Loading...
HomeMy WebLinkAboutE-News-City Publications-8/15/2014GENERAL SH 26/Colleyville Blvd. reconstruction On Tuesday, TxDOT's contractor executed a traffic switch on SH 26, affecting the road from south of John McCain Road north into Grapevine and causing long backups in both directions, as well as on John McCain Road, and general confusion and frustration for everyone. The situation is clearly unacceptable. After multiple calls from members of the City Council, as well as a multitude of calls and emails from Colleyville citizens, to state and county officials about the problems on the project, TxDOT's district engineer (who bears ultimate responsibility for TxDOT's projects in the area) called to promise a greater sense of urgency on the project, improved oversight of the contractor, and a firm completion date for this section of SH 26. TxDOT is bringing in the head traffic engineer for the district to resolve some of the issues at SH 26 and John McCain Road and has committed their top traffic specialists from the district office to the project. There have been some significant changes made to the light sequencing at that intersection during the last few days to mitigate both safety and traffic issues. One of the main issues at John McCain Road was that the system wasn't adequately detecting vehicles traveling eastbound on John McCain when stopped at the intersection. Some changes were made to the system Friday morning and the detection problem seems to be resolved at this point. As of Friday morning, the timing of green lights for northbound and southbound SH 26 were increased to help with traffic flow. Coming this week •The contractor will make a traffic switch on Monday, Aug. 18, for southbound lanes, from north of Longwood to the northern limits of project. The two southbound lanes will shift toward the center, Page 1of 3 where the northern lanes were formerly located. This work will take place during the day on off-peak hours. •The contractor is removing the edge of the John McCain Road median to provide a larger turning radius for southbound SH26 drivers turning right onto John McCain Road. •The contractor will be installing a new storm drain lateral, mill asphalt of existing southbound lanes and start excavating for a new wall. Tarrant County Public Health (TCPH) reports no positive mosquito samples in Colleyville TCPH has notified that the city that none of the mosquito samples submitted from Colleyville this week tested positive for the West Nile Virus. While this is good news, everyone is reminded to stay vigilant. The most important thing citizens can do to reduce the risk of exposure to the West Nile virus is to eliminate mosquito-breeding areas around the home and limit exposure to feeding mosquitoes. Here are some simple things to eliminate potential breeding sites around the home: •Do not allow water to accumulate in the saucers of flowerpots, cemetery urns, or in pet dishes for more than two days •Get rid of tin cans, old tires, buckets, unused plastic swimming pools, or other containers that collect and hold water •Clean debris from rain gutters, remove standing water from flat roofs, and repair leaks around faucets and air conditioners •Change the water in birdbaths and wading pools at least once a week •Fill or drain puddles, ditches and swampy areas •Check for trapped water in plastic or canvas tarps used to cover boats or pools, and arrange the tarp to drain the water