HomeMy WebLinkAboutPlanning and Zoning Commission-Agenda Packets-8/23/2004
n~
Texas
AGENDA
PLANNING AND ZONING COMMISSION
City Hall Council Chambers - 100 Main Street
Monday, August 23, 2004
REGULAR MEETING
7:00 P.M.
CALL TO ORDER
ROLL CALL
Commissioners Bruce Kelly, Earl Swift, Jeff Byerly,
Dave Dudziak, Luann Edwards, Denis Duffy, Thomas
Dolan
INVOCATION
Commissioner Duffy
PLEDGE OF ALLEGIANCE
APPROVAL OF MINUTES
July 26, 2004
August 9, 2004
CITIZEN COMMENTS REGARDING ITEMS NOT ON THE AGENDA
AGENDA ITEMS
1. Case P-04-033 - Minor Plat of Sneed Addition, 6.34 acres located at 709 W LD
Lockett Road
2. Case Z.04-029 - PUBLIC HEARING - Zoning Change from CC2 Shopping Center
Commercial to PUD-C Planned Unit Development Commercial on 15.10 acres
located at the southwest corner of John McCain Road and Colleyville Boulevard
3. Case G.03-029 - Amendment to the Tree Mitigation Plan on 15.10 acres located
on the southwest corner of John McCain Road and Colleyville Boulevard
STAFF COMMENTS. REPORTS AND DISCUSSION ITEMS
The following items were received on the last case submittal deadline:
· Final Plat of Rockrimmon, 12.15 acres located in the 100 block of West Glade
Road
Planning and Zoning Commission
Agenda - August 23, 2004
Page 1 of 2
COMMISSIONERS' COMMENTS AND REPORTS
ADJOURNMENT
Posted: Friday, August 20,2004, 4:30 p.m.
cD~~
Clayton Husband AICP
Development Coordinator
Planning and Zoning Commission
Agenda - August 23, 2004
Page 2 of 2
.$
l"exas
PLANNING AND ZONING COMMISSION
MEETING MINUTES - July 26, 2004
Commissioner Du
corrections noted.
vote of fou
2004,
Chairman Byerly called the meeti
CALL TO ORDER
ROLL CALL
Commissioners Bruce Kelly
Denis Duffy, and Luann E
Barry LeBaron an
present. Ross Fo
were
INVOCATION
APPROVAL OF MINUTES
Commissioner Duffy requested
Commissioner instead of
statement by the appl"
development
reflect his position as a
ested the minutes reflect the
ding open space on a future
es of the July 12, 2004 meeting with the
d the motion. The motion passed with a
tained, since he was absent at the July 12,
tment needs to be made to complete all of the officers for the
was appointed by acclimation.
None
Planning & Zoning Commission
Minutes -July 26, 2004
Page 1 of 10
AGENDA ITEMS
1. Case P-03.033 - Minor Plat of Lot 1, Block 1, KISD Addition, 13.37 acres located at the
southeast corner of Precinct Line Road and McDonwell School Road
Barry LeBaron presented the case to the Commission and reviewed the staff briefing.
Commissioner Duffy asked if the school site had been co
Hills. Staff stated that no discussion had taken place
Precinct Line Road was currently constructed to maxi
had no effect on the North Richland Hills side of
Dudziak questioned the roadway improvements 0
that Keller ISO is dedicating additional right-o
costs of the road in front of and adjacent to th
there were any proposed traffic counts for
Precinct Line Road and McDonwell Scho
analysis prepared by Keller ISO considered t
Commissioner Edwards asked ab t the status
Staff stated that the plan is to co e entire ro
to a point east of the Keller schoo time.
traffic impact would be of the Nort ay 0
stated that the proposed improvem
Tarrant Parkway.
ed with North Richland
orth Richland Hills, since
and the school curb cut
oad. Commissioner
Road. Staff stated
the construction
udziak asked if
st corner of
tated that the ffic impact
al corner as being developed.
oposed roadway improvements.
section from Precinct Line Road
issioner Dolan asked what the
onwell School Road. Staff
isting alignment of North
r's engineer to come forward. Mr. Tom
the peak traffic flows. Commissioner Kelly
re growth of the area, particularly to the
study considered full build-out of the
Edwar s if other entrance locations were considered.
ntrance needed to be as far away as possible from Precinct
iderable drainage channel on the west side of the site.
many lanes were proposed in front of the school site.
Mr. ere a 0 lanes eastbound and one lane westbound in front of
the s .ssioner Dudziak expressed concern over the left turning
moveme the school site. Commissioner Dudziak asked if funding had
been set nwell School Road improvements. Staff stated that upon
completion 0 veloper agreement, it would be taken to the City Council for
funding. Staff hat funds are available in the Roadway Impact Fee Fund for this
purpose. Commis ner Dolan asked if the traffic from the residential development east of
the school site had been considered in the traffic study. Staff stated that the full build-out of
the neighborhood was considered in the traffic study. Edwards asked if four lanes in front
of the school had been considered. Staff stated the pavement width in front of the school
would be forty-eight feet and could be striped for four lanes. Commissioner Edwards asked
if the school was providing for their share of the trail system. Staff stated that the
construction plans include a trail segment along Precinct Line Road.
Planning & Zoning Commission
Minutes -July 26, 2004
Page 2 of 10
Motion by Commissioner Duffy to approve the plat. The motion was seconded by
Commissioner Kelly.
The motion was approved by the following vote:
Aye: Edwards, Dolan, Dudziak, Duffy, Kelly
Nay: None
2. Case P-04-028 - Replat of Lots 3R3 an
acres located in the 5600 block of Colleyvil
Commissioner Edwards stated that City Council should be
discussion by the Commission regarding the need for fou
Commissioner Dudziak stated he would like for the Ci
south road that has been talked about as a part of th
of the great amount of
front of the school site.
o be aware of the north-
date.
Clayton Husband presented the case to the Co
Motion by Commissioner
Commissioner Duffy.
by
The motion was approve
Aye: Edwards, Dola
Nay: None
hase 11,19.13 acres located at 909 John
se to the Commission and reviewed the staff briefing.
C was anything different between this development and
the evelop ent considered at the previous Commission meeting.
Staff st entical. Commissioner Edwards asked if there was any way to
make a sidewalk on any vacant lots that remained in the subdivision at
the end of nt. Staff stated that all sidewalks are put in as a part of the
building perm I new home. Commissioner Dudziak asked if the sidewalk
connection to the onbelt Trail would be constructed of concrete. Staff stated all trails
and trial connections are required to be concrete. Commissioner Dudziak expressed his
concern over labeling detention facilities as open space.
Motion by Commissioner Kelly to approve the plat. The motion was seconded by
Commissioner Dudziak.
The motion was approved by the following vote:
Planning & Zoning Commission
Minutes -July 26, 2004
Page 3 of 10
Aye: Edwards, Dolan, Dudziak, Duffy, Kelly
Nay: None
4. Case P-04-030 - Minor Plat of Stembridge Addition, 0.85 acres located at 6200
Colleyville Boulevard
Motion by Commissioner Dudziak to approv
Commissioner Kelly.
aff advised that the site
is being coordinated.
Clayton Husband presented the case to the Commission an
Commissioner Dudziak asked about cross-access ea
plan is under review and the location of the cross-a
The easements will be addressed by a separate i
The motion was approved by the following vote:
Aye: Edwards, Dolan, Dudziak, D Kelly
Nay: None
5. Case P-04-031 - PU
3308 Glade Road
Clition, 8.44 acres located at
mmission and reviewed the staff briefing.
and screening included in the approved
creening were added in the original zoning
erty owner c ncerns, and that the language is the same in
. Commissioner Edwards asked about the changes to the
t the building lines changes mostly due to the type of
s.
George
residentia
the rear.
cant, summarized the project. He stated it includes fourteen
a gate and private street, and two existing detention ponds in
Commissioner E CIs asked if other improvements will be made to the open space. Mr.
d'Hemecourt stated their landscape architect is working on plans for the area.
Commissioner Edwards opened the public hearing. There being no one wishing to speak,
the public hearing was closed.
Planning & Zoning Commission
Minutes -July 26, 2004
Page 4 of 10
Motion by Commissioner Duffy to approve the replat. The motion was seconded by
Commissioner Dolan.
The motion was approved by the following vote:
Aye: Dolan, Duffy, Kelly
Nay: Edwards, Dudziak
Clayton Husband presented the case to the Com
PUD-R on Lots 1 and 2,
ain Road
6. Case Z-04-026 - PUBLIC HEARING - Zoning Change fro
Block 1, Neidholt Addition, 2.23 acres located at 103-1
Commissioner Du
be located at th
McC Road. He stated his opposition to the request. He
rainage and the increase in the number of lots, and that larger
e area.
Brandon Battl
stated his concer
hn McCain Road. He stated his opposition to the request. He
ut drainage.
There being no one wishing to speak, the public hearing was closed.
Commissioner Edwards asked about the drainage complaint discussed by the Battles.
Staff stated they are not aware of the complaint.
Planning & Zoning Commission
Minutes -July 26, 2004
Page 5 of 10
Jody Boyd, 710 Creek Crossing Trail, Keller, applicant. He stated a drainage swale will be
required by the City at the rear of the lot to redirect the water into a detention pond. He
stated he worked with the Battles during the rains.
Commissioner Edwards asked where the houses would be located on the lots. Mr. Boyd
stated the house pad would be slightly above the street, and the water would be directed
around the house and to the south to an existing pond and to t nt into the street.
Commissioner Dudzi
Boyd stated they w'
ss. Staff advised the lots
t improved. Staff stated
ot wide enough for a
Commissioner Dudziak asked how the two lots have stre
have access from an existing access easement, but th
there is a little amount of right-of-way adjacent to h
street.
Commissioner Edwards asked if the develo
line to 25 feet. Mr. Boyd stated no.
Commissioner Dudziak asked Ms.
response to their drainage issue.
the property, but her concern i
adjacent property developed. S
between her side property line and t
satisfied with the developer's
per has helped with cleaning up
'ngs haven't happened until the
fer a 20-foot wide greenbelt
ts.
request for a greenbelt. Mr.
to commit at this time.
Commissioner
improvements.
could be built on.
ots could be developed without the access
atted and have public access, so the lots
abling the case would be best at this time.
that the item should be tabled.
Motion by Co
by Commissione
Edwards to table the zoning change. The motion was seconded
The motion was approved by the following vote:
Aye: Edwards, Dolan, Duffy, Kelly, Dudziak
Nay: None
Commissioner Edwards stated the Commission will recess for five minutes.
Planning & Zoning Commission
Minutes -July 26, 2004
Page 6 of 10
6. Case Z-04-027 - PUBLIC HEARING - Amendment to the PUD-R for Tiffany Park, 7.16
acres located in the 4300 block of Brown Trail
Barry LeBaron presented the case to the Commission and reviewed the staff briefing.
Commissioner Edwards opened the public hearing.
Commissioner Duffy asked if the
Staff stated they would review the ml
nd reviewed about this item.
City Council meetings.
Mark Crenshaw, 504 Bridlewood North. He stated he rec
allowed by the ordinance to build single story houses.
Linda Crenshaw, 504 Bridlewood North. She sta
prevent two story houses from being constructed.
