Loading...
HomeMy WebLinkAboutOrdinances (O-95-1004)-10/03/1995 ORDINANCE 0-95-1004 AN ORDINANCE OF THE CITY OF COLLEYVILLE, AMENDING SECTION 11 OF SUBDIVISION ORDINANCE BY DELETING SECTION 11 AND ADDING A NEW SECTION 11 REGULATING WATER, WASTEWATER AND ROADWAY IMPACT FEES. WHEREAS, the City of Colleyville is responsible for and committed to the provision of public facilities and services (including roadway facilities and water and wastewater service) at levels necessary to cure any existing public service deficiencies in already developed areas; and WHEREAS, such facilities and service levels shall be provided by the City utilizing funds allocated in the capital budget and capital improvements programming processes and relying upon the funding sources indicated therein; and WHEREAS, new residential and nonresidential development causes and imposes increased demands upon City public facilities and services, including water, wastewater and roadway facilities, that would not otherwise occur; and WHEREAS, planning projections indicate that such development will continue and will place ever-increasing demands on the City to provide necessary public facilities; and WHEREAS, the development potential and property values of properties is strongly influenced and encouraged by City policy as expressed in the Comprehensive Plan and as implemented via the City zoning ordinance and map; and WHEREAS, to the extent that such new development places demands upon the public facility infrastructure, those demands should be satisfied by shifting the responsibility for financing the provision of such facilities from the public at large to the developments actually creating the demands for them; and WHEREAS, the amount of the impact fee to be imposed shall be determined by the cost of the additional public facilities needed to support such development, which public facilities shall be identified in a capital improvements program, and WHEREAS, the City Council, after careful consideration of the matter, hereby finds and declares that impact fees imposed upon residential and nonresidential development to finance specified major public facilities in designated service areas, the demand for which is created by such development, is in the best 1 interests of the general welfare of the City and its residents, is equitable, and does not impose an unfair burden on such development; WHEREAS, in 1987 the Texas Legislature adopted Senate Bill 336, now Chapter 395 of the Texas Local Government Code; and WHEREAS, the City Council finds that in all things the City has complied with said statute in the notice, adoption, promulgation and methodology necessary to adopt Impact Fees; NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COLLEYVILLE, TEXAS: Sec. 1. THAT Section 11 of the Subdivision Ordinance of the City of Colleyville be amended by deleting Section 11 and adding a new Section 11, to be entitled Water, Wastewater and Roadway Impact Fees, to read as follows: WATER, WASTEWATER AND ROADWAY IMPACT FEES ARTICLE I GENERAL PROVISIONS Section 1.01 Short Title This Chapter shall be known and cited as the Water, Wastewater and Roadway Impact Fees Chapter. Section 1.02 Intent This Chapter is intended to impose water, wastewater and roadway impact fees, as established in this Chapter, in order to finance public facilities, the demand for which is generated by new development in the designated service area. I Section 1.03 Authoritv The City is authorized to enact this Chapter by Chapter 395 of the Texas Local Government Code, which authorizes home-rule cities, among others, to enact or impose impact fees on land within their corporate boundaries and for water and wastewater, in their extraterritorial jurisdictions, and to persons with whom they have a water or sewer 2 ..... -"-..---..--..-.....-......-..........-.---------.........--.........-~--"-_...__.._~_..._~~_._.,-~.._--~-_.._...._-~- ,..- 'I I service contract, as charges or assessments imposed against new development in order to generate revenue for funding or recouping the costs of capital improvements or facility expansions necessitated by and attributable to such new development; and by the Colleyville City Charter. The provisions of this Chapter shall not be construed to limit the power of the City to adopt such Chapter pursuant to any other source of local authority, nor to utilize any other methods or powers otherwise available for accomplishing the purposes set forth herein, either in substitution of or in conjunction with this Chapter. Guidelines may be developed by resolution or otherwise to implement and administer this chapter. Section 1.04 Definitions As applied in this Chapter, the following words and terms shall be used: (1) Assessment - The determination of the amount of the maximum impact fee per service unit which can be imposed on new development pursuant to this Chapter. (2) Buildina Permit - Written permission issued by the City for the construction, repair, alteration or addition to a structure. (3) Capital Construction Cost of Service - Costs of constructing capital improvements or facility expansions, including and limited to the construction contract price, surveying and engineering fees, land acquisition costs (including land purchases, court awards and costs, attorney's fees, and expert witness fees), and the fees actually paid or contracted to be paid to an independent qualified engineer or financial consultant preparing or updating the capital improvements plan who is not an employee of the City. (4) Capital Improvements Advisorv Committee (Advisorv Committee) - Advisory committee, appointed by the City Council, consisting of at least five members, not less than 40 percent of which shall be representatives of the real estate, development, or building industries who are not employees of the City, and, if impact fees are to be applied within the extraterritorial jurisdiction of the City, including one member representing the extraterritorial jurisdiction; or consisting of the Planning and Zoning Commission, including one regular or ad hoc member who is not an employee of the City and which is representative of the real estate, development, or building industry, and, if impact fees are to be applied within the extraterritorial jurisdiction of the City, one representative of the extraterritorial jurisdiction area; which committee is appointed to regularly review and update the capital improvements program in accordance with the requirements of Chapter 395 3 11 , of the Texas Local Government Code, and it successors. (5) Capital Improvements Prooram (CIP) - Plan which identifies water, wastewater and roadway capital improvements or facility expansions pursuant to which impact fees may be assessed. (6) Impact Fee - Charge or assessment to be imposed by the City upon new development to generate revenue for funding or recouping the costs of capital improvements or facility expansions necessitated by and attributable to new development. The term includes amortized charges, lump-sum charges, capital recovery fees, contributions in aid of construction, and any other fee that functions as described by this definition. Impact fees do not include dedication of rights-of-way or easements, or construction or dedication of site-related water distribution or wastewater collection facilities, or streets, sidewalks, or curbs if the dedication or construction is required by other valid ordinances of the City Code and is necessitated by and attributable to the new development; or lot or acreage fees placed in trust funds for the purpose of reimbursing developers for oversizing or constructing water or sewer mains or lines. (7) City - City of Colleyville. (8) Citv Council (Council) - Governing body of the City of Colleyville. (9) City Enoineer (Enoineer) - City Engineer of the City of Colleyville. (10) City Manaoer - Chief executive officer of the City, appointed by the Council. (11) Comprehensive Plan - The comprehensive long-range plan, adopted by the City Council, which is intended to guide the growth and development of the City which includes analysis, recommendations and proposals for the City regarding such topics as population, economy, housing, transportation, community facilities and land use. (12) Credit - The amount of the reduction of a impact fee for fees, payments or charges for the same type of capital improvements for which the fee has been assessed. (13) Existino Development - For water and wastewater impact fees, all development within the service area which has a water or wastewater tap on the City's water or sewer system or on another centralized water or sewer system, as of the date of the adoption of this Chapter, and for roadways, all 4 development within the service area for which a building permit has been issued and which has not expired. (14) Facilitv Expansion - The expansion of the capacity of an existing facility which serves the same function as an otherwise necessary new capital improvement in order that the existing facility may serve new development. Facility expansion does not include the repair, maintenance, modernization, or expansion of an existing facility to better serve existing development. (15) Final Subdivision Plat (Final Plat) - The map, drawing or chart on which is provided a subdivider's plan of a subdivision, and which has received final approval by the Planning and Zoning Commission or City Council. (16) Growth-Related Costs - Capital construction costs of service related to providing additional service units to new development, either from excess capacity in existing facilities, from facility expansions or from new capital facilities. Growth-related costs do not include: (a) Construction, acquisition, or expansion of public facilities or assets other than capital improvements or facility expansions identified in the capital improvements plan; (b) Repair, operation, or maintenance of existing or new capital improvements or facility expansions; (c) Upgrading, updating, expanding, or replacing existing capital improvements to serve existing development in order to meet stricter safety, efficiency, environmental, or regulatory standards; (d) Upgrading. updating, expanding, or replacing existing capital improvements to provide better service to existing development; (e) Administrative and operating costs of the City; and (f) Principal payments and interest or other finance charges on bonds or other indebtedness, except for such payments for growth-related facilities contained in the capital improvements program. (17) Land Use Assumptions - Description of the service area and projections of changes in land uses, densities, intensities, and population therein over at least a 1 O-year period, adopted by the City, as may be amended from time to time, upon which the capital improvement plan is based. 5 (18) Livina Unit Eauivalent CLUE) - For water and wastewater, basis for establishing equivalency among and within various customer classes based upon the relationship of the continuous duty maximum flow rate in gallons per minute for a water meter of a given size and type compared to the continuous duty maximum flow rate in gallons per minute for a 3/4" diameter simple water meter, using American Water Works Association C700-C703 standards. The land use equivalency table attached hereto as Exhibit Hand incorporated by reference herein converts water meter size to LUEs. (19) New Development - Subdivision of land; or the construction, reconstruction, redevelopment, conversion, structural alteration, relocation, or enlargement of any structure; or any use or extension of the use of land; any of which increases the number of service units. New development includes the sale of water taps resulting from the conversion of an individual well to the City's water utility and the sale of wastewater taps resulting from the conversion of an individual septic or other individual waste disposal system to the City's wastewater uti I ity. (20) Offset - The amount of the reduction of an impact fee designed to fairly reflect the value of system-related facilities, pursuant to rules herein established or administrative guidelines, provided and funded by a developer pursuant to the City's subdivision regulations or requirements. (21) Roadway Facility - Arterial or collector streets or roads that have been designated on an officially adopted roadway plan of the City, together with all necessary appurtenances. Roadway facilities do not include any roadways or associated improvements designated on the federal or Texas highway system. Roadway facility also excludes dedication of rights-of-way or easements or construction or dedication of on-site streets, sidewalks or curbs required by valid ordinances of the City and necessitated by and attributable to the new development. (22) Roadway Facility Expansion - Expansion of the capacity of any existing roadway improvement for the purpose of serving new development, not including the repair, maintenance, modernization or expansion of an existing roadway facility to serve existing development. (23) Roadwav Improvements Plan - Portion of the CIP, as may be amended from time to time, which identifies the roadway facilities or roadway facility expansions and their associated growth-related costs which are necessitated by and which are attributable to new development, and for a period not to exceed ten (10) years, and which are to be financed in whole 6 __.._".---.-----------~--'---r--.-."~.---.~-.-.,-..'". ". -....-,-,~....--..-,-.~--_---~--.~-."------.-.-.