers of dwelling units for residential uses other than single-family detached, and lot sizes for single-family detached; 4. Proposed estimated total floor area and floor area ratios by category of non- residential uses, together with residential view analysis, if any; 5. Proposed configuration of public and private open space serving the development, showing the relationship to the City's Parks and Open Space Plan, including trail system and access points to the trail system, estimated dimensions and approximate area, and areas to be dedicated to the public or to a private maintenance organization, if known; Page 4 City of Rockwall ZONING ORDINANCE June 7. 2004 Procedures Article X. Planned Development 6. Proposed and existing thoroughfares, boulevards and roadways; 7. To the extent known for adjoining land, existing land uses (by zoning district), existing thoroughfares; and existing open space for such adjoining land; and 8. A general plan for circulation of traffic and pedestrians within and external to the development, including designated points of access. C. Concept Plan Informational Statement. A PO Concept Plan shall be accompanied by an informational statement containing the information set forth below. If the zoning amendment application is approved, the informational statement shall not be binding on the applicant or the land owner and shall not be considered part of the PO Concept Plan or the PO Ordinance. Informational statements shall be updated concurrently with any amendment to the PO Concept Plan and with each PO Development Plan. Each statement shall include the following: 1. A general statement setting forth how the proposed PO District will relate to the City's Comprehensive Plan; 2. The total acreage within the proposed PD District; 3. If the development is to occur in phases, a conceptual phasing plan that identifies the currently anticipated general sequence of development, including the currently anticipated general sequence for installation of major capital improvements to serve the development; and 4. An aerial photograph with the boundaries of the PO Concept Plan clearly delineated. D. -Proposed PD Development Standards. Proposed PO District development standards shall be processed simultaneously with the zoning amendment application, and if the zoning amendment application is approved, such standards shall be iricorporated as part of the PD Ordinance. Such proposed development standards may include (but shall not be limited to) uses; density; lot size; lot dimensions; setbacks; coverage; height; landscaping; lighting, fencing, parking and loading; signage; open space; drainage; and utility and street standards. Any graphic depictions used to illustrate such standards, unless otherwise provided in the PO Ordinance, shall be considered as regulatory standards. E. Traffic Impact Analysis. Prior to or simultaneous with submission of an application for the establishment of a PO District, the applicant shall submit to the City's transportation engineer a traffic impact analysis for the proposed PD District, unless waived by Council. The analysis must be approved by the Council prior to or concurrently with the approval by the Council of the PO District. The traffic analysis shall not be considered part of the PO Concept Plan or the PO Ordinance but may be used to condition the density or intensity of uses or the timing of development within the District based upon the existence of a supporting roadway network adequate to accommodate the traffic expected to be generated. The traffic impact analysis shall be updated with each PD Site Plan. F. Complete Application. No application for the establishment of a PO District shall be deemed to be filed with the City until the Zoning Administrator has determined that the PO Concept Plan is complete, that the proposed PD District development standards have been identified, a traffic impact analysis has been June 7, 2004 City of Rockwall ZONING ORDINANCE Page 5 Procedures Article X. Planned Development submitted, and that the informational statement is complete. Fifteen (15) copies of all such materials shall be submitted. G. Commission Recommendation. The Commission, after notice and public hearing in accordance with the City's Zoning Ordinance procedures, shall formulate its recommendation with respect to establishment of a PD District. The recommendation of the Commission shall be forwarded to the Council for decision. H. Council Decision. Following receipt of the Commission's recommendation, the Council, after notice and public hearing in accordance with the City's Zoning Ordinance procedures, shall conduct a public hearing and shall approve, approve with conditions, or deny the application for establishment of the PD District. I. Approval Criteria. Based upon the PO Concept Plan, the Commission, in making its recommendations to the Council, and the Council, in determining whether the PO District should be established, shall consider whether the following criteria have been met: 1. The plan of development is generally consistent with the City's Comprehensive Plan (as such plan may be amended prior to or concurrently with approval of the PD District); 2. Proposed uses and the configuration of uses are compatible with existing and planned adjoining uses; 3. The general arrangement of streets conforms to the City's Thoroughfare Plan (as such plan may be amended prior to or concurrently with approval of the PO District); 4. Proposed uses, development densities and intensities, and development regulations are generally consistent with this Article; 5. The configuration of the proposed open space serving the development is consistent with the City's Parks and Open Space Plan (as such plan may be amended prior to or concurrently with approval of the PD District); 6. The amenities proposed justify proposed densities or intensities; 7. The proposed plan of development furthers the public health, safety and general welfare of the community; and 8. The traffic impact analysis demonstrates that the capacity of the proposed roadways shown on the proposed PO Concept Plan, together with any roadways within related PO Districts and the supporting roadway network, are adequate to accommodate the traffic expected to be generated by the uses, densities and intensities of use shown on the PO Concept Plan in and authorized in the PD Ordinance in a timely and efficient manner. J. Conditions. The Commission may recommend, and the Council may require, such conditions to the establishment of a PD District and to the approval of a PO Concept Plan as are reasonably necessary to assure that the purposes of the District and the approval criteria for the PD Concept Plan are met. Such conditions may include the requirement of a PD Development Plan. K. Adopting Ordinance. The PO Ordinance shall include the PO Concept Plan as an exhibit to the ordinance and shall include the following: 1. A statement of the purpose and intent of the PO District; Page 6 City of Rockwall ZONING ORDINANCE June 7. 