Wayne Ridenauer, 600 Bridlewood North.
recalls discussion that would prevent
subdivision. He stated he is in favor of the ch
There being no one wishing to sp
the Council meeting with the
ance, but when he received a copy of the
d about half of the adjacent houses are two
ffer between Bridlewood and Tiffany Park.
econd story room designed such that the
there was no discussion about doing only
ut of the ordinance that was intended to be in
pprove the zoning change request. The motion was
The moti
Aye: Edwa
Nay: None
y the following vote:
, Kelly, Dudziak
Commissioner Edwards asked staff to review the records of the previous meetings prior to
this item being heard by the City Council.
Planning & Zoning Commission
Minutes -July 26, 2004
Page 7 of 10
7. Case Z-04-025 - TABLED ITEM - Amendment to Ordinance 0-95-987, the PUD-R for 6.93
acres located at 7171 Colleyville Boulevard
Motion by Commissioner Duffy to remove the item from the table. The motion was
seconded by Commissioner Dudziak.
Commissioner Duffy stated he is not convinc
being treated effectively in the traffic study.
signs and increasing traffic enforcement at
od and SH26 is
ok at placing
The motion was approved by the following vote:
Aye: Edwards, Dolan, Duffy, Kelly, Dudziak
Nay: None
Barry LeBaron presented the case to the Commissio
enting the applicant. He stated
Icohol sales for restaurants as
ely for restaurant use. He stated
ss the improvements to the
en added to the site plan.
Commissioner Duffy
the north side of
would have to c
vard could be enhanced since
ahan stated the additional width
ts attended the applicant's meeting. Mr.
d. Commissioner Dudziak asked if the
decided. cMahan stated no. Commissioner Dudziak
ree to keep the dumpsters away from the fence at the rear.
Co
McMa
buildings.
ed if residents had concerns about other types of uses. Mr.
at they were in favor of the office development over the retail
Commissioner
Mr. McMahan st
stated the ordinance should restrict alcohol sales on Lots 1 and 2.
ey are agreeable to this restriction.
Motion by Commissioner Duffy to approve the zoning change request, with the restriction of
alcohol sales in a restaurant to Lots 1 and 2. The motion was seconded by Commissioner
Kelly.
The motion was approved by the following vote:
Aye: Edwards, Dolan, Duffy, Kelly, Dudziak
Nay: None
Planning & Zoning Commission
Minutes -July 26, 2004
Page 8 of 10
STAFF REPORTS
Staff advised the Commission about the vote on the Strathmore replat on tonight's agenda.
He stated the City Charter requires that four affirmative votes by the Commission are
needed to pass any motion, and that the three votes to approve the replat were not enough
to actually approve the plat.
Ross Foster stated that generally if a plat complies with t
City is obligated to approve the plat. He stated there co
depending on the individual situation. He stated unl
votes, the plat is denied.
lopment regulations, the
e discretion with replats
ceives four affirmative
Commissioner Edwards asked staff what the
stated the plat, as it stands, cannot go f
approval authority of plats.
The motion was approved by the fo
Aye: Edwards, Dolan, Duffy, Kelly, D
Nay: None
Motion by Com
Addition. The
r Case P-04-031, the replat for Strathmore
'ssioner Dolan.
f the joint work session with the City Council about the
4, at 6:00 p.m.
Commissioner
where listed in th
asked that individual commissioners not be identified in the votes
mission's recommendation section in the City Council briefings.
Planning & Zoning Commission
Minutes -July 26, 2004
Page 9 of 10
ADJOURNMENT
The Commission adjourned the meeting at 9:50 p.m. by acclamation.
Respectfully Submitted,
Note: As a matter of public record, an audio recording
available upon request.
J. Clayton Husband AICP
Development Coordinator
Approved on: -------
Planning & Zoning Commission
Minutes -July 26, 2004
Page 10 of 10
.~
Texas
PLANNING AND ZONING COMMISSION
MEETING MINUTES - August 9, 2004
None
Chairman Byerly called the meet"
CALL TO ORDER
ROLL CALL
Commissioners Jeff Byerly,
Dolan, Dave Dudziak, 0
were present.
elly, Earl Swift, Thomas
y, and Luann Edwards
Barry LeBaron
present. Ross E
were
INVOCATION
CITIZEN COMMENTS
AGENDA ITEMS
Change from R20 to CN Neighborhood
s Subdivision, located at 5005 Thompson
at he will recuse himself from discussion and voting on this
company having a property listed for sale on Thompson
aired the meeting for this zoning case.
the case to the Commission and reviewed the staff briefing.
ened the public hearing.
Carol King, 500 Timbers Court. She stated she would like to see the developer
construct an eight-foot fence between her property and this property. She stated her
concern that the site may not have enough parking.
There being no one else wishing to speak, the public hearing was closed.
Jerry Pedersen, 4100 Coachman Lane. He stated they haven't started on landscape
design or plans for fences. He stated the parking issue brought up during the hearing is
related to cars parking in the street.
Planning & Zoning Commission
Minutes - August 9, 2004
Page 1 of 4
Commissioner Edwards asked if the parking requirements have been satisfied. Staff
advised that the layout meets the parking requirements. Commissioner Edwards asked
what type of buffer is required between commercial and residential properties. Staff
explained the landscape buffer and screening requirements.
Motion by Commissioner Duffy to approve the zoning change request. The motion was
seconded by Commissioner Swift.
Motion by Commissioner Kelly
seconded by Commissioner Duffy.
ts 1 and 2,
The motion was approved by the following vote:
Aye: Byerly, Edwards, Dolan, Dudziak, Duffy, Kelly
Nay: None
Chairman Byerly resumed as chair of the meeti
2. Case Z-04-026 - TABLED ITEM - Zoning
Block 1, Neidholt Addition, 2.23 acres locate
The motion was
mission and reviewed the staff briefing.
Iicant. He presented two exhibits showing
layout, which showed location of building
. there were any drainage problems with the most recent
Comm
higher th
stated they
Development
preliminary drain
south to an off-site
most of the surrounding properties to the north and west are
erty and asked how the drainage will be addressed. Mr. Boyd
o satisfy the drainage and detention requirements of the Land
aff advised that the Engineering Department has reviewed the
nalysis for the property and will require a swale to direct the water
etention pond.
Chairman Byerly asked if the developer was willing to increase the rear building line to
twenty-five feet to ensure the houses are further away from the Battle's property. Mr. Boyd
stated he feels that change is not needed because the owner's of the lots will likely want to
have large back yards, which will place the house at the front building line.
Chairman Byerly opened the public hearing.
Planning & Zoning Commission
Minutes - August 9, 2004
Page 2 of 4
Brandon Battles, 101 John McCain Road. He stated his concerns about drainage and the
proximity of the new homes. He stated they met with the developer, who agreed to allow a
third-party engineer to review the drainage plans.
Commissioner Dolan asked if any of the recent rains reach the swimming pool. Mr. Battles
stated the water level was within an inch of going over the top mmissioner Dolan if he
is satisfied with the drainage proposal from the applicant. les stated the detention
pond is higher than it was before, making it difficult for th r to leave the south side of
the lot.
Mr. Boyd stated that Old Grove is in the middle
improvements are not in yet. He stated they h
the overall plans for the subdivision.
cess, and the final
for the water in
Commissioner Edwards asked Mr. Boyd if
setback. Mr. Boyd stated yes. Commissioner
to increase the setback to more th 5 feet. Mr.
to commit to 5-foot rear
ed if Mr. Boyd would be willing
ted no.
There being no one wishing to spe
Motion by Commissioner
building line being ch
ange, subject to the rear
nded by Commissioner Kelly.
Commissioner
especially in re
proposal offset the negative aspects,
e drainage issues need to be closely monitored during
Staff thanke
and that they
Council.
sion for attending the joint work session with the City Council,
vise the Commission of any future work sessions desired by the
COMMISSIONER COMMENTS
Commissioner Duffy stated the draft of the new master plan was well done by the
Commission.
Planning & Zoning Commission
Minutes - August 9, 2004
Page 3 of 4
ADJOURNMENT
The Commission adjourned the meeting at 7:53 p.m. by acclamation.
Respectfully Submitted,
J. Clayton Husband AICP
Development Coordinator
Approved on: -------
Note: As a matter of public record, an audio recordin
available upon request.
Planning & Zoning Commission
Minutes - August 9, 2004
Page 4 of 4
.~
Texas
PLANNING & ZONING COMMISSION
AGENDA BRIEFING
Agenda Date:
Subject:
August 23, 2004
P-04-033 - Minor Plat of Sneed Addition, 6.34 acres located at
709 W LD Lockett Road
STAFF REVIEW COMMENTS
The City of Colleyville is the owner of a 6.34-acre tract of land located on the south side
of W. L.D. Lockett Road, east of Precinct Line Road. The owner has submitted a Minor
Plat of the property for review and consideration by the Planning and Zoning
Commission. The plat will create three lots for the construction of a new park and a 5.0-
million gallon water storage tank and pump station.
Zoning. The property is currently zoned R40 Single Family Residential. The proposed
lot meets the requirements of the R40 zoning district.
Right-of-Way Dedication. The plat includes the dedication of 12.5-feet of right-of-way
for L.D. Lockett Road. L.D. Lockett Road is classified as a Minor Collector roadway on
the Master Thoroughfare Plan, which requires an ultimate right-of-way of 75 feet.
A copy of the approved layout for the park improvements is attached. The surveyor has
addressed all Development Review Committee comments. The proposed plat appears
to satisfy the requirements of the platting standards contained in the Land Development
Code. Since this is a City-owned piece of property, the Commission may recommend
that the City Council approve the plat also.
RECOMMENDATION
Approval
ATTACHMENTS
· Location map
. Park Improvements Plan
. Plat (see large paper copy)
Prepared by:
(;L,
Agenda Item No.1 - Page 1
r
"
~
'"
'"
~
..,
*
~
~
'"
tll tl31N0H
'"
S!
')
'"
..,
'"
...
g;
'"
'"
1-----------
'"
'"
~
- "
'" "
.0
"'u
91<
",,,!
1-...
T~'
'. "'I'
I~
;
; "'I
1~
..-i-
___L.....'........
io
.'11(
II:
I-
'"
:;
u
<
'"
~
'"
I-
u
-<
",u
91<
u
-<
...
N
...
~
'"
'"
'"
~
",ot;
1-'"
u
...<
~'"
...
"''''
I-~
I ~,
: ~i
u
<
on
~
..,
'"
~
II:
I-
! i
~ - '
u
- -<
~ ~
!!!;
'"
<
__----1
-------r-
'"
'"
\ "
'"
on
"-? ~ .X~ g;~
-.-~r-----:~IT
~<6., ct.... I"'.....',
~y '~.
---J
I
.tL~: '0 i~ 01 ! ~ll
.'" u> ~..J><I .. c-1 ~!
~ NUl e:~ l ~ 1
iii (.t. < . .----.--.1 4... '
; =S; [ I ! N u.1 I
I- ~ ~- . -- (.t. '-..--
a::~ ~ ~
.... ..: (C) !2
..
..........
..J
(L
<(
l-
I-
.., <(
., ,....
frO
.....___..._____.1._..._..._,.
