HomeMy WebLinkAboutE-News-City Publications-1/30/2015Having trouble viewing this email?Click here
GENERAL
APPLICATIONS FOR CITY BOARDS, COMMISSIONS, COMMITTEES
There's only one more week to apply for one of the open positions on the committees
below. Applications will be accepted through Feb. 6, 2015.
Architectural Review Commission
Colleyville Events Steering Committee
Colleyville Sidewalks Committee
Traffic Safety Advisory Committee
Access an application here or through the city secretary's office. Applications should
be submitted to the city secretary via email to ashelley@colleyville.com, fax
817.503.1139, or mail to: City of Colleyville, City Secretary, 100 Main Street,
Colleyville, Texas 76034. For additional information, call 817.503.1130.
ROAD CONSTRUCTION
TxDOT SH 26 RECONSTRUCTION PROJECT
Please send any questions, concerns, or comments to 26@colleyville.com.
SH 26 northbound right lane at Brumlow Avene/Pool Road will be closed
during the midday hours from 9:00 a.m. to 3:00 p.m. today and Monday, Feb. 2
to perform island curb work. The SH 26 northbound right turn lane at that intersection
will remain open.
There is a traffic switch planned for Monday, Feb. 2 at the intersection of
Brumlow Avenue/Pool Road. The switch will provide one lane in each direction on
Brumlow Avenue, with no changes anticipated on SH 26 at the intersection.
The upgraded radar signal at the intersection with John McCain Road has been
installed. A radar signal detects vehicles better than the previous video-detection
system, and should improve traffic flow.
SH 26 UTILITY RELOCATION PROJECT (City of Colleyville/utility franchises)
Please send any questions, concerns, or comments to 26@colleyville.com.
The city continues to relocate water and sewer lines along SH 26 in preparation for the
next phase of TxDOT's reconstruction project. This work will be primarily accomplished
in the rights-of-way adjacent to the roadway, but at times, some limited lane closures
may be necessary.
Atmos will also be working on the west side of SH 26, from Centerpark to Glade
Road. Any impact to traffic should be minimal and all affected businesses have
been notified.
Lane closures are possible from 9:00 a.m. to 4:00 p.m. this week on the east
side of SH 26, from Brown Trail south to Felps Drive, as a new sanitary sewer line
is being installed.
Lane closures are also anticipated from 9:00 a.m. to 4:00 p.m., from south of
Centerpark to Little Bear Creek, as AT&T starts placing new telecommunication lines.
Lane closures are expected from 9:00 a.m. to 4:00 p.m. on the west side of SH
26, from Main Street north to First Baptist Colleyville. The contractor will be
placing a waterline in that area.
Lane closures from 9:00 a.m. to 4:00 p.m. are possible this week at the SH
26/Hall-Johnson Road intersection. Atmos has bored across SH 26 at this location
and has the new main in and backfilled. They will be working to get this to final grade
and the sidewalk replaced. The contractor will also be working on the west side of SH 26
at the same location. All affected businesses have been notified.
Lane closures from 9:00 a.m. to 4:00 p.m. are possible this week in the 5100
Block of Colleyville Boulevard to Thompson Terrace as the contractor will be
working on both sides of SH 26 setting manholes and placing sanitary sewer in the area.
Time Warner continues to bore cable and move overhead lines on both sides of SH 26 at
various locations. All businesses affected by the relocation work have been notified.
CHEEK-SPARGER/JACKSON ROAD ROUNDABOUT
The contractor has finished the main lane paving on Central Drive so drivers have now
been shifted onto the roundabout, which is now in its final alignment.
Construction is still taking place around the travel lanes, so for safety reasons, the
temporary stop signs will remain in place to slow traffic prior to entering the
roundabout. The temporary stop signs will be removed once all construction activities
have been completed.
The contractor will be installing the remaining curbs, medians, pavers, bridge
railing, and sidewalks. Brief lane closures will occur as necessary to complete
this work when necessary to keep the crews safe.
The contractor has focused the past few weeks on the completion of the main lane
paving for the south leg of the intersection (Central Drive) to get drivers on the
roundabout as soon as possible. This was done in multiple phases. The first section of
pavement was placed on Jan. 6, the second on Jan. 16 and the third and final section
was placed on Jan. 26. The contractor used a special type of concrete that gets its
strength quickly, which allowed drivers on the lanes sooner.
PONDEROSA LANE/ Kingston Addition Improvements
Ponderosa Lane will be reduced to one lane of traffic from 7:00 a.m. to 6:00 p.m.
this week while a contractor places a storm drain from 6405 Ponderosa Lane south to
6309 Ponderosa Lane. The contractor will also be placing inlets on Ponderosa Lane. The
road will remain open to traffic and the work will not disrupt trash/recycle
collection.
