Loading...
HomeMy WebLinkAboutParks and Rec Advisory Board-Agenda Packets-5/15/2000 City of ~ Texas PARKS AND RECREATION DEPARTMENT PARKS AND RECREATION ADVISORY BOARD. SPECIAL MEETING AGENDA Monday, May 15, 2000 . 6:00p.m. ' For the meeting conducted atthe Park Annex located at 51 09 Bransford Road I" I AGENDA I NUMBER 1. Call to Order AGENDA ITEM 2. Discussion and Consideration of Approval of a Texas Parks 'and. Wildlife Department (TPWD) Recreational Trails Fund Grant Application for. the Design and Reconstruction of the Sparger Park Trail and Authorizing the use of Voluntary Park Funds in an Amount not to Exceed $19,123 3. Adjournment *(ThiS time is allocated for citizens to informally address the Board on matt.ers not on the agenda that require noIormal action. Each presentation will be limited toa maximum offive(5) minutes. Board members may not respond to citizens who 'poa"eg"d,ngm.tt,,, nol on thoagend..j . " . .... ~. ~ I ~My Ih.tlhe.bovoag,nd. w"po,",d no lhe bullet;n bo"d .Wly H.II on ~.ytt, ~1I00~. 0'1- i'. . '. ... .5109 Bransford Road . P.O. Box 185 ' Colleyville, Texas 76034 656-PARK Metro: (817)' 498-4749 Fax: (817)577-1986 MEMORANDUM FROM: Parks and Recreation Advisory Board Dianne McWethy, Assistant City Manager ~; May 11, 2000 \. TO: DATE: SUBJECT: Texas Parks and Recreational Trails Fund Grant for design and reconstruction of Sparger Park Trail I am writing as a follow-up to the May 1, Parks and Recreation Advisory Board meeting concerning the Texas Parks and Recreational Trails Fund grant for reconstruction of the Sparger Park trail. As indicated, funding for this program is on a cost reimbursement basis. Project sponsors must initiate their approved projects with their own funds and be reimbursed up to eighty percent (80%) of allowable costs after submitting documentation of expenditures. As per Bowman-Melton Associates, the preliminary cost estimate for this project is $95,614, which would require a twenty percent (20%) local share match of $19,123. (See attached). As per discussions with Terry Leake, Finance Director, General Fund monies would be available for the eighty percent (80%) reimbursable and the Voluntary Fund Monies would serve as the local share match. Since the preliminary estimates were not available for the May 1 meeting and staff has resolved questions related to the local share match, the Parks and Recreation Advisory Board is being requested to reconsider this item. If you have any questions or need additional information, please contact me at 577.7589, extension 204, or e-mail meatdmcwethy@f1ash.net. Enclosure Sparger Park Trail Preliminary Cost Estimate 10' Concrete Trail $ 7,200 $ 6,000 $46,200 $ 3,525 Site Preparation and Demolition of Existing Trail Grading Sod Repair Design Fee $ 5,000 $67,925 $10,000 Drainage Culverts Sub-Total Geotechnical, Hydrologic and 15% General Conditions $17,688 Total Construction $95,614 City of ~ Texas PARKS AND RECREATION DEPARTMENT PARKS AND RECREATION ADVISORY BOARD SPECIAL MEETING AGENDA Monday ,May 15, 2000 . 6:00 p.m..' For the meeting conducted at the Park Annex located at 5109 Bransford Road [AGENDA I AGENDA ITEM I NUMBER . . 1. Call to Order 2. Discussion and Consideration of Approval of a Texas Parks and Wildlife Department (TPWD) Recreational Trails Fund Grant Application for the Design and Reconstruction of the Sparger Park Trail and Authorizing the use of Voluntary Park Funds in an Amount not to Exceed $19,123 3. Adjournment . - *(ThiS time is allocated for citizens to informally address the Board on matters not on the agenda that require no formal action. Each presentation will be limited toa maximum of five (5) minutes. Board members may not respond to citizens who speak regarding matters not on the agenda.) I certify that the above agenda was posted on the bulletin board at City Hall on May 11, 2000 5109 Bransford Road P.O. Box 185 Colleyville, Texas 76034 656-PARK Metro: (817)498-4749 Fax: (817) 577-1986 MEMORANDUM DATE: Parks and Recreation Advisory Board Dianne McWethy, Assistant City Manager~; May 11, 2000 \ TO: FROM: SUBJECT: Texas Parks and Recreational Trails Fund Grant for design and reconstruction of Sparger Park Trail I am writing as a follow-up to the May 1, Parks and Recreation Advisory Board meeting concerning the Texas Parks and Recreational Trails Fund grant for reconstruction of the Sparger Park trail. As indicated, funding for this program is on a cost reimbursement basis. Project sponsors must initiate their approved projects with their own funds and be reimbursed up to eighty percent (80%) of allowable costs after submitting documentation of expenditures. As per Bowman-Melton Associates, the preliminary cost estimate for this project is $95,614, which would require a twenty percent (20%) local share match of $19,123. (See attached). As per discussions with Terry Leake, Finance Director, General Fund monies would be available for the eighty percent (80%) reimbursable and the Voluntary Fund Monies would serve as the local share match. Since the preliminary estimates were not available for the May 1 meeting and staff has resolved questions related to the local share match, the Parks and Recreation Advisory Board is being requested to reconsider this item. If you have any questions or need additional information, please contact me at 577.7589, extension 204, or e-mail meatdmcwethy@flash.net. Enclosure Sparger Park Trail Preliminary Cost Estimate Design Fee $ 7,200 $ 6,000 $46,200 $ 3,525 $ 5,000 $67,925 $10,000 Site Preparation and Demolition of Existing Trail Grading 10' Concrete Trail Sod Repair Drainage Culverts Sub-Total Geotechnical, Hydrologic and 15% General Conditions $17.688 Total Construction $95,614