Loading...
HomeMy WebLinkAboutPlanning and Zoning Commission-Agenda Packets-1/12/2004 (2) cce0 Texas AGENDA CITY OF COLLEYVILLE CAPITAL IMPROVEMENTS ADVISORY COMMITTEE Monday January 12, 2004 at 6:30 p.m. CITY HALL - COUNCIL CHAMBERS 100 Main Street Call to Order and Roll Call by Chairman Jeff Wall: Bruce Kelly, Bob Culley, Earl Swift, Jeff Byerly, Bud Sellers, Mark Jones, Larry Cole, Andrew Wayne, and Jeff Wall Approval of Minutes of the past meeting - August 12, 2002 Agenda Items: 1. Discussion of a draft proposal by Grady Walker to the Capital Recovery Fee Ordinance for secondary meters for irrigation purposes, Case G-03- 036 2. Staff Reports Adjournment I certify that this agenda was posted on the Bulletin Board at City Hall on Jan. 9, 2003 at 4:30 p.m. 1" J" "~"yo P/'""'"9 & ZO"'"9 A",,,,"/ Impact Fee Advisory Committee Minutes - August 12, 2002 Page 1 of 2 - Draft Copy Vice Chairman Wall called the regular meeting of the City of Colleyville Impact Fee Advisory Committee to order at 6:00 P.M. on August 12, 2002. Roll Call: Present: Jeff Wall, Bob Culley, Mark Jones, Bud Sellers, Larry Cole Absent: Earl Swift, Andrew Wayne, Jo Ann Gasper, Mark Hollis Staff: Barry LeBaron, Clayton Husband, Jan Levy Approval of Minutes: July 23, 2001 Bob Culley moved to approve the minutes of the July 23, 2001 meeting as written. Bud Sellers seconded the motion. The motion passed by a unanimous "Aye" voice vote. Barry LeBaron informed the members that a copy of the draft minutes would be sent to them as soon as they are completed. He told them that the committee meets infrequently and this way the information would be fresh so they could make comments or corrections. CONSIDERATION OF THE APPROVAL OF AMENDMENTS TO IMPACT FEES, CASE G-02-025 Barry LeBaron conducted an orientation and informed the committee what impact fees are and how Colleyville has gotten where they are today in the assessment and collection of impact fees. He said that the City is required to have a ten-year plan for the collection of impact fees. Barry told the committee during the past session of the Texas Legislature, revisions were made to Chapter 395 of the Local Government Code regarding impact fees charged by municipalities, and informed them of the measures the City took to comply with the legislation. He said the City employed the services of Government Resource Associates, LCC to evaluate Colleyville's fee structure and make recommendations if the City was not collecting the maximum allowable fee. He displayed overheads relating to the report. Larry Cole said the chart stipulates fees for a 0/." meter, but the City of Colleyville requires a 1" water line for any new house being built in the City. He asked if the City, by law, has a right to require 1" water lines for new construction when 0/." lines are adequate. Mr. LeBaron said he will probably eliminate the 0/." water line from the chart. Mr. LeBaron then displayed the chart for the sewer impact fees and discussed why the sewer impact fees were lower. He then displayed the roadway impact fee table and discussed the actual impact fees on a typical single-family home. Mr. LeBaron informed the committee that when the state law as passed in 1988 it stipulated how a Capital Improvements Advisory Committee was to be formed. He said that Colleyville set up their committee by appointing the Planning and Zoning commissioners to the committee and appointing Impact Fee Advisory Committee Minutes - August 12, 2002 Page 2 of 2 - Draft Copy one representative from the development industry and one representative from the real estate industry to the committee. Vice Chairman Wall asked for comments or questions from the committee. It was discussed that the City Council will still adhere to the percentages of collection as set forth in the last revision to the ordinance. Barry LeBaron explained the collection system for perimeter street improvement requirements and how that system is based on the thoroughfare plan network within the City versus how the roadway impact fee structure is determined. It was noted by Larry Cole that the perimeter street improvement fees are not as restrictive as roadway impact fees. Mark Jones moved to recommend approval of the report and forwarding the reports to the City Council with a recommendation to adopt the revised impact fees in accordance with the recommendation of the consultant. Bob Culley seconded the motion. The motion passed by unanimous "Aye" voice vote. ADJOURNMENT: The meeting adjourned at 6:40 p.m. Respectfully Submitted, Jan Levy Planning & Zoning Assistant .