9l .J
; \~\
(."....: u.1 ,
__. ~ I
~::::::::--~-'\ "'-.., I
''-... '\P-::.-:c.J~. ",
y " ~ -~-____: I
~ Ut'........-...~..~. ....... --;-L,.._
u.1 -:J.. 4... t"": '---.' /
u.1 ,L.y ~ /
(.t. ...) if' t'1 /
.,...t$) _~____-</
- ~~ ~ 0 tb i
~,'tl! 0 \; I
----- ! ~~-_:_---~
rl!1 .~i .
p:)
'"
_. ~_ ~J
-- 0 '\ I
-~ ~~\ L----
----.---- ,,-,1:2 .j:
"It: ~ ~-~~-~
q :~;
~ I ,,~I
" u
'" -<
~~ I
~I
r-+
:; I = I
I
I
I
,
,
~ ; ~ !!!; I
~ U~iT~ \. i
f---
'" ~: ~ j ~ :--~..-~t' < \J
Nil ~ \ " $ '- \\
~~}===-.:..: ...._~=~=~~~~i8~r\S+L ~:c:-7163 \1~~t~~~~ ~
, .~, '<t 'I
~ 9, I, <.J.y:,.I- ~ 1----------
3 't: I 7 ~V[-T---.L~-------_-.--'
r
-.il
I
,
Ii
---"I
i~
I:
II
Ii
I ~
1______
:1 ~ t$) i}
II 0 y -:; ~
,: .~if'
, 7"t-
11
:\' ;,::: ~~[~-~:!2i~-j-~J(~~~~ ~~~i ~I~li~-]~-~I5~
~~~~ >--, : ! ~ 7"" ;""--{ N I
"{ \.__..1._____......._..L_ _ __ _ _..J --1
'f '" \ u- IUflSflJ:'" (;\ '7 ~ ~~- :
, - '") :-;--i---I-~-T-J- '=T~-r.'?t""1-~i6----1 ~.J
'" \ '" _ I ,~J-- , ~ l!2 t:: ~ I l! ~ ~1;:l.'\Il; ~,';;l I,
r n 1 -, '" J ' ,U a.. I I
,'-; ~--;. J: : -~.~ - -; - - - 1....__ <---.L~ ~ ' ~ i~ : L ~
~~,1- 1i_1~: '-J I]--~ ~--;---EE' ~J-l ~: 1~7~~;
-,z II it) I I ] - I 9 CD CICI .... CD 1I'l1'" N.... I r
rj.. I ' ---- ---.....-~-DL--S- - - - - - ----1 \ - I
. '.m~J..': :~ --Trt';"~:::':~-~-~--'~-8-81 I-~}_-:-;
:>/.,/~~1' -i~ _1", i'" .1., 1::1"1'" i "'liS! I;: i ~ ~ ~-\~y",
.~--' "._- ....::..lmm-JL-LLLL-f-J__Jm; __ m___ ~
,
\
I
~
~
1-....
II: '"
I- "l
"
;5
....
o
...
<0
..;
u
~-<
~
1-....
01
o ~: ~
n-< ~l e
~... ~I
I-:l 3"'"
aI
u:
. t;~----ll
\~~
~
~
",u .
:: !
I-,,!
1
I~
IroI
.~
. .
[-....
f I
u
~-<
","
~:s
~~
----1 ~'"
I"!
m....1
,~\i
~~ ~
~~ !
_"__. .-nn._.ow
I
.
1
- u
l!l <
<
< "
- ...
..,
'" "
I- .
i
/~
.
..-l-
I
,
I
,
.
~
~
.
I
~
'q,
."
I
I
I
I
I
1
t.
19
I~
I'"
I
1
I
I
I
'9:P
C)U)
I-~~
I-~~
ll:lo.U)
-'W
.H~o
ml-....I 0
W~!!!
U)a::U-
~ll.
.
U Ilml
filii..'
~ ffis
;,
z
~
D.
~
W
...
~
:IE
C
...I
W
u:
w
(,)
i=
~
D.
..J
..J
Ill(
COw
t: l:~
O(l)~
en~1-
-b::
..JWui
...I 0.. ..I
Ill( 0 ..I
cof~
wg~
en Wool
IIl(zR
a::I fn...
.~
Texas
PLANNING & ZONING COMMISSION
AGENDA BRIEFING
Agenda Date:
Subject:
August 23, 2004
Z-04-029 - PUBLIC HEARING- Zoning Change from CC2
Shopping Center Commercial to PUD-C Planned Unit
Development Commercial on 15.10 acres located at the
southwest corner of John McCain Road and Colleyville Boulevard
STAFF COMMENTS
Pecan Creek Village Center Partners LLC is the owner and developer of 15.10 acres
located at the southwest corner of Colleyville Boulevard and John McCain Road. The
owner has submitted a request to change the zoning on the property from CC2
Shopping Center Commercial to PUD-C Planned Unit Development Commercial. The
property is proposed to be developed as a retail center.
A zoning change on this property was considered by the Planning and Zoning
Commission and City Council earlier this year, but the request was ultimately denied
without prejudice. Since that time, the developer has met with eight homeowner's
associations to discuss the development of the retail center. The developer met with
the following associations: Monterra, Caldwell's Creek, Monticello, Ross Downs, Pebble
Hill Plantation, Villas at Caldwell's Creek, Timarron, and Shalimar. As a result of the
meetings, the developers are working on a written agreement with the associations that
will include design requirements for the property. A sample copy of a written
agreement, which is titled Memorandum of Understanding, is attached. An email from
the applicant indicates that the majority of the associations support the project as a
result of the requirements in the agreement, and the applicant intends to provide letters
of support from the associations.
The proposed ordinance for this property has also been updated based on the
applicant's revised submittal. Many of the design requirements included in the
proposed agreement with the homeowner's associations are included in the ordinance.
The proposed development is a mixed-use facility for restaurant, retail, office and
commercial uses. The owner proposes to construct approximately 60,000 square feet
of buildings for neighborhood retail and office uses on the property. Along the frontage
on Colleyville Boulevard, three pad sites are proposed for retail and restaurant users.
Near the corner with John McCain Road, a pad site is proposed that would include a
Shell convenience store with gasoline sales, and a Great American tire store and
automotive service facility. The buildings would be constructed of natural stone and
brick. In addition to integrated parking and landscaped areas, a tree preservation area
is proposed along Pecan Creek at the rear of the property.
Agenda Item No.2 - Page 1
City staff has been working with the applicant on this development proposal for about
two years. The applicant is requesting a planned unit development in order to
coordinate development on the entire site. Several of the proposed uses could be
considered separately with special use permits; however, the planned unit development
district provides a more comprehensive regulatory tool that establishes requirements for
the entire development rather than specific sites. The PUD-C district also allows the
Planning and Zoning Commission and City Council to adopt specific requirements for
this property that may include special conditions to minimize or enhance the effect of
the development on adjacent properties.
The surrounding property is commercial in nature. Properties to the north are zoned ML
and are developed as industrial type land use. These properties are located on John
McCain Road adjacent to the railroad right-of-way. Property to the east and south is
zoned CC2 and is presently undeveloped. The properties to the east, across Colleyville
Boulevard, are zoned CC1 and AG, and are mostly undeveloped with the exception of
two single family residences. The Master Plan indicates that properties along
Colleyville Boulevard are anticipated to be developed for commercial uses in the future.
Below is a summary of the major items included in the draft zoning ordinance for this
property.
land Uses. The proposed ordinance contains a specific list of uses in the proposed
ordinance that would apply to the development. This list includes both permitted and
prohibited uses.
Alcoholic Beverage Sales. The draft ordinance includes approval of a Special Use
Permit for alcoholic beverage sales for both on-premise and off-premise consumption.
On-premise consumption is allowed in conjunction with restaurant uses. Off-premise
consumption is allowed .for grocery stores, convenience stores, specialty wine shops
and gourmet food stores.
Phasing of Buildings and On-Site Infrastructure. The first phase of the project will
include the construction of the in-line retail buildings, the automobile service center, and
the convenience store and car wash buildings. The developer also indicated that all
driving areas, fire lanes, drive entrances and site utilities will be constructed as part of
the first phase of the project. The building and parking lot construction on the three pad
sites will take place as those lots are sold and developed. The attached ordinance will
require that the developer obtain a building permit for the construction of the in-line retail
buildings before a certificate of occupancy will be issued for the convenience store or
automobile repair facility.
Economic Development Information. The applicant provided an economic summary
of the project, which is included with the attached information. The project contains
approximately 62,000 square feet of neighborhood retail, restaurant and office space.
The estimated annual gross sales revenue for the overall project is $23,270,000, which
includes restaurant, retail, and other uses. When completed, the estimated sales tax
revenue for the City from this development is $371,080 per year. The ad valorem tax
revenue from this project will depend on the value of the improvements to the property.
Agenda Item No.2 - Page 2
In addition, any restaurant that would sell mixed beverages would also generate mixed
beverage tax revenue to the City.
Landscaping. The proposed layout appears to meet the requirements of the
landscaping regulations. A detailed analysis of these requirements will be made at the
time site plans and building permits are submitted for review. The property provides the
required 20-foot landscape buffer area adjacent to Colleyville Boulevard.
Sidewalks and Trails. The Land Development Code requires sidewalks along all
streets. The developer proposes to construct sidewalks along both Colleyville
Boulevard and John McCain Road.
Signs. The proposed ordinance requires the developer to construct an entry monument
sign adjacent to the corner of John McCain Road and Colleyville Boulevard. A
conceptual drawing of the sign is attached, though the sign dimensions have not been
finalized. The developer has also expressed interest in working with the City to re-
establish the Blue Star Memorial Highway monument on or near this property.
Colleyville Boulevard was designated as a Blue Star Memorial Highway on June 13,
1992. This highway designation is made for certain routes around the country as a
living memorial to those who have served or will serve in the nation's armed forces. At
one time the sign was located at the corner of John McCain Road and Colleyville
Boulevard marking the route until destroyed by a truck in 1995. The replacement of this
marker was a recommendation of the Colleyville Boulevard Corridor Design Study,
which was accepted by the City Council on March 19,2002, by Resolution R-02-1926.
While not a part of the zoning proposal for the property, the Blue Star Memorial
Highway designation may be considered as a separate item by the City in the future.
Tree Preservation. The Planning and Zoning Commission approved a tree mitigation
plan for this property on September 8, 2003, before the original zoning application was
submitted. There is a separate item on the August 23, 2004, agenda that proposes
minor modifications to the plan.
Drive Entrances. The proposed plan shows three drive entrances on Colleyville
Boulevard. The applicant has worked with TXDOT regarding the number and location
of the entrances. There is one drive entrance shown on John McCain Road. This
entrance lines up with a future median break on John McCain Road, and TXDOT will
construct a portion of the drive approach as part of the road construction project.
IMPACT ISSUES
1. Master Plan. The CoJ/eyville Master Plan designates the future use of this area for
commercial and retail type land uses. This request is consistent with the goals and
objectives of the Master Plan. The Master Plan designates all the property on
Colleyville Boulevard in this area as commercial and retail property.
Agenda Item No.2 - Page 3
2. Surrounding Properties. Most of the surrounding properties are undeveloped, but
planned for commercial use. The property along the south side of John McCain
Road is developed as industrial uses. Property south of the site, at the intersection
with Tennison Parkway, is developed as offices.
3. Development Trends. The long-term trend for this area is commercial and retail
development. Property in the area is generally suitable for that type of development.
4. Infrastructure. Water and sanitary sewer services are available along adjacent
rights-of-way. The developer is responsible for the extension of utilities to the lots if
necessary.
5. Property Taxes. According to information available from the Tarrant Appraisal
District, the 2004 taxable value of the property is $2,104,819. The estimated City
property tax revenue for the undeveloped property is $7,312 annually. The future
property tax revenue would depend upon the value the building improvements to the
property.