---... or in part through the imposition of roadway impact fees pursuant to this Chapter. (24) Service Area - For water and wastewater facilities, the area within the corporate boundaries of the City and within the extraterritorial jurisdiction as defined by the Municipal Annexation Act (Article 970a, Vernon's Texas Civil Statutes), and for roadway facilities, the area within the corporate boundaries of the City, to be served by the water, wastewater or roadway capital improvements or facilities expansions specified in the capital improvements program applicable to the service area. (25) Service Unit - Standardized measure of consumption, use, generation, or discharge attributable to an individual unit of development calculated in accordance with generally accepted engineering or planning standards for a particular category of capital improvements or facility expansions; for water and wastewater facilities, the service unit is a living unit equivalent; for roadway facilities, the service unit is the (vehicle) trip. (26) Site-related Facilitv - Improvement or facility which is for the primary use or benefit of a new development and/or which is for the primary purpose of safe and adequate provision of water, wastewater or roadway facilities to serve the new development, and which is not included in the capital improvements plan, and for which the developer or property owner is solely responsible under subdivision and other applicable regulations. (27) Svstem-related Facilitv - A capital improvement or facility expansion which is designated in the Capital Improvements Plan and which is not a site- related facility. A system-related facility may include a capital improvement which is located offsite, within or on the perimeter of the development site. (28) Tap Purchase - The filing with the City of a written application for a water or wastewater tap and the acceptance of applicable fees by the City. The term "tap purchase" shall not be applicable to a meter purchased for and exclusively dedicated to fire protection. (29) Trip - The single operation of a single vehicle which has as its origin or destination a point within the service area. The operation of a vehicle which travels from an origin outside the service area to a destination outside the service area without leaving the public right of way is not counted as a trip. (30) Wastewater Facilitv - Improvement for providing wastewater service, including, but not limited to, land or easements, treatment facilities, lift stations, or interceptor mains. Wastewater facility excludes wastewater 7 I! I' I II Ii lines or mains which are constructed by developers, the costs of which are reimbursed from charges paid by subsequent users of the facilities and which are maintained in dedicated trusts. Wastewater facilities also exclude dedication of rights-of-way or easements or construction or dedication of on- site wastewater collection facilities required by valid ordinances of the City and necessitated by and attributable to the new development. (31) Wastewater Facilitv Expansion - Expansion of the capacity of any existing wastewater improvement for the purpose of serving new development, not including the repair, maintenance, modernization or expansion of an existing wastewater facility to serve existing development. (32) Wastewater Improvements Plan - Portion of the CIP, as may be amended from time to time, which identifies the wastewater facilities or wastewater facility expansions and their associated growth-related costs which are necessitated by and which are attributable to new development, and for a period not to exceed ten (10) years, and which are to be financed in whole or in part through the imposition of wastewater impact fees pursuant to this Chapter. (33) Water Facilitv - Improvement for providing water service, including, but not limited to, land or easements, water supply facilities, treatment facilities, pumping facilities, storage facilities, or transmission mains. Water facility excludes water lines or mains which are constructed by developers, the costs of which are reimbursed from charges paid by subsequent users of the facilities and which are maintained in dedicated trusts. Water facilities also exclude dedication of rights-of-way or easements or construction or dedication of on-site water distnbution facilities required by valid ordinances of the City and necessitated by and attributable to the new development. (34) Water Facilitv Expansion - Expansion of the capacity of any existing water improvement for the purpose of serving new development, not including the repair, maintenance, modernization or expansion of an existing water facility to serve existing development. (35) Water Improvements Plan - Portion of the CIP, as may be amended from time to time, which identifies the water facilities or water facility expansions and their associated growth-related costs which are necessitated by and which are attributable to new development, and for a period not to exceed ten (10) years, and which are to be financed in whole or in part through the Imposition of water impact fees pursuant to this Chapter. 8 II 'I I ! ! Section 1.05 Applicabilitv of Impact Fees A This Chapter shall be uniformly applicable to new development which occurs within the water, wastewater and roadway service areas. B. No new development shall be exempt from the assessment of impact fees as defined in this Chapter. Section 1.06 Impact Fees as Conditions of Development Approval !, No final plat for new development shall be approved within the service area without assessment of impact fees pursuant to this Chapter, and no water and wastewater tap shall be issued and no building permit shall be issued unless the applicant has paid the impact fees imposed by and calculated hereinunder. Section 1.07 Establishment of Water. Wastewater and Roadwav Service Areas A The water, wastewater and roadway service areas are established as shown on the Service Area Map which is Exhibit A for this Chapter. B. The service areas shall be established consistent with any facility service area established in the CIP for each utility. Additions to the service area may be designated by the City Council consistent with the procedure set forth in Chapter 395 of the Texas Local Government Code and its successors. II I Section 1.08 Land Use Assumptions Land use assumptions used in the development of the impact fees are contained in Exhibit B of this Chapter. These assumptions may be revised by the City Council according to the procedure set forth in Chapter 395 of the Texas Local Government Code and its successors. Section 1.09 Service Units A Service units are established in accordance with generally accepted engineering and planning standards. 9 d B. For water and wastewater impact fees, service units shall be calculated in accordance with the land use equivalency table for living units equivalents, which is incorporated as Exhibit H and attached hereto, as determined by the size of the water meter(s) for the development, or alternatively, as approved the City Engineer as a result of an engineering report prepared by a qualified professional engineer licensed to perform such professional engineering services in the State of Texas, which demonstrates that the number of LUE's of service for the new development will be different than those indicated by the size of the water meter. C. If the Engineer determines that the water pressure in the City's transmission main is significantly higher or lower than standard pressure such that the size of the water meter is not indicative of actual service demand, the Engineer may adjust the number of LUE's based on a smaller or larger sized meter which more accurately reflects the flow rate and the system pressure conditions. D. If a fire demand meter (tap) is purchased for a property, the meter size utilized to calculate the number of LUE's shall be the dimension of the portion of the fire demand meter which reflects the meter size which would provide only domestic service to the property. Said reduced meter size shall then be utilized to calculate the number of LUE's. 1. The meter types used to calculate the number of LUE's shall be either simple or compound meters. 2. If the fire protection capacity of the fire demand meter is routinely utilized for domestic purposes as evidenced by the registration of consumption recorded on the City's meter-reading and billing systems, the then-owner of the property shall be assessed the then- current fee for the fire protection capacity which has been converted to domestic capacity by its routine usage as domestic capacity. 3. To avoid the use of fire flow volumes for domestic usage, the owner of any property for which a fire demand meter is purchased shall be required to execute a restrictive covenant on a form approved by the City Attorney, which covenant shall acknowledge the right of the City to assess such fees to subsequent owners of the property. Said covenant shall be executed prior to the purchase of the fire demand meter and shall be filed in the deed records of the County. 4. No fees shall be collected for the purchase of taps which shall be utilized to provide only fire protection capacity. 10 E. Upon wastewater tap purchase for lots for which no water meter has been purchased, service units shall be established by a professional engineer licensed in the State of Texas, shall be reviewed by the Engineer and shall be presented to Council, which shall designate the appropriate number of service units. F. For roadways, service units shall be calculated in accordance with the land use equivalency table for (vehicle) trips which is incorporated as Exhibit "I" and attached hereto. G. The City Council may revise the land use equivalency tables according to the procedure set forth in Chapter 395 of the Texas Local Government Code and its successors. Section 1.10 Impact Fees Per Service Unit A The maximum impact fee per service unit for each service area shall be computed by dividing the growth-related capital construction cost of service in the service area identified in the capital improvements plan for that category of capital improvements, by the total number of projected service units anticipated within the service area which are necessitated by and attributable to new development, based on the land use assumptions for that service area. Maximum impact fees per service unit for each service area shall be established by category of capital improvements and shall be set forth in Exhibit C which is attached hereto and incorporated herein by reference. B. The impact fee per service unit which is to be paid by each new development within a service area shall be that established in Exhibit D, which is attached hereto and incorporated herein by reference, and shall be an amount less than or equal to the maximum impact fee per service unit established in subsection A C. Exhibits C and D may be amended by the City Council according to the procedure set forth in Chapter 395 of the Texas Local Government Code and its successors. Section 1.11 Assessment of Impact Fees A The assessment of an impact fee for any new development shall be made in accordance with the provisions of this section. 11 ~~------~ B. Assessment of the impact fee for any new development shall be made on occurrence of the following events: 1. For new development which is submitted for approval pursuant to the City's subdivision regulations after June 20, 1987, or for which replatting results in an increase in the number of service units after such date, assessment shall be at the time of final subdivision plat approval, and shall be the amount of the impact fee per service unit, as provided in Exhibit C then in effect The City may provide the subdivider with a copy of Exhibit C prior to final subdivision plat approval, but such shall not constitute assessment within the meaning of this Chapter. 2. For new development which has received final plat approval prior to June 20, 1987, and for which no replatting is necessary prior to the issuance of a building permit, assessment shall be upon the issuance of a building permit, and shall be the amount of the impact fee per service unit set forth in Exhibit C then in effect. 3. For new development which occurs or is proposed to occur without platting, assessment shall be upon the issuance of a building permit or water or sewer tap purchase (whichever occurs first), and shall be the amount of the impact fee per service unit set forth in Exhibit C then in effect. 4. For water and wastewater facilities, fees shall not be assessed to a development for which taps previously were purchased and which development does not result in an increase in the number of living unit equivalents as determined by the land use equivalency table. If the exchange of said taps will result in an increase in the number of LUE's, impact fees for the increase in the number of LUE's shall be assessed in accordance with Exhibit C then in effect. 5. Because fire protection is of critical concern to the community as a whole, water demand related solely to fire protection is not subject to assessment or collection of an impact fee. However, if the fire protection capacity of the fire demand meter is routinely utilized for domestic purposes as evidenced by the registration of consumption recorded on the City's meter-reading and billing systems, the current owner of the property shall be assessed the impact fees currently in effect at the time such conversion is established by the City for the fire protection capacity which has been converted to domestic capacity by its routine usage as domestic capacity. 12 I I I I I II II C. Following assessment of the impact fee pursuant to subsection (B), no additional impact fees or increases thereof shall be assessed against that development unless the number of service units increases, as set forth under Section 1.09. D. Following the lapse or expiration of approval for a plat, a new assessment must be performed at the time a new application for such development is filed. Section 1.12 Calculation of Impact Fees A The City shall compute impact fees due for the new development in the following manner: 1. The total service units for the new development shall be multiplied by the impact fee per service unit established in Exhibit D; and 2. Fee credits and offsets shall be subtracted as determined by the process proscribed in Section 1.14 of this Chapter. C. The amount of each impact fee due for a new development shall not exceed a amount computed by multiplying the maximum impact fee per service unit assessed according to Exhibit C by the number of service units generated by the development. Section 1.13 Pavment and Collection of Impact Fees A No water or wastewater tap or building permit shall be issued until all impact fees have been paid to the City, except as provided otherwise by contract. B. Impact fees shall be paid at the time of the issuance of a building permit, except as provided in subsections C through E. C. For new development converting to the City water utility from a water well or to the City wastewater utility from a septic tank or individual waste disposal system, the City may allow the feepayer to pay impact fees in the form of a monthly assessment in the same manner as monthly assessments for related tap fees, if such an extended payment program for tap fees is currently in effect. 