~ l"e:.:aS CAPITAL IMPROVEMENTS ADVISORY COMMITTEE AGENDA BRIEFING Agenda Date: Subject: January 12, 2004 Discussion of proposal by Mr. Grady Walker to amend the Water Impact Fee Ordinance for secondary meters for irrigation purposes, Case G-03-036 Backqround At the June 3, 2003, City Council meeting, Mr. Grady Walker requested a waiver of the water impact fee for a second water meter for his residence. The purpose of the second water meter was to separate the lawn irrigation system from the domestic water service that is connected to his residence in order to increase water pressure in his home while the irrigation system is activated. The City Council denied his request. Mr. Walker subsequently requested an audience with the City Council at the November 4, 2003, Pre-Council meeting to present and discuss a draft amendment to the water impact fee ordinance. It was the City Council's preference to request the Capital Improvements Advisory Committee's review of the proposed changes being offered by Mr. Walker. Current Impact Fee Ordinance The Colleyville Land Development Code requires the payment of impact fees for water service each time a new water meter and/or tap is set. The impact fee is paid either at the time a meter is requested or at the time a building permit is issued for a new structure on a vacant lot. The impact fee for a 1" meter, the size typically serving most single-family residences, is $2,936. Impact fees are collected and placed into a fund to pay for the upgrade and expansion of the water system required by the additional demand placed on the system for new connections. State law allows cities to collect impact fees so that existing customers are not charged higher monthly volume charges to pay for new facilities required by new growth. Mr. Walker's Proposal Mr. Walker has developed an ordinance (see attachment) that would provide for an exemption of the water impact fee for an existing residence when adding a second meter for irrigation purposes. Mr. Walker claims that the addition of a second water meter specifically for a lawn irrigation system will not place an additional demand on the water system. Agenda Item No. 1 - Page 1 Financial Impact The City has approximately 7,200 active water meter accounts. However, there is no information currently available to determine the number of residences that also have automatic irrigation systems. There are over two hundred residential properties in Colleyville that have separate water meters for their irrigation systems and these customers have paid the applicable water impact fee in addition to the regular tapping and connection fees for the additional meter. If the proposed ordinance amendment were approved, it is not possible for staff to accurately estimate of the number of existing residential customers that would request a separate water meter for a lawn irrigation system. Nor can staff make an accurate estimate of the number of new home construction builders that would have a second meter set for irrigation purposes. Staff Analvsis Staff is concerned over the unintended consequences that such an amendment may have and the long term effects on the impact fee fund when it is time to pay for needed water system improvements. The current water and sewer impact fees were approved by the City Council by ordinance 0-99-1199 on January 18, 2000. They were later adjusted on October 21, 2002, with the approval of ordinance 0-02-1367 to bring the rate structure into compliance with Senate Bill 243. The capital improvements plans for the water and sewer systems and the associated impact fees currently being used and collected were prepared by the firm Kimberly Horn and Associates, located in Fort Worth, Texas, in 1999. If the Capital Improvements Advisory Committee feels that Mr. Walker's proposal warrants further study, staff recommends the employment of a qualified professional engineering firm to review the proposal. Chapter 395 of the Texas Local Government Code requires communities that collect impact fees revise and update their capital improvements plan every five years. Funds will be requested in the FY05 budget to prepare the required update. Recommendation Denial Attachments . y Mr. Walker ~ Agenda Item No. 1 - Page 2 Attachment Proposed Ordinance Amendment by Mr. Grady Walker PROPOSED AMENDMENT Chapter 13 Impact Fees Land Development Code City of Colleyville, Texas DRAFT Version 1.0 Modifications Date Editors Version Comments June 23, 2003 GM Walker 1.0 Initial write.up. Chapter 13 -Impact Fees Page 2 of31 Table of Contents 1 INTR 0 D U CTI ON...... .................................................. ................................... ............ 4 2 IRRIGA TION AMMEND MENTS ............................................................................. 4 2.1 Irrigation Meter Use........................................................................................................4 2.2 Base Irrigation Meter Size .............................................................................................. 4 2.3 New Meter To Existing Residence ................................................................................. 4 2.4 New Meter To Vacant Land Or No Residence .............................................................4 3 IMPACT FEE TABLES .............................................................................................4 3.1 New Meter To Existing Residence ................................................................................. 5 3.2 Upgrade Existing Residential Water Meter .................................................................. 