HomeMy WebLinkAboutE-News-City Publications-11/7/2014Having trouble viewing this email?Click here
GENERAL
City offices closed for employee in-service day, Tuesday, Nov. 11
City offices will be closed for an employee in-service day on Tuesday, Nov. 11. Most
employees will be at the Colleyville Center for in-service training; however, police, fire,
and emergency personnel will remain on duty. In the event of an emergency, please call
9-1-1.
SH 26 Public Forum reminder
The SH 26 Reconstruction Project Public Forum is scheduled for Wednesday, Nov.
12, from 6:30-8:30 p.m. at First Baptist Colleyville from 6:30 - 8:30 p.m. Staff and
TxDOT representatives will provide an update on the project and be available to answer
your questions. Get the latest information on the project here.
Comprehensive Plan meetings
As part of the city's Comprehensive Plan update, we will conduct neighborhood focus
groups on the evenings of Nov. 17, Nov. 19, and Nov. 20. These meetings are ideal for
anyone interested in providing valuable input on the city's future in a small group
setting.
There are six neighborhood zones identified in the city's current Master Plan, which is
being updated as part this process. Each focus group will involve residents from their
respective neighborhood zone. If you are interested in participating, please contact Ron
Ruthven at rruthven@colleyville.com by Monday, Nov. 15.
Information on the Comprehensive Plan can be found on the homepage of
Colleyville.com-just look for the Comprehensive Plan button near the top of the page.
Colleyville Comprehensive Plan website.
Mayor for a Day contest entries being accepted
The Mayor for a Day contest is celebrating its tenth year. This year's contest opened
Monday, Nov. 3; all entries must be received by 5:00 p.m. on Monday, Dec. 15.
Announcement of the winner will be made later that week. The contest is open to
Colleyville residents only, in grades 2-7. To enter, all contestants must submit a
one-to-two page essay addressing three ideas he or she would implement to make
Colleyville an even better place to live.
For the Mayor for a Day essay contest winner, a day as the city's "mayor" is the
beginning of an unforgettable year. The student will serve as honorary mayor in
January, touring city facilities and co-presiding with Mayor David Kelly at a City Council
meeting. Additional activities will be scheduled throughout the year, according to the
student's availability.
Full contest details here or email Colleyville@Colleyville.com.
TEX Rail Commuter Rail Project
On Wednesday, Nov. 5, during the pre-council session, representatives from The T and
the North Central Texas Council of Governments (NCTCOG) presented information and
updates on the TEX Rail Commuter Rail Project to the Colleyville City Council.
To view the information as it was shown to the City Council:
Download the agenda packet
Instructions: In the second section, MOST RECENT EVENTS, locate the City Council
meeting for Nov. 5. On the right-hand side of the page under FILES, choose DOWNLOAD
AGENDA PACKET from the drop-down menu. The TEX Rail presentation is listed under
item PC-1.
View a webcast of the meeting, including the presentation by TEX Rail
representatives
The city of Colleyville has requested that The T provide a public presentation
on their TEX Rail Project for Colleyville residents. For your convenience, the city
will provide a Colleyville location for that presentation as soon as The T is able to
confirm a date (anticipated in the first half of 2015). A date, time, and location for The
T's presentation will be posted to Colleyville.com, the city's Facebook page, and in
Colleyville E-news. (Register for E-News here.)
For more information on The T's TEX Rail project, visit the TEX Rail website.
ROAD CONSTRUCTION
We ask that all motorists pay close attention to signs and speed limits as they travel
through these work zones. The safety of our citizens is our number one priority. As you
know, plans can change with construction projects due to weather, scheduling, and
other issues. Please know we'll do our very best to provide you the most accurate
information possible.
SH 26 Public Forum Reminder
The SH 26 Reconstruction Project Public Forum is scheduled for Wednesday, Nov.
12, from 6:30-8:30 p.m. at First Baptist Colleyville from 6:30 - 8:30 p.m. Staff and
TxDOT representatives will provide an update on the project and be available to answer
your questions. Get the latest information on the project here.
TxDOT SH 26 Construction Project
SH 26/John McCain Road intersection
Work is progressing at this intersection with the contractor now utilizing nighttime hours
for concrete paving. Work was slowed for two days due to rain, but is back on schedule.
SH 26 north of Pool Road, and south of John McCain
Crews have now finished pouring concrete for a large section north of Pool Road. This
coming week they will be pouring concrete for another section located south of John
McCain.
SH 26 south of Big Bear Creek
Crews will continue work on a new retaining wall at this location and are excavating and
installing under drains.
Signal lights on SH 26
TxDOT is working toward replacing their video detection cameras with state-of-the-
art radar technology to control the traffic signals at the John McCain Road
intersection on SH 26. Unlike video detection cameras, this radar detects the presence
of cars/trucks, bikes, and pedestrians, regardless of lighting or weather conditions. The
use of this technology should result in more consistent traffic signal operations and
improve traffic flow. Updates on this will be provided as information becomes available.