PLEASANT RUN ROAD PROJECT - Veranda Lane/Mission Lane to Bogart Drive
This week, the contractor will place a new sanitary sewer main along Pleasant
Run on the east side from First United Methodist to Laurel Oaks.
There will also be a road crossing at Pleasant Run and Laurel Oaks. This crossing will be
placed across Pleasant Run and placed one half at a time.
Water line placement will also start at Laurel Oaks, Central, Regina, and Thomas. These
will be road crossings.
Time Warner Cable and AT&T will continue boring new lines along the Pleasant Run
corridor from Bogart Drive to Mission Lane.
Drivers should expect some delays due to various lane closures from 9:00 a.m.
to 4:00 p.m., but the road will remain open to traffic. However, work on the
storm drains is slated to start sometime in February, at which time this section
of the road will be closed to thru traffic for the duration of the project. The
project is anticipated to take 270 days to complete. (Drivers should note that the
road will remain closed to thru traffic, but will continuously provide access throughout
construction to homes or businesses on or adjacent to this section of the road. All others
should plan to use alternate routes: SH 26 to Hall-Johnson Road then to Bogart Drive or
SH 26 to Glade Road, west to Bransford Road.)
This is an extensive project requiring not only complete reconstruction of the road and
construction of sidewalks and trails, but also constructing a new drainage system under
Pleasant Run Road. This is a two-lane road that is being rebuilt as a two-lane road--so
that construction has to take place on existing lanes with little room to maneuver--thus
the extended road closure. However, the condition of Pleasant Run Road necessitates
that the road be reconstructed. Once done, reconstructed roads done to the standards
planned for this project have a lifespan of 40-50 years, with only minimal maintenance
such as asphalt resurfacing, which may take 2-3 days and requires minimal disruption
to traffic.
The Pleasant Run Road and Trail Improvements Project involves reconstructing a two-
lane asphalt street with concrete curbs and gutters, constructing a five-foot sidewalk on
the west side of the road and a 10-foot hike/bike trail along the east side, and new
street lighting. The city has completed a portion of the project-widening Mission Lane,
east of Veranda Lane, from one lane to two, to allow for two-way traffic in that section.
Project Details
TRAFFIC SIGNAL AT BROWN TRAIL AND CHEEK-SPARGER ROAD
Installation is complete on the upgraded traffic signals at Brown Trail and Cheek-
Sparger Road and at Glade Road and Heritage Avenue. Both signals now have flashing
left-turn arrows. Flashing left-turn arrows
TRAIN QUIET ZONES
There is no further update on the quiet zones. We still expect them to go into effect
sometime in February, but it will depend on TxDOT's planned reconstruction of the
median on John McCain Road near the intersection with SH 26. The completion notice
required by the Federal Railroad Administration cannot be filed until the median divider
east of the railroad tracks on John McCain Road is finished.
COLLEYVILLE CLOSEBUY DISCOUNTS
The Colleyville CloseBuy program supports local businesses and provides discounts and
added value purchasing for Colleyville customers. Get all the details, including how
to obtain a complimentary CloseBuy card or to download the app. View discounts
by selecting the "DISCOUNT CARD" tab.
The CloseBuy program welcomed one new business member this week:
New discounts this week:
City Garage
700 Glade Road
817.788.2489
City Garage can take care of all your automotive needs from brake repairto a complete
engine overhaul.
Valvoline Full Synthetic SYNPower Oil Change for $59. Regular Price $89.
Includes 5 quarts Valvoline Full Synthetic Multi Viscosity Oil, new oil filter, and
30 Point Maintenance Inspection. Special price is for spin on filters, imports,
exotics, and diesels requiring cartridge filter costs more. See Service Writer
for details.
dentaleaf
6207 Colleyville Blvd., Suite 150
817.488.2120
From cosmetic dentistry to dental implants and everything in between, dentaleaf offers
all your dental needs under one tree.
New patient special $49.95 exam, x-rays (4 bitewing) a $149 value. *some
restrictions may apply. For patients with no insurance. Cannot be combined
with other offers or discounts.
Explore Horizons - Tutoring and Enrichment Center
5505 Colleyville Blvd.,
Explore Horizons provides enrichment and tutoring for children in grades pre-k to 8.
$15 off the registration fee
Machelle's Boutique
Town Center Colleyville
5611 Colleyville Blvd., Suite 200
Machelle's Boutique has a unique array of impressive accessories and stylish women's
quality brand clothing for all occasions.
20% off all dresses (Jan. 21-Feb. 3)
BOGO DEAL: Buy 1 pair of flip-flops get one FREE (Feb 4-17)
The Posh Paw Resort
6607 Colleyville Blvd.
817.552.5582
The Posh Paw Resort offersdog boarding, professional grooming, and daycare.
One night FREE boarding with purchase of two consecutive nights and a FREE
nail trim during your pet's posh stay.