13 'I I I I D. For new development which is platted in accordance with the City's subdivision or platting procedures before the effective date of this ordinance, no wastewater impact fee may be collected on any service unit for which a valid building permit is issued within one year after the effective date of this amendatory ordinance. E. The City may, at its sole discretion, enter into a contract with the owner of a tract of land for which the plat has been recorded to establish a different time and method of payment of impact fees than those provided in this Section. F. Whenever a property owner proposes to increase the number of service units for a development previously assessed, the additional impact fees to be collected on such service units shall be determined in accordance with Exhibit D then in effect, and such additional fees shall be collected at the times prescribed by this section. G. For roadway impactfees, in circumstances where non-residential uses may be exempt from payment of fees based upon prospective generation of sales tax revenues, such fees shall be paid as provided in this section, subject to rebate pursuant to section 1.18, upon demonstration that more than 50% of the floor area of the structure for which a building permit is issued will be utilized by a business generating city sales tax revenues. Section 1.14 Offsets and Credits Aaainst Impact Fees II II A The City shall offset the reasonable value of any system-related facilities, pursuant to rules established in this section, which have been dedicated to and have been received by the City, including the value of rights-of-way or capital improvements constructed pursuant to an agreement with the City, against the amount of the impact fee due for that category of capital improvement, subject to administrative guidelines established by the City. B. The City shall credit impact, pro rata, acreage or lot fees which have been paid pursuant to the Subdivision Ordinance prior to the effective date of this amendatory ordinance against the amount of an impact due for that category of capital improvement, subject to administrative guidelines established by the City. C. All offsets and credits against impact fees shall be subject to the following limitations and shall be granted based on this Ordinance and additional standards promulgated by the City, which may be adopted as administrative guidelines. 14 I i ~__ln~~~__u . II I I 1 . No offset or credit shall be given for the dedication or construction of site-related facilities, except as set forth in Section 1.14(C)(2), or for any capital improvement which is not identified within the applicable capital improvements plan, unless the City agrees that such improvement supplies capacity to new developments other than the development paying the impact fee and provisions for offsets are incorporated into an agreement for capital improvements. 2. Any construction of, contributions to, or dedications of off-site roadway facilities agreed to or required by the City as a condition of development approval shall be credited against roadway impact fees otherwise due from the development. 3. The unit costs used to calculate the offsets shall not exceed those assumed for the capital improvements included in the capital improvements plan for the category of facility within the service area for which the impact fee is imposed. 4. An offset or credit created pursuant to prior impact fee ordinances shall expire no later than ten (10) years after the effective date of this amendatory ordinance, unless a different expiration date has been agreed to by the City by contract or certificate. Offsets or credits created after the effective date of this amendatory ordinance shall expire within ten (10) years from the date the offset or credit was created, unless otherwise prescribed by contract. 5. In no event will the City reimburse the property owner or developer for an offset or credit when no impact fees for the new development can be collected pursuant to this Chapter or for any value exceeding the total impact fees due for the development for that category of capital improvement, unless otherwise agreed to by the City. 6. Offsets or credits created after the effective date of this amendatory ordinance for a development which has received final plat approval prior to the effective date hereof shall be discounted to take into account the number of service units in the development which will utilize the facility for which the offset or credit was given. D. An applicant for new development must apply for an offset or credit against impact fees due for the development either at or before the time of plat recordation, unless the City agrees to a different time. The applicant shall file a petition for offsets or credits with the City on a form provided for such purpose. The contents of the petition shall be established by administrative 15 guidelines. The City must provide the applicant, in writing, with a decision on the offset or credit request, including the reasons for the decision. The decision shall specify the maximum value of the offset or credit which may be applied against an impact fee, which value and the date of the determination shall be associated with the plat for the new development. E. The available offset or credit associated with the plat shall be applied against an impact fee in the following manner: 1. Such offset or credit shall be prorated proportionally among all service units, or for roadway facilities, among all units of trip generation, as calculated from the applicable land use equivalency table, and shall remain applicable to such service units, to be applied at time of filing and acceptance of an application for a building permit, against impact fees due. 2. If the total number of service units used by the City in the original offset or credit calculation described in subsection (1) is eventually exceeded by the number of total service units realized by the actual development, the City may, at its sole discretion, collect the full impact fee exclusive of any associated offset or credits for the excess service units. 3. At its sole discretion, the City may authorize alternative credit or offset agreements upon petition by the owner in accordance with guidelines promulgated by the City. Section 1.15 Establishment of Accounts and Records A The City shall establish separate interest-bearing accounts, in a bank authorized to receive deposits of City funds, for each major category of capital facility for which an impact fee is imposed pursuant to this Chapter. B. Interest earned by each account shall be credited to that account and shall be used solely for the purposes specified for funds authorized in Section 1.16. C. The City shall establish adequate financial and accounting controls to ensure that impact fees disbursed from the account are utilized solely for the purposes authorized in Section 1.16. Disbursement of funds shall be authorized by the City at such times as are reasonably necessary to carry out the purposes and intent of this Chapter; provided, however, that any fee 16 I' II paid shall be expended within a reasonable period of time, but not to exceed ten (10) years from the date the fee is deposited into the account. D. The City shall maintain and keep adequate financial records for each such account, which shall show the source and disbursement of all revenues, which shall account for all monies received, and which shall ensure that the disbursement of funds from each account shall be used solely and exclusively for the provision of uses specified in the capital improvements program as system-related capital projects. The City Finance Department shall also maintain such records as are necessary to ensure that refunds are appropriately made under the provision in Section 1.18 of this Chapter, and such other information as may be necessary for the proper implementation of this Chapter. Section 1.16 Use of Proceeds of Impact Fee Accounts A The impact fees collected pursuant to this Chapter may be used to finance or to recoup capital construction costs of service. Impact fees may also be used to pay the principal sum and interest and other finance costs on bonds, notes or other obligations issued by or on behalf of the City to finance such capital improvements or facilities expansions. B. Impact fees collected pursuant to this Chapter shall not be used to pay for any of the following expenses: 1. Construction, acquisition or expansion of capital improvements or assets other than those identified in the associated capital improvements plans; 2. Repair, operation, or maintenance of existing or new capital improvements or facilities expansions; 3. Upgrading, expanding or replacing existing capital improvements to serve existing development in order to meet stricter safety, efficiency, environmental or regulatory standards; 4. Upgrading, expanding or replacing existing capital improvements to provide better service to existing development; provided however, that impact fees may be used to pay the costs of upgrading, expanding or replacing existing capital improvements in order to meet the need for new capital improvements generated by new development; or 17 II I I 5. Administrative and operating costs of the City. Section 1.17 Appeals A The property owner or applicant for new development may appeal the following decisions to the City Manager or his/her designate: 1. The applicability of an impact fee to the development; 2. The value of the impact fee due; 3. The availability or the value of an offset or credit; 4. The application of an offset or credit against an impact fee due; 5. The amount of the refund due, if any; or 6. The alternative determination by the City Engineer concerning the size of the water meter which is to be converted to service units, pursuant to section 1.09. B. The burden of proof shall be on the appellant to demonstrate that the value of the fee or the value of the offset or credit was not calculated according to the applicable impact fee schedule or the ordinance provisions and guidelines established for determining offsets and credits. C. The appellant may appeal the decision of the City Manager to the Council. A notice of appeal to the Council must be filed by the applicant with the City Secretary within thirty (30) days following the City Manager's decision. If the notice of appeal is accompanied by a bond or other sufficient surety satisfactory to the City Attorney in an amount equal to the original determination of the impact fee due, the development application or tap purchase or building permit issuance may be processed while the appeal is pending. Section 1.18 Refunds A Any impact fee or portion thereof collected pursuant to this Chapter which has not been expended within ten (10) years from the date of payment, shall be refunded, upon application, to the record owner of the property at the time the refund is paid, or, if the impact fee was paid by another 18 governmental entity, to such governmental entity, together with interest calculated from the date of collection to the date of refund at the statutory rate as set forth in Micle 1.03, Title 79, Revised Statutes (Article 5069-1.03, Vernon's Texas Civil Statutes), or any successor statute. B. If a refund is due pursuant to subsection (A), the City shall pro-rate the same by dividing the difference between the amount of expenditures and the amount of the fees collected by the total number of service units assumed within the service area for the period to determine the refund due per service unit. The refund to the record owner or governmental entity shall be calculated by multiplying the refund due per service unit by the number of service units for the development for which the fee was paid, and interest due shall be calculated upon that amount. C. Upon completion of all the capital improvements or facilities expansions identified in the capital improvements plan upon which the fee was based, the City shall recalculate the maximum impact fee per service unit using the actual costs for the improvements or expansions. If the maximum impact fee per service unit based on actual cost is less than the impact fee per service unit paid, the City shall refund the difference, if such difference exceeds the impact fee paid by more than ten percent (10%). The refund to the record owner or governmental entity shall be calculated by multiplying such difference by the number of service units for the development for which the fee was paid, and interest due shall be calculated upon that amount. D. Upon the request of an owner of the property on which an impact fee has been paid, the City shall refund such fees if: 1. Existing service is available and service is denied; or 2. Service was not available when the fee was collected and the City has failed to commence construction of facilities to provide service within two years of fee payment; or 3. Service was not available when the fee was collected and has not subsequently been made available within a reasonable period of time considering the type of capital improvement or facility expansion to be constructed, but in any event later than five years from the date of fee payment. E. The City shall refund an appropriate proportion of impact fee payments in the event that a previously purchased unused water meter is replaced with a smaller meter, based on the LUE differential of the two meter sizes and the 19 per-LUE fee at the time of the original fee payment, less an administrative charge of $50. F. Petition for refunds shall be submitted to the Engineer on a form provided by the City for such purpose. Within one month of the date of receipt of a petition for refund, the Engineer must provide the petitioner, in writing, with a decision on the refund request, including the reasons for the decision. If a refund is due to the petitioner, the Engineer shall notify the Finance Director and request that a refund payment be made to the petitioner. The petitioner may appeal the determination to the City Manager and Council, as set forth in Section 1.17. G. The City shall rebate roadway impact fees to the owner of property on which a building permit has been isued, for which such permit has expired without construction pursuant thereto, or in circumstances where more than 50% of the structure for which a building permit has been issued will be utilized by a commercial or industrial business that generates city sales tax revenues. Section 1.19 Updates to Plan and Revision of Fees The City shall review the land use assumptions and capital improvements plan for water, wastewater and roadway facilities at least every three years, the first three year period which shall commence from the date of adoption of the capital improvements plan referenced herein. The City Council shall accordingly then make a determination of whether changes to the land use assumptions, capital improvements plan or impact fees are needed and shall, in accordance with the procedures set forth in Chapter 395 of the Texas Local Government Code, or any successor statute, either update the fees or make a determination that no update is necessary. Section 1.20 Functions of Advisorv Committee A The functions of the Advisory Committee are those set forth in Chapter 395 of the Texas Local Government Code, or any successor statute, and shall include the following: 1. Advise and assist the City in adopting land use assumptions; 2. Review the capital improvements plan regarding water, wastewater and roadway capital improvements and file written comments thereon; 20 _.......