2004 Procedures Article X. Planned Development 2. A metes and bounds description of the land within the PO District; 3. A list of the specific land uses permitted within the PO District, together with a description of the sub-areas, if any, in which such uses are allowed; 4. The maximum density or intensity of each permitted land use; 5. A list of all the PD District development standards, together with necessary graphic illustrations; 6. Identification of the City's then-current zoning district standards that shall apply to the extent not otherwise provided by the PO Concept Plan or PD Ordinance; 7. Identification of the development standards, if any (whether in the PO Ordinance or in the then-existing ordinances, rules, or regulations of the City), that may be deferred for specification until approval of a PO Development Plan or that may be varied by the Council as part of the approval process for a PO Site Plan 8. Unless otherwise identified on the PO Concept Plan, the general location and size of open space serving the development; including any proposed dedication of open space to the public or to a maintenance organization. 9. Provisions governing amenities, if any, to justify densities or intensities. 10. Such additional conditions as are established by the Council to assure that the PO District and PO Concept Plan are consistent with the purposes of the District and the approval criteria for the Concept Plan. 2.2 PD DEVELOPMENT PLANS If the Council requires as a condition of establishing the PO District and approving a PO Concept Plan that PD Development Plans be submitted prior to submittal of a PD Site Plan, a PO Development Plan may be prepared and submitted for the entire development at one time or for individual phases of development. Each required copy of the PD Development Plan shall be accompanied by (i) a development plan informational statement and (ii) a preliminary drainage study for the area covered by the proposed plan. If deemed necessary by the City's Transportation Engineer or Zoning Administrator, the applicant for a PO Development Plan shall also submit an updated traffic impact analysis prior to Commission action. A. Submittal Requirements for PD Development Plans 1. Approximations of the following: site boundaries and dimensions, lot lines, site acreage and square footage, and distances to the nearest cross streets; 2. Location map, north arrow, title block and site data summary table; 3. Existing land uses and zoning classifications on adjacent properties; 4. Preliminary tree survey. 5. Any features omitted from the PO Concept Plan upon Council authorization; and 6. Such additional features as are necessary to assure compliance with conditions established by the Council to be satisfied by the Development Plan. June 7, 2004 Page 7 City of Rockwall ZONING ORDINANCE Procedures Article X. Planned Development B. PD Development Standards. Development standards that were not specified in the PO Ordinance, as authorized by the Council, shall be submitted and approved as an amendment to the PO Ordinance and incorporated therein, in conjunction with approval of the PO Development Plan. C. Development Plan Informational Statement. Each PO Development Plan shall be accompanied by an informational statement containing the information set forth below. Informational statements shall be updated concurrently with any amendment to a PO Development Plan and with each PO Site Plan. Each informational statement shall include the following: 1. Name and address of landowner and date of preparation of the PD Development Plan; 2. Name and address of architect, landscape architect, planner, engineer, surveyor, or other persons involved in the preparation of the PD Development Plan; 3. A table listing the specific permitted uses proposed for the property, and, if appropriate, the boundaries of the different land uses and the boundary dimensions; 4. Development standards for each proposed land use, as follows: a) Minimum lot area; b) Minimum lot width and depth; c) Minimum front, side, and rear yard areas; d) Maximum height of building; and e) Maximum building coverage. 5. A list of the development standards, if any (whether in the PO Ordinance or in the then-existing ordinances, rules, or regulations of the City that apply to development within the PD District), for which the applicant is seeking amendment by the Council as part of the PD Development Plan approval process. 6. If Council approval of any height increase is being requested, a view analysis of the impact of such requested variance on adjacent residential areas of the City. 7. Preliminary and approximate building locations and building footprints; 8. Preliminary elevations and perspectives to show the relationship of building heights to surrounding topography; 9. Location of parking areas and structures for multi-family and non-residential uses, including areas for off-street parking; 10. A detailed description of how open space serving the development will be satisfied for the phase of development represented by the PD Development Plan, including any proposed dedications of open space to the public or to a private maintenance organization; . 11. If the PO Development Plan is a phase of the project (as described in the applicant's original informational statement submitted with the PD Concept Plan), depiction of the area subject to the development in relation to the then-current phasing plan, together with any updates of the then-current Page 8 City of Rockwall ZONING ORDINANCE June 7, 2004 Procedures Article X. Planned Development phasing plan that was submitted as part of the applicant's original informational statement; and 12. A list identifying each proposed addition or amendment to the PO ordinance. D. Preliminary Drainage Study. Each PD Development Plan shall be accompanied by a preliminary drainage study for the area covered by the study. The study shall be prepared by a professional engineer licensed in the State of Texas and experienced in the study of drainage issues. 