6. Public Notification. Staff mailed notices to 66 adjacent property owners regarding
this request. Notice was published in the Fort Worth Star-Telegram as required by
state law and the Land Development Code. One letter of opposition has been
received regarding the request, and a copy is attached.
SUMMARY
The site in question is the northern gateway into Colleyville. The Colleyville Master Plan
recommends that retail and commercial development occur at this location. The
economic development goals contained in the Colleyville Master Plan are focused on
building out the remaining commercial areas with revenue-generating businesses.
These types of businesses would include retail oriented activities that provide significant
sales tax revenue. The proposed development satisfies these goals.
The proposed development of the property would have a positive impact on the future
commercial growth of the city in this area through increased property values and sales
tax and property tax revenue. This property is also located within the TIF district for
Colleyville Boulevard.
PUBLIC HEARING SCHEDULE
Planning & Zoning
Commission: August 23,2004
City Council: September 21 and October 5,2004
RECOMMENDATION
Approval
Agenda Item No.2 - Page 4
ATTACHMENTS
· Location and Zoning Map
· I nformation from Applicant
· Site Plan (see large paper copy)
. List of Property Owners Notified
· Correspondence
· Draft ordinance
Prepared by:
~
Agenda Item No.2 - Page 5
LOCATION AND ZONING MAP
Pecan Creek Village Center
Request for
PUD-C Zoning
City of Colleyville, Texas
Purpose and Intent:
This request is for Planned Unit Development - Commercial zoning (pUD-C) for commercial and
retail uses on a 15.1O-acre tract of land, located at the southwest corner of Colleyville Boulevard
(S.H. 26) and John McCain Road. Pecan Creek Village Center is proposed to be an upscale, urban
retail center providing neighbors with convenient access to needed goods and services. A
professional development team dedicated to building a superior 'Gateway' project for the Colleyville
community brings this project before the Commission.
Pecan Creek Village Center will consist of five separate parcels upon platting These pads are in
integral piece in the Village Center and will attract high quality and credit tenants that will become
long-term, committed members of the community. This being said, these pads should be fairly
unrestricted in use to offer and encourage a broad range of potential tenants, including those with
drive-thru offerings. Lot 1 is designated as the site of the Shell and Great American Multi-Facility
Concept, featuring a Shell gas station, convenience store, and car wash, and the Great American One-
Stop Auto Care facility. Lot 5 of the Center will be the location of approximately 40,000 square feet
of in-line retail and service space, housed in two separate buildings. The remaining parcels will be
sold to retail and service users consistent with the allowable uses under the PUD-C.
While the existing zoning is currently "CC2-Shopping Center" and allows for retail uses, the
development proposes a convenience store with gasoline sales and a light automotive service center
with service bays, which require Special Use Permits (SUPs). The PUD-C proposes to incorporate
the requirements of these Special Use Permits with specific development guidelines for the overall
Center. Other potential uses currently requiring a Special Use Permit that would be included in the
PUD-C are tutoring services, vocational schools, antique stores, day care and other appropriate retail
and service uses. The resulting zoning district will allow for a more creative and efficient
development and provide the City and the neighbors with the assurances of quality development and
servIces.
Despite the fact that there are no direct abutting residential neighbors, our development team has held
a series of meetings with representatives of eight nearby homeowner's associations to discuss the
overall project and their concerns. The collective result of these ongoing meetings is to enter into a
Development Agreement for the project that meets with the support of the majority of the eight
subject homeowner's associations. It is the goal of the development team to have this agreement
finalized and available for review prior to the Planning and Zoning Commission meeting for this
project and to incorporate the developer's obligations in the City approvals, as well as the recorded
Covenants, Conditions, and Restrictions for the project.
The architecture of the Center proposes to promote and maintain the character of the City of
Colleyville and of the newer commercial centers in the immediate area. Low rise, warm retail/office
buildings will offer storefront windows with strong horizontal and vertical components. Buildings
proposed for the center will consist largely of natural stone and brick construction in warm colors and
complementary tones. Public access to open spaces and landscaped areas will be provided and
maintained throughout the development.
The design of the center includes strong city entry features for the City of Colleyville including a new
entry monument sign, a permanent water feature with fountains, a bridge feature over the water,
decorative lighting, tasteful signage and lush landscaping. It is the intention of the development team
to work with the City as appropriate to accomplish a goal of the SH 26 Corridor Study and re-
establish the Blue Star Memorial Highway monument at the intersection as well.
Pedestrian access throughout the Center is a key to its planning and development and careful
consideration has been given to provide access to local residents and patrons. The sidewalk and
circulation plan promotes pedestrian level views and access to elements throughout the site and will
provide a connection to both sidewalks along Colleyville Boulevard and the Cotton Belt trail.
The establishment of new landscaped common areas, medians, and entries will cover the retail center
in natural vegetation, colors and textures. Perpetual maintenance of all common areas, including tree
preservation areas along Pecan Creek, will be the responsibility of the Pecan Creek Village Center
Owners Association, which will be established in conjunction with timing of the public hearings and
the associated Covenants, Conditions, and Restrictions for the Center.
The Concept Plan, as proposed, provides a general layout of the lots and built improvements for the
retail center. While the lot sizes and building configurations may alter slightly prior to actual
development, this plan will be used as a tool and a guide for the future development of the property.
Once approved, the PUD and Concept Plan will be used by the city to insure that all final
development plans will maintain the same character and integrity of the approved zoning.
Land Uses I Areas:
The property consists of approximately 15.10 acres of land, which will be subdivided into five
separate lots. The base zoning for the PUD-C is proposed as CC1 (Village Retail), as provided in the
City of Colleyville Zoning Ordinance. All conditions and requirements of the CC1 district, the
approved PUD-C and the approved Concept Plan shall be followed and maintained throughout the
development of the property.
General land uses and proposed land areas are proposed as follows:
Lot 1
Convenience Store with Gasoline Sales
and Automotive Service and Tire Sales
Retail/Commercial Pad Site
Retail/Commercial Pad Site
Retail/Commercial Pad Site
Retail/Commercial Site
Apx. 1.92 Acres
Apx. 1.19 Acres
Apx. .94 Acres
Apx. 1.19 Acres
Apx. 9.87 Acres
Lot 2
Lot 3
Lot 4
LotS
Approximate Total Area
Apx.15.1 Acres
Open Space is included within the proposed development in the form of landscaped parkways and
medians. Great care was taken to protect and enhance the existing creek that has heavy vegetation
and storm water detention areas featuring permanent water and fountains will be incorporated into the
plan. A permanent tree preserve along the creek will assure the city and the public that the creek and
trees will remain in their natural condition from this point forward.
The development team previously worked diligently with Staff (Clayton Husband & Barry LeBaron)
to create a tree mitigation plan that subsequently was approved by the P&Z Commission. This open
space will be guaranteed by restrictive covenants, describing the conditions, restrictions and
maintenance, to be filed with the Final Plat and approved by the City.
Development Controls:
Covenants, Conditions and Restrictions will be established for all improvements proposed within the
development. Consistency in building architecture, landscape design, lighting and sign age will be
required and controlled by the developer, as well as, future owners.
Anticipated Tenants and Uses:
Lot I will include a Shell convenience store, fueling facility and carwash, as well as, a Great
American One Stop Auto Care. Together, this facility is called a MFC, Multi-Facility Concept,
which is a new breed of automotive center, offering customers a complete menu of automotive
services in one, convenient location designed to meet today's very mobile consumer demand -
including fuel, drive through car wash, expert light automotive services, tire services, automotive
lubrication services, and a convenience store - all in one location. This facility is modem and
different, which offers a new level of service and convenience, complete with upscale amenities to
meet today's consumer driving needs. A company that specializes in upscale tenants with new and
innovative designs designed the interior of the Great American. They have a very long list of
satisfied clients such as Starbucks, Seattle's Best, Sears, Radio Shack, Home Depot and many more.
The MFC is not only modem in design but in operation too. All employees are uniformed,
professional in character and driven by quality customer service. The tires are encased in pullout
drawers; the customer waiting area is plush with leather couches, complimentary refreshments, TV,
Internet hookups and even game-boys to help children pass the time. There is no outside storage and
all work done on vehicles is handled inside the service bays. It is a very consumer friendly
environment where all services are menu-driven and prices are posted.
Shell and Great American are examples of the top-shelf, quality oriented and long-term commitment
tenants that can be expected to reside in our neighborhood center. Both tenants are making a long-
term operating commitment to the center and the local community and will add value by taking part
in local promotions that benefit charities and other benevolent organizations.
Lot 5 will hold two in-line retail/service buildings, which will house national and local retail and
office tenants. It is anticipated that these tenants will include uses that are typically present in upscale
and modem developments of this nature. The selection of tenants will be a balanced mix of everyday
retailers and service providers to enhance the quality and convenience for the City of Colleyville
residents.
Lots 2, 3 & 4 are expected to attract quality, national and/or local retailers to provide much-needed
services to the local ColleyviIle community, as well as, drive-by consumers.
City Sales Tax Benefits:
Preliminary site plans show the potential for approximately 62,000 square feet of leaseable retail and
commercial development in Pecan Creek Village Center. With this mix of tenants, it is expected that
the City of Colleyville will benefit from the intake of sales tax as seen in the following data:
Projected Buildine: Square Footae:e1
Lot 1 - Multi-Facility Concept
Great American One Stop Auto Care
Shell Convenience Store (does not include Car Wash or Canopy)
Lot 2 - Retail Commercial
Lot 3 - Fast Food Restaurant with Drive- Thru
Lot 4 - Full Service Restaurant
Lot 5 - In-Line Retail/Service
6,150 sf
2,107 sf
4,300 sf
3,600 sf
5,660 sf
40,000 sf
Total Projected Building Square Footage
61,817 sf
Projected Annual Gross Sales Revenues
Lot 1 - Multi-Facility Concept
Great American One Stop Auto Care
Shell Convenience Store
Lot 2 - Retail Commercial
Lot 3 - Fast Food Restaurant with Drive- Thru
Lot 4 - Full Service Restaurant
Lot 5 - In-Line Retail/Service (Including Anticipated Restaurant)
$ 1,800,0002
$ 5,220,0002
$ 5,000,0003
$ 1,250,0004
$ 2,500,0005
$ 7.500.0006
Total Projected Annual Gross Revenues
$23,270,000
Projected Annual Taxable Revenues
Lot 1 - Multi-Facility Concept
Great American One Stop Auto Care
Shell Convenience Store
Lot 2 - Retail Commercial
Lot 3 - Fast Food Restaurant with Drive- Thru
Lot 4 - Full Service Restaurant
Lot 5 - In-Line Retail/Service (Including Anticipated Restaurant)
$ 1,260,0007
$ 1,~,0007
$ 5,000,0003
$ 1,250,0004
$ 2,500,0005
$ 7.500.0006
Total Projected Annual Taxable Revenues
$18,554,000
Proiected Annual Sales Tax Revenue to the City of Collevville8
Lot 1 - Multi-Facility Concept
Great American One Stop Auto Care
Shell Convenience Store
Lot 2 - Retail Commercial
Lot 3 - Fast Food Restaurant with Drive- Thru
Lot 4 - Full Service Restaurant
Lot 5 - In-Line Retail/Service (Including Anticipated Restaurant)
$ 25,200
$ 20,880
$ 100,000
$ 25,000
$ 50,000
$ 150.000
Total Projected Annual Sales Tax Revenue
$ 371,080
IProjected building square footages have been estimated based on conceptual site plans for Pecan Creek Village Center.