-___,u.___.,,______~_ __'0--___. h" .__,_,_~.~_~_~.__..H _<,__. ", "'~_'_"~"" .- 3. Monitor and evaluate implementation of the capital improvements program; 4. Advise the City of the need to update or revise the land use assumptions, capital improvements program and impact fees; and 5. File a semiannual report evaluating the progress of the City in achieving the capital improvements plans and identifying any problems in implementing the plans or administering the impact fees. B. The City shall make available to the Advisory Committee any professional reports prepared in the development or implementation of the capital improvements plan. C. The Council shall adopt procedural rules for the committee to follow in carrying out its duties. Section 1.21 AQreement for Capital Improvements A The City Council may approve the owner of a new development to construct or finance some of the public improvements identified in the CIP. In the case of such approval, the property owner must enter into an agreement with the City prior to fee collection. The agreement shall be on a form approved by the City, and shall establish the estimated cost of improvement, the schedule for initiation and completion of the improvement, a requirement that the improvement shall be completed to City standards, and any other terms and conditions the City deems necessary. The Engineer shall review the improvement plan, verify costs and time schedules, determine if the improvement is contained in the CIP, and determine the amount of the applicable credit for such improvement to be applied to the otherwise applicable impact fee before submitting the proposed agreement to the Council for approval. B. The City and such owner either may agree that the costs incurred or funds advanced will be credited against the impact fees otherwise due from the new development, or they may agree that the City shall reimburse the owner for such costs from impact fees paid from other new developments which will use such capital improvements or facility expansions. 21 ! Section 1.22 Use of Other Financina Mechanisms I ! ! I II A The City may finance water, wastewater and roadway capital improvements or facilities expansions designated in the capital improvements plan through the issuance of bonds, through the formation of public improvement districts or other assessment districts, or through any other authorized mechanism, in such manner and subject to such limitations as may be provided by law, in addition to the use of impact fees. B. Except as herein otherwise provided, the assessment and collection of an impact fee shall be additional and supplemental to, and not in substitution of, any other tax, fee, charge or assessment which is lawfully imposed on and due against the property. Section 1.23 Exemption A new development, more than 50% of which is utilized by a commercial or industrial business generating city sales tax revenues, shall be exempt from payment of roadway impact fees. I, 'I Section 1.24 Impact Fees as Additional and Supplemental Reaulation A. Impact fees established by this Chapter are additional and supplemental to, and not in substitution of, any other requirements imposed by the City on the development of land or the issuance of building permits or the sale of water or wastewater taps. Such fees are intended to be consistent with and to further the policies of City's Comprehensive Plan, capital improvements plan, zoning ordinance, subdivision regulations and other City policies, ordinances and resolutions by which the City seeks to ensure the provision of adequate public facilities in conjunction with the development of land. B. This Chapter shall not affect, in any manner, the permissible use of property, density of development, design, and improvement standards and requirements, or any other aspect of the development of land or provision of public improvements subject to the zoning and subdivision regulations or other regulations of the City, which shall be operative and remain in full force and effect without limitation with respect to all such development. 22 Section 1.25 Relief Procedures A Any person who has paid an impact fee or an owner of land upon which an impact fee has been paid may petition the Council to determine whether any duty required by this ordinance has not been performed within the time so prescribed. The petition shall be in writing and shall state the nature of the unperformed duty and request that the act be performed within sixty (60) days of the request. If the Council determines that the duty is required pursuant to the ordinance and is late in being performed, it shall cause the duty to commence within sixty (60) days of the date of the request and to continue until completion. B. The Council may grant a variance or waiver from any requirement of this ordinance, upon written request by a developer or owner of property subject to the ordinance, following a public hearing, upon finding that a strict application of such requirement would, when regarded as a whole, result in confiscation of the property. 23 ARTICLE II WATER FACILITIES IMPACT FEES Section 2.01 Water Service Area A There is hereby established a water service area as depicted on Exhibit A, attached hereto and incorporated herein by reference. B. The boundaries of the water service area may be amended from time to time, and new water service areas may be delineated, pursuant to the procedures in Section 1.07. Section 2.02 Water Improvements Plan A The Water Improvements Plan for the City is hereby adopted as Exhibit E attached hereto and incorporated by reference herein. B. The Water Improvements Plan may be amended from time to time, pursuant to the procedures set forth in Chapter 395 of the Texas Local Government Code and its successors. Section 2.03 Water Impact Fees A The maximum impact fees per service unit for water facilities are hereby adopted and incorporated in Exhibit C attached hereto and made a part hereof by reference. B. The impact fees per service unit for water facilities which are to be paid by each new development are hereby adopted and incorporated in Exhibit D attached hereto and made a part hereof by reference. C. The impact fees per service unit for water facilities may be amended from time to time, pursuant to the procedures in Section 1.10. 24 II I I I ARTICLE III WASTEWATER FACILITIES IMPACT FEES Section 3.01 Wastewater Service Area A There is hereby established a wastewater service area as depicted on Exhibit A, attached hereto and incorporated herein by reference. B. The boundaries of the wastewater service area may be amended from time to time, and new wastewater service areas may be delineated, pursuant to the procedures in Section 1.07. Section 3.02 Wastewater Improvements Plan A The Wastewater Improvements Plan for the City is hereby adopted as Exhibit F attached hereto and incorporated by reference herein. B. The Wastewater Improvements Plan may be amended from time to time, pursuant to the procedures set forth in Chapter 395 of the Texas Local Government Code and its successors. Section 3.03 Wastewater Impact Fees A The maximum impact fees per service unit for wastewater facilities are hereby adopted and incorporated in Exhibit C attached hereto and made a part hereof by reference. B. The impact fees per service unit for wastewater facilities which are to be paid by each new development are hereby adopted and incorporated in Exhibit D attached hereto and made a part hereof by reference. C. The impact fee per service unit for wastewater facilities may be amended from time to time, pursuant to the procedures in Section 1.10. 25 I, I ARTICLE IV ROADWAY FACILITIES IMPACT FEES II Section 4.01 Roadwav Service Areas A There is hereby established roadway service areas as depicted on Exhibit A, attached hereto and incorporated herein by reference. B. The boundaries of the roadway service areas may be amended from time to time, and new wastewater service areas may be delineated, pursuant to the procedures in Section 1.07. Section 4.02 Roadwav Improvements Plan A The Roadway Improvements Plan for the City is hereby adopted as Exhibit G attached hereto and incorporated by reference herein. B. The Roadway Improvements Plan may be amended from time to time, pursuant to the procedures set forth in Chapter 395 of the Texas Local Government Code and its successors. Section 4.03 Roadwav Impact Fees A The maximum impact fees per service unit for roadway facilities are hereby adopted and incorporated in Exhibit C attached hereto and made a part hereof by reference. B. The impact fees per service unit for roadway facilities which are to be paid by each new development are hereby adopted and incorporated in Exhibit D attached hereto and made a part hereof by reference. C. The impact fees per service unit for roadway facilities may be amended from time to time, pursuant to the procedures in Section 1.10. (End Section 11 of the Subdivision Ordinance) Sec. 2. THAT this ordinance shall be and is hereby declared to be cumulative of all other ordinances of the City, and this ordinance shall not operate to repeal or affect any of such other ordinances except insofar as the provisions thereof might be inconsistent or in conflict with the provisions of this ordinance, in which event such conflicting provisions, if any, in such other ordinance or ordinances are hereby repealed. I I I ~_._-~._._-~-_.._.__._-_._---~--~-~~ 26 Sec. 3. Sec. 4. Sec. 5. Sec. 6. Sec. 7. If any sentence, section, subsection, clause, phrase, part or provision of this Chapter be declared by a court of competent jurisdiction to be invalid, the same shall not affect the validity of the ordinance as a whole, or any part thereof, other than the part declared to be invalid. The provisions of this Chapter shall be liberally construed to effectively carry out its purposes, which are hereby found and declared to be in furtherance of the public health, safety, and welfare. Any member of the Councilor any City official or employee charged with the enforcement of this ordinance, acting for the City in the discharge of his or her duties, shall not thereby render himself or herself personally liable; and is hereby relieved from all personal liability for any damage that might accrue to persons or property as a result of any act required or permitted in the discharge of said duties. Any violation of this ordinance can be enjoined by a suit filed in the name of the City in court of competent jurisdiction, and this remedy shall be in addition to any penal provision in this ordinance or in the Code of the City. This Chapter shall take effect upon passage as provided by City Charter. The City Secretary is hereby authorized and directed to cause publication of the descriptive caption and penalty clause hereof as an alternate method of publication provided by law. AND IT IS SO ORDERED. The first reading and public hearing being conducted on this the ,5"iJ.- day of S f'.p+~wtbt( , 1995. tA. The second reading and public hearing being conducted on this the I q - day of l Sa.p +- uVLh t.1" ,1995. . d The third reading and public hearing being conducted on this the 3 r, day of O~+o hif ,1995. ATTEST: JJ~ CITY OF COLLEYVILLE r?lP Je n Harris, CMC City Secretary Ed Baker Mayor APPROVED AS TO FORM AND LEGALITY: ;j?T~ Ross T. Foster City Attorney 27 ORDINANCE 0-95-1004 INDEX OF EXHIBITS EXHIBIT A - Service Area Map EXHIBIT B - Land Use Assumptions Land Use Plan Map EXHIBIT B1 - Water and Wastewater Land Use Assumptions EXHIBIT B2 - Current and Projected Land Uses and Population EXHIBIT C - Schedjule of Maximum Impact Fees EXHIBIT D - Schedule of Maximum Impact Fees to be Collected EXHIBIT E - Water Improvements Plan Capacity Demand for Each New Water Lue Current Meter Count and Estimation of Living Units Equivalent Estimated Water Service Demand by Faicility Type Water CIP Inventory and Costing Categorization of Water Utility Debt Water Maximum Impact Fee EXHIBIT F - Wastewater Improvements Plan Capacity Demand for Each New Wastewater LUE Estimated Wastewater Service Demand by Facility Type Wastewater CIP Inventory and Costing Categorization of Wastewater Utility Debt Wastewater Maximum Impact Fee EXHIBIT G - Roadway Improvements Plan Transportation System Impact Fee Determination 1994-2004 EXHIBIT H - Water and Wastewater LUE Multipliers EXHIBIT I - Land Use Equivalency Table 28 PAGE 29 30 31 32 33 34 35 36 37 37 38 39 44 47 48 49 49 50 55 57 58 59 81 82 EXHIBIT A SERVICE AREA MAP SERVICE AREA 2 . . iI . ....iI CREEK .... ......S........... . JOHN MeCAIN RD. i '" c ... ~ t.k~LL 501001. RO. SERVICE AREA 1 LO.lOCKETT RD. '" ... > = ~ g; c .... <.> .... z o 2 ... . ........- ~If ... ~ if ~ Q, ; 19 GlACE RD. :: .,; . . . ...... Description of Service Areas LEGEND Water Service Area: Entire City Wastewater Service Area: Entire City Roadway Service Area 1: East of SH 26 Roadway Service Area 2: West of SH 26 . II II.. - SERVICE AREA BOUNDARY . . . . . .. - PLANNING ZONE 29 .. ~.,"_.