1. Purpose. The purposes of the drainage design policies are to prevent flooding of adjacent properties, owned by third parties and to regulate water surface elevations and peak discharges. Development within the PO District shall not produce any increase in the water surface elevation (either upstream or downstream) due to as-year, 10-year, 50-year, or 100-year storm. If the discharge from the area proposed for development would increase the water surface elevation above predevelopment conditions on any property owned by third parties due to any of such storms, then such peak discharge must be regulated to the extent necessary to eliminate the increased water surface elevation. The regulation of discharges to eliminate such increases may be achieved using either on-site or off-site storm water management facilities (such as detention areas, retention areas, and infiltration and sedimentation ponds). 2. Content. The preliminary drainage study shall a) Contain a topographical map of the area proposed for development to a scale not smaller than 1 inch = 200 feet; b) Generally describe how the proposed development will comply with the drainage design policies set forth below; c) Include all information deemed necessary by the preparing engineer to support his or her determination that the proposed development will comply with the drainage design policies; and d) Include all information reasonably requested by the City Engineer to support his or her review of the preliminary drainage study. E. Updated Traffic Impact Analysis. If deemed necessary by the City's transportation engineer or if required by the PO Ordinance, the applicant for a proposed PO Development Plan shall submit an updated traffic impact analysis prior to action by the Commission. The purpose of the updated analysis is to determine whether the traffic estimated to be generated by the development shown on the proposed PD Development Plan will necessitate specific on-site or adjacent traffic improvements (e.g., turn lanes, stacking lanes, signalization, etc.) and to determine whether conditions attached to the Concept Plan based on the original traffic impact analysis have been met. F. Commission Recommendation. The Commission, after notice and public hearing in accordance with the City's Zoning Ordinance procedures, shall recommend to the Council whether to approve, approve with conditions, or disapprove each PD Development Plan, together with each proposed amendments to the PO Ordinance. G. Council Decision. Upon receipt of the Commission's recommendation, the Council, after notice and public hearing in accordance with the City's Zoning Ordinance procedures, shall approve, approve with conditions, or disapprove June 7, 2004 City of Rockwall ZONING ORDINANCE Page 9 Procedures Article X. Planned Development each PO Development Plan and each proposed addition or amendment to the PO Ordinance. H. Approval Criteria. The Commission, in making its recommendation to the Council, and the Council, in acting upon each PD Development Plan and proposed addition or amendment to the PO Ordinance, shall determine whether the proposed PO Development Plan and ordinance addition or amendment meets the following criteria: 1. The plan generally is consistent with the approved PO Concept Plan (including open space, trails, and thoroughfares); 2. The plan generally is consistent with the development standards set forth in the PO Ordinance; 3. The plan satisfies any conditions established by the Council in the PO Ordinance relating to Development Plan approval; 4. The plan is generally consistent with the standards and conditions of the Zoning Ordinance and of other ordinances, rules and regulations of the City (to the extent that such standards and conditions are applicable to development within the PD District); 5. The traffic estimated to be generated by the plan is generally consistent with the original, Council approved traffic impact analysis and any conditions to be satisfied at the time of the Development Plan approval have been met; 6. The plan includes the necessary on-site or adjacent traffic improvements to accommodate traffic generated by the plan (e.g., turn lanes, stacking lanes, signalization, etc.); and 7. The preliminary drainage study for the plan indicates that the proposed development can be achieved without increasing the upstream or downstream water surface elevation on property owned by third parties and that detention and drainage areas can be improved in a natural manner. I. Conditions. The Commission may recommend, and the Council may require, such conditions to the approval of a PO Development Plan as are reasonably necessary to assure that the approval criteria are met. J. Approving Ordinance. The Development Plan shall be incorporated within an ordinance amending the PO Ordinance and the Concept Plan. The amending ordinance shall set forth all standards necessary for development of the land subject to the Development Plan that were not included in the PD Ordinance. The amending ordinance also shall repeal or amend any conditions that were attached to the PD Ordinance that have been satisfied as a result of approving the Development Plan and associated amendments. 2.3 PD SITE PLANS A. Delegation to Commission. The Commission hereby is delegated the authority to approve, conditionally approve, or deny PO Site Plans and all amendments thereto, subject to appeal to the Council. Any Site Plan subject to a request for variances or other modifications that are reserved for the Council by these PD regulations shall be decided by the Council upon recommendation of the Commission. B. Submittal Requirements. The following requirements apply to each application for PD Site Plan approval: Page 10 City of Rockwall ZONING ORDINANCE June 7, 2004 Procedures Article X. Planned Development 1. Size. PO Site Plans shall be prepared on one or more standard sheets of sizes of 30" x 42" or 24" x 36" and at an engineering scale of 1 "=1 00' or larger. If multiple sheets are required, an overall plan shall be submitted as well (which may be to any scale). PO Site Plans shall be prepared by a registered engineer, architect; or landscape architect. 