Actual square footage for the project will be dependent on the detennination of end users for Lots 2, 3, and 4.
2Projected revenues for the Multi-Facility Concept are based on historical figures for similar developments across the United
States.
3Lot 2 revenues are based on a retail use such as a pharmacy, national video rental chain, high-end furniture store, or similar
stand-alone retail use. Revenues have been estimated based on data published by the Urban Land Institute in "Dollars and
Cents of Shopping Centers: 2004" for these types of uses.
4Lot 3 revenue projections are based on the Urban Land Institute average sales figures of $347 per square foot for sandwich
or hamburger type operations ("Dollars and Cents of Shopping Centers: 2004").
5Lot 4 revenues have been estimated based on higher end national chain or independent restaurant sales data, obtained from
2004 Urban Land Institute data ("Dollars and Cents of Shopping Centers: 2004"). Sales per square foot of $440 have been
used in the projections.
6Lot 5 In-Line revenues are based on 8,500 square feet of restaurant use, and 75% of the remaining 31,500 square feet being
occupied by retail tenants (23,625 sf). Restaurant revenues for the in-line building assume sales of approximately $175 per
square foot, versus the industry average of $273 per square foot estimated by the Urban Land Institute. Retail revenues in
the in-line building are projected at $254 per square foot per year, which is conservatively less than estimates of $262 per
square foot from the Urban Land Institute for this type development ("Dollars and Cents of Shopping Centers: 2004").
7projected Annual Taxable Revenues for the Multi-Facility Concept do not include gas sales or service revenues.
8Sales tax revenues to the City of Colleyville have been estimated based on a 2% local sales tax rate.
Estimated Development Schedule
It is the intent of the ownership of the Pecan Creek Village Center property to begin construction on
the Village Center as soon as all necessary permits are obtained. At this time, we are expecting to
begin site work in early 2005, which would include grading, installation of utilities, internal
roadways, detention and perimeter landscaping. Construction on Lot 1, on the Shell and Great
American structures would start approximately 45 days following the commencement of site work, or
as soon as grading and utility installation will allow. Construction on the in-line buildings planned
for Lot 5 will be undertaken concurrently with the Shell and Great American facilities. This is
expected to happen in the 1st quarter of 2005. Lots 2. 3 & 4 will be delivered as "finished pads" and
will be ready for development in the 2nd quarter of 2005. This is a fairly aggressive schedule, but it
is the intent of the Village Center ownership group to develop and build-out the center in a very quick
timeframe.
MEMORANDUM OF UNDERSTANDING
FOR PECAN CREEK VILLAGE CENTER
COLLEYVILLE, TEXAS
AUGUST _,2004
Purpose ofthe
Understanding:
The purpose of this Memorandum of Understanding (the "Understanding) is to establish
parameters for the zoning, platting, design, and construction of Pecan Creek Village Center
("Center") which are mutually acceptable to each of ServiceStar Development Company LLC
("Developer") , Pecan Creek Village Center Partners LLC ("Owner") and each of the nearby
HOA Participants (listed below) whose representatives have participated in detailed
discussions and negotiations with the Developer regarding the development of the Center.
Parties to the
Understanding:
Developer and OWner,
and
Each of the following Homeowners Associations of the respective residential
subdivisions located in the City near the Center: Monterra, Caldwell Creek, Monticello,
Ross Downs, Pebble Hill Plantation, Villas at Caldwell Creek, Timmaron and Shalimar
(the "HOA Participants")
I. Recitals
1. In an effort to reach a mutually acceptable understanding pertaining to the zoning, subdivision,
design and construction (collectively, "development") of the Center, a number of meetings and discussions have
taken place between representatives of the Developer, Owner and Homeowner Associations of the following
subdivisions: Monterra, Caldwell Creek, Monticello, Ross Downs, Pebble Hill Plantation, Villas at Caldwell Creek,
Timmaron and Shalimar.
2. Among other things, formal meetings among such representatives were noticed, scheduled and
held and the following activities took place (or are scheduled):
Fall,2003
2nd Otr, 2004
June 22, 2004
July 13, 2004
July 21-29,2004
July 30, 2004
August4,2004
August 19,2004
Initial Meetings with representatives of Ross Downs, Timmaron and
Monterra
Modifications to the Center plans based on public comments at City
COuncil meetings in April of 2004
First Meeting between Developer, Owner and the HOA representatives
Detailed meeting minutes and project information was subsequently
distributed via e-mail so that it could be shared with the HOA r~sidents.
Second Meeting with the HOA representatives. Detailed meeting minutes
were again subsequently distributed, including the Development
Agreement Outline discussed at the meeting.
Detailed information on the Center was delivered to the HOA
representatives for sharing with the residents
Zoning submittal of the Center was made to the City Staff
Third Meeting with the HOA representatives
Fourth Meeting with the HOA representatives (if necessary)
3. Among other things, various Center drawings, surveys, preliminary elevations and renderings of
the proposed Center buildings, and other information relating to the proposed development was provided to the
HOA representatives. The Parties were given the opportunity to raise and discuss potential problems, issues and
concerns relating to the development of the Center.
4. The Parties acknowledge that the current zoning in place on the Center property permits a number
of uses and improvements that could create problems or issues for the nearby residential subdivisions (traffic,
noise, the presence of "big box" retail buildings, negative impacts on residential values, etc. and that the uses and
improvements permitted by the contemplated Development Understandings are more desirable.
5. The mutual understanding more particularly described below was reached among the Parties
regarding the development of the Center.
II. Proposed Center Design and Development Understandings
6. As a result of the meetings and negotiations among the Parties, it is proposed that the Center be
developed in substantial compliance with each of the following uses and conditions ("Development
Understandings") :
A. the site plan, preliminary building renderings and building elevation drawings provided to
the HOA representatives in the above-referenced meetings and thereafter in electronic and hard copy (the
"Drawings");
B. the quality, integrated design, colors and appearance of the structures and other
improvements as generally depicted on the Drawings;
C. with the various features ("City Entry Features") located at the southeast corner of
Colleyville Boulevard (S.H. 26) and John McCain Road which are intended to be appropriately indicative of
the entry to the City from the north on Colleyville Boulevard, as reflected on the Drawings, and such City
Entry Features will specifically include the water and fountain elements, the land bridge entry feature
(between the water features) from John McCain Road, the corner signage prominently incorporating "City
of Colleyville" identification, upgraded landscaping and character lighting, the installation of the Blue Star
Memorial Highway Monument (if desired by the City) in coordination with the corner signage, all as
indicated on the Drawings;
D. the commencement of construction of all of the site work, perimeter landscaping, internal
drives and the two in-line retail buildings along the western property line of the Center prior to the opening
of the motor fuel station and/or Auto Care Business building for business, all as generally indicated on the
Drawings;
E. the further design and construction of the Center in a manner that is generally consistent
with the Highway 26 Design Study previously published by the Texas Department of Transportation ("TX-
DOT") and approved by the Cit;.
F. the execution by Developer of a CitylDeveloper Agreement with the City of Colleyville with
provisions pertaining to the tree mitigation plan ("Tree Mitigation Plan") for the Center as previously
submitted to the City by Developer and approved by the Planning and Zoning Commission of the City a
number of months ago;
G. in addition to its commitment to the Tree Mitigation Plan, the design and development of
the Center by Developer in a manner that the vast majority of the existing trees located in the creek areas
to the west of the Center will be preserved as a tree preservation area and the existing large trees in that
area will continue to serve as a visual screen of the Center from the west;
H. the recordation of deed restrictions covering the property owned by Owner on the
southeast corner of Colleyville Boulevard and the extension of John McCain Road, the site of the former
Mobil gas station parcel (also known as Fast Phil's) (the "Existing Gas Station Property"), prohibiting the
sales and/or storage of gasoline and other automobile fuels on the Existing Gas Station Property,
regardless of whether the zoning ordinances of the City otherwise permit such sales or storage;
I. the demolition and removal of the existing gasoline pump canopy and associated
underground storage tanks and appurtenances located on the site of the Existing Gas Station Property;
J. the design and construction of a sidewalk by Developer on the south side of the relocated
portion of John McCain Road for the full distance of the depth of the Center property line as depicted on the
site plan in the Drawings, from east to west along relocated John McCain Road (to the extent such
sidewalk improvements are not included in the TX-DOT improvements currently under construction), and
2
the connection of the sidewalk to the existing Cotton Belt Pedestrian Trail located to the west of the railroad
located just west of the Center;
K. the design and construction by Developer of all site lighting for the Center so that there will
be no off-site direct glare from the parking and exterior site lighting fixtures that are constructed and located
within the Center;
L. the filing of Covenants, Conditions and Restrictions ("CC&Rs") by Developer covering the
Center which contain, among other things, the following deed restrictions, which shall apply to all lots and
business operations within the Center:
(1) No soda or ice machines may be placed or located on the outside of any
building within the Center;
(2) No tires or other automotive-related merchandise may be stored or displayed
outside of any building in the Center;
(3) Propane supply tanks and related supplies, if any, must be kept and maintained in
an enclosure which is enclosed on at least three sides and constructed of the same materials as
the adjacent building;
(4) All automobile lubrication, maintenance and repair operations for the business
operated in the building indicated for auto care ("Auto Care Business") indicated in the Drawings
must be conducted inside the indicated building and with the bay doors in the down position except
during those times when the doors shall be raised to allow for auto movements in or out of the
building and otherwise only to the extent reasonably required for human safety or as required by
law;
(5) No automobiles being serviced or repaired by the Auto Care Business may be
parked or stored overnight outside of the Auto Care Business building;
(6) Any vehicle left continuously unattended for more than 48 hours on the Center
property shall be towed from the Center;
(7) All trash enclosures on the Center property must have enclosures on at least three
sides of at least 7'-6" in height, constructed of the same type materials as the primary buildings in
the Center, with a gate on the front of the enclosure. All trash enclosures will be reasonably
landscaped and screened;
(8) Trash removal service for the Center will be restricted so that all of it occurs during
the hours between 8:00 a.m. to 6:00 p.m., local time, Monday through Friday, 9:00 a.m. to 5:00
p.m., local time, Saturday, and such removal service shall not be permitted on Sundays.
III. Understandings
7. Subject to observation of this Understanding by the majority of the HOA Participants, the Developer
and Owner agree to: (i) take all reasonable actions to obtain the approval of the zoning and platting of the Center
and obtain all other necessary City permits and approvals in accordance with the Development Understandings
above in Section 6, Items A through G, inclusive, and (ii) cause the Center to be developed in accordance with, and
to cause the requirements to be met in all material respects of, Section 6, Items H through L above, inclusive.
Developer agrees to submit the CC&Rs and the deed restriction on the Existing Gas Station Property to the City for
review in connection with the zoning of the Center and to record such CC&Rs and deed restriction in the deed
records of Tarrant County, Texas prior to the commencement of construction on any public or private improvements
within the Center and prior to the sale of any of the Center property and the Existing Gas Station Property
(together, the "Affected Real Property") and to make specific reference to such restrictive covenants in all sale and
lease agreements of the Affected Real Property.
8. Subject to and conditioned upon the compliance and observation of this Understanding by all of the
other Parties, Developer and Owner further agree to exercise reasonable efforts to make the Development
Understandings a specific part of the City's governmental approvals of the Center.