________._,.~~._~,.._ ."_w_.>..,,.,..",~._. ORDINANCE 0-95-1004 EXHIBIT B LAND USE ASSUMPTIONS Contains the following: EXHIBIT B1 - Water and Wastewater Land Use Assumptions EXHIBIT B2 - Current and Projected Land Uses and Population Land Use Plan Map. · This map is a representation of the Official Land Use Map on display in the City Council Chambers. 30 31 32 33 EXHIBIT B-1 WATER AND WASTEWATER LAND USE ASSUMPTIONS CURRENT AND PROJECTED lAND USES AND POPULATION FOR THE CITY OF COLLEYVILl..E I I . 1991 .. 1994 2004 ULTIMATE .. .. LAND USE AC " } AC " AC " AC " [a] , [b] . [b] [a] Single Family 3,051 35.98% 3,338 39.36% 5,233 61.71% 6,750 79.60% Multifamily 20 0.24% 13 0.15% 13 0.15% 13 0.15% School 74 0.87% 81 0.95% 127 1.50% 161 1.90% Building Institution 11 0.13% 11 0.13% 11 0.13% 11 0.13% Churches 38 0.45% 38 0.45% 38 0.45% 38 0.45% Cemeteries 110 1.30% 110 1.30% 110 1.30% 110 1.30% SUBTOTAL .. ..... .,. 3,304 I 38.96% 3,591 42.35" 5,532 65.24" 7,083 83.53% Business/Commercial 194 2.29% 212 2.50% 333 3.92% 750 8.84% Industrial [el 160 1.89% 160 1.89% 160 1.89% 160 1.89% , 4.17" SUBTOTAL Cd] .,... 354 372 4.39" 493 5.81" 910 10.73% Parks 189 2.23% 207 2.44% 324 3.82% 487 5.74% SUBTOTAL 189 2.23% 207 2.44% 324 3.82% 487 5.74" Vacant 4,633 54.63% 4,310 50.82% 2, 131 25.13% 0 0.00% I TOTAL II 8,480 I 1 00.00% II 8,480 1100.00% II 8,480 I 100.00% " 8,480 I 100.00% I DWELLING UNITS 4,942 5,407 8,477 11 ,588 [cl [c] POPULATION/DWELLING UNIT [c] 3.11 3.11 3.11 3.11 ESTIMATED POPULATION 15,370 16,816 26,363 36,039 {aJ Source: City of Colleyville Land Use and Thoroughfare Plan Elements of the Colleyville Master Plan, 2/2/94, except for current industrial use, which was measured by City Staff. {bJ Prorated according to chDnge in dwelling unit growth, except for st:Jble land uses. {cJ Source: City Staff. fdJ Master Plan includ8l$ a total of 910 acres for a combined Business/Commercial and Industrial Uses at Ultimate Buildout 31 N I ~ - ~ ~ - - C) U .... C) .e- U ~ .c - ... ~ eM ~~ =- :; . =.,l'Il = = g.Z "'Cl = e e =< l'Il ~ :;: u ;:J .- "'Cl ~ e ~ =00 .J "'Cl ~ - u ~ .C' ... g. "'Cl e = - e e ... = U lJ:l ~ lJ:l J: X W 2 II) .S! l'l ~ ~ ~ il ., 0 ,~ 8 ~ 8 - - ,... CJi ci - ci ci - ci - on i8 ~ ~ ,... ::;:;:::.... lil ~ ~ - ~ 0 ~ ~ ~ 0 i! ~ - i ..... - - - "",',;u t; - (W) itJ'!i - - ,... ~ N II) ~ 0 8 I/) lR 0 "",.8 ~ ~ ~ .. \I) "': - - ,. f!! - oj (W) an iiS 0;; 0;; ...~ :~:::'.. ~ l'l ;:: (I) Ql 0 ~ ~ l!i 0 oti ~ - ~ ,~ - - - - :-:::;.~ (W) l'l """"" ....... - .... .. &l 0 S - ~ ~ ;; ~ &J 0 ,.J~ ~ 0< ~ - z .. I!! N N ci ci ,,; \8 $ $ : .... ! 0 i I/) Ql ~ Ie ~ ~ 0 .......~ ,... - ! c ":::;~ - ~ - l'l (W) .....-...;. - ~ \I) ~ l'l ~ ~ &J ~ &l l'l :1 8 ~ 8 - - - ... ;; - - (W) - (W) lQ ~ ~ rl ;':::.:~ a l'l ~ - ~ 0 ~ 2 ., ;;; ..! ~ - ~ - - - ~ - """,j - - - N (W) :.:.:.;:.... I/) :.;.".:.;.:.:. l!l ~ ~ \I) ~ 0 8 \I) :B , ",.,8 :8 ~ :8 ............. - - 'rl lB - (W) (W) . ~ ,8 ~ ~ t',',lll ;::-:.'" ;:iI ! ~ lR (I) ~ 0 ~ ~ ~ 8 J,!S ~ - ~ (:::~ - - (W) .:.:-:.:.:.:.;. - r~ ... - .... 8 0 ~ - ~ ~ i ~ :B lD >8 - ~ - .... - - - ::::.::,... 13 - N . N ~ :8 N N """'. \I) \I) ..,~ ... ~;:I ~ 0 ~ II) ~ 0 III ~ ~ ~ "S ,... - ~ ; - - - (W) ... . - ~ \I) S l'l ~ ~ lil il ; 13 ::8 8 ~ 8 - - ~ ci ci ci ci N - N S }8 8 ~ .:-:::::,... ~ ~ ;; - ~ 5! N ~ ~ 0 "I ~ - (I) i:::t~ - N ~ - i - (W) ....... - ~::::::::::;.. ~ ~ ~ II) ~ 0 ~ \I) \I) s '1 \I) ~ I/) - - - iJ - :::0:. ;;; - (W) (W) m ~ i::~ .-...... ..:.;-:.:.:-;-: ~ l'l ~ (I) ~ 0 il ~ ~ ~ ti ~ - i ... ... ".,~ - - :::.:.::W- N (W) :...:: - - . "'",;oor ... ~ 0 l'l ... ~ ~ ~ i! ~ 8 <a. :B 0< :B - - z , - N (W) - rJ 8 2 fa ........ ~ 0 " \I) ~ ~ ~ ~ r::: N :1 ~ - ~ :::'~ ,... - - - CD (W) ""'~ - i ~ ,... l'l ~ ~ l!l ~ ~ 13 :.8 8 ~ 8 CD - !Ii ci ci ci ci N - N ~ ,:~ 8 ~ - ~ ~ ., - ~ 0 iI iii Z i ..! i - ~ lt~ ,,... - - - - - - - (W) ..... - ... ~ ~ ~ ,... ~ 0 ., \I) S N ::; 13 0< :l ..... f'! ~ z "",,1 ~ - (W) (W) :; ~ ~ .i,l~ ~ ~ ~ ,... ~ 0 Wi ~ ~ ~ >'"t:; I - ~ ,j,:.= - - ... .;:::;::.... (W) ;; ... ",/"". - .... ....lli~ ~ 0 Ci ~ ~ ~ l!l ~ ~ 0 \8. ,... 0< ,.. - i z i t= ~ - N (W) - , :'~ "'~Ir ! 0 ; ., lD 5! ~ ~ ~ i HI ., - ~ .."...".,.!i - ~ - - - (W) St - li I ~ j ) II i i :~ 1,S ~ I c Go !5 1! ::l i lL E .. li ~ J! .5 to i j ! I ~ ~ ~ C! ~ ~ j ~ -e to "2 .. " rn ~ aJ 0 0 aJ Go Go ::l W 32 II'l'.,!". ~ J i : "'c';(1 \ \ ~ : =."~"7~.a- . ..l .-- 1 c iI :i J ~ 1 li i 0 :I :, . ..I tli '. , z ~ i " i~ I ~I ': i j 8 lIo. -<' a: .1 ; a.w~ .. :, I > ji! W~..1 a: ( i. i "'a:O c .i. :l =ou a: 141 Qu.u. III . ~' I, j Z 0 ... I if : j ~ '" . .. ,i: u -.- .......... c I .......... 0 ... .......... I ~ : ... ::I!::: I ... 'I' ... I. ; !.! !ll = c .", "1 :1, \. . ,'\~ . . ~\.... . . . '\ _i..... Y I~\ --"L,~ \:.0....... . ~'--. " " ,? \0:1 " ' .\\ iI " ~~ ~).. u.q: O~ ~~ o Q . j:: CI) ~a:: ~01Ll ffiQ.~ CI)~q: ~UJ~ Q.CI)..,J 1LI;::,_ a:: 0 q:~~ Cl)q:O -..,JO Q...,J).. oq:-1- ~~- -=00 Cl)i:i:1LI -u.- i:o~ 33 EXHIBIT C SCHEDULE OF MAXIMUM IMPACT FEES The maximum impact fees assessed are as follows: Water: $816 per LUE Sewer: $51 per LUE Roadways: Land Use Service Unit ... Area 1 Fee Area 2 Fee Single Family Dwelling Unit $1,690 $1 ,767 Multi-Family Dwelling Unit $1 ,145 $1,197 Schools Student $193 $202 Institutions Acre $8,850 $9,250 Church 1,000 Square Feet $1,650 $1,724 Cemeteries Acre $736 $770 Commercial Acre $54,516 $56,980 Industrial Acre $9,204 $9,620 34 Water: EXHIBIT D SCHEDULE OF MAXIMUM IMPACT FEES TO BE COLLECTED $816 per LUE $51 per LUE Sewer: Roadwavs: ',' ..,.......-.- "".'"....". 0._,.... ____. ___.,...... ." ,_. ~. ..-....,............... .........-..._-..............-........... .... . .:;Da1.Fe;nnU.Arfia2':f'ii'} Single Family Dwelling Unit Multi-Family Dwelling Unit Schools Student Institutions Acre $1,600 $1,600 $1,100 $1 ,100 $190 $190 $8,000 $8,000 $1,600 $1,600 $700 $700 $3,000 $3,000 $3,000 $3,000 $0 $0 Church 1,000 Square Feet Cemeteries Acre Non-Sales Tax Generating Acre Commercial Non-Sales Tax Generating Acre Industrial Sales Tax Generating Acre Commercial and Industrial 35 ORDINANCE 0-95-1004 EXHIBIT E WATER IMPROVEMENTS PLAN Contains the following: Capacity Demand for Each New Water Lue Current Meter Count and Estimation of Living Units Equivalent Estimated Water Service Demand by Faicility Type Water CIP Inventory and Costing Categorization of Water Utility Debt Water Maximum Impact Fee 37 37 38 39 44 47 36 CAPACITY DEMAND FOR EACH NEW WATER LUE ., . - -.-. .... ..., -. ......."..... ... < ~R()e()RTIOr-J,c\TE> . ..... .... I.. ..... ......". ...... . '.--...-. ... ... ........ - .... ..._, d. ._.. ..'.__.. .... '-'. - -, ... ..... --..... ,_.. ........ ,...", -,- .."_...,..,,... '-,. -,.. -.-....... ..- -,- -. . -..-. ..,... ""'''''''''''-' . -- -. . '.... .'. .. .... .... ... -, ,........ .......... --. .. ..., -. '.._- ..... ... ,..... "" - ..- -..,. . -, -.-.. . ........ FACILITY CONTROLLING BASIS < .. CAPACITY PERLUE SupplyfTreatment Peak Day 2,251 gallons daily Pumpage Engineer's Analysis 1 ,409 gallons daily Ground Storage State Board of Insurance 397 gallons Elevated Storage 1 5% of Peak Day 427 gallons Major Transmission Engineering Analysis Per analysis SOURCE: Knowlton-English-Flowers, Inc., June 1, 1995. Water System Design Criteria. CURRENT METER COUNT AND ESTIMATION OF UVING UNITS EQUIVALENT NUMBER OF 1 LUEs PER . NUMBER METER SIZE METERS (a) '.....METER(b)... .OF LUEs 3/4" 2,901 1.000 2,901 1" 2,995 1.000 2,995 1%" 35 2.000 70 2" 70 3.200 224 3" 4 6.000 24 4" 1 10.000 10 .... ..... Total. .. 6,006 ... ... ........ I. ... .. 6,224 Population 16,816 Population/LUE 2.70 (a) Source: Derived from City of Colleyville customer count, January 1994; and distribution of meters by size, March, 1995. (b) See Table 5-6. 37 ESTIMATED WATER SERVICE DEMAND BY FACIUTY TYPE i LU~'S(~) tie! VOLUME I FACIUTYTYPE 1994 .., .:.:2004. I ULTIMATE i 6,224 i 9,758 13,339 I WATER SUPPLY AND TREATMENT PEAK MGD: (b) Estimated Demand 14.011 21.996 30.027 Existing Capacity (t) 14.011 14.011 14.011 Excess! (Deficiency) . . ..... 0.000 (7.955) ............ ..... 'i.. I . (16.016) BOOSTER PUMP PEAK MGD: (c) Estimated Demand 8.768 13.747 18.792 Existing Capacity (t) 0.000 0.000 0.000 Excess/(Deficiency) . ... 1><(13.747).. . (8.768)d (18.792) GROUND STORAGE MG: (d) Estimated Demand 2.473 3.8n 5.300 Existing Capacity (t) 1.200 1. 200 1.200 Excess/ (Deficiency) . >:.'. .....(1.273) . (2.6n) ... (4.100) ELEVATED WATER STORAGE MG: (e) Estimated Demand 2.660 4.170 5.700 Existing Capacity (t) 2.500 2.500 2.500 Excess!(Deficiency) ... . (0.160) ......... (1.670) ... (3.200) ..... (a) 1994 LUE's Illken from Table 5-5. 2004 and ultimate LUE's determined by 1995 persons per LUE. (LUE = 2.70 persons) (b) Capacfty Demand = 2,251 gallons/LUE/day. (c) Capacity Demand = 1,4099allons/LUE/day. (d) Capacity Demand = 397 gallons/LUE. Some 9round storoge provided by elevated storage; TRA ground storage is reseNe. (e) Capacity Demand = 427 gallons/LUE. (f) Existing Capacity delllils are conlllined in Table 5-8. 38 WATER CIP INVENTORY AND COSTING .. . .. I ACIL ...... .. ........ .... . .. TYPE..' .. ...... ... ..... ... . NAME. .. .... .... ............... .... .. ._- ..' . I .. . >. ... ,>. . ... . ...... SUPPLY AND TREATMENT EXISTING FACIUTIES TRA Plant Facilities (d) $8,239,310 .. ... '.- ..._--.. ..-.... -,.. ..--.."' Subtotal Existing Supply/Trea1ment ...........$8.23e.310 FUTURE FACIUTIES . ..-. '........... FACILITY CAPAClTYtrnQdOr981S)"'> ..._-..._-. ..... ..-. .......... ,... .....-., .'..---.. ... FOR . .f)(CESS EXCESS CURRENT.<JO .......>10... .........::- ..... . <CUST... ......YEARS.. ..YEARS ....... PEAK MGD 14.011 14.011 0.000 14.011 . ... 14.011 0.000 39 <NEXT.. .....".- .. ..10-YEAR ..... CAPITAL <"COST . . TOTAL 0.000 0.000.1... . . NEXT 10-YEAR ...COST . PER WE (aY. $0 $0 WATER CIP INVENTORY AND COSTING ..... \ ......-.- . -'.-, .'. > i \ FACIUTYCAPACrry(mgdOr 9aIs) : NEXT. NEXT .. !. . -.- . .... .'. . <\ .. -.. - ..."...-..... ........ ....... 10-YEAR . 10-YEAR ..... ."..-.. """" ... ,.... .. '--"',. (,;051 ... ....FOR.....:.... .... .. exCESs .. ... EXCESS. CAPITAL COST ..... JUIAL CURRENT <10 . . > 10 .. COST PER WE I . TYPE . . NAME ..... .... I. ..... ... ..... CUST;... . YEARS : YEARS TOTAL ...... (a) GROUND STORAGE EXISTING FACIUTlES MG Glade Road (To be abandoned) (e) Overland Trail (h, k) $88,692 1.200 Subtotal Existirlg Facilities 1< ... ._~.. . !. Ii> .... .. ...... $88,692 1.200 /1.200 0.000 I.. 0.000 $0 FUTURE FACIUTIES McDonwell School Road (t, h) $1,820,000 4.100 1.273 1 .404 1 .423 .. ....: 4.1ooi ..... .......1m < $623,294. .. ... Subtotal Future FaCIlities .<. $1,820,000 .. .1.404 1.423 .... TOTAL GROUND STORAGE $1,820,000 5.300 2.473 1.404 1.423 $623,294 $176.38 .. (b) (e) . (e) ........... ..... ElEVATED STORAGE EXISTING FACIUTIES MGD Hall-Johnson Road (h) $888,500 1.500 Bransford Road (h) $568,391 1.000 Subtotal Existing Facilities $1,456,891 ... .... k 2.500 2.300 0.099 0.101 .... $57,889 FUTURE FACIUTIES Pleasant Run Road (t, h} $1,620,000 2.200 Western Trails (High Plane) (t, h) $900,000 1.000 Subtotal Future Facilities . $2,520,000 3.200 0.360 ....... 1.411 1.430 . $1,110,973 Hi TOTAL ElEVATED STORAGE $3,976,891 5.700 2.660 , 1.510 1.530 $1,168,863 $330.76 .... . i. \i ..............,.. . (e) (el . I.. .. .. .... 40 WATER CIP INVENTORY AND COSTING ........ . . .. ..... ~ ..... .... ..:0:.....1. -00....--. 'FACIUTYCAPACrry(mgd otgals) it ... . I ..............L.... ....................i......(..... ....NEXT . NEXT <~A"''' rrv ............. ... ..."...."..... ---,-... JO-YEAR .10-YEAR ,- . ..... ."..._,. ..-. 1(> ........... ./ ..< ..(i ...... ......................FOR........./.... EXCESS EXCESS ... ...CAPITAl.. . COST ...--.,.. ..... .._-. l'YPE/.. :!.... .. . ..... ...> < .... ( TOTJ\L CURRENT> <10 . >10.... >.COST .. PER WE ......... .......<. """'1111:: ~ . .. .........CUST........ .. '.YEARS YEARS ....TOTAL. .(8)< TRANSMISSION UNES EXISTING FACIUTIES (i) % Bransford Road (k) $425,195 100.00% 47.78% 25.94% 26.28% $110,282 Brown Trail (Study Une 33) $6,688 100.00% 47.n% 25.94% 26.29% $1,735 Brown Trail (Study Une 1033) $4,518 100.00% 47.75% 25.95% 26.30% $1,173 Brown Trail (Study Une 1032) $6,638 100.00% 47.76% 25.95% 26.29% $1,722 Brown Trail (Study Une 272) $1 ,580 100.00% 47.87% 25.89% 26.24% $409 Brown Trail (Study Une 61) $12,556 100.00% 47.78% 25.94% 26.28% $3,257 Brown Trail (Study Unes 62, 464) $12,317 100.00% 47.n% 25.94% 26.29% $3,195 Oak Knoll Drive (Study Une 1064) $13,511 100.00% 48.34% 25.66% 26.00% $3,467 Oak Knoll Drive (Study Une 1065) $8.978 100.00% 47.53% 26.06% 26.41% $2.340 Jackson Road (Study Une 1 327) $9,523 100.00% 47.86% 25.90% 26.24% $2,466 Jackson Road (Unes 104, 538) $11,682 100.00% 47.76% 25.95% 26.29% $3,031 Pool Road $8,975 100.00% 47.78% 25.94% 26.28% $2,328 Arbor Trail $65,096 100.00% 47.78% 25.94% 26.28% $16,884 Amador Trail $68,595 100.00% 47.78% 25.94% 26.28% $17,791 Hall Johnson Road $138,443 100.00% 47.78% 25.94% 26.28% $35,908 Hall Johnson Road $58,323 100.00% 47.79% 25.93% 26.28% $15,124 Hall Johnson Rd Elevated Supply $19,289 100.00% 47.n% 25.94% 26.29% $5,004 Bluebonnet (Study Unes 875, 876) $30,892 100.00% 47.79% 25.93% 26.28% $8,011 Bluebonnet (Unes 572, 573, 205) $58,129 100.00% 47.78% 25.94% 26.28% $15,On Bluebonet (Study Une 492) $30,117 100.00% 47.75% 25.95% 26.30% $7,816 Cherry Lane $22,099 100.00% 47.78% 25.94% 26.28% $5,732 Rose Street $29,393 100.00% 47.78% 25.94% 26.28% $7,623 Behrens Road (Study Une 940) $6,655 100.00% 47.82% 25.92% 26.2SO.4. $1.725 Behrens Road (Study Une 941) $27,769 100.00% 47.83% 25.91 % 26.26% $7,195 Behrens Road (Study Une 938) $10,895 100.00% 47.85% 25.90% 26.25% $2,822 41 WATER CIP INVENTORY AND COSTING .. .... , . FACIUTYCAPACrrY(mgd orgais) . NEXT . I NEXT ...... ..>r.. ..... "'A"" !TV /> ... CONSTRUCT \/ .. ..10-YEAR 10-YEAR ...>/ .i< ..COST....