2. General Information. a) North Arrow; b) Total site acreage; c) Submission date; d) Scale (written and graphic); e) Vicinity map; f) Names, addresses, and telephone numbers of designer, engineer, developer, and owner; g) A boundary survey of the site with the location of proposed land uses; h) Adjacent subdivision names and property lines; and i) Adjacent land uses and structures. 3. Structures a) Location, dimensions, and use of all existing facilities and proposed building sites; b) Setback and separation distances between building sites; c) Proposed construction type and facade materials for all multi-family and non-residential buildings (the Commission may require elevations and perspective drawings); d) Proposed density of each use; e) Proposed location of screening along public roadways shown on the PD Concept Plan; f) Location and types of signs, including lighting and heights; g) Elevation drawings citing proposed exterior finish materials; and h) Location of solid waste collection facilities. 4. Streets and Sidewalks a) Location and width of all rights-of-way and easements; b) Location and dimensions of all pavement and curbing; c) Location and width of all sidewalks; d) Location and width of all ingress/egress points; e) Location and width of all medians and median breaks; f) Location of any special traffic regulation facilities; g) Location of Fire Lanes; and h) Street names on proposed streets. 5. Off-Street Parking and Loading Areas a) Number, location, and dimension of spaces; b) Type of surface material of parking facility; June 7, 2004 City of Rockwall ZONING ORDINANCE Page 11 Procedures Article X. Planned Development c) Dimension of aisles, driveways, maneuvering areas, and curb return radii; d) Distance between spaces and adjacent rights-of-way; e) Location of all existing and proposed fire lanes and hydrants; and f) Proposed lighting diagram. 6. Landscaping a) Location and size of major tree groupings and existing hardwood trees of 6" caliper or greater , noting whether they are to be removed or retained; b) Location and size of proposed plant materials, including paving, together with type and species of plants; c) Number and type of each landscape element; d) Height and type of all fencing or buffering; e) Height of all planters, sculptures, and decorative screens; f) Location and type of trash receptacle screening; g) Location and type of lighting for streets, signage, and parking areas; and h) Location of visibility triangles where required. 7. Drainage a) Direction of water flow; b) Quantity of on and off-site water generation; c) Topographic contours at a minimum of 5 foot intervals; d) Points of concentrated water discharge; e) Areas where special design and construction may be necessary due to slope or soil conditions; f) Location and design of all water detention and drainage areas; and g) Drainage ways, creeks, and limits of the 100 year floodplain and f100dway as shown on current FEMA mapping or the City's master drainage plan, including location and acreage, together with a general plan for accommodating flood waters and drainage. 8. Preliminary Service Plan a) A preliminary drainage plan of the area showing the size and location of each existing and proposed drainage way and retention or detention area. If no Development Plan has been required and approved by the Council, the drainage plan shall incorporate the requirements of the preliminary drainage study; b) The proposed method of providing water and sewer service; and c) If no Development Plan has been required and approved by the Council, an updated traffic impact analysis. 9. Special Exceptions. A list of the development standards, if any (whether in the PO Ordinance or in the then-existing ordinances, rules, or regulations of the City that apply to development within the PD District), for which the applicant is seeking a special exception by the Council as part of the PD Site Plan approval process. Page 12 City of Rockwall ZONING ORDINANCE June 7. 2004 Procedures Article X. Planned Development C. Commission Decision. The Commission, after notice and public hearing in accordance with the City's Zoning Ordinance procedures, shall approve, approve subject to conditions, or deny each PO Site Plan. D. Approval Criteria. The Commission, in approving, conditionally approving, or denying a PO Site Plan, shall consider the following criteria: 1. The plan complies with the applicable PO Concept Plan or Development Plan, if any, and with the PO Ordinance, expressly including conditions attached to the Concept Plan, Development Plan or PO Ordinance. 2. The plan complies with the standards and conditions of the Zoning Ordinance and of other ordinances, as well as other rules and regulations of the City (to the extent that such standards and conditions are applicable to development within the PO District); 3. If no Development Plan was required and approved by the Council, the traffic estimated to be generated by the plan is generally consistent with the original Council-approved traffic impact analysis; 4. If no Development Plan was required and approved by the Council, the plan includes the necessary on-site or adjacent traffic improvements to accommodate traffic generated by the plan (e.g., turn lanes, stacking lanes, signalization, etc.); 5. If no Development Plan was required and approved by the Council, the preliminary drainage study for the plan indicates that the proposed development can be achieved without increasing the upstream or downstream water surface elevation on property owned by third parties and that detention and drainage areas can be improved in a manner approved by the Council; and 6. Landscaping promotes continuity and unity consistent with the landscape plan for the development and encourages views to public open space and public landmarks. E. Conditions. The Commission, or the Council on appeal, may establish such conditions to the approval of a PD Site Plan as are reasonably necessary to assure that the approval criteria are met. F. Appeal from Commission Action. If the Commission approves a PD Site Plan with conditions or if it disapproves a PO Site Plan, the applicant may appeal the decision to the Council by filing a written request with the City Secretary within ten (10) days after the Commission's decision. G. Variances. The granting of variances for Planned Development District regulations shall be the purview of City Council, not the Board of Adjustment. If the applicant requests a variance from PD Ordinance standards or other ordinance requirements, the variance request will be forwarded to the Council with the Commission's recommendation for decision. Procedures and criteria for approval shall be those applicable to variances under Article 11.11.4 Criteria for Granting Variances. 