SH 26 Utility Relocation Project (City of Colleyville/utility franchises)
The city continues to relocate water and sewer lines along SH 26 in preparation for the
next phase of TxDOT's reconstruction project. This work will be primarily accomplished
in the rights-of-way adjacent to the roadway, but at times, some limited lane closures
may be necessary. For the most part, crews will bore horizontally along the roadway to
provide a new location for the water and sewer lines. Franchise utilities, such as Atmos
Energy (gas lines) and ONCOR (overhead power lines) are also relocating their
respective utilities. Please send any questions, concerns, or
comments to 26@colleyville.com.
Water line relocations
The outside northbound lane of SH 26, from Brown Trail to Bransford Road (just
south of the Texaco station), will be closed from 9 a.m. to 4 p.m. next week for a
sanitary sewer line installation.
A new water line is being installed from Glade Road to Centerpark on the east side of SH
26. Sanitary sewer is being placed on the east side of the road from Thompson Terrace
to Professional Court. And, AT&T and TWC are relocating overhead lines and services.
Lane closures are possible from south of Glade Road to Professional Court from
9 a.m. to 4 p.m. each day. In the same area, on the west side of the road, the
contractor will be boring under SH 26 for new water line installation just north of Old
Glade Road. There will also be some water line tie ins. These will be coordinated with
affected businesses and residents.
Sanitary sewer placement
Work will take place from Little Bear Creek south toward Brown Trail, on the east side of
the road. Lane closures are possible in this area from 9 a.m. to 4 p.m. each day.
Atmos Energy line relocations
Atmos will be relocating gas lines from Hardage Lane to Hall-Johnson Road on the both
sides of SH 26, and from Tinker Road to Hall-Johnson Road on the west side. The
contractor will also be working on Tinker from SH26 to Ponderosa. There will be no
lane closures and any impact to traffic in the area should be minimal. All
businesses affected by the relocation work have been notified and the city is helping to
schedule the work to minimize the impact on those businesses.
Atmos will be working on the west side of the road from Church Street to Pleasant
Run Road. Crews will be boring for a new waterline from just south of the First Baptist
Colleyville to Church Street. All affected businesses have been notified and the city is
helping schedule the work to minimize the impact on those businesses. Lane closures
in this area are possible from 9:00 a.m. to 4:00 p.m. each day.
Oncor power line relocations
The contractor will continue to move overhead lines along SH 26 from Glade Road to
Brown Trail. There should be no impact to traffic in that area.
Time Warner relocations
Time Warner continues to move overhead cable on the east side of SH 26--southbound
from Tennison Parkway to Tarrant Lane. The company is also working on the both sides
of the road from Oak Pointe to Glade Road. No lane closures will be required for this
work.
AT&T
AT&T will be swapping out overhead lines and drops from Professional Court to Church
Street.
ADDITIONAL ROAD CONSTRUCTION
Jackson/Cheek-Sparger roundabout and Jackson Road rehabilitation
Jackson Road is open to thru traffic. The intersection is still under construction;
motorists are asked to use caution and observe all regulatory and advisement signage
as it is still a construction site. The roundabout is anticipated to be complete in
February.
Pleasant Run Road reconstruction
The Pleasant Run Reconstruction Project has been pushed back to allow more time for
franchise utilities to move their lines (phone, power, communications). An exact start
date has not been determined but will most likely be delayed until after the
first of the year.
Quiet Zone preparations
Colleyville three rail crossings are all open and work substantially completed. Additional
crossing arms, as required to establish quiet zones, must now be installed by Fort Worth
& Western Railroad, along with safety fencing and pedestrian crossing arms at the trail
crossings. The federal government determines when a quiet zone is ready to be
instituted. Early indications are that the quiet zones through Colleyville will take effect
before the end of this year.
Southlake Bridge - Pleasant Run Road/White Chapel Boulevard
The city of Southlake is planning to close the small bridge on White Chapel Boulevard
just north of the Colleyville city limits to address structural issues with the bridge. At
this time, that closure is anticipated to start the first week of December. Once
closed, the bridge is anticipated to be closed for construction for up to 30 days.
Orange Barrel Report
The Orange Barrel Report is distributed monthly. See the latest edition.
ECONOMIC DEVELOPMENT
Cash Mob at Dunkin Donuts - Nov. 12
You DO-NUT want to miss the November Cash Mob Colleyville. The mob descends on
Dunkin Donuts for coffee, donuts (what else?) and good company Wednesday, Nov. 12,
at 7:30 a.m. If you can't stay to eat with the mob, drop in, say hi, and grab a dozen
donuts or a tray of coffee to take back to the office. Your coworkers will love you! We
hope to see you there.