( .....FOR. EXCESS . . EXCESS CAPITAL COST .. . ..:.. > CURRENT. <10 >10 . COST PER WE I > - ..... TYPE NAME ..... .. . CUST; YEARS YEARS . TOTAL .. (a) Existing Transmission Unes (Cant.) Tyler Drive $34,769 100.00% 47.88% 25.89% 26.23% $9,001 Bowman Drive $23,147 100.00% 47.98% 25.84% 26.18% $5,981 Oak Knoll Drive (Study Une 628) $25,333 100.00% 47.96% 25.85% 26.19% $6,548 Oak Knoll Drive (Study Une 627) $5,820 100.000/0 48.61 % 25.52% 25.87% $1,486 Jim Mitchel Trail West $58,025 100.00% 100.00% 0.00% 0.00% $0 Cross Country $9,437 100.00% 47.86"10 25.90% 26.24% $2,444 Tumblewood Trail $24,975 100.00% 100.00% 0.00% 0.000/0 $0 Glade Road $126,645 100.00% 47.78% 25.94% 26.28% $32,848 Glade Road (Study Une 159) $10,467 100.00% 47.50% 26.08% 26.42% $2,729 Colleyville Blvd. $25,711 100.00% 47.78% 25.94% 26.28% $6,669 LD Lockett $29,804 100.00% 47.78% 25.94% 26.28% $7,730 LaVaca Trail (Study Une 802) $25,087 100.00% 47.67% 25.99% 26.34% $6,520 LaVaca Trail (Study Une 801) $26,424 100.00% 47.76% 25.95% 26.29% $6,856 LaVaca Trail (Study Unes 183, 175) $10,278 100.00% 47.77% 25.94% 26.29% $2,666 Cross Country (Study Une 222) $23,288 100.00% 47.83% 25.91 % 26.26% $6,035 Cross Country (Study Une 221) $9,816 100.00% 47.78% 25.94% 26.28% $2,546 Tinker Road $31,992 100.00% 47.78% 25.94% 26.28% $8,298 Bill Simmons (Study Une 1310) $19,845 100.00% 47.75% 25.95% 26.30% $5,150 Bill Simmons (Study Unes 945, 944) $53,082 100.00% 47.79% 25.93% 26.28% $13,765 Subtotal Existing Facilities .. $1,661 ,800 .. ..... > . ... < I:.. .... $409.387 .. .. 42 WATER CIP INVENTORY AND COSTING FACIUTY CAPACITY. (mQdOr9aJs).. .. .....-..-... .. ....... ..-. ,- ..., -.' - -.....,.,...-. )<FORi .. . ""..--.. ...,.... ~~~S. .... .'. -- ...... EXCESS . .-<JO YEARS. ...., '.,. .-.... '. EXCess ._-. ',.. . .... .... ,-... - . <.>10< YEARS> · NEXT 1(). YEAR CAPITAl ........... COST .... TOTAl NEXT 1c)'YEAR COST PER WE a FUTURE FACIUTIES LUE's Water Main Network (For Existing) U) $4,202.849 6.224 6,224 o o $0 Water Main Network (For Future) Q) $6,599.701 $10,802,550.. 7,115 o 3,534 3,581 $3,2n,962 TOTAlS .$12.464.350 $31.584.673 .. $3:zn.962 .. ...> (c) ....$3.687.349. $1.043.43 ...... ...... $8,230.069 $2.328.91 (a) Assumes the following gals to LUE conversion factors: Supply: 2,251 gals daily Pumpage: 1.409 gals daily Ground Storage: 397 gals Elevated Storoge: 427 gals (b) Facility sizes needed to serve existing customers. (c) Prorata share of incremental growth capacity. (ei) Total facmty cost data from KEF letter, July 10, 1995; prorated to Colleyville according to relative capacities shown in 'Tarrant County Water Supply Forecast of Plant Capacity and Colle}"lille's Share of Capacity", KEF, July 7, 1995. (e) KEF letter, July 10, 1995. (f) Costs from 'City of Colle}"lille, Water & Sewer Capital Improvements Plan, Water System Proposed Facilities to Meet Build-Out Demands, Preliminary Opinion of Probable cosr. KEF, June 1, 1995. (g) Capacities from 'City of Colleyville Water & Sewer C.I.P., Proposed Pumps', KEF, June 1, 1995. (h) Capacity from 'City of Colle}"liJle Water & Sewer C.I.P., Water Storage System', KEF, July 7, 1995. (I) Includes only lines which were financed by bonds which still have outstanding debt service. Costs and capacities from 'City of Colle}"lille Water & Sewer Capital Improvements Plan Existing Water Lines Funded by Revenue Bonds: Cost Share to Serve Existing Customers', KEF, July 7. 1995. (j) Costs for existing customers taken from 'City of Colle}"lille, Water & Sewer Capital Improvements Plan, Water System Proposed Facilities to Meet Existing Demands, Preliminary Opinion of Probable cosr, KEF, June 1, 1995. Costs for future customers represents the difference between build-out costs and costs for existing demands. (k) Cost from 'Water & Wastewater System Improvements Projects Funded by Revenue Bonds', KEF, July 18, 1995. 43 CATEGORIZATION OF WATER UTIUTY DEBT ..... ... I.... ..... . ..----- .. BOND ... ( ......... .... ;.\\ ----if--/ >Hir .......> ..c>-- T. .. <. ...... .. rr. . ....::....:. ...... .. PAYBACK TYPE I NAME ': ..... .... ....... ..... .--- .... -,....". ....-.......,--. """. . . .....;ii/ PER ................ -, .._-.. ........ < ISSUANCE < .......... .F1EMAINING.. .. .....................I.(JIAt....:... .... '.r. FOR CURRENT .(< .. < ...:.:.......--DATE ..........:..:...... AMOUNT .1. P1.YB1.CK (a)/ CURRENT WE > ../ :.. . ..................r.< ... ... CUST. .. SUPPLY Tarrant Water District Purchase (b) 1975 $1,400,000 $1,750,875 14.011 14.011 $281 Repairs on Tarrant System (b) 1975 $250,000 $341,150 14.011 14.011 $55 TRA Plant Facilities (c) $8,239,310 nla 14.011 14.011 $0 TRA Plant Facilities - Upgrade 1995 $407,710 $1,281,670 14.011 14.011 $206 TRA Plant Facilities - Upgrade (d) 1995 $884,966 $1,657,623 14.011 14.011 $266 Subtotal Supply . . <. .... .... $11,181,987 I $5,031,318 ...........:. ... $808 PUMPING Western Trails Pump Station (d) Prospective $479,502 $898,151 7.560 3.528 $67 McDonwell School Road (d) Prospective $581,706 $1,089,588 11.232 5.241 $82 Subtotal Pumping .... ..... ............ ...../..... . $1,061,208 .. $1,987,7:39 ......... .......... ...... F $149 GROUND STORAGE Overland Trails Tank (e) 1981 $88,692 $107,887 1.200 1.200 $17 McDonwell School Road (d) Prospective $1,856,400 $3,477,207 4.100 1.273 $173 ... i< . Subtotal Pumping .... . .. $1,856,400 $3,4n,207 . .. .. $173 ELEVATED STORAGE Bransford Road (e) 1981 $566,861 $689,546 1.000 0.920 $102 Hall-Johnson Road (e) 1987 $869,000 $1,071,342 1.500 1.380 $158 Pleasant Run Road (el) Prospective $1,652,400 $3.095,096 2.200 0.247 $56 Western Trails (High Plane) (d) Prospective $918,000 $1,719,498 1.000 0.112 $31 ,.... ... ....... ..---.-.- ... ... I .. Subtotal Elevated Storage ... . ... $4.006,261. ... $6,575,482 ... ... .. . .. $347 44 45 CATEGORIZATION OF WATER UTIUTY DEBT (a) Where more than one facility was funded by an issue, remaining payback amounts are prorated among the various facilities. (b) From 'Outstanding Debt Service Requirements - Utility Department", City of Colleyvil/e, faxed May 8, 1995. (c) Debt Service information not available. (d) Assume financing parameter. 7.00% interest & 20 years & bonding costs of 2.0% over construction costs. (e) From 'Water & Wastewater System Improvements Projects Funded by Revenue Bonds', KEF. July 18. 1995. 46 WATER MAXIMUM IMPACT FEE UTILITY FACILITY COST/LUE* ....... CREDITILUE* MAXIMUM 1 i . ..... ........ FEE/LUE.. .... WATER Supply and Treatment (TRA) $700 $425 $275 Pumping $78 $78 $0 Ground Storage $176 $91 $85 Elevated Storage $331 $183 $148 Major Transmission $1,043 $744 $300 Study Costs $8 $0 $8 ... . . $2.337 .< $1.521 TOTAL WATER ... $816 * An LUE is equal to use by a typical household with a 1" water meter. 47 ORDINANCE 0-95-1004 EXHIBIT F WASTEWATER IMPROVEMENTS PLAN Contains the following: Capacity Demand for Each New Wastewater LUE Estimated Wastewater Service Demand by Facility Type Wastewater CIP Inventory and Costing Categorization of Wastewater Utility Debt Wastewater Maximum Impact Fee 49 49 50 55 57 48 CAPACITY DEMAND FOR EACH NEW WASTEWATER LUE Treatment Major Collection TNRCC Criteria Peak Day ':-'>'::-:-::':::"":::-:->"":>:::"":'::::::<::".:::,'.-:".-:.. ....-- '. ....../PROPORTIONATE<.. .... . CAPACIT'fPERLUE< 270 gallons/day Per analysis SOURCE: Knowlton-English-Flowers, Inc., June 1, 1995. Wastewater System Design Criteria. ESTIMATED WASTEWATER SERVICE DEMAND BY FACIUTY TYPE l<iii .... I VOLUME ~t~~~.1 FACIU1Y lYPE ....1994>1 2004\ I i 6,457 i 10,123 i I I LUE's (a) 13,838 WASTEWATER TREATMENT PEAK MGD: Estimated Demand (b) 1 .682 2.636 3.604 Existing Capacity (c) 1 .682 1 .682 1 .682 .. ! .. .. ... Excess! (Deficiency) .... 0.000 (0.955) ...._H// ........ ... .... ...... ....... I.. ... I .. ... .... ..<.\./.... "' (a) Wastewater LUE's same as water. (b) Averoge flow = 270 gallons/LUE/daily. (c) Existing Capacity equivalent to existin9 demand. 49 WASTEWATER CIP INVENTORY AND COSTING I CONSTRUCT . . . ('.l"lRT .1. ... ~............ . .. . ..... .. .. . .. TYPE I ... .. . .. TREATMENT EXISTING FACIUTlES TRA Treatment Facilities (1989) (b) TRA Treatment Facilities (1992) (b) 1992 TRA Treatment Expansion (b) $898,783 1.476 $246,919 0.206 $415,061 0.955 .... .. . I . $1.560.763 2.636 . ,-.-..,-.-., .-,-.,..... ..,...'..,....-.-...-.-...... '-'."'--- -.-.---.-. .. .. Subtotal. ExiSiiriQ FacilitieS FUTURE FACILITIES 1994 TRA Treatment Expansion (b) $368,566 1994 TRA Treatment Upgrade (b) $345,570 0.955 1.682 .. .... -- .--.--.,. -,..... .. .... ......-.-.......- ....... SubtOtal FlltlJreFac:ilitieS. .... .... ......... $714.136. TOTAL WASTEWATER TREATMENT >$2,274,899 ..... .. . .... ... . .... . 2.636 2.636 50 FACIUTY CAPACITY (mgd or gals) NEXT 10- YEAR CAPITAL COST TOTAL . NEXT 10- YEAR COST PER WE . .(a\ FOR ... CURRENT.... cusr EXCESS <10 YEARS EXCESS .> 10 YEARS AVG MGD 1.476 0.000 0.000 0.206 0.000 0.000 0.000 0.955 0.000 . 1.682 ..0.955 0.000 $565,240 0.000 0.955 0.000 1.682 0.000 0.000 1.682 0.955 0.000 $258,629 ... 1.682 0.955 0.000 .. ..$823.869 $233.13 I :. TYPE I WASTEWATER CIP INVENTORY AND COSTING ~,.. . ..:. . :. ....... t,;...r.llrry . . . ... ... ~UN~IHU~I, . . :..> ,..._ . .... .... ..cn~T . I TOTAl NAMt: ...... MAJOR COLLECTION EXISTING FACIUTIES (c) A1f A1e A1d A1c $12,881 A1b $27,150 A1a $19,395 $13,213 B1c B1b $21,791 B1a $19,100 C1g C1f (400' N of Shelton) C1f (Beverly Drive) C1e $8,614 $7,880 C1d C1c $36,206 C1b $16,635 Cla (Glade Rd) C1 a (250' S of Glade Rd) $4,755 C1 a (250' N of TRA Interceptor) $5,419 01 d (200' N of Kingswood Ln) 01 d (250' W of Royal/Bluebonnet) D1c (1400' N of Glade Rd) D1c (Glade Rd) D1b $6,414 D1a $2,498 FACIUTY CAPACITY (mgd or gals) n/a 100.00% n/a 100.00% nfa 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% $0 $0 $0 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% $0 100.00% 100.00% $0 $0 $0 100.00% 100.00% 100.00% 100.00% $0 100.00% 100.00% FOR CURRENT .... CUST. 52.02% 62.81 % 58.74% 71.04% 75.26% 80.03% 93.96% 89.55% 88.60% 91.52% 80.22% 78.86% 90.75% 87.34% 86.08% 83.99% 87.01% 83.57% 87.01% 70.21 % 70.21% 53.62% 52.67% 68.46% 64.36% 51 I.. EXCESS <10 YEARS % 23.83% 18.47% 20.49% 14.38% 12.29% 9.92% 3.00% 5.19% 5.66% 4.21% 9.82% 10.50% 4.59% 6.29% 6.91% 7.95% 6.45% 8.16% 6.45% 14.80% 14.80% 23.04% 23.51% 15.67% 17.70% EXCESS > 10 YEARS 24.15% 18.72% 20.n% 14.58% 12.45% 10.05% 3.04% 5.26% 5.74% 4.27% 9.96% 10.64% 4.66% 6.37% 7.01% 8.06% 6.54% 8.27% 6.54% 14.99% 14.99% 23.34% 23.82% 15.87% 17.94% NEXT 10-YEAR CAPITAl COST TOTAL .... NEXT 10- YEAR COST PER WE Ca\ $0 $0 $0 $1.853 $3,336 $1,924 $396 $1,131 $1,081 $0 $0 $0 $396 $495 $2,503 $1,323 $307 $0 $350 $0 $0 $0 $1,508 $0 $442 WASTEWATER CIP INVENTORY AND COSTING ... ....................... li/.......< . . ..... ........... I . . .. . FACIUTY CAPACITY (mgd or gals) NEXT NEXT ...... ... 1.- , 11"T. 1 0- YEAR ................... ........ 10- YEAR I. FOR EXCESS EXCESS CAPITAL COST . . .....i.. .. . .. . . .. ... .../.. .. ... ISl)~1 ....... r.Tt"\TA'. Ii ........... .... ..CURRENT .... . <=.10 >10 COST PER WE < ' '" I .....< TYPE ...1..... ................... .................... .... ........ ...... ..... CUST. YEARS . YEARS TOTAL (a) Existing Major CoDection Unes (Cont.) Ele $0 100.00% 66.49% 16.64% 16.87% $0 E1 b (200' S of Normandy Dr) $0 100.00% 67.30% 16.24% 16.46% $0 E1 b (Camelot Dr at Avondale) $20,652 100.00% 55.64% 22.03% 22.33% $4,550 E1 b (Glade Rd at Camelot) $3,867 100.00% 55.64% 22.03% 22.33% $852 Ela $26,350 100.00% 57.02% 21.35% 21.63% $5,625 E2 $0 100.00% 96.36% 1.81 % 1.83% $0 E3 nla 100.00% 92.59% 3.68% 3.73% $0 F1b $0 100.00% 65.24% 17.26% 17.50% $0 Fla $0 100.00% 83.57% 8.16% 8.27% $0 Glg $0 100.00% 90.50% 4.72% 4.78% $0 G1f $0 100.00% 76.16% 11.84% 12.00% $0 G1e $0 100.00% 63.34% 18.21 % 18.45% $0 G1d $0 100.00% 79.35% 10.26% 10.39% $0 G1a2 $0 100.00% 89.89% 5.02% 5.09% $0 Glal $0 100.00% 86.31 % 6.80% 6.89% $0 G2 $0 100.00% 86.90% 6.51% 6.59% $0 L1 $0 100.00% 93.80% 3.08% 3.12% $0 L2e $0 100.00% 100.00% 0.00% 0.00% $0 L2b $0 100.00% 10.89% 44.26% 44.85% $0 L2a $23,590 100.00% 39.97% 29.82% 30.21 % $7,034 M2e - $0 100.00% 100.00% 0.00% 0.00% $0 M2b $0 100.00% 90.68% 4.63% 4.69% $0 M2a $0 100.00% 47.02% 26.31% 26.67% $0 Ole $0 100.00% 86.23% 6.84% 6.93% $0 01b $0 100.00% 78.92% 10.47% 10.61% $0 01a $48,076 100.00% 75.56% 12.14% 12.30% $5,836 52 WASTEWATER CIP INVENTORY AND COSTING ...: -- ... . ... ..........:. .. ...>.) I.. ..... . FACIUTY CAPACITY (mgd or gals) ...NEXT NEXT ..... i ,.~"'IU I J (;U~~T~~U{; I ... . I.~ 10- YEAR 10-YEAR I......... .................. .. ...... ........... .........,."..... .i .......... FOR EXCESS EXCESS CAPITAL COST TYPE/I < NAME . d. ...:...... I ............... ) CURRENT <10 > 10 COST PER WE ...... ......... ....... ... CUST. YEARS YEARS TOTAl .. (a) .. Existing Major Collection Unes (Coot.) P1d $3,023 100.00% 94.63% 2.67% 2.70% $81 P1c $5,806 100.00% n.35% 11.25% 11.40% $653 P1b $16,6n 100.00% 39.31 % 30.14% 30.55% $5,027 P1a $7,767 100.00% 51.68% 24.00% 24.32% $1,864 R2 (200' S of Charlottesville) $0 100.00% 87.88% 6.02% 6.10% $0 R2 (Leesburg Dr at Charlottesville) $8,225 100.00% 87.72% 6.10% 6.18% $502 R2 (Lees burg Dr at Jefferson Cir) $0 100.00% 90.04% 4.95% 5.01% $0 Sl c1 (J McCain 200' W of $0 100.00% 30.42% 34.56% 35.02% $0 Monticello) Slc1 (Monticello 500' S of Adams) $9,236 100.00% 52.49% 23.60% 23.91 % $2,179 Sla $22,605 100.00% 40.86% 29.37% 29.n% $6,640 Slb1 $0 100.00% 75.42% 12.21% 12.37% $0 Slc2 $9,375 100.00% 79.32% 10.27% 10.41% $963 S1c1 $12,912 100.00% 79.16% 10.35% 10.49% $1,337 U2 $0 100.00% 80.50% 9.69% 9.81% $0 U3 $6,310 100.00% 68.Q1% 15.89% 16.10% $1,003 V1f $0 100.00% 70.80% 14.50% 14.70% $0 V1e $0 100.00% 64.52% 17.62% 17.86% $0 W1b $0 100.00% 80.05% 9.91% 10.04% $0 W1a $0 100.00% 79.54% 10.16% 10.30% $0 X $0 100.00% 81.76% 9.06% 9.18% $0 Z $0 100.00% 93.15% 3.40% 3.45% $0 >i< ........ .... .. SUbtotal Existing FaciUties ... .. $426,422 .. . $61,190 53 WASTEWATER CIP INVENTORY AND COSTING I... ..... ......................i . .............. i.. <1 <i.............. .. ..... ...... .. FACIUTY CAPACITY (mgd or gals) NEXT NEXT Ii >...~A ,...T. 10- YEAR 10- YEAR ""~'Ti< ....... I... .... < 'I.......... FOR .... EXCESS EXCESS CAPITAL COST .... ..... Tt'\TAI CURRENT <10 > 10 COST PER WE .. TYPE>>! ..... NAME. .... i. ...............i.... ..... .............. I.. CUST. YEARS YEARS TOTAL (a) FUTURE FACILITIES (<1) A1h $38,880 100.00% 7.27% 46.06% 46.67% $17,907 A1g $88,800 100.00% 4.30% 47.53% 48.17% $42,208 11 $157,056 100.00% 10.42% 44.49% 45.09% $69,881 Sld $149,050 100.00% 38.98% 30.31 % 30.71 % $45,171 Sla $48,180 100.00% 41.00% 29.30% 29.70% $14,119 T1 $110,592 100.00% 37.31% 31.14% 31.55% $34,433 V1b $108,075 100.00% 12.82% 43.30% 43.88% $46,797 V1c2 $88,368 100.00% 37.74% 30.93% 31.34% $27,328 V1c1 $83,136 100.00% 22.99% 38.25% 38.76% $31,800 V1d $104,610 100.00% 55.68% 22.01 % 22.31% $23,027 V1a $296,645 100.00% 80.00% 9.93% 10.07% $29,468 Slb2 $23,664 100.00% 47.06% 26.30% 26.65% $6,222 Slb1 $144,650 100.00% 88.57% 5.68% 5.75% $8,211 I. .. SUbtotal Future Facilities .. .'