2.4 AMENDMENT OF PD PLANS A. PD Concept Plans. PO Concept Plans (excluding informational statements) are considered part of the PO Ordinance. Any amendment to a PO Concept Plan shall be considered a zoning change, and the provisions of Chapter 211 of the Texas Local Government Code relating to notices, public hearings, and written June 7, 2004 City of Rockwall ZONING ORDINANCE Page 13 Procedures Article X. Planned Development protests for changes in zoning districts or regulations shall apply. If a PO District is established subject to approval of PD Development Plans, the provisions of this Subsection 2.4.A shall apply to such PD Development Plan. B. PD Site Plans. PO Site Plans are not considered part of a PD Ordinance. Except as otherwise provided, any amendment to an approved PD Site Plan must be approved by the Commission. However, "minor modifications" to any PO Site Plan may be approved by the Zoning Administrator. If the Zoning Administrator believes that a request for minor modification entails a significant change in the Site Plan, he may refer the request to the Commission for determination. A "minor modification" to a PO Site Plan is defined as any modification that does not: 1. alter the basic relationship of proposed development to adjacent property; 2. change the uses permitted; 3. increase the maximum density, floor area, or height; 4. decrease the amount of off-street parking, unless parking remains sufficient in number and conforms to ordinance requirements; or 5. reduce the minimum yards or setbacks. 2.5 PERIODIC REVIEW A. Applicability. Each tract of land not yet fully developed, for which (PD) Planned Development District Zoning has been granted, shall be reviewed by the Planning and Zoning Commission in order to make inquiry and ascertain the following: 1. Whether a Preliminary Plan and/or Development Plan can reasonably be expected to be filed; 2. If a Preliminary Plan and/or Development Plan can be reasonably expected to be filed at any time within the two (2) year interval as set out herein; 3. Whether the granted uses for the tract of land under consideration continues to have a desired relationship with the surrounding area; and 4. If such density and other design standards originally granted are in accordance with the current community growth patterns and values. B. Determination. If, upon inquiry and review, the Planning and Zoning Commission finds that a particular tract of land zoned (PO) Planned Development is not reflective of current community growth patterns or community design policies, or is not in accordance with the Comprehensive Plan, it may request the City Council to initiate hearings on the particular tract of I land to consider 1) reform or modification of the PO District on the particular tract; or 2) change the zoning to a more suitable land use classification. C. Frequency. The Planning and Zoning Commission shall review each tract of land for which Planned Development zoning has been granted beginning in January of each year, at least on two year intervals. The Planning and Zoning Commission may review certain tracts (for which Planned Development zoning has been granted) more frequently if it determines such review is necessary. Page 14 City of Rockwall ZONING ORDINANCE June 7, 2004 Procedures Article X. Planned Development SECI'ION 3 EFFECI' ON EXISTING PDS 3.1 DISTRICT AMENDMENTS If an amendment is proposed after the effective date of this Article to any Concept Plan, Development Plan, Site Plan or planned development ordinance approved prior to the effective date of this ordinance under prior development regulations, the provisions of this Article shall apply to those amendments. 3.2 SITE PLANS For any PD District established under prior planned development regulations for which at least one Site Plan has been approved pursuant to such prior regulations, the provisions of this Article shall not apply, except that procedures related to approval of PO Site Plans pursuant to this ordinance shall apply to any application for PO Site Plan approval submitted more than thirty (30) days after the effective date of this Article. SECI'ION 4 AMENDMENTS TO APPROVED PD APPLICATIONS 4.1 PROCESSING AMENDMENTS 1. Amendments to all applications and approvals shall be processed in the same manner as the original application. However, the applicant shall submit a summary of all elements that are proposed to be changed along with the revised plans and application. 2. Notwithstanding the above, the Zoning Administrator may approve minor modifications in an approved Site Plan or PO Site Plan administratively, provided that they do not: a) Alter the basic relationship of proposed development to adjacent property; b) Change the uses permitted; c) Increase the maximum density, floor area, or height; d) Decrease the amount of off-street parking, unless parking remains sufficient in number and conforms to ordinance requirements; e) Reduce the minimum yards or setbacks; or f) Detrimentally change or alter the characteristics of the elevation drawings or Site Plan as approved, but rather allow for some flexibility in minor modification to same. June 7, 2004 City of Rockwall ZONING ORDINANCE Page 15 City of Southlake Scxf'R.