3
9. The commitment of the Developer and Owner to this Understanding, shall be specifically
conditioned on the public support of the governmental approvals for the Center by a majority of the HOA
Participants as described herein and the successful receipt of all necessary final governmental approvals of the
City and all other governmental entities having jurisdiction over the development of the Center for the development
of the Center, including without limitation all required building permits for the Center, from the City and TX-DOT.
Such public support shall include attendance and public statements of support by representative members of the
Board of Directors of each of the HOA Participants at all public hearings and meetings with the Colleyville Planning
and Zoning Commission and City Councilor as reasonably requested by Developer and/or Owner. The HOA
Participants must also submit written letters evidencing the support of their respective Boards of Directors for the
Center in accordance with the terms and conditions of this Understanding to the Planning Commission and the City
Council. Developer and Owner shall not be required to satisfy the Development Obligations in the event that
either: (i) a majority of the HOA Participants do not meet the requirements for their support as set forth above for
the governmental approvals and/or (ii) the necessary governmental approvals are not successfully obtained as
required by the terms of this Understanding.
IV. Miscellaneous
10. Developer and Owner reserve and shall have the right, without prior notice to or consent of all or
any of the HOA Participants for the Developer to conveyor assign the obligation to develop the Center or the
Existing Gas Station Property and all of its duties, privileges, rights and benefits under this Understanding to its
successors and assigns, whereupon all of such duties, privileges, rights and benefits shall automatically be vested
in, be binding on and inure to the benefit of the Owner; provided that Developer shall give each HOA Participant
written notice of such conveyance or assignment within thirty (30) days after it becomes effective. None of the
duties, privileges, rights and benefits of any HOA Participant under this Understanding may assigned or transferred
without the express prior consent of Owner, and all attempted transfers or assignments in violation of this provision
shall be void ab initio.
This Understanding shall be effective as of August _, 2004, regardless of when signed.
DEVELOPER:
OWNER:
ServiceStar Development Company LLC
Pecan Creek Village Center Partners LLC
By:
Name: Mark E. DeRose
Its: Manager'
By:
Name: Mark E. DeRose
Its: Manager
4
Z-04-029
Monument Custom Homes Inc
PO Box 159
Colleyville TX 76034
Riley, Shelly W etux Vina J
2217 Collins Path
Colleyville TX 76034
Stuteville, Gregory etux Teres
7207 Stilton Court
Colleyville TX 76034
Parshall, John C etux Misty H
7205 Maranatha Court
Colleyville TX 76034
Mathis, Kimberly D etvir Kevin
6508 Westcoat Drive
Colleyville TX 76034
Silverberg, AI
7204 Thames Trail
Colleyville TX 76034
Turner, CAllen
1908 John McCain Road
Colleyville TX 76034
Dees, John etux Vilma
7200 Maranatha Court
Colleyville TX 76034
Nelson, Arnold E & Joyce Ann
5800 Hunter Trail
Colleyville TX 76034
Rice, Norman S & Rosalind Rice
7205 Braemar Terrace
Colleyville TX 76034
Wall, Kevin R etux Wendy S
7209 Thames Trail
Colleyville, TX 76034
Hinson, Timothy etux Kelly
7211 Stilton Court
Colleyville TX 76034
Crowell, Bernard Jr etux Karen
7204 Braemar Terrace
Colleyville TX 76034
Roland, Terrance etux Joyce
7205 Thames Trail
Colleyville TX 76034
Kim, Sang Taek
7203 Stilton Court
Colleyville TX 76034
Timarron Owners Assn Inc
1800 Preston Park Blvd Ste 101
Piano TX 75093
Cimperman, Brian R etux Cyndi
1813 Prince Meadow Drive
Colleyville TX 76034
Rtan-Rtan Enterprises Inc
346 Parkwood Lane
Coppell TX 75019
Ridley. Kenneth J
PO Box 826
Keller TX 76244
Beglari, Marc & M Hatamieh
7208 Stilton Court
Colleyville TX 76034
Heatley Capital Corp Tr
2108 Hurd Dr Ste 200
Irving TX 75038
Kim, Jane M
7212 Thames Trail
Colleyville TX 76034
Christensen, Jen M etvir Chas
7208 Thames Trail
Colleyville TX 76034
Orler, John J etux Allison
7200 Braemar Terrace
Colleyville TX 76034
Ninios, Louis etux Lucy N
7201 Thames Trail
Colleyville TX 76034
Render, Richard E etux Sylvia
7200 Thames Trail
Colleyville TX 76034
Raman Chandler Properties
PO Box 611
Colleyville TX 76034
Maverick Drywall & Insulation
1901 John McCain Road Ste A
Colleyville TX 76034
Ferange, Terry & Rita
1514 Spruce Court
South lake TX 76092
Cannatella, Angelo & Phyllis
7111 Colleyville Blvd
Colleyville TX 76034
Hampton, Anthony C etux Cather
2200 Danielle Drive
Colleyville TX 76034
Applewhite, Larry etux Sandra
7001 Primrose Lane
Colleyville TX 76034
Whitco Consulting Ltd
3930 Glade Road Ste 108
Colleyville TX 76034
Kouzes, Stephen etux Kyle
1713 Heathermore
Colleyville TX 76034
Grossman, Lisa
1701 Heathermore
Colleyville TX 76034
Warner, Burdette Lee
1621 Heathermore
Colleyville TX 76034
Franco, Ronald V
PO Box 5287
Culver City CA 90231
Pulte Home Corp of Texas
1234 Lakeshore Drive
Coppell TX 75019
Cannatella, Angelo
515 Hillside Drive
Colleyville TX 76034
Corder, Mark & S Scalzitti
7009 Primrose Lane
Colleyville TX 76034
Stuart, Carroll S
7005 Primrose Lane
Colleyville TX 76034
Brack, John V etux Evelyn S
1717 Heathermore
Colleyville TX 76034
Grantland, Gary M
7201 Braemar Terrace
Colleyville TX 76034
Staggs, Gary M etux Barbara A
1709 Heathermore
Colleyville TX 76034
Seiber, F Dean etux Kristen
1625 Heathermore
Colleyville TX 76034
Talley, Jean
1617 Heathermore
Colleyville TX 76034
Dietrich, Charlotte
7001 Colleyville Boulevard
Colleyville TX 76034
Ctaj Ltd
6904 Colleyville Boulevard
Colleyville TX 76034
Hasting Cove Ltd
PO Box 5287
Culver City CA 90231
Kuhn, Alyce
2204 Danielle Drive
Colleyville TX 76034
Tropicana Group LLC
3930 Glade Road Ste 108
Colleyville TX 76034
Hudson, Rocky & Cynthia
7011 Colleyville Blvd
Colleyville TX 76034
Whiteo Consulting Ltd
2105 Harwood Road Ste 215
Bedford TX 76021
Freitas, Michael W etux Rebecc
1705 Heathermore
Colleyville TX 76034
Villas at Caldwell Creek HOA
PO Box 293
Colleyville TX 76034
West, Charles F Sr
7009 Colleyville Boulevard
Colleyville TX 76034
Jomel LP
1307 Haddington Lane
Keller TX 76248
Davis, Carol
3300 Spring Valley Drive
Bedford TX 76021
Colleyville Creme de la Creme
5922 DTC Blvd Ste 360
Greenwood Village CO 80111
Groesbeck, Gary
1608 Douglas Avenue
Colleyville TX 76034
Boyd, Kenneth D etux Linda
1617 Douglas Avenue
Colleyville TX 76034
Monterra Home Owner's Assoc
6707 Brentwood Stair Road
Fort Worth TX 76112
Total Enterprise Inc
PO Box 610764
Dallas TX 75261
The Wickham Family Ltd Prtnshp
PO Box 110278
Carrollton TX 75011
Monarch Photographic Corp
1700 Tennison Pkwy
Colleyville TX 76034
Pecan Creek Village Center ptnrs
5670 Greenwood Plaza Blvd
Suite 300
Greenwood Village CO 80111
ServiceStar Property Company LLC
5670 Greenwood Plaza Blvd
Suite 300
Greenwood Village CO 80111
Case Z-04-029. Notices dated August 13, 2004.
According to the last published tax rolls, individuals who own property that is within 500 feet of the proposed zoning change or special use permit request al
listed above. I certify that the parties listed above have been notified of the proposed zoning change or special use permit request as required by the Texas Loc
Government Code and the Colleyville Land Development Code.
Clayton Husband AICP
Page 1 of2
Barry LeBaron
From: Janice Cole Uanicecole1066@comcast.net]
Sent: Monday, August 16, 2004 7:05 PM
To: Andrewsorrell@cs.com; Barry LeBaron
Cc: Joe Hocutt; Mark Skinner; Elaine Dolan; Rich Hendler; Jon Ayers; Tom Hart
Subject: The Ratliff Group/Pecan Creek Village Center
To Andy Sorrell, President, Monticello Homeowner Assoc.
Barry LeBaron, AICP, Community Development Manager, City of Colleyville
cc: Colleyville Mayor and City Council
I have attended two recent meetings with Bennett Ratliff, Dan Poremba, Mark
DeRose, and other member of the Ratliff Group regarding the property located at
John McCain and Colleyville Blvd. (Hwy. 26). I am opposed to their development at
this site for the following reasons:
There are currently three Shell Gasoline Stations within three miles of the proposed
development, and seven automotive repair or maintenance businesses in less than
five miles of one another. The proposed Shell Station and Tire store at JM and Hwy.
26 does not make sound economic sense for our city. Gasoline, car washes, tire and
convenience stores does not translate into a sales tax advantage for Colleyville.
Small "impulse" drive through businesses do not appear to be successful in
Colleyville. These include the abandoned "Phast Phils" gasoline and convenience
store, the closed Chevron Station, the boarded up Taco Bell, Whataburger and Jack
in the Box, all located on Colleyville Blvd.
Contrary to the belief of the Ratliff Group, Colleyville and Grapevine residents are
bargain shoppers.
Shell and the Great American Tire store are expensive brands at expensive prices.
Will their prices compete with Sams Club;
Fast Track and Discount Tire Store also located within a five mile radius of JM and
Colleyville Blvd?
There have been many articles in area newspapers recently discussing the toxicity
levels of the gasoline additive MTBE. This additive in nOw required by the Federal
government to be added to gasoline under the Clean Air Act. EPA studies have
shown that MTBE's are not as soluble in ground water as once thought.
This should be a red flag to everyone as the proposed gas station abuts Big Bear
Creek. If, as suggested by the developer, a well is drilled to aid the drainage
detention area, there is a possibility of polluting the Big Bear Creek river system that
flows through not only Colleyville but Southlake, Euless and Bedford.
The architectural rendering of Pecan Creek Village shows a large pond, i.e.
"Colleyville water feature", on the corner of the property closest to John McCain. This
area floods with every heavy rain and although drainage improvements have been
8/17/2004
Page 2 of2
made by the city; there still exists the potential for toxic material to be expelled into
Bear Creek.
The traffic situation will not improve at the corner of JM and Hwy. 26 with the addition
of this business. Every morning and every afternoon there are school buses and
traffic attempting to negotiate turns at this intersection. Mature trees will be sacrificed
to add one more strip center to an area that is replete with available real estate.
I am impressed with the Ratliff Group and their willingness to negotiate improvements
to their development. However, a gas station and convenience store is just that.
What happens to the Ratliff Groups promises several years from now, or in the great
possibility that it too becomes another boarded up, closed business? This one,
however, will be located at the gateway to our city.