5 3.3 New Irrigation Meter To Vacant LandINo Residence .................................................5 4 USE CASE SENARIOS..............................................................................................5 4.1 Upgrading Existing Residence........................................................................................5 4.2 Installation Of New Irrigation Meter To Existing Residence...................................... 5 4.3 Installation Of New Irrigation Meter To Vacant Land Or No Residence.................. 6 4.4 Property Is Subdivided With Existing Irrigation Meter.............................................. 6 4.5 Existing Home Is Rebuilt ................................................................................................ 6 5 IMPACT TO EX/STING WATER SERVICE AND IMPACT FEES...................... 6 6 SUMMAR Y........................................ .......................................... ........................ ........ 7 Chapter 13 - Impact Fees Page 3 of3I 1 INTRODUCTION The purpose of this document is to provide an amendment to "Chapter 13 Impact Fees" to the existing "Land Development Code", for the purpose of addressing irrigation meters. The existing ordinance is focused on new development and makes no explicit provisions for irrigation meters. At present there are two hundred seventy (270) irrigation meters, of which, approximately two hundred ten (210) are at Colleyville residence. This constitutes two point nine percent (2.9%) of the seven thousand one hundred forty five (7145) total meters in the City ofColleyville. The following proposal is submitted to help Citizens who request or require new meters or upgrades to existing meters, for the purpose of irrigation. These amendments are meant to clarify any confusion, or concern on current and future use, current and future impact fees and current and future impact to the water services infrastructure. 2 IRRIGATION AMMENDMENTS The following amendments identify the proposed specific changes: 2.1 Irrigation Meter Use Irrigation meters so identified may not be used for any other purpose. a) Meters identified for the purpose of irrigation may not be used for residence, commercial, home business or any other purpose. b) In the event the existing property is re-platted for the purpose of subdividing, impact fees will be collected at the time the permits are issued. (as per the current ordinance) c) In the event the existing property has already been platted, and will be subdividing, impact fees will be collected at the time permits are issued. 2.2 Base Irrigation Meter Size Irrigation meters will be %" x 5/8" as the base standard. Note: Any larger meters will require an increased impact fee equal to the current delta. See Impact Fee Tables Section 3 2.3 New Meter To Existing Residence a) will require payment of existing permit and service fees b) will NOT require impact fees for standard '/.," x 5/8" meter c) will require service to the existing residence be active 2.4 New Meter To Vacant Land Or No Residence a) will require payment of existing permit and service fees b) WILL require impact fees based on current model 3 IMPACT FEE TABLES The following Impact Fee tables details the impact fee rate schedule for irrigation meters: Chapter 13 - Impact Fees Page 4 of 31 3.1 New Meter To Existing Residence Meter Type Meter Size Actual Water Impact Fee Collected Simnle 'j.," x 5/8" $0 Simnle I" 800 Simnle 1-112" 3465 Simnle,Comnound 2" 6664 Turbine 2" 8797 Comnound 3" 14,127 Table 1 Note: This table is based on a zero dollar cost for the base meter. An increase in size from the base meter size of %" x 5/8", will incur an impact fees equal to the difference of the current base meter fee and the desired meter size as detailed in the current fee schedule "Exhibit 13-G", Chapter 13 of the Land Development Code, Rev 10/0 1102. This table has pre-calculated the actual impact cost to the residence based on current impact rates. All available meter sizes have not been listed within the table. 3.2 Upgrade Existing Residential Water Meter If a residence elects to increase the current meter size, which increases the Living Unit Equivalents (LUE's), the impact fees will be assessed as detailed in "Table I" Section 3.1. This is based on the existing Land Development Code, Chapter 13, Section 13.13F "Notification Due to Increased Service Units". 3.3 New Irrigation Meter To Vacant LandINo Residence Installation of a new meter to vacant land or vacant lot with no residential structure, constitutes "new development" and would incur impact fees based on the current rate fee schedule "Exhibit 13-G", Chapter 13 of the Land Development Code, Rev 10/01102. 4 USE CASE SENARIOS The following Use Case Scenarios are meant to identifY and address potential concerns for misuse or impact to the existing water service use projections. 4.1 Upgrading Existing Residence Impact fees are collected based on the current model. i.e. A residence wants to upgrade there existing %" x 5/8" meter to a 1" meter. The impact fee would be $800. All permit and service fees apply. 