\ LJ-..Ke SECTION 30 "PUD" PLANNED UNIT DEVELOPMENT DISTRICT (As Amended by 480-RR) 30.1 PURPOSE AND INTENT - The purpose of this district, sometimes identified as a suffix to one of the other districts, is to permit flexibility and encourage a more creative, efficient and aesthetically desirable design and placement of buildings, open spaces, circulation patterns and to best utilize special site features such as topography, size and shape. It is intended that the flexibility permitted by this zoning category extends to discretionary approval, in cor\iunction with site plan or concept plan review, not limited to, but including such itemsas those relating to parking space requirements, building line setbacks, square footage of buildings and structures, sign placement and specifications and protective screening in order to achieve conformance with good planning practices. This district may also be used to accommodate planned associations of uses developed as integral land use units, including mixed uses, which may be planned, developed and operated either by a single owner or a combination of owners. 30.2 PERMITTED USES - The PUD District, when approved as a suffix to a particular zoning district, will allow the development of any combination of uses which are permitted in that district. The PUD District may also be approved for a specific use or uses, or a class of generic uses such as office, retail, personal services, educational facilities or warehousing. a. In the event certain uses are deemed inappropriate in a PUD district, whether approved for specific uses or as a suffix to another district, the use ofthe property may be specifically restricted by eliminating certain uses from the category of permitted uses. 30.3 RESIDENTIAL PLANNED UNIT DEVELOPMENTS - Where the PUD District is developed primarily for residential uses, the tract shall have a gross area of at least twenty (20) acres. A residential PUD district may be designed to accommodate the following development: a. Dwelling units grouped into clusters, allowing an appreciable amount ofland for open space. b. Projects with much or all of their housing in townhouses or apartments or both. c. Higher densities than conventional single-family projects of the same acreage. d. Part of the land used for non-residential purposes, such as shopping or employment centers. e. Preservation or enhancement of areas exhibiting environmentally significant natural features. 30-1 30.4 NON-RESIDENTIAL PLANNED UNIT DEVELOPMENTS - Where the POO District is developed primarily for non-residential uses, the tract shall have a gross area of at least five (5) acres. A non-residential POO district may be designed to accommodate the following development: a. Commercial or industrial uses grouped into clusters, allowing an appreciable amount ofthe land for open space or joint use such as parking and storage. b. Commercial or industrial projects with part ofthe land used for residential purposes. c. Single purpose commercial or industrial uses projected to involve innovative land utilization. 30.5 DEVELOPMENT REGULATIONS - The height, setback, area, floor space, and other development regulations for permissible uses in a POO district shall conform to the development regulations which would be applicable to such uses if the same were situated in the most restrictive district in which such uses are permitted. Zero lot line development may be permitted for non-residential uses on a common interior lot line where construction of a party wall is used. Where zero lot development is utilized, the equivalent open space and plantings (normally provided in adjoining bufferyards along the common lot line) shall be provided elsewhere within the two developing lots. In addition, the City Council may approve more flexible development standards if other design features provide adequate protection to surrounding and adjacent properties. For any residential POO, the maximum density permitted shall not exceed 1.80 dwelling units per gross acre. This calculation shall exclude all proposed nonresidential acreage from the gross acreage. In any residential PUD, all buildings and structures shall have a maximum lot coverage not exceeding thirty percent (30%) of the lot area, except the sum total of accessory buildings shall not exceed six hundred (600) square feet. (As amended by Ordinance No. 480-U.) (As further amended by Ordinance No. 480-X.) When developing a residential POO in phases, the City Council shall establish in the individual PUD ordinance the maximum density permitted in each phase to assure that the maximum density of the entire residential POO is not exceeded once complete buildout is achieved. (As amended by Ordinance No. 480-C.) The Board of Adjustment may grant variances of up to, but not exceeding, ten percent (10%) of any required setback or lot coverage requirement established by the City Council in the specific P .U.D. regulations at the time of zoning of said Planned Unit Development. This approval shall be per the requirements set forth in Section 44.3 (b) of the Zoning Ordinance. (As amended by Ordinance No. 480-L). 30.6 ADDITIONAL DEVELOPMENT REGULATIONS FOR BUILDINGS OR USES LYING WITI-lIN FOUR HUNDRED FEET (400') OF SINGLE F AMIL Y RESIDENTIAL PROPERTY - In addition to the development regulations applicable to this zoning district, the development regulations in Section 43, Part IlL Residential Adjacency Standards, shall 30-2 also apply. When any requirements in this section are in conflict with any other requirements for this zoning district, the more stringent requirements shall apply. (As amended by Ordinance No. 480-CC). 30.7 PARKING REGULATIONS a. All parking and vehicle use areas shall be paved with an all-weather surface. b. Off-street parking facilities shall be provided at locations designated on the approved development plan. c. Minimum off-street parking requirements shall be established in the approved development plan. Any deviation less than the minimum requirements specified in Section 35 shall require specific approval from the City Council. (As amended by Ordinance No. 480-M.) 30.8 APPLICATION - An application for a Planned Unit Development District shall be made to the Planning and Zoning Commission in the same manner that an application for zoning change is made. The application shall be processed according to the procedures specified herein. For purposes of application processing, all Planned Unit Development applications shall initially be divided into two (2) broad categories: 1. Planned Unit Developments encompassing one hundred (100) acres or less in land area. These shall require the submission and processing of a Development Plan and any specific Planned Unit Development ordinance approving such a proposal shall require specific compliance with the terms of the development plan which shall be incorporated by reference into the Zoning Ordinance Amendment. 