Please consider this development carefullv.
Regards;
Janice Cole
8/17/2004
ORDINANCE 0-04-xxxx
AN ORDINANCE AMENDING CHAPTER 3, LAND USE OF THE LAND
DEVELOPMENT CODE OF THE CITY OF COLLEYVILLE, TEXAS, BY AMENDING
THE OFFICIAL ZONING MAP AND CHANGING THE ZONING OF 15.10 ACRES
OUT OF THE ABSALOM J. LOTT SURVEY, ABSTRACT 963, FROM THE CC2
SHOPPING CENTER COMMERCIAL DISTRICT TO THE PUD-C PLANNED UNIT
DEVELOPMENT COMMERCIAL DISTRICT; PROVIDING FOR THE VIOLATION OF
THIS ORDINANCE; PROVIDING A SAVINGS CLAUSE; AUTHORIZING
PUBLICATION; AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, an application for a zoning change was filed by Pecan Creek Village
Center Partners LLC, on August 2, 2004, under Case No. Z-04-029; and
WHEREAS, the City of Colleyville has complied with the notification requirements of
the Texas Local Government Code and the Colleyville Land
Development Code; and
WHEREAS, the Planning and Zoning Commission has held a public hearing and
made a recommendation on the proposed zoning amendment; and
WHEREAS, the City Council has determined that the proposed zoning amendment is
in the best interests of the City of Colleyville.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
COLLEYVILLE, TEXAS:
Sec. 1.
THAT the Master Plan, the Land Development Code of the City of
Colleyville, Texas, and the Official Zoning Map are hereby amended
insofar as they relate to certain land located in Colleyville, Texas, as
shown on the Zoning Map attached as Exhibit "A", and described by
metes and bounds as shown on the attached Exhibit "8", by
changing the zoning of said property from the CC2 Shopping Center
Commercial district to the PUD-C Planned Unit Development
Commercial district, including any other conditions and restrictions
imposed and approved by the City Council, which are incorporated
herein.
Sec. 2.
THAT the PUD-C area shall be subject to the following conditions:
1. GENERAL
a. The purpose of this PUD-C is for retail, commercial and office
land uses.
Ordinance 0-04-xxxx
Page 2 of 7
b. This property is subject to all the regulations contained in the
Colleyville Land Development Code, except where amended by
this Ordinance.
2. PERMITTED AND PROHIBITED LAND USES
a. The following land uses shall be permitted within this Planned
Unit Development.
(1) One (1) convenience store with gasoline sales and car
wash
One (1) automobile repair and service facility without
outside storage
Convenience store without gasoline sales
Restaurants with drive-in or drive-through service
Supermarket or grocery store
Bakery
Meat and fish market
Cafe, cafeteria and restaurants
General retail sales
Pharmacy and drug stores
Retail plumbing, electrical and hardware stores
Bookstore or stationery shop
Jewelry, camera or music store
Florist shop
Furniture store
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11 )
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
.
(24)
(25)
(26)
Pet shop
Gasoline service station
Building material sales without outside storage
Barber shop, beauty shop, salons and day spas
Dry cleaners
Alterations shop
Health and fitness studios
Music and dance studios
Interior decorator shop
Caterer
Medical and physician offices
Ordinance 0-04-xxxx
Page 3 of 7
(27) Veterinary clinics without outside kennels
(28) General offices
(29) Banks and financial institutions
(30) Day care center and day nurseries
(31) Community buildings
(32) Business and professional schools
(33) Train passenger terminals
(34) Government buildings and parks
b. The following land uses shall be prohibited within this Planned
Unit Development.
(1) Self-service laundromats
(2) Funeral homes or mortuaries
(3) Bus passenger terminals
(4) Cemeteries and mausoleums
(5) Kindergarten, primary or secondary private schools
(6) Junior and senior colleges and universities
(7) Vocational, technical and trade schools
(8) Indoor and outdoor amusements
3. ALCOHOLIC BEVERAGE SALES
a. A Special Use Permit for alcoholic beverage sales for on-
premise consumption in conjunction with a restaurant use is
hereby authorized.
b. A Special Use Permit for alcoholic beverage sales for off-
premise consumption for a grocery store, convenience store,
specialty wine shop or gourmet food store is hereby authorized.
3. CONCEPTUAL SITE PLANS. PLATTING AND PHASING OF DEVELOPMENT
a. The arrangement, location, and footprint of buildings within the
PUD-C may differ from that shown on the attached Exhibit "C"
and Exhibit "D" and will be determined at time of site plan and
landscape plan approval.
b. Prior to the issuance of any development permits within this
PUD-C and as a condition to the development of the subject
property, the developer shall obtain approval of a final plat of the
Ordinance 0-04-xxxx
Page 4 of 7
property in accordance with the procedures and requirements of
the Colleyville Land Development Code.
c. Prior to the issuance of a certificate of occupancy for the
convenience store with gasoline sales and/or the automobile
repair and service facility, the developer must apply for and
receive a building permit for the construction of the two
neighborhood retail buildings, as shown in Exhibit "C".
4. LOT REQUIREMENTS AND SETBACKS
a. The lot requirements and setbacks shall be the following
minimum standards:
(1) Minimum Lot Size
(2) Building Line adjacent to street
(3) Side Building Line
(4) Rear Building Line
(5) Maximum Lot Coverage (building)
None
40 feet
15 feet
15 feet
60 percent
b. The buildings shall not exceed thirty-five (35) feet in height.
c. No buildings shall be located within one hundred fifty (150) feet
of the south right-of-way line of John McCain Road, as shown
on Exhibit "C".
5. OPEN SPACE AND LANDSCAPING
a. The building site shall comply with the minimum landscaping
requirements of the Land Development Code, which shall
satisfy the open space requirements for the PUD-C area.
b. The landscaped area may be utilized for storm water detention
purposes.
c. Each of the storm water detention ponds shall be designed to
maintain a permanent water level, and each pond shall include
a fountain.
d. This property shall be subject to the tree mitigation plan
approved by the Planning and Zoning Commission on
e. The tree preservation area, as shown on Exhibit "C", shall be
designated as an easement on the final plat of the property.
Ordinance 0-04-xxxx
Page 5 of 7
6. LIGHTING
a. The height of a light standard located on the property shall not
exceed twenty (20) feet in overall height.
7. SIDEWALKS AND TRAILS
a. The developer shall construct a 5-foot wide sidewalk adjacent to
John McCain Road, unless funds are escrowed with the City for
future construction of the sidewalk. The sidewalk shall be
constructed at the time building improvements are constructed
on the property.
b. The developer of each lot shall construct a 5-foot wide sidewalk
adjacent to Colleyville Boulevard, unless funds are escrowed
with the City for future construction of the sidewalk. The
sidewalk shall be constructed at the time building improvements
are constructed on the property.
8. SIGNS
a. All signs located on the property shall comply with the standards
contained in Chapter 7 of the Land Development Code, except
where modified in this ordinance.
b. The developer shall construct an entry monument sign adjacent
to the corner of John McCain Road and Colleyville Boulevard,
as shown in Exhibit "C". The sign shall not exceed feet in
height.
9. SPECIAL DEVELOPMENT CRITERIA RELATED TO AUTOMOTIVE-RELATED
USES
a. The columns of the gasoline canopy shall be constructed of
masonry or stone material.
b. Structures for automobile service uses shall be oriented in such
a manner that the bay doors or garage doors do not face
Colleyville Boulevard.
C. Tires or other automotive-related merchandise shall not be
stored or displayed outside of any building within the
development.
Sec. 3.
Ordinance 0-04-xxxx
Page 6 of 7
d. All automobile lubrication, maintenance and repair operations
shall be conducted inside the building and with the bay doors in
the down position. The doors may be raised to allow for
vehicles to be moved in or out of the building.
e. Automobiles being serviced or repaired shall not be parked or
stored overnight outside of the building.
10. GENERAL DEVELOPMENT CRITERIA
a. The architectural design score for all commercial buildings shall
be a minimum of 30 points, as described in Chapter 6 of the
Land Development Code.
b. The exposed exterior walls of each building must be constructed
of 75% masonry material. Window and door openings shall not
be included in the calculation of the area of the wall.
c. Vending machines or ice machines shall not be placed or
located on the outside of any building within the development.
d. Propane supply tanks and related supplies, if any, shall be kept
and maintained in an enclosure which is enclosed on at least
three sides and constructed of the same material as the
adjacent building. Said tanks and supplies shall be stored in
conformance with related building, fire and related codes.
e. All trash dumpster enclosures on the property shall be enclosed
on at least three sides of at least seven (7) feet six (6) inches in
height, constructed of the same materials as the primary
buildings in the development. A gate, constructed of an opaque
material, shall be placed on the front of the trash dumpster
enclosure.
f. The internal drive accessed from John McCain Road shall
incorporate a bridge feature over the water between the two
ponds, as shown in Exhibit "C". The driving surface of the
bridge shall be arched. The rails on the sides of the bridge shall
be constructed of ornamental metal, brick or stone.
THAT any person, firm, or corporation violating any of the provisions
of this ordinance shall be guilty of a misdemeanor and upon
conviction thereof shall be fined a sum not to exceed Two Thousand
Dollars ($2,000.00). Each and every day such violation continues
shall constitute a separate offense and shall be punishable as such.
Sec. 4.
Ordinance 0-04-xxxx
Page 7 of 7
THAT the Land Development Code of the City of Colleyville, Texas,
shall remain in full force and effect, except where amended by this
ordinance.
Sec. 5.
THAT the City Secretary is hereby authorized and directed to cause
publication of the descriptive caption and penalty clause hereof as an
alternative method of publication provided by law.
Sec. 6.
THAT this ordinance shall become effective immediately upon
publication.
AND IT IS SO ORDERED.
The first reading and public hearing being conducted on the
2004.
day of
The second reading and public hearing being conducted on the
2004.
day of
ATTEST:
CITY OF COLLEYVILLE
Cynthia Singleton, TRMC
City Secretary
Joe Hocutt
Mayor
APPROVED AS TO FORM AND LEGALITY:
Ross T. Foster
City Attorney
.~
TexaS
PLANNING & ZONING COMMISSION
AGENDA BRIEFING
Agenda Date:
Subject:
August 23, 2004
G-03-029 - Amendment to the Tree Mitigation Plan on 15.10
acres located on the southwest corner of John McCain Road and
Colleyville Boulevard
STAFF COMMENTS
On September 8, 2003, the Planning and Zoning Commission approved a Tree
Mitigation Plan for a 15.10-acre parcel of property located at the southwest corner of
John McCain Road and Colleyville Boulevard. The plan is a performance-based plan,
subject to the issuance of building permits for targeted square footage of buildings. The
plan was originally approved to cover the time period 2004 to 2007.
The Tree Mitigation Plan was approved prior to the developer submitting the original
zoning application on the property. The zoning change request was ultimately denied
by the City Council. As a result, the target dates in the approved Tree Mitigation Plan
cannot be satisfied. The developer has requested that the Tree Mitigation Plan be
revised to coincide with the new zoning case submitted in August 2004.
A copy of the revised plan is attached. The changes are noted through strikethrough
and bold-underline text. A summary of the changes follows.
1. The developer of the project has been revised to reflect the current owner of the
property. The name has changed from ServiceStar Property Advisors to Pecan
Creek Village Center Partners LLC.
2. The calendar years in the development schedule have been changed to run
from 2005 to 2008.