.. $1,441,706 $396,573 TOTAL TRANSMISSION UNES ....... .... ..... .. .... .... $1,868,128 ...> ........ . $457,763 $129.54 .. WASTEWATER CONSTRUCTION COST TOTAL ... ..$4,143,027 ...... ....... ... $1,281,632 $362.07 ... ..... ... .... . .. (a) Assumes the following gals to LUE conversion factors: Treatment 270 gals daily (b) Capacities from 'Centml Regional Wastewater System Forecast of Plant Capacity & Colleyville's Share of Capacity", KEF, January 31, 1995. (c) Capacities and costs from 'City of Colleyville Water & Sewer Capital Improvements Plan Existing Sewer Line Costs for Future Customers', KEF. June 28, 1995. (d) Costs for existing customers taken from 'City of Colleyville Water & Sewer Capital Improvements Plan Wastewater Collection System Proposed Interceptor Sewers to Meet Existing Demand Preliminary Opinion of Probable cosr, KEF, June 15, 1995. (e) Costs from 'City of Colleyville Water & Sewer Capita/Improvements Plan Wastewater Collection System Proposed Interceptor Sewers to Meet Build-Out Demand Preliminary Opinion of Probable cosr, KEF, June 15, 1995. 54 CATEGORIZATION OF WASTEWATER UTIUTY DEBT . .........>...... .. <:.... ..... ...< .... FACILITY CAPACITY . < 80NDISSUE <>/ PAYBACK . I:Af"'1I IT IT 11\l4~ .....> .... .. 1/\ ., ~".... .... .... ..,~, ...1... .-- -- PER ....d ....\\ ......:. > /<<<.- __-.- I .....,. .'- . ...: ... REMAINING ....<<..< FOR CURRENT .......\ ............. .: ....:.. PAYBACK ..TOfAl.\ .:. CURREN LUE <<I ... ... I....... .......>< ....... < <>1>..... ......<.......q>....... ....>/<< ... T I...... ..... .} > > <> .... ....... >....1>. ... CUST. .. TREATMENT TRA Treatment Facilities (1989) (a) 1989 $898,783 $2,478,098 1.476 1.476 $204 TRA Treatment Facilities (1992) (b) 1989 $246,919 $383,523 0.206 0.206 $62 1994 TRA Treatment Upgrade (b) 1994 $345,570 $604,706 1.682 1.682 $97 SubtOtal I ./.......... .......... ..... >> $1 ,491,271 $3,466,326 $363 .... . MAJOR COLLECTION (b) A1c 1975 $12,881 $16,109 100.00% 71.04% $2 A1b 1975 $27,150 $33,954 100.00% 75.26% $4 A1a 1975 $19,395 $24,256 100.00% 80.03% $3 81c 1975 $13,213 $16,525 100.00% 93.96% $2 81b 1975 $21,791 $27,252 100.00% 89.55% $4 81a 1975 $19,100 $23,887 100.00% 88.60% $3 C1e 1975 $8,614 $10, n3 100.00% 90.75% $2 C1d 1975 $7,880 $9,855 100.00% 87.34% $1 C1c 1975 $36,206 $45,280 100.00% 86.08% $6 C1b 1975 $16,635 $20,804 100.00% 83.99% $3 C1 a (Glade Rd) 1975 $4,755 $5,947 100.00% 87.01% $1 C1 a (250' N of TRA Interceptor) 1975 $5,419 $6,777 100.00% 87.01% $1 L2a 1975 $23,590 $29,502 100.00% 39.97% $2 1990 Wastewater Improvements (d) 1989 $584,917 $899,145 100.00% 62.51% $90 A1 h (c) Prospective $38,880 $72,826 100.00% 7.27% $1 A1g (c) Prospective $88,800 $166,331 100.00% 4.30% $1 11 (c) Prospective $157,056 $294,180 100.00% 10.42% $5 S1d (c) Prospective $149,050 $279,184 100.00% 38.98% $17 S1a (c) Prospective $48,180 $90,246 100.00% 41.00% $6 T1 (c) Prospective $110,592 $207,149 100.00% 37.31% $12 V1b (c) Prospective $108,075 $202,434 100.00% 12.82% $4 55 CATEGORIZATION OF WASTEWATER UTIUTY DEBT FACILITY CAPACITY FOR CURREN T CUST. PAYBACK PER CURRENT LUE Major Collection (Cont.) V1 c2 (c) Prospective $88,368 $165,521 100.00% 37.74% $10 V1 c1 (c) Prospective $83,136 $155,721 100.00% 22.99% $6 V1d (c) 1994 $104,610 $162,262 100.00% 55.68% $15 V1 a (c) 1994 $296,645 $460,131 100.00% 80.00% $59 S1 b2 (c) 1994 $23,664 $36,706 100.00% 47.06% $3 S1 b1 (c) 1994 $144,650 $224,369 100.00% 88.57% $32 Other Sewer Collection for Existing 1994 $2,290,431 $3,552,729 100.00% 100.00% $571 Subtotal Collection.. . $867 $1,229 (a) From "Central Regional Wastewater System Forecast of Plant Capacity & Colleyville's Share of Capacity", KEF, January 31, 1995. (b) From "Outstanding Debt Service Requirements - Utility Departmenf', City of Colleyville, faxed May 8, 1995. Remaining payback amounts are prorated among the various facilities. (c) Assume financing parameter: interest and 20 years & bonding costs of 2.0010 over construction costs. (d) From "Water & Wastewater System Improvements Projects Funded by Revenue Bonds", KEF, July 18, 1995. 56 UTIUTY SEWER WASTEWATER MAXIMUM IMPACT FEE COST/LUE* CREDITILUE* MAXIMUM FE ElLU E* Treatment (TRA) Study Costs TOTAL SEWER $233 $8 $371 * An LUE is equal to use by a typical household with a 1" water meter. 57 $190 $0 $190 $43 $8 $51 ORDINANCE 0-95-1004 EXHIBIT G ROADWAY IMPROVEMENTS PLAN Contains the following: Transportation System Impact Fee Determination 1994-2004 59 58 TRANSPORTATION SYSTEM IMPACT FEE DETERMINATION 1994-2004 CITY OF COLLEYVILLE August 3, 1995 Prepared By: Schrickel, Rollins and Associates, Inc. 1161 Corporate Drive West, Suite 200 Arlington, Texas 76006 (817) 649-3216/Metro (817) 640-8212 FAX (817) 649-7645 SRA Project No. 3056 As amended by City of Colleyville through August 3,1995 59 TABLE OF CONTENTS Page Overleaf Executive Summary 1 List of Exhibits 11 I Introduction 1 II Transportation Facilities 1 III Growth Projections 3 IV Equivalent Service Unit Determination 3 V Cost of Growth 4 Appendix A Trip Generation Rates Appendix B Roadway Costs Appendix C Maximum Impact Fee for Each Land Use 60 City of Colleyville - 1994 Transportation Impact Fee - 8RA No. 3056 EXECUTIVE SUMMARY The purpose of tIus report is to detennine the maximum impact fee which the City of Colleyville can assess for the transportation system. The City is divided into two service areas and a separate fee is calculated for each. The first step is to estimate the cost of transportation facilities attributable to new growth during the time period 1994-2004 for each service area. These figures are $5,134,000 for Area 1 and $7,338,000 for Area 2. The second step is to estimate the growth in equivalent service units during the study time period. These figures are 29,076 ESU for Area 1 and 39,768 ESU for Area 2. A single transportation "trip" is used as the standard service ruut. The final step is the calculation of the maximum allowable impact fee using the data presented above: AREAl: $5,134,.000 = $177 perESU 29,076 ESU AREA 2: $7,338,000 = $185perESU 39,768ESU These figures are lower than tile 1987 Impact Fee Study. The figures calculated in the 1987 study for Area I were $268, and for Area 2 were $219. 61 CITY OF" COLLEYVIL.LE - I 994 TRANSPORTATION IMPACT FEE - SRA No. 3056 LIST OF EXHffilTS Exhibit 1 Major Thoroughfare Plan Exhibit 2 Service Area Boundary Map Exhibits 3 & 4 Capital Improvements Plan - Area 1 & 2 Exhibits 5 & 6 Upgrade Plan to Serve Existing Development - Area 1 & 2 Exhibit 7 Current and Projected Land Uses and Population - Area 1 & 2 Exhibits 8,"9 & 10 Equivalent Service Unit Calculations - 1994, 2004, and Ultimate Exhibit 11 Summary of Growth Projections - Area 1 & 2 62 City of Colleyville - 1994 Transportation Impact Fee - SRA No. 3056 _._.._~~,___,_. .,-+-___._'_._.__..__._..,.....~__c__~......"._.._,...._.--.._,_._._____.,_~.__.,._. I. INTRODUCTION This study determines the maximwn assessable impact fee for transportation facilities within the City'of Colleyville. This is an update of a study prepared by Parsons, Brinckerhofr, Quade & Douglas (PBQD) in 1987 for the City of Colleyville. As required by the enabling legislation (SB336), only cost attributable to new growth can be included in the impact fee determination. This study uses the following procedure: 1. Detennine the cost of transportation facilities attributable to growth during the study period; 2. Determine the amOlmt of new growth from the land use plan and population study provided; 3. Determine the cost of new growth, i.e., the maximum allowable impact fee. Consistent with the 1987 PBQD study, the transportation impact fee is divided into two service areas, and the "trip" is the standard service unit. The boundaries of Service Area 1 and 2 are identical to those used in the 1987 PBQD study. Different types of land uses can be converted using the table provided in Appendix A. II. TRANSPORTATION FACILITIES The initial step in the impact fee determination is the development of a Capital Improvement Plan (CIP) for the time period 1994 to 2004 for eligible transportation facilities. The City of Colleyville Master Thoroughfare Plan dated February 1994 was used for the development of the Impact Fee CIP. Design, construction and right-of-way costs were estimated using the data provided in Appendix B. The CIP used for tIns analysis is presented in Exhibits 3 and 4. It is important to note tIlatthe total cost calculated for the ultimate development is reduced so that only tIIat cost attIjbutable to growth during the study period is included. City of Colleyvllle - 1994 Transportation Impact Fee - SAA No. 3056 1 63 Consistent with the 1987 PBQD study, this analysis assumes that the existing Colleyville thoroughfare system is generally adequate for the current population. However, there are a number of existing two-lane roads that are less than 24 feet wide. These facilities are considered sub-standard and the cost to widen these facilities is considered as improvements to serve existing development. These costs are provided in Exhibits 5 and 6. III. GROWTH PROJECTIONS The second major step in the detennination of an impact fee is the evaluation of growth. The calculations herein are based upon the City ofColleyville Land Use Master Plan dated February 2, 1994. This data is presented in Exhibit 7. It is divided into service areas and presented for the years 1991, 1994, 2004 and Ultimate Development. IV. EQUIVALENT SERVICE UNIT DETERMINATION The third step in this study is determining the number of existing service units and estimating future service units. The basic service unit has been established as a single traffic "trip." ,. Equivalent service units (ESU), can be calculated using the conversion table provided in Appendix A. ESU's for each category of Land Use and divided into the two major study areas are presented in Exhibits 8 through 10. Using the infonnation developed above, Exhibit 11 shows the change in ESUs from 1994 to 2004. TIns figure represents the projected growth over the 10-year study period. City of Colleyville - 1 994 Transportation Impact Fee - SRA No. 3056 2 64 v. COST OF GROWTH The final step in the detennination of the maximum impact fee is the calculation of the cost of growth. The cost figures developed on Exhibits 3, 4, 5 and 6 are combined as follows: AREA 1 AREA 2 Impact Fee CIP (1994-2004) $5,655,000 $7,970,000 less Upgrade to Serve Existing Development - 521,000 - 632,000 Total Cost to be Included in Impact Fee (1994-2004) 5,134,000 $7,338,000 The amount of growth is determined by obtaining the difference between the existing ESU's and the estimate for ESU's in the year 2004: AREA I AREA 2 Equivalent Service Units (2004) less ESU (1994) Growth in ESU (1994 to 2004) 112,363 -83,287 29,076 87,520 -47,752 39,768 The maximum allowable impact fee is the ratio provided by caS/', therefore: 6ESU Area 1 hnpact Fee = $5,134,000. $177 29,076 Area 2 Impact Fee = $7,338 ,000 . $185 39,768 City of Colleyville - 1994 Transportation Impact Fee - SRA No. 3056 3 65 These amooots represent the cost of new growth during 1994 to 2004 and are the maximwn allowable impact fees for the transportation system. These figures are different than the 1987 PBQD study as shown: 1987 Study $268 per trip $219 per trip Service Area 1 1994 Study $177 per trip $185 per trip Service Area 2 A brief review of the 1987 PBQD Study reveals that the eIP used in 1987 is significantly greater than tlIat used in tile 1994 study. These figures are included herein for comparison purposes only: 1987 PBQD Study' Area 1: $30,215,657 . $268 112,610 ESU Area 2: $15,521,853 . $219 70,999 ESU It should be noted that any impact fee calculation is merely an estimate of future occurrences and tllerefore is subject to tile variabilities inherent in the development of a growing community. City of Colleyvllle - 1994 Transportation Impact Fee - SRA No. 3056 4 66 Exhibit 1 Thoroughfare Plan . . - ............, ~ r."!"" ..... I ......1'.. ~ ; I ! I t I I I.. .~!!~... ....81~!'I..... ..... .... ".: .... ....... '" APPROXIMA TE SCALE: ,.. z 4000' ~ ~ i ... f 8 ... c:i ... HAL~ JOIIISON t t I 'j I i :.---' ... '" ... ! i '" '" i I I 1 t '-. a.AllE RO. alEE!< SP AllGEII RD. i : L_! i i : I .__..~ .-.... ,. il LEGEND CITY BOUNDARY MAJOR ARTERIAL MINOR ARTERIAL (UNDIVIDEDI MINOR ARTERIAL (DIVIDEDI MAJOR COLLECTOR MINOR COLLECTOR RAILROAD ..... C3C3E3C3C3 ....... aaoeae ':''''''''''''''- :.:.-. ::- .~. -'!Yo...=ii!L~.~~I':~-'- :_h. ~ CIty of Colleyville - 1994 Transportation Impact Fee - SRA No. 3056 67 Exhibit 2 Service Area and Planning Zone Map SERVICE AREA 2 ...~ : ~...............~ i ill ;. _ .."..n@ · l!i CV~ o 2 @ o-fiK SP ARGER RO. iI . .. ..... LEGEND .. 3:1 2 it - SERVIC~ AREA BOUNDARY . . . . . .. - PLANNING ZONE 68 City of Colleyvlile _ 1994 Transoortotlon Imcoc! t:'~e - SRA No. 3056 , I APPROXIMA TE SCALE: IN . 4()OO' SERVICE AREA 1 HAll - ~. 0""" ~* ~.* 12 : '" - -------...........---- Exhibit 3 Capital Improvements Plan for Impact Fee Determination 1994 - 2004 Service Area No.1 Unit Street Limits Imr Lenldh Cost Total Cost ($1,000) SanderslWyatt SH 26 to Industrial E 2,000 335 670 Longwood Rd. SH 26 to Broad Oak 2 1,000 20 20 Pool Road Glade to Hall Johnson B (ex) 4,000 Hall Johnson to Big Bear Creek 4,6 5,600 75 420 Jackson Rd. Cheek Sparger to Glade E 3,700 371 1,373 B (ex) 4,200 Hall Johnson Road SH 26 to Pool 0 7,000 371 2,597 Signal at Pool 80 River Walk Road Glade to Hall Johnson 01 4,200 371 1,558 Montclair Drive Glade to Hall Johnson E 4,000 335 1,340 Glade Road SH 26 to SH 121 D 14,2QOl 371 5,268 Martin Parkway Cheek Sparger to Glade 2 3,200 10 32 Heritage A venue4 Cheek Sparger to City Limits C 6,000 2274 1,362 2,400 453 1.087 Signal at Glade 80 (credit for Bond Financing 1994) (109) Cheek Sparger SH 26 to Heritage 2,4 19,500 74 1,443 Bedford Road Cheek Sparger to Glade E 2,800 335 938 2 2,000 20 40 Brown Trail4 So. City Limit to SH 26 B 2,800 2224 1.240 2 1,500 20 30 Center Park SH 26 to Bedford Rd. 2 2,400 20 48 Signal at Bedford Rd. 80 Current Available Perimeter Thoroughfare Escrows (1,576? Total Net Cost for Ultimate Development $18,02 "Times" Level of Growth at Year 2004 x 0.31386 Cost of Improvements (1994-2004) $5,655 To Be Built By Developer Improvements ~r Ci~ Staff, see Ap~di." B Reauced by (~ 5~ LF to account for existin~ half section at the Brook Meadows and Woodland Hills Addition. Assume ~ Cost S . g with adjacent City: Eu ess, Bedford, etc. TxDOT to consUUct roadway under PASS program. From Exhibit II Cit'( of Colleyville . 