2. Planned Unit Developments encompassing more than one hundred (100) acres of land area shall be given the opportunity at the time of zoning application to select between two (2) alternative processing procedures: a. The applicant may choose to submit a Development Plan in conformance with the provisions of this Section and thereby complete all processing requirements at the inception of the zoning action. b. The applicant may choose to submit a Concept Plan for the entire Planned Unit Development area. In addition to the requirements set forth in Section 41.3 of this ordinance, the Concept Plan shall include the following: (1) A preliminary drainage study; (2) A preliminary major utility layout showing water and sewer mains, etc. 30-3 (3) A proposed major thoroughfare plan; and (4) A legend detailing the minimum area of open space, the maximum density, the percentage of land allotted to each use, and the general location of each use. The zoning application may then be processed and a zoning classification of Planned Unit Development allocated to the site by appropriate municipal ordinance. The ordinance will identify the tract as a Planned Unit Development and will identify the types, intensity and density ofland uses on the site. The ordinance will further provide that no actual construction can commence on any portion ofthe project until a Development Plan complying with the provisions of this Section has been processed and approved on that specific section or phase of the Planned Unit Development. Each Development-Plan which is submitted for approval of a specific section or phase of the Planned Unit Development shall cover a minimum of fifty (50) acres. This approach is designed and intended to allow a large development to be approved in concept and then constructed in phases. The City recognizes that it may not be feasible and it may be unrealistic to require a highly detailed development plan to be completed on a very large project when it is recognized that it will be constructed in sections or phases over several years. Any Planned Unit Development projects undertaken on the basis of Concept Plan approval rather than full Development-Plan approval do not reflect the concurrence of the City to any specific lot arrangement or sizing, street arrangement or pattern, or approval of any specific open space or public facility plans not reflected on the approved Concept Plan. Planned Unit Development zoning based solely on a concept plan reflects only zoning approval of the basic concept and may not be implemented until full development plan approval on each section or phase has been granted; however, an applicant receiving approval of a Concept Plan shall be entitled to rely on, and implement by subsequently approved Development Plans, the type, intensity and density of land uses set forth in the approved concept plan. A concept plan based upon the Planned Unit Development Ordinances shall be subject to the following additional restrictions: Consistency Requirement. Each and every development plan submitted to secure implementation authority under the concept plan approval option must be consistent with the original concept plan. If the Zoning Administrator should identify any material variance between a submitted development plan application and the approved concept plan for the Planned Unit Development, he shall reject the development plan application and not accept it for processing until a new concept plan for the entire Planned Unit Development has been approved under the terms and provisions of this ordinance. 30-4 CitylDeveloper Agreement. All Planned Unit Development zoning granted on the basis of concept plan approval or development plan approval shall be required to enter into a CitylDeveloper Agreement prior to or contemporaneous with [mal plat approval. This Agreement is designed and intended to reflect the agreement of the City and the Developer as to the phasing of construction to insure the timely and adequate provisions of public works facilities and public type improvements. This Agreement is also intended to insure balanced intensity of development to avoid overloading existing public facilities during the construction phase. This Agreement will be individually negotiated for each project, but should address the following Issues: (1) Any agreements on cost sharing for the installation or oversizing of major utility systems, lines or facilities. (2) Any agreements on cost sharing for the installation of interior or perimeter roadways, thoroughfares, or street systems. (3) Any agreements as to a mandatory construction or dedication schedule for a specific amount of park or open space area or improvements, school site or sites, landscaping or greenbelt development or other comparable items to be dedicated or constructed for each acre of property within the development released for construction by development plan approval. This requirement is intended to allow the City to insure that pre-planned public type facilities, improvements or amenities are installed concurrently with other development on the basis of a negotiated formula. (4) Any agreements between the City and the Developer as to the establishment of a maximum residential density or commercial or industrial intensity of use during the construction process. This requirement is intended to allow the City to establish a maximum development intensity that cannot be exceeded while each phase of the project is being completed. Under this provision, the City may establish a maximum overall density for each phase of the project to be applicable only during the construction phase ofthe Planned Unit Development. This restriction would require concurrent development of lower density or intensity of use activities with higher density or intensity of use activities. (5) An agreement by the Developer to maintain all open space landsat no cost to the City. (As amended by Ordinance No. 480-M.) 30-5 30.9 DEVELOPMENT PLAN a. Except as otherwise provided in Section 30.7, an application for a Planned Unit Development shall include and be accompanied by a development plan which shall become a part of the amending ordinance and shall be referenced on the Official Zoning