4.2 Installation Of New Irrigation Meter To Existing Residence No impact fee is collected on the base meter. An increase in the size, greater than the base, will impose a rate based on the current model. i.e A residence request to add a separate additional meter. There would be no impact fee for a ';.," x 5/8" meter. All permit and service fees apply. If the request for a new separate meter is for a meter larger than the base, %" x 5/8", then an impact fee, SEE Table I, would apply. i.e. If the meter size was I", then the impact fee would be $800. All permit and service fees apply. Chapter 13 - Impact Fees Page 5 of31 4.3 Installation Of New Irrigation Meter To Vacant Land Or No Residence Impact fees are collected based on the current model. i.e If a new base, %" x 5/8", meter is installed at a vacant lot, the impact fee would be $1,866. All permit and service fees apply. 4.4 Property Is Subdivided With Existing Irrigation Meter Impact fees are collected based on the current model if the property is re-platted. In the event the property does not require re-platting, then impact fees will be collected at the time permits are issued. i.e. If a property is re-platted or does not require re-platting, and the existing irrigation meter is located in a different lot than the original residence lot for which it was installed, the meter may be connected to the new residence after current impact fees have been paid. No additional permit and service fees for the water meter applies. The normal plumbing inspection would be required. The plumbing inspection or final occupancy inspection would/could be used to insure the impact fee has been collected. An additional check and balance could be at the time of the permit and impact fee for the wastewater. The impact fees collected would be $1,866. NOTE: All meters must be located on the property, which they will service. A meter is not located on the property which it will service, will constitute and require a new service and require impact fees based on meter size. All permit and service fees apply. i.e. New service is requested to a home that adjoins a property that has service and a separate irrigation meter. The irrigation meter may not be used for the new residence and the impact fee for a new base, 'I." x 5/8" meter is $1,866. All permit and service fees apply. 4.5 Existing Home Is Rebuilt If an existing home has an irrigation meter that is larger than the residence meter, and the existing home is tom down or rebuilt, the meter usage maybe reversed, and so identified, at no additional cost. Note: There is no additional cost due to the fact the impact fees associated with the normal increase in Living Unit Equivalents (LUE's) have been paid. The meter that was connected to the residence will now be identified as irrigation for the purposes of billing and future use. 5 IMPACT TO EXISTING WATER SERVICE AND IMPACT FEES The impact to the existing water service infrastructure will be negligible at most. With Colleyville being an established community that is quickly reaching build out, water usage based on historical data is well known for the existing homes. As most homes are locate within an existing subdivision the likelihood of changes in external irrigation habits, that significantly increase usage, as the result of installation of a separate meter, is highly unlikely. The likelihood that a change of occupancy of a home, is going to significantly impact usage on an existing residence, is very low. As a result, where existing homes, on larger lots, are tom down and luxury homes are built, the water consumption of a couple residing within a 2,000 sq. ft home versus a family of six (6) in a 10,000 sq. ft home is minimal. Projections are made based on the meter size potential. Since the old and new home both use a base meter size of 'I." by 5/8" the projections for water service requirements, would remain the same. As the "footprint" of the home increases, as well as the driveway, sitting and patio areas, the amount of area to be irrigated decreases. Please note that many homes within Colleyville have existing wells and many of the new luxury homes being built on larger lots, are opting to install or currently have shallow wells. Chapter 13 -Impact Fees Page 6 of 31 It is important to note that most future housing development is planned for subdivisions thus limiting the request/need for separate irrigation meters. Separate or upgraded meters still carry the existing permit and service fees and ALL request for meters greater than the base of 'I." x 5/8", will require an impact fee. 6 SUMMARY In summary it is not anticipated that the request for separate meters will be significant. In any event, the increased number of meters to existing residence will have a negligible impact at most. As for ALL other scenarios, both current and future, the impact, as represented by the impact fee structure, remains the same. However these changes have removed the possibility of misuse not addressed in our current city ordinance. They also maintain the existing model of investment recovery for new development and increased demand through meter upgrades in both the residence and irrigation. Please let me know if there are any questions, concerns, or comments. Regards Grady Walker (w) 972-497-2594 (h) 817-498-6402 gradv walker(iV,hp.com Chapter 13 -Impact Fees Page 70f3I