1994 Transportation Impact fee . SRA No. 3056 69 Exhibit 4 Capital Improvements Plan for Impact Fee Determination 1994 - 2004 Service Area No.2 Unit ~ Umlts TVDe1 Len2th (LFl Cost Total Cost ($1,000) Precinct Line Rd. I So. City Limit to Davis Blvd. 2 8.600 10 86 McDonwell School Rd. Precinct Line to Westcoat E 6,000 371 2,226 Signal at Westcoat 80 L. D. Lockett Road Precinct Line to Pleasant Run E 10,200 371 3,784 BransfordlWestcoat Drive SH 26 to John McCain E 13,900 371 5,157 (credit for Bond Financing 1989) (252) Pleasant Run Road SH 26 to Big Bear Creek D 14,000 371 5,194 Signal at John McCain 80 John McCain Road Westcoat to SH 26 D 9,300 371 3,450 Tinker Road Pleasant Run to SH 26 E 2,800 335 938 Shelton Road Bransford to Pleasant Run E 2,200 335 737 Glade Road West City Limit to SH 26 D 5,70Q3 371 2,115 Signal at Bransford 80 Bogart Road Pleasant Run to SH 26 D 2,100 371 779 John McCain Road Maranatha to SH 26 ... 900 1,583 SH26 Cheek Sparger to Big Bear 2,4 22,000 74 1,628 Creek Current Escrows (259) Total Net Cost for Ultimate Development $27,449 "Times" Level of Growth at 2004 x 0.2908. Cost of Improvements (1994-2004) $7,970 County Project - No Cost to City 2 Improvements per City Staff, see Appendix B J Reduced by (~) 1,700 LF to account for existing half section at the Mill Crossing Addn. . From Exhibit 11 ... Grade separation is considered as separate, additional project. See Appendix B for cost breakdown. CITY 01'" COll.EYVIUZ - I 994 TRANSPORTATlON IMPACT rEI!: - SRA No. 3056 70 Ex1nbit 5 Upgrade Plan to Serve Existing Development Service Area No. 1 Aw:rage PaviD& FDtiDg R.c:quired Length Quantity Total Street T imits Width Upuade ...a.a (SY) eosr ($1,000) Sanders/Wyatt I SH 26 to Industrial 15'/10' 9'(24' 1,600noo 3,470 69 Pool Road Hall Johnson to Big Bear 20' 4' 5,600 2.490 SO Creek Jackson Rd. Cheek Sparger to 20' 4' 3,700 1,650 33 Shenandoah Hall Johnson Road SH 26 to Pool 20' 4' 7,000 3,120 62 Montclair Drive Glade to Hall Johnson 20' 4' 4,000 1,780 36 Glade Roadz SH 26 to SH 121 22' 2' 11,400 2.540 51 Heritage Avenue Cheek Sparger to City 16' 8' 8,400 7,470 149 Limits Cheek Sparger McClain to Heritage 22' 2' 12,000 2,670 53 Bedford Road Bridge to Glade 20' 4' 2,000 890 18 Total Cost to Upgrade Roadways to Serve Existing Development $521 1 Existing 10' Grav~l Drive to be replaced with 24' HMAC. ~ Reduced by 5,600 to account for existing ~ sections. 3 Cost for widening = $20 per S. Y. 71 City of Colleyville - 1994 Transportation Impact Fee - SRA No. 3056 "-.. Exhibit 6 Upgrade Plan to Serve Existing Development Service Area No. 2 EmtiDg Paving A...enge Required Length Quantity Total Street T mits W'1dtb. Upuadc ~ (SY) eosr (SI,<XXJ) McDonwell School Rd. Precinct Line to 20 4 6,<XXJ 2,670 S3 Westcoat L D. Lockett Road Precinct Line to 20 4 10,200 4,540 91 Pleasant Run Bransford/Westcoat Drive Glade to John McCain 20/17 4n 12.900 7,890 158 Pleasant Run Road1 SH 26 to Big Bear 20/17 4n 12.900 7,890 158 Creek John McCain Road Westcoat to SH 26 20 4 9,300 4,140 83 Tinker Road Pleasant Run to SH 26 20 4 2.800 1,250 25 Shelton Road Bransford to Pleasant 20 4 2,200 980 20 Run Glade Road West City Limit to SH 20 4 4,900 2,180 44 26 Total Cost to Upgrade Roadways to Serve Existing Development $632 1 Reduced by 1,100 LF for the Cutter Ridge Subdivision. 2 Reduced by 1,700 LF for the Mill Crossing Addn. 3 Cost for widening = $20 per S. Y. 72 City of Colleyville - 1994 Transportation Impact Fee - SRA No. 3056 ~ - - '& - - Q U """ Q ~ U ~ .c: - '" .s eM .~ ~ ~- ::I 0 __ c.. fI) .- Q Q .-:: Q. Z :9"C~ ~ e f ~=< ~ ~ fI) CJ ;:l .- "C t: e ~ ~rJ'1 ...J "C ~ - CJ ~ oC' '" l:l. "C e ~ - e f '" ::I U l6 It) ,S\ .., !4 ~ ~ ~ ~ 0 ::8 8 < 8 - - .... z ~ c;j c;j c;j .0 - ,.; ms 8 8 "I ::::::::p ,."Jt ~ .., iD - ~ 0 ~ l6 .... 0 I ~ Ol 1:1 - - - ~ - ~ :::'::::::::::: .... - - - ..; CD - - rn ~ N It) ~ 0 8 It) l8 0 I ~ < ~ "": - z ml ~ - al ..; ,.; Ii) Ii) ..1 ">:<'~ ~ .., ;:: CD Ol 0 It) ~ ~ 0 :F:l ~ - ~ :::::.~ - - :;; - ':':';':':';-.- - {(; ..; ... .... .H - H .. l;f 0 l:i - ~ f3 iD Ol .., 0 is .... < ~ - CD Ol ~ z tJi; al N N .0 c;j ,.; ts ~ ~ .... :::::.:1 ..... ~ 0 ~ II) ~ 0 II) ~ ~ 0 I .... - ~ :::9 :;; 18 - - ..; .... .... .... ~ .... ~ II) ~ .., ~ ~ Sl ~ &l .., :~ 8 < 8 - - - z iD - - ..; - ..; ,.; 8 8 .::::.; N - - a .., ~ - ~ 0 ~ ~ ~ ;;; )! ~ - i ..,..,.,,- ::I::~ - - - PI - II) - N ..; . . ....... ~ ~ ~ II) ~ 0 8 II) :8 ~ :,1 ~ < ~ - - z r= fa - ..; ..; oj ~ ~ ~ :.,...,..iI .:-:::.... ;::::';1 ~ ~ l8 CD ~ 0 .., ~ ~ ~ it. ~ - ~ N - - - :::::::~ ..; .;.:.:.:.:-:.'. N - :.."...~ - :8 0 ll! ~ f3 5l f1! :8 .... - < - H - CD - z ::!:i 13 - N oj N ~ N N II) II) ....... !4 0 N II) ~ 0 ~ ~ ~ a .... - ~ rr~ .... - N ; - ~ - - ..; :;; ::::~::::::::: - ~ II) s .., !4 ~ ~ ~ ; :3 :.1 8 < 8 - - z ... III c;j c;j c;j c;j - N - N S 8 8 ::...; ::::::;:p - ~ ~ a; - ~ 0 N ~ ~ 0 I ~ - CD ::::!W tru - N ij - i ........~ - ..; ....... - ~ ~ CD II) ~ 0 ~ It) II) l:i :,S II) < II) "": - - - z - ;'::1 ;;; - ..; ..; m ;.:8 III al .., ...1 .~:~: .:.... ~ .., PI CD Ol 0 l6 ~ ~ ~ hF:l .... ~ Sf - - - - - - :-:.:::.... - ..; - N "...)! N .-.... H ... ... ~ 0 .., - ~ f3 ~ Ol ~ 8 8 :8 < :8 ........ - - CQ Z ,.,.,.:;; ~ - N ..; - ~ }8 fa fa J:: :::::::~ )}c .....-. ~ 0 ~ II) Ol 0 N ~ I:: N "HI ~ ~ :t~ - - II) Iii - - - ..; - ..........,. ..... - ..... s ~ Iii .., !4 ~ ~ ~ ~ 1Cl .8 8 < 8 - z .. ~ c;j c;j c;j c;j - N - N ~ is 8 8 I::rl .:::::-~ - - ~ ~ .., - ~ 0 Cli l6 III ~ I ~ - 0 .......i;i, ....... .,.. - - - .... ;;:::::~ - - - - ..; f3 ....... ..... .. - . II) ~ ~ .... ~ 0 ~ II) a N .'....8 .., < :3 .:.:-:.:.:.:.:. - - C'! - ~ :.~ CD z 1m. ~ - ..; ..; iD III al .., ..li.:1 ~ ~ ~ .... ~ 0 in ~ ll3 ~ rt:! Ii - ~ :,r'~ - - - rt; ..; iD ",.:.,,;c - - ....... ..-. !4 0 C! ~ ~ f3 ~ ~ ~ 0 :~ .... < .... I:;; - - z ~ ~ - N ..; - ~ g ...1 ::::::::~ {{b ! 0 ; ~ U) 0 ~ ~ ;1; ~ HI ~ - ~ - - ~ - .,...)!iiI: - - - ..; Sl ii c: ~ ~ .2 .. ~ .~ E ~ ~ s '" g "" ~ .~ 13 Xl ~ c: ~ D. "" Sl ::l al ... E ~ 'C: ii & J! ~ .c .. 1: C Ji ~ .. i: ~ u ~ c: 'to ~ ~ 5 OJ ::J ~ ~ 5- "" ::J U .c .. ::J '2 ca ca 0 c: 'to en :::!i en CD 0 0 CD D. > D. ::l w 73 Exhibit 8 Equivalent Service Unit Calculations 1994 Trip Generation Areal Area 2 :tAreal&2 Land Use Rate Unit Qty. # trips Qty. # trips Qty. # trips Single Family 9.55 D.U.\ 3,290 31,421 1,961 18,726 5,251 50,148 Multi Family 6.47 D.U.2 0 0 156 1,009 156 1,009 Elem. School 1.09 students3 1,745 1,902 1,356 1,478 3,101 3,380 Bldg. Institution 50 acre 5 250 6 300 11 550 Churches 9.32 1000 sq.ft.GFA4 76 708 76 708 152 1,417 Cemeteries 4.16 acre 110 458 0 0 110 458 Business/Camm'l 308 acre 152 46,816 60 18,480 212 65,296 Industrial 52 acre 30 1,560 130 6,760 160 8,320 Parks 2.23 acre 77 172 130 290 207 462 . 1 ESU = 1 Trip \ S.F. du = [est. pop. + (pop./du)] - MF du 2 assumed 12 du/acre (multifamily only) 3 1994 enrollments prorated by appropriate increase in du since 1994 4 assumed 4,000 ftZOF Nacre City of Colleyville - 1994 Transportation Impact Fee - SRA No. 3056 74 Exhibit 9 Equivalent Service Unit Calculations 2004 Trip Generation Area 1 Area 2 ~Areal&2 Land Use Rate Unit Qty. # trips Qty. # trips Qty. # trips Single Family 9.55 D.U.l 4,417 42,185 3,903 37,271 8,320 79,456 Multi Family 6.47 D.U.2 0 0 156 1,009 156 1,009 Elem. School 1.09 students) 2,343 2,554 2,600 2,834 4,943 5,387 Bldg. Institution 50 acre 5 250 6 300 11 550 Churches 9.32 1000 sq.ft.GFA4 76 708 76 708 152 1,417 Cemeteries 4.16 acre 110 458 0 0 110 458 Business/Comm'} 308 acre 209 64,372 124 38,192 333 102,564 Industrial 52 acre 30 1,560 130 6,760 160 8,320 Parks 2.23 acre 124 277 200 446 324 723 . 1 ESU = 1 Trip 1 S.F. du = [est. pop. + (pop./du)] - MF du 2 assumed 12 du/acre (multifamily only) ) 1994 enrollments prorated by appropriate increase in du since 1994 4 assumed 4.000 ft~GFNacre City of Colleyville - 1994 Transportation Impact Fee - SRA No. 3056 75 Exhibit 10 Equivalent Service Unit Calculations Ultimate Development Trip GcDeradoD Area 1 Ala. 2 XA1al&2 . . .. LaDd Use Rate Unit Qty. # ttipa .Qty.. .... # trip& ~.. #tripJ Single Family 9.55 D.U.1 5,617 53,640 5,815 55,537 11,432 109,177 Multi Family 6.47 D.U.2 0 0 156 1,009 156 1,009 Elem. School 1.09 students) 2,979 3,247 3,825 4,169 6,804 7,416 Bldg. Institution 50 acre 5 250 6 300 11 550 Churches 9.32 1000 sq.ft.GFA4 76 708 76 708 152 1,417 Cemeteries 4.16 acre 110 458 0 0 110 458 Business/Comm'l 308 acre 375 115,500 375 115,500 750 231,000 Industrial 52 acre 30 1,560 130 6.760 160 8,320 Parks 2.23 acre 258 575 229 511 487 1,086 . 1 ESU = 1 Trip 1 S.F. du = [est. pop. + (pop./du)] - MF du 2 assumed 12 dulacre (multifamily only) 3 1994 enrollments prorated by appropriate increase in du since 1994 4 assumed 4,000 ftlGFNacre City of Colleyville - 1994 Transportation Impact Fee - SRA No. 3056 76 Exhibit 11 Summary of Growth Projections AREA 1 TRIPS AREA 211UPS I.:.md UlIe . 1994 A 2D04 A OIL 1994 A 2D04 A UIL Single Family 31,421 10,764 42.185 11,455 53,640 18,726 18,545 37,271 18,266 55,537 Multi Family 0 0 0 0 0 1,009 0 1,009 0 1,009 E1cm. School 1,902 652 2,554 693 3,247 1,478 1,356 2,834 1,335 4,169 Bldg. IDstitutiooal 250 0 250 0 250 300 0 300 0 300 Churches 708 0 708 0 708 708 0 708 0 708 Cemeteries 458 0 458 0 458 0 0 0 0 0 Business/Comm'! 46,816 17,556 64,372 51,128 115,500 18,480 19,712 38,192 77,308 115,500 Industrial 1,560 0 1,560 0 1,560 6,760 0 6,760 0 6,760 Parks 172 105 277 298 575 290 156 446 65 511 I Totals II 83,2871 19,006 I 112,363 I 63,5741 175,938 I 47,752 39,768 tr1,520 96.jT1':' .^. ,^ , I % of Ultimate II 47.34% I -I 63.87% I -I 100% II 25.88% I -I 47.44% I -I 100% I Growth from 1994 - 2004 as a % of growth from 1994 to Ultimate AREA. 1: 29,076 175,938 - 83,287 = 0.3138 = 31.38% AREA 2: 39,768 184,494 - 47,752 = 0.2908 = 29.08% City of Colleyville - 1994 Transportation Impact Fee - SRA No. 3056 77 Appendix A Trip Generation Rates (24 Hour Rates) Trips Generated Unit of Trip Land Use per Unit Generation Single Family 9.55 Dwelling Unit Multi-Family 6.47 Dwelling Unit Elem. School 1.09 Students Building Institution 50 Acre Church 9.32 1000 ft2 GFA Cemeteries 4.16 Acre Business/Commercial 3081 Acre Industrial 52 Acre Parks 2.23 Acre Source: Institute of Transportation Engineers. Trip Generation. Fifth Edition. Washington, D.C., 1991. 1 Aggregate rate using eight different land uses typical of business/commercial development. City of Colleyville - 1994 Transportation Impact Fee - SRA No. 3056 78 Appendix B Roadway Cost I. TYPICAL STREET PROJEcrs rype Major Arterial Minor Arterial (undivided) Minor Arterial (divided) Major Collector Minor Collector Designation Paving Width A 2-26' FF B 48' FF C 2-24' FF D 40' FF E 36' -40' FF Cost Calculation Assumptions: Cost per LF $489 $443 $453 $371 $335-$371 1. Street Paving ..... $5.00 per S.F. * 2. Sidewalk paving ..... 5% of No.1 (Use $101LF for 4' walk) 3. Drainage ......... 20% of No. 1 4. Utility Relocations .. 20% of No.1 5. Engineering ....... 12% of No.1 6. Right-of- Way ...... 10% of No.1 7. Contingency....... 15% of No.1 * Includes removal items, excavation, subgrade preparation, pavement, driveways, pavement markings, erosion control, landscaping, and traffic control. II. GRADE SEPARATION - JOHN MCCAIN ROAD OVER DART RAIL Paving ....................... $180,000 Earthwork ...................... 325,000 Bridge ........................ 625,000 Sidewalks, Utilities, Drainage, ROW . . . . 99,000 Contingencies . . . . . . . . . . . . . . . . . . . . 184,000 Engineering .................... 170.000 Total Project Cost ............ $1,583,000 City of Colleyville . 1994 Transportation Impact Fee - SRA No. 3056 79 Appendix C Maximum Impact Fee For Each Land Use 1994-2004 Maximum Calculated2 Trips Generated} Unit of Trip Impact Fee Land Use per Unit Generation Areal Area 2 Single Family 9.55 Dwelling Unit $1,690 $1,767 M ulti- Family 6.47 Dwelling Unit $1,145 $1,197 Elem. School 1.09 Students $193 $202 Building Institution 50 Acre $8,850 $9,250 Church 9.32 1000 ft2 GFA $1,650 $1. 724 Cemeteries 4.16 Acre $736 $770 Business/Commercial 3081 Acre $54,516 $56,980 Industrial 52 Acre $9,204 $9,620 Parks 2.23 Acre $395 $413 1 From Appendix A in 1994-2004 Impact Fee Determination Study. 2 From 1994-2004 Impact Fee Determination Study: Area 1 = $177 per ESU; Area 2 = $185 per ESU. City of Colleyville - 1994 Transportation Impact Fee - 8RA No. 3056 80 EXHIBIT H WATER AND WASTEWATER LIVING UNIT EQUIVALENCY (LUE) MULTIPLIERS FOR SELECTED WATER METER SIZES SIMPLE SIMPLE SIMPLE SIMPLE, COMPOUND ------------------------- ------------------- ----------------------- TURBINE 2" 4.000 COMPOUND 3" 6.000 ------------------------- ------------------- ----------------------- TURBINE 3" 7.000 COMPOUND 4" 10.000 ------------------------- ------------------- ----------------------- TURBINE 4" 12.000 _~_~~~~~~_~__________ ________~~~________ ______________~Q~Q9_Q_ TURBINE 6" 25.000 TURBINE 8" 36.000 TURBINE 10" 58.000 . ...... -. ....,.. ..... --... .._-...,--..._-,........................... .........."...............................-..". ....,.........-....,........................... .................."...."'...........--...,...... i~5'!!~:$lZe) :::.::al~:rrt"?,~t :;, ::::::: :~::~:: :~~:;~:;;~;:~~::;i; :i: :::::::::::;: ::: :::::: ::::::;::~:~::: }:~:: :i: ::::i: ::;:i:: ;:; ::;; ;;; ;:: :::::::=::. .~:~~):~:~~M ~l'gl~1~:1~1~~::~:::~::~~ :~: ~~~~~::~~:~: :~: 5/8" x 3/4" 0.667 3/4" or 1" 1.000 1-1/2" 2.000 2" 3.200 " 81 EXHIBIT I LANDUSE EQUIVALENCY TABLE TRIP GENERATION RATES FOR SELECTED LAND USES (24 Hour Rates) Trips Generated Unit of Trip Land Use per Unit Generation Single Family 9.55 Dwelling Unit Multi-Family 6.47 Dwelling Unit Elem. School 1.09 Students Building Institution 50 Acre Church 9.32 1000 ft2 GFA Cemeteries 4.16 Acre Business/Commercial 3081 Acre Industrial 52 Acre Parks 2.23 Acre Source: Institute of Transportation Engineers. Trip Generation. Fifth Edition. Washington, D.C., 1991. 1 Aggregate rate using eight different land uses typical of business/commercial development. 82