Map. Changes in the development plan shall be considered the same as changes in the Official Zoning Map. The proposed development plan shall be processed as required except that changes of detail which do not alter the basic relationship of the proposed development to adjacent property and which meet the conditions set forth in Section 40.6 of this ordinance, may be approved by the Administrative Official. b. The Development Plan may, in some cases, be a two-phase document. The first phase shall illustrate and contain the applicant's request and suggestion for the use, configuration of buildings, parking, etc., and the second phase shall illustrate the development plan showing the suggestions and recommendations ofthePJanningand Zoning Commission after review of Phase One. In addition to the requirements set forth in Section 40.3 of this ordinance, the development plan shall provide as much detail as possible including, but not necessarily limited to: 1. A scale drawing showing any proposed public or private streets and alleys; building site, or building lots; any areas proposed for dedication, or reserved as parks, parkways, playgrounds, utility and garbage easements, school sites, street widening, street changes; and the points of ingress and egress from existing public streets on an accurate slirvey of the boundary of the tract. 2. For buildings more than one (1) story in height, except single-family and two- family residences, elevations and/or perspective drawings may be required in order that the relationship ofthe buildings to adjacent property, open spaces and to other features of the development plan may be determined. Such drawings need only indicate the height, number of floors and exposures for access, light and air. 3. For development projects influenced by, impacting on flood-prone areas, or containing major drainageways or areas flood-prone by defmition of the City Engineer, a preliminary drainage plan shall be a part of the development plan. This requirement may be waived only upon the recommendation of the City Engineer. 4. A screening and landscaping plan shall be required where such treatment is essential to the proper arrangement of the development in relation to adjacent property. Such plan shall, when required, include screening walls, planting, wooded areas to be retained, and lawns if such are determined to be necessary by the City Council. 30-6 5. Any or all ofthe required features may be incorporated on a single drawing if such drawing is clear and capable of evaluation and interpretation by the Administrative Official. c. In any residential and nonresidential Planned Unit Development, all nonresidential building sites shall submit a site plan meeting the requirements of Section 40 ofthis ordinance. This site plan shall be submitted either concurrently with the development site plan for this phase of the Planned Unit Development or prior to requesting a building permit. This site plan may only be approved following a public hearing before the Planning & Zoning Commission and the City Council in accordance with the same notice and hearing requirements for zoning changes as set forth in Section 46 of this ordinance. (As amended by Ordinance No. 480-M.) 30.10 DEVELOPMENT SCHEDULE - The Planning and Zoning Commission may, at its discretion, require that an application for a Planned Unit Development District be accompanied by a development schedule indicating the approximate date on which construction is expected to begin and the rate of anticipated development to completion. Such schedule shall not be binding upon the applicant, but the City shall be entitled to utilize this schedule in arranging for the construction of supporting public works facilities. 30.11 COMMON OPEN SPACE - For all residential uses within a planned unit development, common open space (whether dedicated to public use or owned and maintained in common by all or part of the occupants of the PUD through a property owner association) shall be reserved primarily for the leisure and recreational use of the occupants of the residential uses. The common open space shall comprise not less than ten (10) percent of the total area devoted to the residential use. The location of open space shall be subject to City Council approval. The amount of said common open space may be varied downward by the City Council when a lesser amount of such open space would be more appropriate to the density of development or size of families or households proposed in a project, or where the availability and nature of adjacent public open space is such that a lesser amount of connnon open space would adequately protect the health, safety and welfare and promote the orderly development of the residential uses. For the purpose of this section, common open space shall include: 1. Land area accessible to and permanently reserved for the common use and enjoyment of the occupants of the residential project for leisure and recreational purposes, not including area devoted to parking and accessory uses. 2. Golf courses, parks, and other open greenbelt areas adjacent to the project, whether publicly or privately owned, which are readily accessible. 3. School sites, excluding the area devoted to buildings. 30-7 Land required for common open space shall not include the following: 1. Areas reserved for the exclusive use and benefit of an individual tenant or owner. 2. Dedicated streets, alleys or public rights-of-way. 3. Vehicular driveways, private streets or parking, loading or storage areas. In residential PUDs where homeowners associations are to be established for the purpose of ownership and/or management of common open spaces, all such associations shall be subject to the approval of the City. 30.12 APPROVAL - Every Planned Unit Development District approved under the provisions of this ordinance shall be considered as an amendment to the zoning ordinance as applicable to the property involved. In carrying out the development of a Planned Unit Development District, the development conditions shall be complied with and such conditions as are specified for the development of a Planned Unit Development District shall not be construed as conditions precedent to the approval of the zoning amendment, but shall be construed as conditions precedent to the granting of a certificate of occupancy. 30-8