3. The acreage of the property has been revised to 15.10 acres.
The Tree Mitigation Plan only requires approval by the Planning and Zoning
Commission. If the zoning case is ultimately approved, the Tree Mitigation Plan will be
submitted to the applicant for signature, and then signed by the City. A copy of the
original Planning and Zoning Commission briefing regarding this case is attached for
your reference.
Agenda Item No.3 - Page 1
RECOMMENDATION
Approval
ATTACHMENTS
. Amended Tree Mitigation Plan
. Staff Briefing - September 8,2003
Prepared by:
~
Agenda Item No.3 - Page 2
City of Colleyville
City/Developer Agreement
for a Tree Mitigation Plan
WHEREAS, Chapter 5 - Tree Preservation of the Colleyville Land Development
Code establishes requirements for tree preservation, and
WHEREAS, Chapter 1 - General Provisions of the Colleyville Land Development
Code authorizes the Planning and Zoning Commission to approve a tree
mitigation plan, and
WHEREAS, Risk HerR, .^.ICP, prsje€lt maRa~er v:itA Pate ER~iReeFs,
mpFeseRtiR~ ServissStar PrsPSWj ^€Ivisers, Pecan Creek Village Center
Partners LLC, a company from Greenwood Village, Colorado, the prssp8stiv9
owner of approximately 15.10 acres of Tract 3A, A. J. Lott Survey, Abstract 903,
located at the southwest corner of State Highway 26 and John McCain Road,
has submitted a request for an appeal of the tree mitigation requirements
contained in Chapter 5 of the Land Development Code, and
WHEREAS, the Planning and Zoning Commission has authorized the Chairman
of the Planning and Zoning Commission to enter into the following agreement
between the City of Colleyville, Tarrant County, Texas, hereinafter called "City"
and SmvieeStar PrepeRy ^€I'.'i&9FS Pecan Creek Village Center Partners LLC,
hereinafter called "Developer" for tree mitigation.
The parties hereto agree as follows:
1. The Developer and the City agree that the total number of caliper-inches
eligible for mitigation according to this plan is 1,967 caliper-inches. The
amount of tree mitigation applicable for each calendar year shall be
performance-based on the issuance of building permits. The developer shall
obtain building permits for a targeted square footage of building area.
2. Developer agrees to obtain building permits totaling 55,000 square feet of
retail and office space on said 15 acre site and to develop said property in
accordance with the development schedule contained in Table 1, below.
Development shall include obtaining a building permits for the targeted
square footage before the end of each calendar year, as shown in Table 1.
3. City agrees to apply an amount of tree mitigation each calendar year,
provided the developer has satisfied the building permit requirements
specified in this agreement.
CitylDeveloper Agreement
ServiceStar Development Company
Tree Mitigation Plan
Page 1
4. If the targeted square footage has not been met at the end of the year, the
developer shall make payments into the Colleyville Tree Preservation Fund
based on the following formula:
Payment ($) =
[(Targeted Square Footage - Actual Square Footage) I Targeted Square Footage] * 1,967 *
$100
5. Developer and City agree, if a payment is required as described in Paragraph
4 above, building permits shall not be issued for the property until the required
payments have been made.
6. Developer and City agree that if the targeted square footage has been met at
the end of the year, no payments shall be required of the developer.
7. Developer and City agree, if the targeted square footage has been exceeded
at the end of the year, the overage shall be applied to the following year, up to
the total build-out of the project.
8. Developer and City agree, the tree mitigation plan for this property shall
expire on December 31, 2008~. If the total targeted square footage for
the project has not been met by this date, the penalty provision shall apply as
referenced above.
9. If for any reason the ownership of the property should change prior to the
expiration of this agreement, it is agreed that this plan will pass from this
Developer to the next owner or developer and the City will require proper
signatures of the new owner or developer agreeing to the terms of this
Agreement.
Table 1
Development Schedule and Tree Mitigation Applied
End of Calendar Targeted Square Footage Tree Mitigation Applied Penalty
Year
~ 2005 19,250 s.f. 689 caliper-inches
~ 2006 13,750 s.f. 492 caliper-inches
~ 2007 11,000 s.f. 393 caliper-inches see formula
~ 2008 11,000 s.f. 393 caliper-inches
Totals 55,000 s.t. 1,967 caliper-inches
City/Developer Agreement
ServiceStar Development Company
Tree Mitigation Plan
Page 2
PECAN CREEK VILLAGE CENTER PARTNERS LLC SER'}ICESTAR
DEVElOPMENTCOMP~NYLLC
By:
Name:
Date
CITY OF COLLEYVILLE, TEXAS
By:
Jeff \^Jall, Chairman Date
Colleyville Planning and Zoning Commission
Authorized by action So~teml;)er S, 299J Auqust 23.2004
City/Developer Agreement
ServiceStar Development Company
Tree Mitigation Plan
Page 3
.~
rexaS
PLANNING & ZONING COMMISSION
AGENDA BRIEFING
Agenda Date:
Subject:
September 8, 2003
G-03-029 - Tree Mitigation Request on 15 acres located on the
southwest corner of John McCain Road and Colleyville Boulevard
STAFF REVIEW COMMENTS:
Rick Horn, AICP, project manager with Pate Engineers, has submitted a request for an
appeal of the tree mitigation requirements contained in Chapter 5 of the Land
Development Code. The property in question is 15 acres in size and is located at the
southwest corner of John McCain Road and Colleyville Boulevard. The property is
zoned CC2 Shopping Center Commercial, and the prospective owners intend to
construct a retail shopping center on the property. The prospective owner is
ServiceStar Property Advisors, a company from the Denver, Colorado area. The
applicant is requesting approval of an alternate tree preservation plan for the property.
Representatives from ServiceStar will attend the meeting and make a short presentation
to the Commission.
Chapter 5 of the Land Development Code establishes criteria for the preservation of
trees on developing property. On commercial properties, trees that are located under
the proposed building pads are exempt from replacement. Trees located under parking
lots or other paved areas are not exempt from replacement. The Code requires that if a
3-caliper-inch or larger tree is removed, the owner is required to replace the tree on a
caliper-inch basis. If the owner cannot physically replace an equivalent number of
caliper-inches on site, the owner may pay money into the Colleyville Tree Preservation
Fund or appeal the replacement requirement to the Planning and Zoning Commission.
The applicant submitted a conceptual site plan for this property that includes a tree
survey. The Development Review Committee (DRC) reviewed the conceptual site plan.
The plan shows areas where buildings and parking lots would be constructed, areas
where fill dirt will be added to build up pad sites, detention ponds, and tree preservation
areas. In addition, a 1 OO-foot wide tree preservation zone is proposed at the rear of the
property along the creek. A copy of the conceptual site plan is attached.
The following are the assumptions the ORC used in developing the tree mitigation plan
discussed in this briefing.
1. The total number of trees on the site is 1,015, accounting for 9,037 caliper-
inches.
2. There are 184 trees that will be preserved on site, totaling 1,775 caliper-inches.
These trees are included in the proposed tree preservation zone at the rear of
the project.
Agenda Item No.3 - Page 1
3. There are 530 trees totaling 4,995 caliper-inches that will be removed from
under building pads and in utility easements, detention areas and fill zones.
Trees under the building pads are already exempt from replacement provisions.
The owner is requesting that the trees located in utility easements, detention
areas and fill zones also be considered exempt from the replacement provisions
of the ordinance.
4. As part of the landscaping on the lot, 100 new trees totaling 300 caliper-inches
will be planted.
5. The developer is requesting that the remaining 201 trees totaling 1,967 caliper-
inches be exempted from replacement.
6. There will be 284 trees on site at the completion of the project.
The DRC recognizes that to develop this 15-acre site, a considerable amount of
earthwork is necessary to create building sites and construct detention ponds. The
proposed site plan is conceptual in nature, though substantial time and effort have been
put into developing the current plan, as evidenced by the many meetings held with City
staff on this project over the past two years. Since the property has not been platted
and development is not imminent, the DRC proposes that the Planning and Zoning
Commission consider a performance-based mitigation plan. Staff and the proposed
owners desired to present a proposed plan to the Commission for consideration in order
to have a starting point for discussion. Both staff and the proposed owners agree to the
terms of the plan. The details of this plan are as follows.
Tree MitiQation Plan
15-Acre Site at John McCain Road and Colleyville Boulevard
A. Th e total number of caliper-inches eligible for mitigation is 1,967 caliper-inches. The
amount of tree mitigation applicable for each calendar year shall be performance-
based on the issuance of building permits. The developer shall obtain building
permits for a targeted square footage of building area before the end of each
calendar year, as shown in the following table.
End of Calendar Year
2004
2005
2006
2007
Totals
Penal
see formula
B. If the targeted square footage has not been met at the end of the year, the developer
shall make payments into the Colleyville Tree Preservation Fund based on the
following formula:
Payment ($) =
[(Targeted Square Footage - Actual Square Footage) I Targeted Square Footage] * 1,967 * $100
C. If a payment is required as described in Paragraph B above, building permits shall
not be issued for the property until the requirement payments have been made.
Agenda Item No.3 - Page 2
D. If the targeted square footage has been met at the end of the year, no payments
shall be required of the developer.
E. If the targeted square footage has been exceeded at the end of the year, the
overage shall be applied to the following year, up to the total build-out of the project.
F. The tree mitigation plan for this property shall expire on December 31, 2007. If the
total targeted square footage for the project has not been met by this date, the
penalty provision shall apply as referenced above.
The percentages listed in the building area may be replaced with actual square footages
based on the most current layout. The payment provision noted above generally
calculates the percent difference in the targeted square footage and the actual square
footage, and then applies that percentage to the total caliper-inches of trees eligible for
mitigation. The $100 is the current penalty per caliper-inch for removing trees without
permission (see Chapter 5 of the Land Development Code).
This mitigation plan encourages the developer to construct more square footage of
buildings early in the project to benefit from the applicable tree mitigation amount. It is
intended that this mitigation plan will encourage economic development on the site
while addressing the practical aspects of tree preservation. Without a tree mitigation
plan, this heavily treed site will be very difficult and costly to develop. If the prospective
owners were to pay money into the tree preservation fund based only on the 1,967
caliper-inches of trees proposed for exemption, the owners would have to pay
approximately $218,000. If all trees on the site other than those under building pads or
preserved were considered for payment, the total caliper-inches would be 5,833,
resulting in a payment of over $647,000.
The options available for the Commission in this case are:
. Approved the tree mitigation plan as submitted. This action will approve the
tree mitigation plan as proposed.
. Approve the request in part. The Commission may modify portions of the plan,
require additional tree planting or by payment into the Colleyville Tree
Preservation Fund.
. Deny the request. The owner would be required to plant replacement trees or
make payments into the Colleyville Tree Preservation Fund based on current
ordinances.
According to City policy, payments into the Colleyville Tree Preservation Fund include
the following costs: the value of the replacement trees, caliper-inch per caliper-inch, as
estimated by a licensed nursery; the cost of irrigation for those trees; and a 15%
administrative fee. In past cases, owners have paid approximately $111 per caliper-
inch, but the actual amount will vary depending upon the estimate of the nursery.
RECOMMENDATION
Approval as submitted
Agenda Item No.3 - Page 3
ATTACHMENTS
· Letter from Pate Engineers
· Conceptual site plan
Prepared by:
J. Clayton Husband, AICP
Interim Community Development Manager
Agenda Item No.3 - Page 4